Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

Similar documents
1.1 This section applies to air handling units for HVAC Systems.

University of Delaware

A. Section includes Factory Packaged, Modular units, providing cooling and heating for air distribution systems.

UNIVERSITY OF MISSOURI Central Station Air-Handling Units March

SECTION AIR HANDLING UNIT

AIR HANDLING UNITS Vibration Isolation Air Filtration Equipment Ductwork.

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise Modular Climate Changer Full Spec. Prepared by: Phone Number: Prepared for:

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

A. Air Handling Units shall be designed to the specific requirements of the application: Recirculation or 100% Makeup.

Construction Standards Page Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

A. This Section includes air-handling units with coils for indoor installations.

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

A. Codes and Standards that are Standard at the University:

AIR HANDLER SPECIFICATION

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

SECTION AIR HANDLING UNITS WITH COILS. 1. Central Station Air Handling Units. 1. Section Basic Mechanical Requirements.

SECTION CUSTOM INDOOR CENTRAL-STATION AIR-HANDLING UNITS For large systems, 50,000 cfm or more.

UNIVERSITY OF ROCHESTER DESIGN STANDARDS NOVEMBER 1, 2013

Complete HVAC Capability. Central Station Air Handling Units. Publication No. WT-CSX-0616A

SECTION AIR COILS

High Plume Blowers Suggested Specification Section (Master Format 1996) Suggested Specification Section (Master Format 2004)

SECTION FAN COIL UNITS

A. American National Standards Institute (ANSI) : Establishes requirements applicable to certifying direct gas-fired heaters.

SECTION (15833) - HVAC POWER VENTILATORS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION EXHAUST FANS

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

DIVISION 15 MECHANICAL

A. General: Refer to paragraph entitled "SUBMITTAL" in Section Include the following data:

SECTION AIR-COOLED SPLIT SYSTEM AIR CONDITIONING UNITS

A. Section Common Motor Requirements for HVAC Equipment: Fan motors.

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS - CUSTOM

Copyright 2003 and 2005 by The American Institute of Architects (AIA) Modified by MSU Physical Plant / Engineering and Architectural Services

Bulletin C6200 MAY Buffalo. Big Buffalo. Air Handling. Custom Applications

Advance Release September 2009

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

SECTION DIRECT GAS-FIRED INDUSTRIAL HEATING AND VENTILATING UNITS

City of Duluth Festival Center 04/25

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

Internal ridged board 1" x 1.5 foil face installation shall be installed on roof, walls and base of casing.

Direct Fired Heater Model AD Specification

SECTION WATER-SOURCE UNITARY HEAT PUMPS

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

TECHNICAL GUIDE SPLIT-SYSTEM AIR-COOLED EVAPORATOR BLOWER 25, 30, 40 & 50 TON LA300, LB360, 480 & 600 (50 Hz) PROVEN PERFORMANCE GENERAL FEATURING

SECTION AIR COILS

SECTION CONVECTION HEATING AND COOLING UNITS

Turning Air Into Solutions. TUBEAXIAL PAINT SPRAY BOOTH EXHAUST FANS. Model TCBS

A. Section includes split-system air-conditioning units consisting of separate evaporator-fan and compressor-condenser components.

SPLIT-SYSTEM EVAPORATOR BLOWERS K2EU060, K4EU090, K3EU120 & K1EU180 5 Thru 15 Nominal Tons DESCRIPTION ACCESSORIES FIELD INSTALLED

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

SECTION CENTRAL HVAC EQUIPMENT

Propeller Fans. Industrial And Commercial Fans Belt And Direct Drive. Your Clean Air Source!

