Daikin Blueprint: Delivering Hot Water with a Chiller

Similar documents
Update Dedicated Heat Recovery Chiller Technology. Don Frye. Gulf South

Energy Efficiency Through Waste Heat Recovery. Heat Recovery Centrifugal Chillers and Templifier Water Heaters

Appendix 13. Categories of Cooling and Heating systems

COMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems

Chiller Plant Design. Julian R. de Bullet President debullet Consulting

Vapor-Compression Refrigeration

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

Challenges and Methods of Estimating a Conceptual HVAC Design

ENGINEERING. Edition No. 13 October 2002

NET ENERGY WATER LOOPS A clear path to net zero energy buildings

Energy Recovery Ventilation

H O B O K E N R E S I D E N T I A L

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE

By Thomas H. Durkin, P.E., Member ASHRAE, and James B. (Burt) Rishel, P.E., Fellow/Life Member ASHRAE

Exploratory Lab Testing of a Residential-Scale Combined Space and Water Heating CO 2 Heat Pump

9/18/2017. Nicholas Thornton, CEM. Systems: HVAC, Electrical, and Technology. Overview. Today s Goals Introductions HVAC Electrical Technology Q&A

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline

1. Packaged Variable Air Volume (VAV) Rooftop Units (RTU) with Hot Water Reheat. 2. Geothermal Heat Pump VAV Rooftop Units with Hot Water Reheat

Summary Comparison of Simulation Program Features

Method to test HVAC equipment at part load conditions

HVAC Water chiller selection and optimisation of operation

GARCIA GALUSKA DESOUSA Consulting Engineers

High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

SYNOPSIS. Part-Load Control Strategies for Packaged Rooftop Units. In this issue... Bin Hour Profile Charlotte, NC

General HVAC Recommendations

b.) Technical Information:

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

Energy Savings Potential of Passive Chilled Beam System as a Retrofit Option for Commercial Buildings in Different Climates

Session: HVAC 101 HVAC 101. Steve Sain Sain Engineering Associates, Inc. August 9, Rhode Island Convention Center Providence, Rhode Island

Dehumidifying with Dedicated Outdoor Air

CTI Sponsored Educational Program

HONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING

Your Chiller Solution For Efficiency And Reliability. McQuay Dual Compressor Centrifugal Chillers 160 to 2500 Tons

Architectural Engineering Senior Thesis Mechanical System Redesign

A Technical Introduction to Cool Thermal Energy Storage Commercial Applications

Trailblazer air cooled scroll chillers

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS

Engineered for flexibility and performance

Application of Air Source Variable Refrigerant Flow in Cold Climates

SECTION I: EXISITNG SYSTEM AND PROPOSED SYSTEMS

PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM ENERGY EFFICIENT DEHUMIDIFICATION

DISTRIBUTION SYSTEMS. Water Piping and Pumps

AC SYSTEM CONFIGURATION- CENTRAL CHILLER PLANT

Designing Energy Efficient Outdoor Air Systems

Technical Assignment 3

TOTAL SYSTEM EFFICIENCY: SYSTEM APPLICATIONS & DESIGNS. David Grassl PE Mechanical Engineer Principal

Hot Water a Hot Commodity Better Buildings by Design, February 2012 Burlington, VT

Geothermal Heating and Cooling Using Ground Source Heat Pumps. Prepared by: Steven Forrester, P.E. Principal

Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1. Contextual Reminder

DIGI-VAV APPLICATIONS

Temperature. In the HVAC area, we talk about two kinds of temperatures.

Heat Pumps COMFORT NEED IT. When You

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

COMMERCIAL HVAC PACKAGED EQUIPMENT. Rooftop Units Level 1: Constant Volume

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer

Product Release Summary

DX Units. Ranging from 15 to 750 tons and 1,000 to 300,000+ CFM

COMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems

Air Conditioning Clinic. Absorption Water Chillers One of the Equipment Series TRG-TRC011-EN

EP SERIES PACKAGED ENERGY RECOVERY SYSTEM ENERGY EFFICIENT AIR COMFORT

Variable refrigerant flow (VRF) systems

terminal units only provide sensible cooling, a separate dehumidification system is usually needed.

NRP MULTIPURPOSE HEAT PUMPS 2 AND 4-PIPE SYSTEMS PLUS PRODUCTION OF DOMESTIC HOT WATER

Heat pump and energy recovery systems

2. CURRICULUM. Sl. No.

Small Commercial Business Energy Audits. Recognizing and addressing the special requirements of the small business market segment.

