Getting Started On Your Green Infrastructure (GI) Plan

Similar documents
SCVURPPP Green Infrastructure Handbook. Kristin Kerr, P.E. EOA, Inc. April 19, 2017

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

Green Streets and Green Infrastructure Planning A Tale of Two Cities: San Mateo and Emeryville

Green Stormwater Infrastructure Handbook. Kristin Kerr, P.E. EOA / SCVURPPP November 29, 2018

Green Streets. Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay

Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development

Selecting Appropriate Stormwater Control Measures for Your Development Project

GSI Handbook Details Pervious Pavement

What Are We Inspecting? Stormwater Treatment Measure Type and Design

COMPLETE GREEN STREET CHECKLIST

The Green Infrastructure Plan Requirement: shifting from gray to green infrastructure June 14, 2016

Kristin Kerr EOA, Inc. February 1, 2017

Chapter 6. Green Streets

1 North San Antonio Road Los Altos, California MEMORANDUM GREEN INFRASTRUCTURE PLAN FRAMEWORK

Seattle s Natural Drainage Systems and Complete Streets

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

Case Study: City of San Mateo

Communications Planning Commission April 19, 2017

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA

Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater. Laura Prickett, EOA, Inc.

Melissa Bernardo Hess, PE, CFM February 18, 2016

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

BASMAA Development Committee. Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program Projects May 6, 2016

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

3. Are there any projects exempt from the definition of Regulated Projects?

6.2 Flow-Through Planter

Annual Reporting for FY Regional Supplement for New Development and Redevelopment

An Integrated Green Infrastructure Plan to Address Combined Sewer Overflow, Stormwater and Nutrient Reductions in Lancaster City, PA

Toronto Complete Streets Guidelines

Juniper Networks CO-8

Managing Stormwater Naturally. July 17, 2013

Appendix E: Illustrative Green Infrastructure Examples

Tennessee Stormwater Management Program. Stormwater Management Site Assessment and Inventory Checklist. Quick Check o Vicinity Map within Watershed

New Tools/Resources for

Green Plan-IT Technical Advisory Committee Meeting Thursday December 15, 2016 A US EPA Region 9 WQIF Funded Project

Potential Green Infrastructure Strategies May 6, 2015 Workshop

City of San Jose Green Infrastructure Plan Framework

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

LID Resources. Matt Yeager San Bernardino County Flood Control District. Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Program

San Mateo County Storm Water Resource Plan

Background / Regulatory Requirements

Watershed Planning Workshop

Water in storm drains does not go to a treatment plant

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT

FACT SHEET: Pervious Pavement with Infiltration

Complete and Green Streets

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting

City of Hermosa Beach Administrative Policy #

Low Impact Development Site Design

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By:

4. CONCEPT PLAN DEVELOPMENT

Green Infrastructure and Low-Impact Development Technologies

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre

Green Street BMP Matrix

SANTA CRUZ COUNTY REGULATORY IMPEDIMENT GAP ANALYSIS TOOL

Yahoo! Inc. CO-7. Santa Clara Valley Urban Runoff. Site Location: 701 First Avenue Sunnyvale, CA

Site Design Measures. Chapter

Cottage Grove Road Reconstruction. City of Madison Engineering

In the Plan Area, sustainable principles and strategies should be incorporated into the planning and design of buildings, streets and sidewalks, and

Introduction Post Construction Stormwater Management Performance Requirements

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

TENTATIVE MAP CHECKLIST

water that enters our streams during storms. Any water the rain garden can t accept will continue into the storm sewer system.

