EUTECTIC EC-20 OIL-FIRED WATER BOILERS/NO. 2 OIL ASSEMBLY INSTRUCTIONS EUTECTIC EC-20 ASSEMBLY GUIDE

Similar documents
SENTRY. High efficiency, cast-iron gas boiler LOWER PROFILE MAKES PROBLEM INSTALLATIONS EASY

EUTECTIC EC-10DV Series

Heat Exchanger Block Replacement Instructions

Light Duty Commercial Electric Voltage and Wattage Conversion Instructions

SLANT/FIN AUTOMATIC VENT DAMPER For Galaxy, Sentinel and Sentry Series Boilers INSTALLATION INSTRUCTION MANUAL AND TROUBLESHOOTING GUIDE

VSL II QUICK START GUIDE

Light Duty Commercial Electric Voltage and Wattage Conversion Instructions

Platen Heater Pad Replacement

VICTORY VSPH VICTORYVSPH THE PERFECT CHOICE FOR. Cast-iron sealed combustion, direct vent gas boiler

User s Information Manual Lynx Direct-Vent Sealed Combustion Condensing Boiler Model LX-90, LX-120, LX-150

Ti/Lx 150 ASME HX ASSEMBLY

/13 Price - $5.00

High efficiency, cast-iron gas boiler

DELEVINGNE WIDESPREAD FAUCET INSTALLATION

RYLE WIDESPREAD FAUCET INSTALLATION

WATTS WALL-MOUNT WIDESPREAD BATHROOM FAUCET INSTALLATION

MONITRON II MODEL EH-M2 ELECTRIC BOILER OPERATION AND INSTALLATION INSTRUCTIONS. Four stage electronic control with energy saving and other features.

GV Series 4 Section Assembly

EMPIRE II SERIES II Models 3EW.65 3EW.75 3EW1.00 4EW.90 4EW1.25 4EW1.50 5EW1.20 5EW1.75

Installation Instructions

High Efficiency Oil Fired Hot Water Boiler REPAIR PARTS & OPTIONAL KITS. P/N# , Rev. C [01/09]

Single-Control Lavatory Faucet

DRAIN WATER TEMPERING INSTALL

Installation Instructions

Single-Control Bathroom Sink Faucet

PROPANE CONVERSION INSTRUCTIONS. Applies to: Gas-Fired, Tubular Radiant, Low-Intensity Infrared Heater

User s Information Manual Galaxy GG/GX Series, Sentry S/SX Series and Sentinel SE Series Gas Boilers with Continuous Burning Pilot

User s Information Manual

INSTALLATION INSTRUCTION

Ultra Boiler Series 1 & 2 Jacket Parts

MODEL EH ELECTRIC BOILER OPERATION AND INSTALLATION INSTRUCTIONS

27" Gas Dryer MODELS: MGDB950YW3 (White) MGDB950YG3 (Cosmetallic) 05/31/ Maytag Part No. W Rev. A

EUTECTIC EC-10 INSTALLATION AND OPERATING INSTRUCTIONS SERVICE COMPANY OIL-FIRED WATER BOILERS/NO. 2 OIL. Name Address. Telephone Model # Serial #

OIL-FIRED CAST IRON HOT WATER BOILER. Parts and Optional Accessories

REFRIGERATOR PARTS LIST

NXR3. 70 / 290 kw HIGH-EFFICIENCY, PRESSURIZED, CAST IRON, OIL OR GAS BOILERS. 1. Standards - Regulations. 3. Assembly and installation

Vortex 15/21 Utility and Outdoor Module Vortex Combi 21 and Outdoor Vortex Combi 21

TARVER SINGLE HOLE FAUCET INSTALLATION

BROEG SINGLE HOLE FAUCET INSTALLATION

VSL II QUICK START GUIDE

LUDGATE SINGLE HOLE FAUCET INSTALLATION

Single stage operation oil burner

Installation Instructions

PAGOSA SINGLE HOLE FAUCET INSTALLATION

Home Stacked Washer/Dryer

MODEL EH ELECTRIC BOILER OPERATION AND INSTALLATION INSTRUCTIONS

Harvey Chemiclave EC Series Sterilizers

MODEL EM-10 ELECTRIC BOILER CONTROL OPERATION AND INSTRUCTION MANUAL

TOP MOUNT REFRIGERATOR MODELS: WRT106TFDW01 (White) WRT106TFDB01 (Black) WRT106TFDT01 (Biscuit)

Crown Boiler Company

OR Replacement Instructions Heat Exchanger Assembly, ASME

MONITRON II MODEL EH-M2 ELECTRIC BOILER OPERATION AND INSTALLATION INSTRUCTIONS. Four stage electronic control with energy saving and other features.