Redesign of Bennett Hall HVAC System

Technical Development Program. COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems PRESENTED BY: Ray Chow Sigler

THERMAL ICE STORAGE: Application & Design Guide

NON-REVERSING, 100% OUTSIDE AIR HEAT PUMP FOR HEATING AND COOLING

Existing Mechanical System Operation

Design Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE

Institute of Aeronautical Engineering (Autonomous) Dundigal, Hyderabad B.Tech (III II SEM) MECHANICAL ENGINEERING

HOW IT RELATES TO PERFORMANCE IN REFRIGERATED COMPRESSED AIR DRYERS

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.

VARIABLE HEAT RECOVERY IN DOUBLE BUNDLE ELECTRIC CHILLERS. Richard J Liesen 1, Rahul J Chillar 2 1 University of Illinois at Urbana Champaign

MECHANICAL SERVICES 101. Ian White

Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: ,

Green Maintenance Needed to Keep HVAC Systems Green

Hello, my name is Sarah Hilden and I am a Marketing Engineer in the C.D.S. group at Trane.

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee

Variable Refrigeration Flow Systems Overview 10/11/2016

Maverick II Commercial Rooftop Systems 15 to 75 tons

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN

Single Zone System. One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return

CHAPTER 4. HVAC DELIVERY SYSTEMS

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503

HVAC 101. H V A C S y s t e m s

Daikin VRV Systems Plugin VE2012 User Guide

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

Daikin VRV Sizing & Simulation Plug-in User Guide

Evaluation. ems. Prepared By: Martha. a s Vineyard. Box P.O. Box June 2015

To Keep Docs Cool, Dry and Happy

Versa- Hydro. up to 96% Efficient

Description of All Alternatives Considered-

Element Z General Design Requirements Existing Facilities Information

ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards

Transcription:

Daikin Blueprint: Delivering Hot Water with a Chiller Analyzing the design of heat recovery on air-cooled chillers and the effect it has on building energy consumption By Paul Crisman Daikin Chiller Applications Engineer, Daikin Applied Americas. Chillers are considered primarily as a cold water provider. With today s technology, they are also capable of heat recovery. Given HVAC equipment s substantial contribution to a building s total energy consumption, heat recovery (HR) offers an appealing way to reduce energy use. ASHRAE standard 90.1 may require HR in certain applications. Combining HR with the Daikin Trailblazer, the industry s most efficient scroll chiller available on the market today, gives you unprecedented efficiency capability. This Daikin Blueprint explains how chillers can add HR with desuperheaters to reclaim normally rejected energy, and reduce hot water loads for process or comfort cooling applications. 2018 Daikin Applied 1

CONTENTS 1 2 3 4 5 Understanding Heat Recovery Heat Recovery Design Heat Recovery Operation Typical Applications Energy Considerations 6 Summary 2 2018 Daikin Applied

1 Understanding Heat Recovery HR involves harvesting energy normally discarded during heating and cooling processes from air or water mediums. For air-side equipment (rooftop units, air handlers, etc.), the selected approach is either an enthalpy wheel (top diagram, below) mounted inside the cabinet, or an energy recovery ventilator (bottom diagram), external to the rooftop unit or air handler, with the ducting run. Figure 1 below shows each of these designs. Figure 1: Heat Recovery Systems Enthalpy Wheel Exhaust Air Outdoor Air Energy Recovery Ventilator Sources Daikin Applied & Cold Climate Housing Research Center 2018 Daikin Applied 3

In each approach, the engineering concept is to extract the otherwise wasted energy (enthalpy) of exhaust air and use it to preheat cold outdoor air. These approaches must be used, at a minimum, to comply with ASHRAE 62.1. Unlike air systems with an enthalpy wheel directly inside the air handling unit, chiller heat recovery is more complex because it requires integration into the existing refrigeration circuits. This paper explains how chillers can reclaim normally rejected energy to help reduce hot water loads for process or comfort cooling applications. Since chillers are among the largest energy consuming devices in an HVAC system, many different avenues can be taken to reduce energy consumption, including: altering set points, maximizing control strategies, adding unit features such as variable frequency drives (VFDs), and HR. The two main chiller designs used today are air-cooled and water-cooled. Air-cooled chillers reject building load heat to the atmosphere via condenser fans. In contrast, water-cooled chillers reject heat to another water loop (condenser loop), which subsequently rejects the heat to the atmosphere by means of a cooling tower. There are pros and cons to each approach, but the selection often comes down to the size of a facility, available engineering and maintenance staff, and upfront costs. It is imperative to fully analyze the future facility operating profile and customer needs to take advantage of emerging technologies and efficiency improvements. For HR to be an appropriate application for a chiller, the building needs simultaneous heating or cooling demand. Since HR adds complexity to a project, the application should be analyzed in detail to ensure it is a good fit for the project in question. The following section explores applications that fit an HR profile. 4 2018 Daikin Applied