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Site Design for Protecting Water Quality 2013 Award Winning Projects

Implementation Guide Comprehensive Plan City of Allen

Green Infrastructure & Low Impact Development

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

Stormwater Control Plan: Small (Tier 1) Land Development Project

City of Dallas Complete Streets Program. SAME Infrastructure Forum February 2, 2018

Introduction Post-Construction Stormwater Management Performance Requirements

Flooding Hearing: Long and Short Term Strategies

The West Vaughan Employment Area Secondary Plan Policies

Chapter 2: Strategies for Local Governments Chapter 3: Site Assessment and Design for Low Impact Development. Break Out Group 10:30 am to 12 pm

LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES. Powerpoint Templates. MS4 Statewide Stormwater Summit June 18, 2013

Planning for Sustainable Infrastructure: A Collaborative Integrated Approach. Background on Berkeley. Background on Paving Needs 8/30/2015

DEFINITIONS AND RULES OF MEASUREMENT DEFINITIONS AND RULES OF MEASUREMENT 7-1

Onondaga County Sustainable Streets Project. Onondaga County Planning Federation June 7, Onondaga County Sustainable Streets Project 1

Dallas Complete Streets Initiative and Design Manual. City Council Briefing December 2, 2015

Phase II Storm Water Permit Program MS4 Permit

21st Street Green and Complete Street City of Paso Robles

Public Meeting May 20, 2014

Executive Summary. NY 7 / NY 2 Corridor

6.1 Bioretention Areas

MALLETTS BAY INITIATIVE

Technical Guidance for Stormwater Treatment and Site Design Measures

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey

Lambeth Main Street Streetscape Improvements

understanding Green Infrastructure In Zoning

Swan Creek Urban BMP Inventory and Assessment. Jeff Grabarkiewicz, Kari Gerwin, Ann-Drea Hensley TMACOG, Lucas SWCD/Engineers, and Partners

GREEN STREETS & INFRASTRUCTURE: A COUNTY APPROACH. Mimicking Nature to Manage Stormwater in Developed Areas

Stormwater Technical Guide

Scorecard. WaterQuality. Appendix B USEPA WATER QUALITY SCORECARD APPENDIX B

Preparing Permit Application Submittals

Transcription:

Getting Started On Your Green Infrastructure (GI) Plan Peter Schultze-Allen EOA Inc. Annual SCVURPPP C3 Workshop June 16, 2015

Presentation Outline MRP 2.0 C.3.j (GI) requirements GI Framework elements GI Plan elements

Strategy to Meet MRP 2.0 GI 1 st Year: Requirements Develop and approve a GI Framework 2 nd Year: Prioritize & map planned potential GI projects 3 rd Year: Continue to develop GI Plan 4 th Year: Finalize, approve & Submit GI Plan

GI Framework Development

GI Framework 1 st Task in C.3.j sets stage for GI Plan Desired outcomes: Get buy-in from electeds and management on a GI approach/process with both short term and long term goals Describe GI Plan and MRP requirements Estimate and allocate resources required for preparation of GI Plan

Contents of Framework MRP requires that the following items be addressed in the Framework that are needed to complete the GI Plan: 1. Statement of Purpose 2. Tasks and Timeframes 3. Plans, Policies and Specifications to be updated. 4. GI Measures to be selected

1. Statement of Purpose Overall GI goal is to disconnect impervious areas (IA) throughout urban watersheds to reduce runoff and improve water quality Describe water quality problems including pollutants of concern in permit (TMDLs) Describe multiple benefits of GI Measures Time frames short and long term Coordination with transportation projects: integrate complete streets and green streets

2. Tasks and Timeframes Tasks: Describe tasks that will be undertaken in order to develop the GI Plan such as: Collecting data and maps Using/developing a prioritization mechanism such as the GreenPlan IT tool Assembling a interdepartmental team Process for educating staff, electeds and public Timeframes: Break out tasks for each permit year

3. Plans, Policies and Specs General Plan & specific/area/precise plans Bicycle and pedestrian plans Storm drain master plan Long term trash plan Parks and open space plans Urban forestry plan Transportation & pavement maint. plan Complete streets policy Street design specifications

4. GI Measures Biotreatment Measures: Green Streets: Buildings and Parking lots: Green Bulb-out Flow-through planter Sidewalk planter Green roof Traffic Circle Tree Trench Tree Trench Rain garden Rain garden Other Measures Pervious Paving Infiltration trenches Cisterns

