Standard Operating Manual

Similar documents
Standard Operating Manual

Standard Operating Manual

Standard Operating Manual. Semitool Spin Rinser Dryer SRD

Standard Operating Manual

Standard Operating Manual. PEL Wet Station X Clean Organic Solvent Station

Operating Instructions for the SAMCO RIE800iPB

INSTRUCTION MANUAL FOR

AGC 200 Advanced Gen-set Controller OPERATOR S MANUAL

Operating Instructions for the STS ICP Metal Etcher

University of Minnesota Nano Fabrication Center

Standard Operating Procedure: Spinner

OXFORD PLASMALAB 100 PECVD

Standard Operating Manual. Ultra Fab Wet Station F Non-standard Processing Station

Arizona State University Center for Solid State Electronic Research Title: Oxford Plasmalab 100 PECVD Page 1 of 7

Spas with 2 or 3 Pumps

Plasma-Therm 790 RIE (Reactive Ion Etcher) Basic Operation Guide

Operations Manual TS400. Test Station for G450/G460 Gas Detector

Standard Operating Manual. Ultra Fab Wet Station C Oxide/ Nitride Etch Station

Focus 4010\ Focus 4010 HT porcelain firing furnace

JAG group microwave manual. (updated October ) Table of contents. 1 General information 2. 2 General safety rules 2. 3 The microwave reactor 3

EZ9Plus & EZ11Plus Instructions on: Operating

OPERATING MANUAL UNIT 8 - WHITEBRIDGE INDUSTRIAL ESTATE STONE STAFFORDSHIRE ST15 8LQ ENGLAND TEL: +44 (0) FAX: +44 (0)

Operations Manual TS400. Test Station for G450/G460 Gas Detector

P4200W2 Series Air Dryer

Tempco PCT-3000 Series Temperature Control Console with Relay Output for Heating or Cooling Applications

Tempco Part Number PCT30006 Temperature Control Enclosure with Relay Output for Tote Tank Heating Applications

Smart Thermostat. Set-Up Guide

Autoclave Operations Manual

Follett Performance Plus

PRODUCT BULLETIN. Rev. A Monitoring Station offering PN Rev. B as a direct replacement. OVERVIEW / DESCRIPTION

IMAGE PRESS & IMAGE PORCELAIN OVEN. 120V, 50/60 Hz Models and 230V, 50/60 Hz Models. Operator s Manual

CSP-204 CSP-208 CSP-104 CSP-108

Quick-Start Guide Digi-Sense TC9000 Advanced PID and On/Off Temperature Controller with Thermocouple Input Models and

PL-1 Thermostat User s Guide

Air Conditioner. user manual. imagine the possibilities. Wired Remote Control MWR-WH02. This manual is made with 100% recycled paper.

Compact Genset Controller, CGC 400 Push-buttons LEDs Display and menu structure Display readings Alarm handling and log list

Guardian II Pipeline Washer B Instruction Supplement

University of Minnesota Nano Fabrication Center Standard Operating Procedure

No part of this publication may be reproduced, stored in an automated data file or made public in any form or by any means, whether electronic,

ELECTRONIC COMMUNICATING THERMOSTAT

Standard Operating Procedure: Sputter

User Manual. Digi-Sense TC9500 Advanced Multiparameter Temperature Controller with Thermocouple, Thermistor, and RTD Inputs

SP2000. Solder Pot. Environment Friendly. Instruction Manual

EAGLE 2000B EAGLE 2000BE EAGLE 2000EBT MUST READ MANUAL PRIOR TO INSTALLING MACHINE

Spa Touch Control Panel with BP2100, BP6013 spa controllers. (Spa Owner s Manual insert)

OPERATING MANUAL TORREY PINES SCIENTIFIC, INC. DIGITAL HPLC COLUMN HEATER MODEL CO20 DOCUMENT NUMBER CO20-00

Spa Touch Control Panel with 2000, 2100 controllers. (Spa Owner s Manual insert)

SP2000. Solder Pot Instruction Manual. Environment Friendly

Tune-Rite Software Operation Manual

HA06. User manual. (SDO Hot Air One) HOT AIR / QUARTZ REFLOW OVEN. Version 2.21

Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.com HCT HCT-1000 User Guide

! WARNING To avoid risk of electrical shock, personal injury or death; disconnect power to oven before servicing, unless testing requires it.

