Washington County, Maryland Division of Public Works Policy Manual

Similar documents
Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Article 20 Stormwater Management

CHECKLIST FOR PHASE II DRAINAGE REPORT

City of Waco Stormwater Management Regulations

Appendix I. Checklists

Erosion & Sediment Control Plan Application Form & Checklist

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Draft Rhode Island Stormwater Design and Installation Standards Manual

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Chapter 4 - Preparation of Stormwater Site Plans

When planning stormwater management facilities, the following principles shall be applied where possible.

Gloucester County PLAN SUBMITTER'S CHECKLIST

Why a new Food & Farm Ordinance?

COUNCIL OF THE TOWN OF LA PLATA. Ordinance No Amended

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

MARYLAND DEPARTMENT OF THE ENVIRONMENT SWM GUIDELINES FOR STATE AND FEDERAL PROJECTS. 1.0 Purpose and Authority Incorporation by Reference

STREAM BUFFERS

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

Zoning Ordinance Chapter 10

New Development Stormwater Guidelines

Stormwater Management Resource Type:

PLAN SUBMITTER'S CHECKLIST

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

SITE PLAN REVIEW APPLICATION AND CHECKLIST

ENGINEERING & CONSTRUCTION MANAGEMENT

Appendix 6-A. Site Plan Preparation and Submission as Part of the Land Development Process

STORMWATER CREDITS AND BETTER SITE DESIGN PRACTICES

Chapter 1: General Program Information

SEMSWA s Role in the Land Development Process

City of Fort Worth. December 1, 2004

4. Contractor (and subcontractors if applicable) certification statement(s)

County Council Of Howard County, Maryland

County of Fairfax, Virginia


IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

FLOODPLAIN USE PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT W. Ten Mile Road Novi, MI (248)

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

NAPA COUNTY PUBLIC WORKS Standards & Specifications

Drainage Control Plans

Huntington Stormwater Utility

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

Town of Windsor. Stormwater Manual

Northeast Ohio Regional Sewer District Stormwater Management Plan Review Policy

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Net Land Area (NLA): Area within zoning lot boundaries NLA= sq. ft. a) Credited Street Area (total adjacent frontage) x ½ width of public rightof-way

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Pollutant Removal Benefits

Appendix K. Stormwater Management Plan

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE

Plan Review Checklist

Project phasing plan (if applicable) 12 copies of site plan

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT

Project Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number:

STREAM BUFFER PROTECTION AND MANAGEMENT

A. Regional Detention Requirements

Please highlight flow chart where applicable and return with Form 2 and Form 3 (tab 1) to the City of St. Charles Engineering Department.

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) General Application

Table of Contents G.1.a Water Resources - Surface Water - Drainage

Appendix A - Submittal Checklists

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW

ZONING COMPLIANCE PERMIT APPLICATION

CONCEPTUAL SITE PLAN APPLICATION

Radnor Township. Factors affecting storm water issues.

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING

Level 1 Downstream Analysis

ARIZONA WATER COMPANY

Low Density Projects. Design Objective

Caledon Villas Corp. c/o Mr. John Spina 55 Blue Willow Drive Woodbridge, ON L4L 9E8 May 14, Floodplain Characteristics, Old Church Road

VA DCR STORMWATER DESIGN SPECIFICATION NO. 11 WET SWALE. VERSION 2.0 January 1, 2013 SECTION 1: DESCRIPTION

Phase II Storm Water Permit Program MS4 Permit

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME:

Urban Planning and Land Use

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Tennessee Stormwater Management Program. Stormwater Management Site Assessment and Inventory Checklist. Quick Check o Vicinity Map within Watershed

Stormwater Solutions for Residential Sites. Section 2 Stormwater Management Approach VERSION 1.0. EcoWater Solutions. Prepared for

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Appendix E Outfall Identification Standard Operating Procedure

Figure 1 Cypress Street Study Area Location Map

Problem Understanding

MEMORANDUM. September 10, 2018

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

CHAPTER 5: SITE DEVELOPMENT

The Art and Science of Stormwater Retrofitting

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

Net Land Area (NLA): Area within zoning lot boundaries NLA= 1,076,181 sq. ft.