2 Heat Recovery Design Two HR heat exchangers (HX) are shown in Figure 2 below for different applications. Figure 2: Vapor compression cycle with different HR options installed. Vapor Compressor Vapor HX-1 Evaporator Condenser HX-2 Expansion Valve Liquid + Vapor Liquid HX-1 is used with air-cooled chillers and is commonly called a desuperheater. During HR mode, hot refrigerant gas leaves the compressor and enters the HX where the energy contained in the refrigerant gas is transferred to the incoming hot water loop serving the building. As a result, the refrigerant is pre-cooled prior to entering the condenser coil section, reducing fan energy and further improving energy efficiency. There are limitations to how much energy can be extracted from the refrigerant; the gas must not precondense prior to entering the condenser coils, or it will result in operational issues and lower efficiency. A desuperheater allows production of higher temperature water without raising the saturated condensing temperature of the condenser loop. Because of this, even though a desuperheater offers less capacity than a full HR condenser barrel, it can offer the water at a higher temperature without impacting the chiller s cooling efficiency. For water-cooled chillers, the design utilizes a special condenser barrel (HX-2) able to transfer heat to a separate water loop or reject heat to the normal condenser loop if HR is not needed. Next, we ll focus specifically on desuperheaters in air-cooled chiller applications. 2018 Daikin Applied 5

3 Heat Recovery Operation HR use in chillers requires additional design considerations, since greater infrastructure and controls are needed than with air-side recovery. Figure 3 below shows a standard piping layout for the hot water loop serving reheat VAV boxes, fan coil units, etc. The components shown are typical of most water loops and include: vibration eliminators, a strainer, and shut-off valves at the pump. Control of the HR loop is performed by the chiller controller to ensure the leaving water temperature does not encroach on the refrigerant temperature limits, inadvertently causing a pre-condensing event. As conditions change, the controller sends a signal (either a 0-10 DCV or 4-20 ma signal) to modulate the device selected by the engineer, which can be a three-way valve or VFD pump. Daikin s ability to control the three-way valve or pump from the unit controller helps simplify installation and ensure proper operation. Without this ability, additional sensors and control strategies would have to be added thus increasing costs and the probability of operation outside proper safety range values. The controller uses algorithms that rely on refrigerant pressures, outside air temperature, and other inputs to send the appropriate output signal for HR loop control. The engineer can determine which device is best by evaluating factors including equipment served, piping design, and capital costs. Figure 3: Heat Recovery Piping Schematic BACK END OF UNIT FIELD CONNECTIONS 5 THERMOMETER (USER OPTION) VIBRATION ELIMINATOR VIBRATION ELIMINATOR INLET WATER STRAINER TEE CONNECTION TEE CONNECTION & ELECTRONIC 3-WAY VALVE ARE NOT REQUIRED WHEN USING A VFD CONTROLLED WATER PUMP TERMINAL BOX FOR FIELD WIRING TO HEAT EXCHANGER FREEZE PROTECTION HEATERS MAIN HEATING SOURCE (BOILER) 1 ELECTRONIC 3-WAY VALVE HEAT RECOVERY HEAT LOAD 1 FIELD INSTALLED WATER PUMP SHUT OFF SHUT OFF NOTES: 1. A VFD CONTROLLED WATER PUMP OR AN ELECTRONIC 3-WAY VALVE IS REQUIRED FOR TEMPERATURE CONTROL. 2. FIELD INSTALLED 3-WAY VALVE OR WATER PUMP VFD TO BE CONTROLLED BY 0-10 DCV OR 4-20 ma OUTPUT FROM THE CHILLER UNIT CONTROLLER. 3. GALLONS OF WATER VOLUME FOR THE HEAT RECOVERY PIPING LOOP SHOULD EQUAL 2 TO 3 TIMES THE HEAT RECOVERY LOOP GPM FLOW RATE. 4. FOR POTABLE WATER USE - A SECONDARY HEAT EXCHANGER IN A SEPARATE LOOP IS REQUIRED. 5. WATER PIPING CONNECTIONS AT THE UNIT ARE 2.0" VICTAULIC. 6 2018 Daikin Applied