Electronic Pellet Burner Controller NPBC-V3M

Laptop / PC Programming Manual

User Manual. Digi-Sense TC9600 Advanced Multiparameter Temperature Controller with Thermocouple, Thermistor, and RTD Inputs

OPERATING AND MAINTENANCE MANUAL

Davis Soil Moisture and Temperature Station Protocol

User manual for reversible heat pump

Operating Manual. for. SMD/BGA Rework System IR860

Operator s Manual Use and Care Instructions

CONTENTS Installation Precautions... 1 Chapter 1 Product Introduction... 2 Chapter 2 Technical Specifications... 3

Ref. 1067/024 Ref. 1067/032A Ref. 1067/052A

IMPORTANT. PLEASE NOTE: The infrared beam path MUST be kept clear of obstructions at all times!

Generator Control Unit, GCU 100 Push-buttons LEDs Display and menu structure Display readings Alarm handling and log list

MSA / MSA19.710

QA16 Addressable System

User Operation Manual

Figure 1-1 Furnace Front Elevation

Instruction Manual for Electric Ovens OO757X OO986X

THX-DL Data Logger USER & INSTALLATION MANUAL V

RC-90 / RC-90B Single Stage Heat/Cool Thermostat for Zone Control Systems Installation Instructions

QuadraTouch Pro Software Manual Dryer Control System

Advisor Advanced Mobile Application User Manual

SmartVent. Digital Controller User Guide Manual. NZ s Home Ventilation Specialists

6100 SINGLE LOOP DIGITAL ADDRESSABLE FIRE ALARM CONTROL PANEL

RC-112 Two Speed Heat Pump 3 Stage Heat / 2 Stage Cool With Energy Efficient Control

AOYUE SP Environment Friendly Hot Plate System INSTRUCTION MANUAL

SmartVent. Keypad Controller User Guide Manual. NZ s Home Ventilation Specialists

AJA THERMAL EVAPOTOR STANDARD OPERATING PROCEDURE

SOP FOR FEP CENTURA TOOL

Glovebox Usage Manual v1.4. When you enter the lab walk straight to the log book. Enter all information including N2 and O2/H2O levels.

ZERIO PLUS EDA-Z5008, Z5020 & Z5100

Operating Instructions High-spec Wired Remote Controller

Skyport Wi-Fi Installation for the ColorTouch in 5 Easy Steps

NexSysLink. 2 CAN Display Operation Manual. CAN Instruments Product Family

USER S MANUAL. Wired Remote Controller MWR-WS00. System Air Conditioner ESPAÑOL FRANÇAIS ITALIANO PORTUGUÊS DEUTSCH EΛΛHNIKA RUSSIAN

ATS UV Monitor Operations Manual

Operating manual. Wascator FOM71 CLS

RC-122BZ Two Stage Heat/Cool 2 Stage Heat / 2 Stage Cool Thermostat Installation Instructions

Conical Fermenter. Instructions

TABLE OF CONTENTS. 1. Introduction Machine Set-Up Checklist...

High-Efficiency Front-Load Washer

UV Lamp and Quartz Sleeve Replacement/Maintenance

Cleaning the internal optics surfaces

Hydro-Pnuematic Tank Contoller. HTC200 and 300 Series. User Manual

DEIF A/S. Operator s Manual. Basic Gen-set Controller. Display readings. Push-button functions. Alarm handling. Log list C (UK)

AIR CONDITIONER OPERATING MANUAL. Duct type. Indoor Unit ARTG45LDTA ARTG54LDTA ARTG60LDTA KEEP THIS MANUAL FOR FUTURE REFERENCE. PART No.