Stormwater. Management Manual

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES


CHAPTER 22 Rural Open Space Community Developments

Stormwater Fee Credit Manual

Transcription:

Washington County, Maryland Division of Public Works Policy Manual Subject: Downstream Drainage Easement Category: Land Development Engineering Number: 7-4.1 Date: June 1, 2009 (effective) PURPOSE: The purpose of this policy is to promote the health and safety of County residents by ensuring that no deleterious impacts are created to existing down stream properties or public road infrastructure from stormwater runoff associated with new land development activity. POLICY: 1. Definitions: a. Adequate outfall: The natural or man-made open conveyance system or watercourse which has the capacity to convey the stormwater runoff from a site, without a change in flow characteristics, onto private property. An adequate outfall might be a drainage channel in a public right of way, a public storm drain pipe conveyance, or a recorded flood plain. b. Site outfall: the point of discharge of stormwater from the development at the property line. c. Study point: the point selected at the approval of the Deputy Director, Land Development Engineering, for which all hydrologic, hydraulic and photographic studies are to be performed. 2. Minimum Stormwater Design Criteria: 2.1. The stormwater runoff from a site cannot change from pre-development conditions in flow rate and location of discharge for the design storm. In addition, stormwater runoff from a site shall maintain the capacity and stability of the down stream conveyance system to an adequate outfall. Any change in these characteristics from predevelopment conditions will require a down stream offsite drainage easement. In addition, the following criteria must be met: 2.1.1. The location of the site outfall shall not change from pre-development conditions, unless approved by the Deputy Directory, Land Development Engineering; and, 06/04/09 Page 1 of 6

2.1.2. The design storm shall be site specific and shall be determined by the Deputy Director, Land Development Engineering. The design storm will be at a minimum the 2 and 10-year 24-hour frequency storm event. A site located in a known flooding problem area may need to include the 100-year 24-hour frequency storm event as an additional site design storm, as determined by the Deputy Director, Land Development Engineering. 2.2. A determination shall be made of conditions in the watershed downstream of each development site. It is important to identify any existing structures that are subject to an unacceptable flooding hazard. In the event that a known downstream flooding condition or erosion condition exists under the pre-development condition, the Deputy Director, Land Development Engineering may require that an off-site drainage easement be provided or improvements be made per the requirements of Section 4 through Section 6 of this Policy. 3. Requirements for Offsite Drainage Easement: 3.1. The developer must employ the best available stormwater management technology to meet the conditions identified in Section 3. If one or more of the conditions identified in Section 3 cannot be achieved, the developer shall obtain a recorded off-site drainage easement from all abutting property owners to convey managed stormwater runoff to an adequate outfall. 3.2. All necessary offsite drainage easements are to be obtained prior to final plat or site development approval. 3.3. An adequate outfall shall be a minimum of one of the following: 3.3.1. The point at which the site outfall discharges into the first adequately sized public storm drain structure down stream of the site; 3.3.2. The first point of confluence where the drainage area to the site outfall is joined by another drainage area equal to or greater than the drainage area of the site outfall; 3.3.3. A FEMA floodplain or a recorded floodplain easement; or, 3.3.4. An existing recorded drainage easement, SWM easement, or public right-of-way as deemed adequate by the Deputy Director, Land Development Engineering. 3.4. The off-site drainage easement must contain the 10-year water surface elevation (WSE) with 1-foot of freeboard. 3.5. All down stream conveyance systems, whether man-made or natural, located between the site outfall and the adequate outfall must safely pass the 10-year 24-hour frequency storm event without impacting any existing structures. In addition, the 100-year WSE 06/04/09 Page 2 of 6

