SITE INVESTIGATION REPORT: CONSTRUCTION OF NTUMBA VEHICULAR/PEDESTRIAN BRIDGE ACROSS A STREAM IN ROOKDALE, OKHAHLAMBA LOCAL MUNICIPALITY

Similar documents
MEETING HELD AT THE EDTEA OFFICES (ethekwini) ON 03 July 2018 AT 10h00. Ms. Naadira Nadasen (NN) Mrs Chen read (CR) and Mrs Tejal Singh (TS)

BASIC ASSESSMENT PROCESS THE PROPOSED CANELANDS EXTENSION, KWAZULU-NATAL KZN DAEA REF NO: DM/0031/2012 BACKGROUND INFORMATION DOCUMENT AUGUST 2012

NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION

Cape Environmental Assessment Practitioners(Pty)

BASIC ASSESSMENT REPORT. Background Information Document

BACKGROUND INFORMATION DOCUMENT:

PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE

SINGITA SWENI LODGE EXPANSION: SUMMARY REPORT - BAR

PURPOSE OF MEETING MEETING GUIDELINES PROJECT BACKGROUND ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE

RIVER MAINTENANCE MANAGEMENT PLAN APPLICATION

ENVIRONMENTAL IMPACT ASSESSMENT

BACKGROUND INFORMATION DOCUMENT

APPENDIX D PUBLIC NOTIFICATIONS

Reg. No. 2008/004627/07 VAT No Facsimile: (044) Progress Street, George Web:

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT

Digital Terrestrial Television Infrastructure Rollout. Environmental Impact Assessment - Corridor -

CORNUBIA RETAIL PARK- PLANNING REPORT REVERT 3

APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM

BASIC ASSESSMENT PROCESS

2. PROJECT SITE LOCATION & DESCRIPTION

PROPOSED NGWADINI WEIR AND ABSTRACTION WORKS, PIPELINE AND ACCESS ROAD, LOWER UMKHOMAZI BULK WATER SUPPLY SCHEME, KWAZULU-NATAL

PUBLIC CONSULTATION MACROBERT INCORPORATED GREENWAY FARMS (PTY) LTD BOKPOORT OPERATIONS INTEGRATED WATER USE LICENCE APPLICATION

RURAL TRANSPORT TRAINING MATERIALS

Digital Terrestrial Television Infrastructure Rollout

Town of Vershire Road Erosion Inventory Report

ONTARIO MUNICIPAL BOARD

Digital Terrestrial Television Infrastructure Rollout. Environmental Impact Assessment - Tsumkwe -

Stellenbosch Viewsheds

Environmental Assessment (Scotland) Act 2005: Clackmannanshire Council Sustainability Strategy Scoping Request

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.

APPENDIX 9 POSSIBLE INTERCHANGES ALONG THE DE BEERS PASS ROUTE AVIFAUNAL ASSESSMENT

Town of Corinth Road Erosion Inventory Report

CURRICULUM VITAE MAGNUS VAN ROOYEN

Highlands Region Stormwater Management Program Guidance

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

BUSHFIRE CONSTRAINTS ASSESSMENT FOR THE SHONE AVENUE WEST DAPTO ROAD NEIGHBOURHOOD PLAN HORSLEY

Highway Alignment and Route Location Survey

LAND EAST OF SUDBURY ROAD, HALSTEAD PUBLIC CONSULTATION. Proposed Residential Development

East Panorama Ridge Concept Plan Amendment

BACKGROUND INFORMATION DOCUMENT (BID) AND INVITATION TO PARTICIPATE

Anglo American Platinum; Mogalakwena Mine: Construction of Bridge and Gravel Road. Consultation with community members 26 July 2016

STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70

Circular L8/08 2 September Water Services Investment and Rural Water Programmes Protection of Natural Heritage and National Monuments

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

7. The Landscape. 7.1 Introduction. Environmental Impact Statement (EIS) Scoping Report

CHAPTER 4: CONTEXTUALISING THE PROPOSED PROJECT ENVIRONMENT WITHIN THE NATIONAL AND LOCAL

Dublin Mountains Visitor Centre

MEMORANDUM OF BOG TURTLE HABITAT INVESTIGATION

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

9 Archaeology & Cultural Heritage

City of Hume Planning Scheme Amendment C207. Statement of Expert Evidence Provided to Planning Panels Victoria

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM

Proposed Amendment to the

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

REF: INSPECTION OF THE CONSTRUCTION AREAS [CONTRACTOR NO. 1, 2, 3 & 4].