Rosemex Products 96 VENTILATION CLIMATAIR COMPARTMENT AIR HANDLING UNITS

SECTION COMPUTER ROOM AIR CONDITIONING SYSTEMS

MIN. CCT. QTY RLA LRA HP FLA AMPACITY /1/ /3/

Stanford University Facilities Design Guidelines SECTION DECENTRALIZED UNITARY HVAC EQUIPMENT

Centeral Station Air Handling Unit

SECTION AXIAL FANS

AIR HANDLING. B. Section Building Automation and Control System Guidelines. C. Section Air Cleaning Devices and Filters

CS 2. Central Station Air Handlers Double Wall & Single Wall Installation, Operation & Maintenance Manual. Form No. 6120A

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

SECTION AIR DUCT ACCESSORIES

HVAC REPAIR/REPLACEMENT 07/18/12 SECTION HVAC - MAJOR EQUIPMENT

Modular Supply Make-Up Air Unit

SECTION AIR COOLED WATER CHILLERS

SECTION ROOFTOP REPLACEMENT AIR UNITS

KAP Horizontal Product Coolers

AIR HANDLERS. Central Station (CS3) Roof Mounted (RT) (Modular AL Frame AHU)

DSV Model Air Cooled Self Contained Indoor Packaged Units 3-5 Tons Preliminary Application Data

SECTION CUSTOM FAN WALL AIR HANDLING UNITS

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

SPLIT-SYSTEM EVAPORATOR BLOWER DESCRIPTION FEATURES L4EU NOMINAL TONS

CHAMPION SPLIT-SYSTEM EVAPORATOR BLOWER DESCRIPTION FEATURES L2EU NOMINAL TONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION ROTARY-SCREW WATER CHILLERS

1.03 RELATED SECTIONS: The following sections contain requirements that relate to this section.

CxA to Answer this Section

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise T-Series AHU Full Spec. Prepared by: Phone Number: Prepared for: Acceptable Manufacturers

RTU. Roof Top Units 8 30 Ton. Maxi-Kool.

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

DIVISION 23 - HVAC HVAC Air Distribution

3.0 Factory packaged or modular constructed AHUs, when approved for use, shall conform to the following criteria:

JCseries EVAPORATIVE CONDENSER. engineering data

TYPICAL CPA SPECIFICATIONS

A. Section includes factory-packaged units capable of supplying up to 100 percent outdoor air and providing cooling and heating.

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems

Product Data. Features/Benefits. OMNIZONE 50BV Remote Air-Cooled and Water-Cooled Indoor Self-Contained Systems and Water Source Heat Pumps

Bulletin FH05 FUME EXHAUST

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - "Systems and Equipment.

Technical Guide DESCRIPTION CHAMPION SPLIT-SYSTEM EVAPORATOR BLOWER L4EU240A 20 NOMINAL TONS (WORLD 50 HZ) FEATURES XTG-A-0307

VIFB Coil Technical Guide

Construction Standards Page

Transcription:

SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett Electric Company Rebate Program B. Section 03 30 00 - Cast-In-Place Concrete: Execution requirements for housekeeping pads specified by this section. C. Section 23 00 10 HVAC Design Criteria. D. Section 23 05 29 - Hangers and Supports: Execution requirements for supports specified by this section. E. Section 23 05 48 - Mechanical Sound, Vibration, and Seismic Control: Product requirements for vibration isolators for placement by this section. F. Section 23 07 16 - Mechanical Insulation: Product requirements for insulation for placement by this section. G. Section 23 20 00 - Piping Specialties: Product requirements for meters, gages and steam traps for placement by this section. H. Section 23 20 00 - Heating and Cooling Piping: Product requirements for piping connections to air handling units. I. Division 23 - Humidity Control Equipment: Product requirements for humidifiers and dehumidifiers for placement by this section. J. Division 23 - Duct Accessories: Product requirements for flexible duct connections for placement by this section. K. Section 23 09 00 - Direct Digital Controls: Controls remote from unit. L. Division 23 - Pneumatic Controls: Product requirements for pneumatic controls to interface with air handling units. 1 23 70 00-1 of 8 Air Handling Units