must pass between the site outfall and the adequate outfall without entering any existing residential dwelling units or business structures. 3.6. In the event that an off-site drainage easement is needed, it must be prepared in a format that can be recorded in the land records office by either Plat or Deed of Easement. 4. Discharge Study Criteria: 4.1. For all site plan or preliminary plan development submittals, an upstream and down stream impact study is required to characterize existing conditions and determine potential impacts of site stormwater runoff on adjacent properties, streams and existing conveyance systems between the site outfall and the adequate outfall. The study shall include: a. Characterization of Existing Site Conditions; b. Design Storm Selection; c. Pre and Post Development Hydrology and Hydraulics; d. Design of Proposed Conveyance 4.2. A Characterization of Existing Site Conditions shall be provided with the first submission of the preliminary plat or site plan. The characterization study shall include: 4.2.1. A photographic study, scaled with a site map identifying the location of each picture is to be submitted with the first submission of the preliminary plat or site plan. At a minimum, photos are to be taken at all critical areas showing buildings, streams, road crossings, and existing conveyance systems. 4.2.2. Off-site topography is required in the vicinity of the site outfall and within 500 feet of the site. For potentially critical structural flooding conditions, field run topography at a minimum of 2-foot contours may be required where stormwater runoff must flow offsite across private property between or near an existing structure prior to reaching an adequate outfall. Spot elevations along all foundations are required for any existing offsite permanent structure within 15 feet of an existing or proposed conveyance system, or 100-year WSE, which ever is greater. The determination of a potentially critical structural flooding condition shall be made by the Deputy Director, Land Development Engineering. 4.2.3. A pre-development drainage area map at a scale no less than 1 = 200, must be provided showing existing topography, the existing drainage area(s), on-site subdrainage area(s), site outfalls, site tributaries, proposed study points, adjacent property boundaries, property owners, zoning, existing structures, existing storm drains, existing outfalls, existing driveways and vegetation. 4.2.4. In the event that the down stream conveyance passes under an existing public or private road or driveway, an additional analysis is required to ensure that the existing water surface elevation for the road design storm at the road crossing does not exceed design requirements per Washington County road crossing design standards. 06/04/09 Page 3 of 6

4.3. A Pre and Post Development Hydrology and Hydraulics Analysis shall be provided with the characterization study. This analysis shall include: 4.3.1. The hydrologic analysis shall include the site and all down stream contributing drainage areas. 4.3.2. Runoff curve number (CN) reduction allowed when using water quality credit practices as per the 2000 Maryland Stormwater Design Manual is not applicable to these pre and post development hydrology calculations. 4.3.3. The pre-development hydrologic condition for all agriculture shall be meadow in good condition. 5. Additional Analysis Required for Offsite Drainage Easement: 5.1. Where the requirements of Section 3 cannot be met, an additional hydrologic and hydraulic analysis will be required to be submitted to define the limits of the down stream drainage easement. This analysis shall include the following: 5.1.1. The hydraulic analysis shall calculate the pre and post development velocity, depth and width of flow to the adequate outfall. 5.1.2. Where stormwater runoff from the site outfall is conveyed through a down stream conveyance channel, swale, stream, or other open natural or man-made conveyance to the adequate outfall, the pre and post development velocity, depth and width of flow shall be computed along this conveyance at pre-determined locations. Surveyed cross-sections at each study point shall be used to determine water surface elevation, velocity, depth, and width. 5.1.3. Where stormwater runoff from the site outfall is conveyed through a down stream closed public or private storm drain system, the system shall be shown to have the capacity to safely convey the post development 10-year 24-hour frequency storm. 5.1.4. The hydrologic and hydraulic analysis methods indicated in the latest version of the Washington County Hydraulic Design Criteria shall apply. 6. Exemptions: Any development activity exempt from the provisions of the Washington County Stormwater Management Ordinance is exempt from the requirements of this Policy. 7. Waivers: The Deputy Director of Land Development Engineering my grant a waiver to all or a part of the requirements listed in this policy for an individual site. Waivers will be evaluated, on a case-bycase basis, after a written request is submitted to the Deputy Director, Land Development 06/04/09 Page 4 of 6

Engineering. The written request must contain all necessary photos, written description of the project and waiver request, calculations and any other information that is necessary to adequately evaluate the waiver request. The decision on the waiver request will be granted in writing by the Deputy Director, Land Development Engineering. In considering waiver requests, the Deputy Director shall consider circumstances specific to the site that may dictate that strict adherence to this Policy would result in unnecessary hardship to the applicant.. 06/04/09 Page 5 of 6

06/04/09 Page 6 of 6