Boyne Valley to Lakelands County Greenway. Feasibility Report. Navan Kingscourt Railway Committee

TOWNSHIP REPLANNING: THE CASE OF INK CASE STUDY

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

Fabriek Street 45 Paarl. P.O. Box 2632 Paarl Tel: Cell:

PROJECT FEATURE CORNUBIA MALL

West London Dyke, April 1947 Flood. Forks of the Thames, July 2000 Flood. Source: UTRCA

LEGEND : FUTURE M18 CORKER OVERFLOW OFFICE OF PUBLIC WORKS REGRADING WORKS LAYOUT PLAN AT KILTARTAN PROPOSED WORKS AREA LIABLE TO FLOODING N18

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED SWARTLAND SHOPPING MALL

Ontario Municipal Board Commission des affaires municipales de l'ontario

Shoreland Protection in Maine Communities of the Piscataqua River Estuary

LIDBURY, SUMMERS & WHITEMAN

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Attention: Interested and Affected Party (I&AP) Commenting Period: 22 November January 2018 GNEC Code: 20327

PUBLIC PARTICIPATION REPORT PPP SUMMARY

A: Downtown Diversion Pipe

Experiences of dealing with Lesser Horseshoe Bats (Rhinolophus

LIST OF APPENDICES. Appendix A Terms of reference and descriptions of the services. Appendix B Key Criterions for Selection

PROPOSED GARDEN CITY NEW TOWN DEVELOPMENT, KRAAIFONTEIN DRAFT ENVIRONMENTAL IMPACT REPORT Summary Document

Environmental Impact Assessment. York Glasgow Edinburgh

AND STATEMENT OF EVIDENCE OF JOHN LONINK ON BEHALF OF CHRISTCHURCH CITY COUNCIL SPECIFIC PURPOSE (GOLF RESORT) ZONE

PDS June 1, 2016 Page 1. Planning and Development Committee. MEETING DATE: Wednesday, June 01, 2016

National Conservation Council AGENDA

Route Alignment Options Summary Report

A firm commitment to successful projects.

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

Digital Terrestrial Television Infrastructure Rollout. Site-specific Environmental Management Plan - Omega -

SUMMARY CURRICULUM VITAE FOR DR. MCEDWARD MURIMBIKA

Saranac River Trail Greenway C O N D I T I O N S R E P O R T

2. PROJECT SITE LOCATION & DESCRIPTION

Appendix N Survey. City of Barrie - Hewitt's Secondary Plan Class Environmental Assessment (Phase 3 and 4) Study Environmental Study Report

Archaeological Monitoring of Land at 29 Royal Pier Road, Gravesend, Kent

Draft Rhode Island Stormwater Design and Installation Standards Manual

PRESENTATION ON JOHANNESBURG S BIODIVERSITY PROGRAMME

URBAN FLOOD MANAGEMENT IN CYPRUS CASE STUDY IN NICOSIA URBAN AREA

Public Consultation. Land at Monks Farm, North Grove. Welcome

TIDAPA Structure Plan

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

Final Master Plan and Development Control Regulations

Feasibility Analysis for Expansion of the Provincial Greenbelt Plan Area into Mississauga

Chapter 8: Cultural Heritage Assessment

Road Safety Impact Assessment

1. Local Plan Context

Rapid Transit Implementation Working Group September 14, 2017

Transcription:

SITE INVESTIGATION REPORT: CONSTRUCTION OF NTUMBA VEHICULAR/PEDESTRIAN BRIDGE ACROSS A STREAM IN ROOKDALE, OKHAHLAMBA LOCAL MUNICIPALITY PREPARED ON BEHALF OF: ECA CONSULTING CIVIL & STRUCTURAL ENGINEERS Contact Person: Mr. K. Msane Telephone: 036 631 0249 Email: ladysmith@ecaconsult.co.za PREPARED BY: HANSLAB (PTY) LTD P.O. BOX 2135, Umhlanga Manors, 4021 Tel No: 031 563 1978 Fax No: 086 552 4224 BEE Status: Level One Email: sheldon@hanslab.co.za Website: www.hanslab.co.za DATE: 05 APRIL 2018

CONSULTANT DETAILS COMPANY Hanslab (Pty) Ltd POSTAL ADDRESS P.O. Box 2135, Umhlanga Manors, 4021 COMPILED REPORT SIGNED Ms. Jashmika Maharaj (Jnr. Environmental Assessment Practitioner) DATE 05 April 2018 REVIEWED REPORT SIGNED Mr. Sheldon Singh (Sen. Environmental Specialist) DATE 05 April 2018 HANSLAB (PTY) LTD Page 2

TABLE OF CONTENTS 1. BACKGROUND... 4 2. INTRODUCTION... 4 3. METHODOLOGY... 5 5. PROJECT LOCATION... 5 6. SITE DESCRIPTION... 8 6.1. Site Visit... 8 7. PROJECT DESCRIPTION... 8 8. NEEDS & DESIRABILITY OF THE PROPOSED DEVELOPMENT... 9 4. CONCLUSION... 9 5. REFERENCES... 9 LIST OF FIGURES: Figure 1: Aerial map of the proposed development site. (Source: ArcGIS Ver 10.5.1)... 6 Figure 2: Locality map of the proposed development site. (Source: KZN DoT GIS, 2018)... 7 HANSLAB (PTY) LTD Page 3

1. BACKGROUND The Okhahlamba Local Municipality identified the need for a vehicular/ pedestrian bridge across a stream in Brookdale, Bergville, KwaZulu-Natal. A feasibility study was undertaken by the applicant, that included a topographical survey and geotechnical investigation. The results of the investigations were thereafter utilised to determine the most cost-effective way to construct the proposed bridge crossing. It should be noted that the upgrade of the access roads leading to the bridge does not form part of the scope of works. The following recommendations were proposed for the bridge construction: Construct a Low-Level River Crossing Culvert Structure Protection Gabions and Reno Mattresses 2. INTRODUCTION A Site Investigation is the process of collecting information, assessment of the data and reporting potential hazards within a site which is unknown (O Brien & Gere, 2011). A site investigation/ assessment is an environmental management tool that highlights potential ecological issues or constraints in relation to a proposed development (Perry, 2011). A site investigation forms part of the screening phase of a project. Screening is a decision-making process which determines whether a development/proposed activity requires an environmental assessment and if so, the level of assessment (DEAT, 2002). Hanslab (Pty) Ltd. was appointed by the Applicant (ECA Consulting) to undertake a site visit for the proposed construction of a vehicular/ pedestrian bridge over an unnamed stream in the Rookdale area, within the Okhahlamba Municipality, KwaZulu-Natal. The aim of the site investigation was to determine whether the proposed development requires an environmental assessment. The objectives of the site investigation include: To identify the need for the proposed development. To identify and determine activities that may trigger listed activities in terms of the EIA Regulations, 2014 as amended (07 April 2017). HANSLAB (PTY) LTD Page 4