OptiSoft Softeners Simple Install Steps 1-17

HX Field Replacement Kit

User s Information Manual

Homestyle Stacked Washer/ Dryer

ASSEMBLY and INSTALLATION INSTRUCTIONS. Pipe wrench Ratchet 3/8 socket 9/16 socket 11/16 socket 3/16 Allen key 3/32 Allen key 9/64 Allen key

Lavatory Faucet INSTALLATION INSTRUCTIONS P24490-CR, P24490-LV, P24491-CR, P24491-LV, P24492-CR, P24492-LV, P24700, P24705, P24706, P24736, P24800

27" GAS DRYER MODELS: WGD95HEDW0 (White) WGD95HEDC0 (Chrome Shadow) 05/13/ Whirlpool Corporation Part No. W Rev.

Homestyle Stacked Washer/Dryer

Description Model Weil-McLain part number. Vent Termination Kit for 3" Stainless Steel All

Twin & Triple Exposed Thermostatic Shower Valve Installation & Operating Guide

INSTALLATION INSTRUCTIONS

Installation Instructions for Med Touch Master Alarms - Wireless

GAS DRYER MODELS: WGD8000DW0 (White) 03/30/ Whirlpool Corporation Part No. W Rev. C

User s Information Manual

6. Cooling System XCITING 400i. This chapter covers the location and servicing of the cooling system components for the KYMCO XCITING 400i.

Buccaneer G.T. Installation, Assembly and Servicing. Oil or Dual Gas Fired Boilers

Installation Instructions

The Bradford White DEFENDER Safety System (M1, 2XR)

MAKAI WIDESPREAD FAUCET INSTALLATION

Installation Manual. Models 99168, 99169, 99170

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL INDIRECT POWERED WATER HEATER

Installation Instructions

COMMERCIAL STACKED. Supersedes repair parts list located behind lower panel on washer. Models: CGT8000AQ1 (White)

INSTALLATION AND OPERATING INSTRUCTIONS GN2. HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS

TECHNICAL INSTRUCTIONS

REF. NO Clamp Assembly 8 1 set Gasket (4 per set) S.S. Lock-washer 3/8 x 1/ Brass Impeller 3.

2 ADULTS REQUIRED FOR ASSEMBLING

Intelligent ways to save fuel heating your Commercial building. Caravan Modular Boiler System. CHS Multiple Boiler System

Grant Spira 6-26kW and 9-36kW Wood Pellet Boilers

Installation Instructions

Installation Instructions 30 French Door Built-in Wall Ovens

TOP AND CONSOLE PARTS

NHR-25 Feed Hopper with Agitator

INSTALLATION AND OPERATING INSTRUCTIONS TABLE OF CONTENTS IMPORTANT

Parts List for Ener-Radiant XL Tube Heaters

T4031A,B,P; T6031A,B Refrigeration Temperature Controllers

Welcome! Today s topic: Small Home Repairs. November 14, 2015

HeatMaster. Assembling and installation instructions. 201 Booster. HeatMaster. HeatMaster. 200N (Gas) Booster ENGLISH FRANCAIS NEDERLANDS ESPAÑOL

Rotary XL (558 Series) and Classic (548 Series)

Quantity X Section Assembly (Intermittent and Continuous Circulation Only)

D1/D2 Direct Vent Pilot Replacement Model #: D INSTALLER: Leave these instructions with consumer. CONSUMER: Retain for future reference.

ALTAIR II CONVECTION STEAM COOKER PARTS AND SERVICE MANUAL

Home Stack Washer/Dryers

STONE TROUGH CONSOLE SINK

12a. Replacement parts. GOLD CGs Gas-Fired Water Boiler Boiler Manual. Section assembly Base Jacket Trim Controls...