4 Typical Applications Building designs where HR can be used effectively vary depending on geographical location, load profile, etc. When applied correctly, HR can be an attractive option for increasing system efficiency and reducing energy consumption. Currently, not all projects will be a good fit for HR applications for the aforementioned variables, which is why it is imperative to review the building design to determine the viability of integrating HR. However, as greater focus to environmental influences and tightened energy efficiencies is adopted, HR will become commonplace in building designs and retrofits. Below is a list of typical facilities where HR should be considered during the initial design stage of the project: Hotels The hospitality industry is potentially the largest sector when it comes to using HR. The high demand for domestic hot water (DHW*), high utility rates (for remote locations), and other stints of simultaneous heating/cooling makes HR an effective option. Schools Educational buildings vary widely in design due to the large variations in space types (classrooms, labs, gymnasiums, etc.) and can sometimes require large amounts of DHW, lending itself a candidate for HR. Health Care Facilities The group can range from hospitals to medical office buildings, depending on the specific building tenants. These facilities use large quantities of energy for conditioning their space and in most cases require heating/cooling. Office Buildings (mostly larger facilities where heating and cooling are simultaneous) The physical size and geographical location will likely be the largest factors in whether or not HR should be considered for office buildings. For smaller buildings, normally there is only cooling or heating at any one time rather than simultaneous, especially if these buildings are located in more extreme climates such as Florida. * Note that for any use in domestic hot water systems a dual wall HX must be used to comply with building codes. 2018 Daikin Applied 7

5 Energy Considerations Energy savings play a large role when deciding whether or not to implement an HR application since HR requires additional capital investment. The typical relative increase in full load EER for various sized scroll compressor chillers when switching from a standard packaged unit to an HR unit is about 0.5 EER. This full load EER bump is due to the condenser fans running for fewer hours as the hot refrigerant vapor is pre-cooled by transferring heat to the hot water loop prior to entering the condenser coil. When comparing part load operation, the efficiency boost with HR is expected. However, at low loads there are relatively low efficiency gains as the condenser fan operation time has already been reduced in order to maintain head pressure. This means in addition to full load EER being increased, a chiller with HR would have an IPLV equal to or greater than a normal chiller without HR. Switching over to the hot water loop, the energy savings would be linked to the boiler(s) serving the reheat loop. A 100 ton air-cooled scroll chiller with HR can output ~417,600 BTU/hr into the hot water loop when fully loaded. Assuming the average boiler efficiency is 86%, the boilers would require some 485,600 BTU/hr of input energy in order to achieve the same value of output to the system. A system running natural gas at a cost of $1.34/therm (average price in Washington/Baltimore area for August 2017 according to U.S. Department of Labor Statistics) will produce a cost savings of $6.50 per hour on the boiler side while the chiller is running at full load. The chiller will see a reduction of 4.3 kw at full load, resulting in a cost savings of ~$0.50 per hour. This does not take into account any additional savings from demand billing. These cost savings quickly add up depending on the size of the system and the amount of time these systems operate. This example analysis calculates a simple payback of less than two years. Another area affected by installing an HR application is the hot water loop and associated pumps. By adding an additional heat exchanger and piping, there is an increased pressure drop that the pumping system needs to address. For the chiller HR example above, there was an additional 3.2 ft pressure drop for the HR HX, which does not include any additional piping losses accounted for in an application. If the chiller is going into an existing building as a replacement job, any existing pumps need to be checked to see if they can handle the additional head requirements. The energy losses associated with the increased head will vary from pump to pump based upon the efficiency curve, so a proper analysis needs to be performed. In our simulation, an increase of 0.10 kw was revealed. 8 2018 Daikin Applied

6 Summary Determining equipment selection and the necessary options for a specific job can be a daunting task given the amount of items to consider in today s marketplace. More emphasis is being placed on equipment and system efficiency than ever before, and adding HR to a project can provide potential energy savings for chillers and boilers. In some cases, HR can even help with downsizing heating equipment. One key step for HR application is to ensure that the building team (including design, operations, and owner) has evaluated adding the HR option to their chiller selection to determine the prospective energy and cost savings. The new discussion to have is, Do you want hot water with your chiller? Daikin Applied s diverse line of chiller products offer energy conscious solutions for a variety of designs and building uses, including heat recovery. Trailblazer air-cooled scroll chillers are available with optional desuperheater heat recovery technology, raising performance to new levels of efficiency and comfort. To learn more about the Trailblazer and other revolutionary Daikin chiller technologies, contact your local Daikin Applied Representative (http://www.daikinapplied.com/sales.php) or visit http://www.daikinapplied. com/chiller-trailblazer-air-cooled-scroll.php. 2018 Daikin Applied 9