3. METHODOLOGY The methodology followed for conducting this site investigation report included: 1. Compilation of an environmental site-visit checklist. The site visit checklist included the basic information which was required to make the initial site visit. It also included information regarding the existing road/tracks and any watercourses which were observed. The purpose of the site-visit checklist was to record all observations and findings after the site visit/site walk-over. 2. Site Visit/Site Walk-Over (Conducted on 1 st February 2018). This site visit/walkover was conducted with a representative of ECA consulting (Mr. Khumbulani Msane). Refer to Appendix B Site Register. 3. Taking site photographs for environmental evaluation. This will further be used in conjunction with the environmental management tools for the desktop analysis. 4. Desktop analysis using environmental management tools i.e. Google Earth, KZN Department of Transport GIS software, SANBI BGIS (2018), and ArcGIS (Version 10.5.1). 5. PROJECT DESCRIPTION & LOCATION The Applicant (ECA consulting Engineers) proposes to construct a vehicular/pedestrian bridge over an unnamed stream within the Rookdale area, Okhahlamba Local Municipality, KwaZulu-Natal. The design specifications are to be confirmed and the it should be noted that the design of the proposed structure is still in the planning phase. However, the project engineer has confirmed that the physical footprint of the structure will be >100m 2 and will take place over the unnamed stream, and >15m3 of soil will be removed from the watercourse, and therefore triggers Activity 12 and 19 of Listing Notice 1 of the EIA Regulations, 2017, as amended (07 April 2017). The location of the proposed construction of Ntumba Culvert Bridge will take place within the Ntumba area, Rookdale in ward 10 of Okhahlamba local Municipality, within Uthukela District Municipality. The site is located 13km West of Bergville town with coordinates as follow: 28 42 48.9 S and 29 13 44.5 E. The location of the project is depicted in Figure 1 &2 below. HANSLAB (PTY) LTD Page 5

Figure 1: Aerial map of the proposed development site. (Source: ArcGIS Ver 10.5.1)

Figure 2: Locality map of the proposed development site. (Source: KZN DoT GIS, 2018) HANSLAB (PTY) LTD Page 7

6. SITE DESCRIPTION The description of the site is based on the observations made during the initial site-visit and the confirmation of observations during the desktop analysis. 6.1. Site Visit The following observations were made during the initial site visit: Existing Roads: The proposed bridge alignment is currently used as a crossing point by villagers and will interlink two roads (D2439 & D2101) in future. The proposed site is currently accessible via District Road D2439. Watercourses: The current crossing is classified as a stream, which is unnamed at present. Fauna & flora: Vegetation within the immediate proposed site consists mainly of grass species. The vegetation sensitivity of the area will be confirmed by the Wetland specialist, and wetlands will also be confirmed. With regards to faunal life, there local residents are located in close proximity to the site and have cattle that graze within the proposed site. General observations: The topography of the site is undulating and very steep. There are several schools in the Rookdale area, that use the crossing point. Residents were observed crossing the river, and the river was flowing at a fairly rapid rate. 7. PROPERTY DESCRIPTION PROVINCE DISTRICT MUNICIPALITY LOCAL MUNICIPALITY KwaZulu-Natal uthukela Municipality Okhahlamba Local Municipality WARD NUMBER(S) 10 FARM PARENT AND NUMBER SURVEYOR GENERAL CODE PORTION NUMBER Crowfield 8854 N0GS 00000000 885400080 8854 N0GS 00000000 885400081 8854

8. NEEDS & DESIRABILITY OF THE PROPOSED DEVELOPMENT The proposed new bridge will serve the local communities on either side of the stream, within the Rookdale area, Okhahlamba Municipality. The stream flows into the adjacent Woodstock Dam, and the flow increases compared to any other river in KwaZulu-Natal, especially during the rainy seasons. During these periods, it is impossible to cross the river and the local residents are forced to commute long distances to get to work, school and other facilities. Many have risked their lives attempting to cross the river during floods with little success. A major beneficiary will be the large number of school children who risk their lives to cross the river so that they can attend schools on the opposite side. Children are presently using a make-shift floatation device which is extremely dangerous especially during rain events. 4. CONCLUSION The proposed project is part of the Ministers social upliftment plans for the local communities and the overall improvement to the Province of KwaZulu-Natal. Therefore, Hanslab (Pty) Ltd makes an appeal to AMAFA as the commenting authority to consider this during the assessment of the information related to this project. 5. REFERENCES DEAT. (2002). Screening, Information Series 1, Department of Environmental Affairs and Tourism (DEAT) O Brian & Gere. (2011). Geophysical/Geotechnical Environmental Investigation: Restoration Project Perry, B. (2011). Environmental Investigation Report. HANSLAB (PTY) LTD Page 9