21 TRV Blower Installation Instructions

Ceiling Fan Blade Arm Replacement

COMMERCIAL ELECTRIC DRYER

Transcription:

EUTECTIC EC-20 OIL-FIRED WATER BOILERS/NO. 2 OIL ASSEMBLY INSTRUCTIONS Slant/Fin Corp. 2013 Printed in the U.S.A. 1113 Part # 470911000 Publication No. EC-20-50 Rev.B

Package List Packaging: The following table shows the package numbers included with the boiler to be installed. The packages are presented in the order in which they should be opened for assembly. EC-20 Contains the boiler instructions Boiler Boiler Casting Sub-Assembly Jacket and Insulation EC-25 475002000 475009200 EC-26 475003000 4750010200 EC-27 475004000 475011200 EC-28 475005000 475012200 Contains the control panel instructions Control Panel Basic or SF-10 for EC-20 Series Basic 475014000 SF-10 475299000 Basic 475014000 SF-10 475299000 Basic 475014000 SF-10 475299000 Basic 475014000 SF-10 475299000 2

Tools required: 1 Phillips screwdriver 1 Wide flat screwdriver 1 13mm open end wrench 1 17mm open end wrench 1 19mm open end wrench Step 1 Mounting Feet Boiler body assembly 1 1. Fit the adjustable feet to the height converter (The feet are delivered with the screw bag in the jacket and insulation. package) 3

Step 2 Mounting: Hinged door Boiler casting assembly is normally shipped with boiler door hinges on the right when viewing boiler from front. If boiler casting assembly has door removed, it can be mounted with hinges on the right side when viewing from the front by following the procedure below.. 1. Put the lower hinge in place against the front section 2. Secure the lower hinge: 1 screw HM 10x50 + CL 10-20 wide conical washer. 3. To be prefitted to the front section, in the upper hinge position: 1 screw HM 10x50 + CL 10-20 wide conical washer. 4. Hang on the boiler door 5. Put the upper hinge in place and tighten the screw. 6. Fit the H10x20 adjustment screw to the upper hinge. If you want to mount boiler door with hinges on the left when viewing from the front, then follow the above directions, in much the same way. 4

Step 3 Adjusting the boiler door B 17 A To adjust the boiler door, adjust the top hinge: Untighten screw A turn the screw B to position the door, Tighten screw A. 5

8227N029A Step 4 Baffles Put the baffles in place. Align the convection accelerators with the first fins. B C D E EC-25 X X EC-26 X X X X EC-27 X X X X EC-28 X X X X Step 5 17 Close the boiler door and tighten using the 2 special nuts. 6

Step 6 Mounting: Front crosspiece with Basic or Thermatic Control Thermatic Basic 7

Step 7 Fitting the body insulation 8

Step 8 Assembling the burner Fix the gasket with the flange on the burner door using four 3/8 16 studs, supplied. (screw shorter length of metric thread into burner door.) Push the burner into the burner door until it will not go any further. Fix the burner using hex nuts, supplied. Note: After the installation has been connected and filled with water, start the burner into service following the instructions supplied with it. 4 Fix the cable in position using the cable clamp. Slide the surplus cable backwards between the insulation and the front cross piece. Secure cable clamp and tighten screw after slack is removed from cable to make sure cable will disconnect when burner door is opened. Replace the burner cover. If hinged door is changed to left side, cable routing must be moved to the right. To be plugged into molex plug on burner. Cable Clamp Cable routing must come from left side for right hand hinge (factory equipped). 9

Step 9 Danger Label Rating Label Baffle Label Attach Burner Instructions Label that is packed with Burner 10

Step 10 Step 11 Fitting the rear panel Remove the clean out trap 11

Step 12 Fitting the rear panel - continued Fit the rear panel 12

Step 13 Replace the clean out trap 13

Step 14 Control panel assembly Installing sensor bulbs - Then, insert the bulbs inside the pocket and maintain them with the spring Detail A: Basic Control Panels - Boiler sensor - Safety thermostat - Thermometer - Contact spring (can be found in the boiler instructions bag) - Detail B: Thermatic Control Panel - Boiler thermostat - Boiler sensor - Safety thermostat - No contact spring 14

Step 15 Fitting the front panel - Fitting the top panel Connect burner hanress to molex connector. Make sure it disconnects when opening door. See page 9 for adjustment if necessary. 15

16

17

18

19

Slant/Fin Corp. 2013 Printed in the U.S.A. Part # 470911000 Publication No. EC-20-50RevA SLANT/FIN CORPORATION., Greenvale, N.Y. 11548 www.slantfin.com Phone: (516) 484-2600 Fax: (516) 484-5921 In Canada: Slant/Fin LTD/LTEE, Mississauga, Ontario www.slantfin.can