Tempered Water Logic Control OPERATION l TROUBLE SHOOTING

USER S MANUAL. Bottom-Load Water Cooler MODEL NO. CLBL420

Operation Manual Fighter ProVision Software. Version: 0.0 Revision: 1

Transcription:

Standard Operating Manual RTP-600S Rapid Thermal Processing System Version 1.2 Page 1 of 11

Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Process Temperatures, Time and Process Gases Available 2.3 Wafer Size 3. Contact List and How to Become a Qualified User 3.1 Emergency Responses and Communications 3.2 Training to Become a Qualified User 4. Operating Procedures 4.1 System Description 4.2 Important Cautions 4.3 Power Up Procedure 4.4 Wafer Loading 4.5 Start Annealing 4.6 Cooling and Unloading 4.7 Power down Procedure Version 1.2 Page 2 of 11

1. Picture and Location Fig. 1: RTP-600S is located at NFF Phase II Room 2240 2. Process Capabilities 2.1 Cleanliness Standard RTP-600S is Clean equipment for rapid thermal annealing. 2.2 Process Temperatures, Time and Process Gases Available 700 to 1150 Process gases available: N2, O2, Ar Maximum allowable steady time (Suppose temperature ramp up/down rates are not less than 45 /s): 2min Version 1.2 Page 3 of 11

2.3 Wafer Size The maximum wafer size is 4 inch in diameter, 1mm thick. 3. Contact List and How to Become a User 3.1 Emergency Responses and Communications Safety Officer: Mr. Wing Leong CHUNG 2358-7211 & 64406238 Deputy Safety Officer: Mr. Man Wai LEE 2358-7900 & 9621-7708 NFF Phase 2 Technicians: Mr. Li Ho,Mr. Chan Tai Shing, Mr. Chen Yi gong 2358 7896 Security Control Center: 2358-8999 (24hr) & 2358-6565 (24hr) 3.2 Training to Become a Qualified User Please follow the procedure below to become a qualified user of the RTP-600S. 1. Read all materials on the NFF website concerning the RTP-600S. 2. To register RTP-600S operation training, logon to NFF Equipment Reservation System. Go to User Info page. Select Equipment Operation Training. Please follow the instructions on the web page. Version 1.2 Page 4 of 11

4. Operating Procedures 4.1 System Description The RTP-600S is rapid thermal processing (RTP) system, which uses high intensity visible radiation to heat single wafer for short process period of time at precisely controlled temperatures. The system consists of an oven unit with an integrated computer control system and software. The wafer to be processed is placed on a quartz tray that slides into a quartz isolation tube in the oven unit. Two banks of lamps, one above the quartz tube and one below it, provide the source of energy for heating the wafer. System Component Locations Fig. 2: System component locations Version 1.2 Page 5 of 11

Hazards The RTP-600S system presents certain hazards. These fail into the following categories: - Electrical shock hazards - Process gas hazards - Process byproduct hazards - Oxygen hazards - Thermal hazards Emergency Stop Procedure If an emergency condition is suspected, depress fully the Red Emergency Off (EMO) Button located on the system as shown in Fig. 2. 4.2 Important Cautions (1) If an equipment failure while being used, never try to fix the problem by yourself. Please contact NFF staff. (2) This is clean equipment. Clean your wafers in Wetstation A before the process. (3) Also make sure your wafer container and handling tweezers are clean. (4) Use tweezers to handle your samples. (5) Materials such as photoresist which cannot sustain high temperature are not allowed. Follow your process flow. Materials which are not mentioned in the process flow are NOT allowed to put into the RTP-600S. (6) The machine consists of quartz wares which are fragile. Be careful to avoid breaking them. (7) Please contact NFF staff for editing a new recipe. Version 1.2 Page 6 of 11

(8) Remember to fill in the Log Sheet. 4.3 Power up Procedure (1) To turn on the cooling water supply and return, use the suction cup lifter to securely attach to the cleanroom raised floor panel located near the back side of the machine. Lift the floor panel. Find there are two water ball valves labeled RTP-600S. Open BOTH of them by turning the handles a quarter of one turn anticlockwise (See Fig. 3 below for the correct opening positions of the handles). Fig 3.: Cooling water supply and return (2) Turn on the wall circuit breaker (labeled RTP 600S as shown in Fig. 4) Fig 4.: Wall circuit breaker for RTP-600S Version 1.2 Page 7 of 11