Biotreatment: Green Bulb-out Palo Alto Campbell

Biotreatment: Sidewalk Planter San Mateo Alameda

Biotreatment: Traffic Circle Berkeley

Biotreatment: Tree Trench E Sunnyvale

Biotreatment: Rain Garden San Jose El Cerrito

Biotreatment: Flow-Thru Planter Emeryville Alameda

Biotreatment: Green Roofs San Jose San Bruno

Pervious Paving Berkeley Berkeley

San Jose Infiltration Trenches

Cisterns Oakland Berkeley

Framework: 1 st Step Guidance The following slides give suggestions for initial steps that jurisdictions can take to begin the GI planning process. Your jurisdiction may already have completed some or all of these steps BASMAA and/or your Countywide Stormwater Program may be able to provide assistance in some of these areas.

1. Assemble Staff from Related Departments Engineering Planning Transportation Maintenance Urban Forestry Landscaping Community Development Parks

2. Identify Gaps in Engineering Data Engineering data: Geometry: widths and lengths of streets (curb to curb), rights of way, curbs, gutters, sidewalks, planting strips, medians, travel and parking lanes Topography and drainage: street cross slopes, longitudinal slopes, crown heights, curb cuts, curb ramp slopes, sidewalk slopes, underground utility maps, storm drain system maps and drainage areas

Data continued Planning and environmental data: Street tree inventory, Priority Development Areas, projected areas of development, existing and proposed land uses, parcel and building footprint data, creek buffers and water bodies Pollutants of concern - land use (proxy for PCBs), trash management areas, roadway vehicles per day volumes (proxy for vehiclerelated pollutants) Treatment system inventory

3. Educate Management, Electeds and the Public on Green Infrastructure Issues City of San Mateo Taste and Talk Series www.sustainablestreetssanmateo.com/tasteandtalk/ Public Hearings Workshops Staff Training

GI Plan Development

Required GI Plan Elements Statement of Purpose and Tasks Timeframes and Targets for Retrofitting IA Plans and policies coordinated and updated GI Tools, prioritization mechanisms to be used and outputs (maps) Integration of GI into future projects Process for tracking and mapping progress Streetscape Design Guidelines and specs Alternative Compliance Coordination Funding options discussion

Step 1: Prioritize Efforts Using the existing list of plans, GIS data, maps, and other resources, begin to prioritize short term and long term planning efforts. Consider using GreenPlan IT, Google Earth or similar tool to identify areas of prioritization. Another option is to overlay maps of Priority Development Areas, Trash Management Areas, and land uses.

Example: Large/Medium City

Example: Medium/Small City

Step 2: Early Implementation Review Capital Improvement Projects to identify opportunities for GI: Road diets (bicycle lane projects) Pedestrian Safety projects (use bulb-outs) Street Tree Planting (suspended pavement) Roadside Landscaping (rain gardens) Storm drain maintenance (curb extensions) Utility work (curb extensions) Roadway reconstruction (all options) Diagonally angled street intersections (space) Checklists to assist in reviewing projects will be developed

Road Diet Example: Colma Before: two travel lanes in each direction, no parking and no cross-walks

After: new bike and parking lanes & green bulb-outs with cross walk.

Roadside Landscaping Retrofit Example: Berkeley Before: City park area - low use with high maintenance

After: re-graded area with new rain garden treating street run-off

3. Leverage Private Development Review Private Projects in the pipeline for opportunities to add GI elements Consider adding public roadway runoff treatment landscapes to conditions of approval on project frontages where curb, gutter, sidewalk and/or street tree improvements will be taking place.

4. Review Standard and Typical Details Consider adding new typical or standard green infrastructure construction details to jurisdictional toolbox. Discuss common construction errors and training needs for staff. Regional standards are being developed as part of the Urban Greening EPA grant

For More GI Information San Mateo County Green Streets Guide: www.flowstobay.org/gsdesignguide SFPUC GI Typical Details: www.sfwater.org/index.aspx?page=446 Central Coast LIDI GI Typical Details: www.centralcoastlidi.org

Contact Information Peter Schultze-Allen 510-832-2852 x128 pschultze-allen@eoainc.com Jill Bicknell 408-720-8811 x1 jcbicknell@eoainc.com