(3) Turn on the front panel key switch. (4) Press the EMO Reset button this turns the entire system on. Once the computer boots up, the system Main Menu should appear on the monitor screen. If it does not, check that the monitor is on. (5) Press the Power On button this enables the heating unit. (6) At the rear panel of the machine, visually inspect that the process gas exhaust connection is in position. Check that there is no restriction to the cabinet exhaust and there is proper air flow from the exhaust fan. Check also for possible water leaks at the cooling water inlet and outlet connections. 4.4 Wafer Loading Warning: The wafer will be VERY HOT after unloading from the heated chamber. Warning: The quartz tray, quartz chamber etc. must be allowed to cool down before they are serviced. Warning: Change a new pair of Latex gloves if touching of parts (eq. quartz tray) of the chamber is necessary. (1) Gently push up the handle of the chamber door to unlock the chamber door. Then gently pull out the chamber door. Beware that a delicate quartz tray is attached to the chamber door. (2) Check the quartz tray is clean and level. (3) Place the wafer directly on the middle of the tray. (4) Slowly push the chamber door back into the chamber (Look at the quartz tray and wafer during door closing to make sure they do not collide with the chamber or other parts of the machine. If so, stop and contact NFF staff. Gently push down Version 1.2 Page 8 of 11

the handle to lock the chamber door. 4.5 Start Annealing (1) Press [F5] from the Main Menu for recipes under Pyrometer Control. The Recipe Data File Directory Pyrometer Control Recipes Screen will appear. (2) Note that users are NOT allowed to create a new recipe. Follow your approved process flow. Contact NFF staff if a new recipe is needed. Warning: If an unwanted recipe is accidentally pressed [Enter] to start, you can abort the process by pressing [Esc]. (3) Use the [Up Arrow]/[Down Arrow] keys to highlight a recipe file. Press [F9] to enter the recipe edit screen. Check the steady time. Don t change any contents of the recipe other than the steady time. And don t set the steady time exceeding the maximum allowable steady time as stated in Section 2.2. Steady time of recipes with more than one ramp up/ramp down cycle is not allowed to be changed. (4) If change of steady time is not needed, go to step (6). (5) Use the arrow keys to move the blinking cursor to the field of steady (Hold) time at the Time column. Change the time required. Then press [F10] :Validate. A message Congratulations! Validation Success! Press any key go on. will appear at bottom of the screen. Press any key once. Then Press [F2] to save the recipe. Overwrite it? message will appear. Press [y]. (6) Press [Esc] back to the recipe screen. (7) Check the temperature of the machine casing is below 28. If not, wait unit it drops to 28 or below. Version 1.2 Page 9 of 11

(8) Check the required recipe is highlighted. To start the annealing process, press [Enter]. After initializing, the Process Run screen will appear. The Process Run screen shows the process data in real-time. All process parameters are displayed on the screen, both the recipe values and the actual measured values. (9) After the process has completed, the words Process Over will appear. Press [Esc] back to the Recipe Data File Directory Pyrometer Control Recipes Screen. If another annealing process is needed on the same wafer, go to Step (2) of Start Annealing. 4.6 Cooling and Unloading (1) Wait until the wafer is cooled to 400 or below. (2) Gently unlock the chamber door and pull it out. Warning: The wafer and the quartz tray will be VERY HOT after unloading from the heated chamber. (3) Remove the wafer. (4) Go to Step (2) of Wafer Loading for another run. (5) Slowly push the chamber door back into the chamber and lock it. 4.7 Power down Procedure (1) Check the temperature of the machine casing is below 28. If not, wait unit it drops to 28 or below. (2) Press the Power Off button. (3) Press [Esc] back to the Main Menu screen. Press [q] to exit the RTP-600S program. Version 1.2 Page 10 of 11

(4) Turn off the front panel key switch. (5) Switch off the wall circuit breaker (labeled RTP 600S ). (6) Turn off the cooling water supply and return. Reference: (1) Operation Manual by Modular Process Technology Corp. (2) Operation Manual by Allwin21 Corporation Version 1.2 Page 11 of 11