M. Section 23 09 00 - Sequence of Operation: Sequences of operation applying to units in this section. N. Section 26 05 31 - Wiring Connections: Execution requirements for electric connections specified by this section. O. Section 26 05 90 - Motors: Product requirements for electric motors for placement by this section. P. Division 26 - Variable Frequency Controllers: Variable frequency controllers. 1.3 Show Manufacturer s recommended service clearances and pull clearances as shaded areas on mechanical plans. 1.4 Provide complete unit information in project schedule. Include all applicable information from example below. AIR HANDLING UNITS Drawing Code AHU-1 AHU-2 AHU-3 [Basis of Design Manufacturer & Model] Fan capacity Air flow External static Pressure Motor power Heating coil Capacity Max. Face Velocity Fin spacing Rows Entering Air Temperature Leaving Air Temperature Entering Water Temperature Leaving Water Temperature Water Pressure Drop ***** (OR) ***** Steam Capacity Entering Steam Pressure Cooling Coil Capacity Max. Face Velocity Fin spacing Rows Entering Air Temperature 23 70 00-2 of 8 Air Handling Units

Dry Bulb Wet Bulb Leaving Air Temperature Dry Bulb Wet Bulb Water flow Rate Entering Water Temperature Leaving Water Temperature Pressure Drop ***** (OR) ***** Saturated Suction Temperature Max. Face velocity Fin spacing Rows Humidifier Select appropriate capacity information based on humidifier type. Evaporation Capacity Coil water temperature Coil steam temperature Electrical heat input Air Pressure Drop Minimum Saturation Efficiency Steam Flow Rate Entering Steam Pressure Sound Power Fan Discharge 1st Octave 2nd Octave 3rd Octave 4th Octave 5th Octave 6th Octave 7th Octave 8th Octave Casing Radiated 1st Octave 2nd Octave 3rd Octave 4th Octave 5th Octave 6th Octave 7th Octave 8th Octave 23 70 00-3 of 8 Air Handling Units

PART 2. PRODUCTS 2.1 CASING 2.2 FANS A. Channel base of welded steel. Assemble sections with gaskets and bolts. B. Casing: 1. Galvanized Steel: All housings shall be double wall, insulated type. 2. Insulation: No exposed insulation in air stream. Insulation shall be adequate to prevent condensation. 3. Floor Plate: a) Casing pans shall be braced to support internal equipment components without sagging or pulsating. Floor shall be painted with rust-inhibiting primer and exterior enamel. Provide drains extending through sides of unit base. 4. Finish: Rust inhibiting primer and exterior enamel as a minimum. 5. Condensate Drain Pans: a) Provide IAQ type condensate drain pan. Insulated stainless steel drain pan shall extend beyond cooling coil section as required to catch blow-by. Pan shall be minimum 20 gauge stainless steel continuously welded to form watertight basin, with insulation. Condensate drain pipe shall be either bottom connected or, if side connected, with bottom of nipple flush with bottom of pan. A. Backward inclined fans are preferred; where unavailable in smaller sizes forward curved centrifugal type is acceptable. All fans to be statically and dynamically balanced, and resiliently mounted. B. Performance ratings per ANSI/AMCA Standard 210 Laboratory methods of Testing Fans for Aerodynamic Performance Rating. C. Sound ratings per AMCA Standard 301 Methods for Calculating Fan Sound Ratings from Laboratory Test Data. D. Internal Mounting: Locate fan and motor internally on welded steel base coated with corrosion resistant paint. Factory mount motor on slide rails. Furnish access to motor, drive, and bearings through removable casing panels or hinged access doors. Mount base on vibration isolators. 23 70 00-4 of 8 Air Handling Units

E. External Mounting: Locate motor, drive, and belt guard on integral casing framework on exterior of casing. Mount casing on vibration isolators. F. Fan Modulation: Variable Frequency Drive. Refer to Division 26. G. Provide flexible connection to separate unit from connecting ductwork. 2.3 BEARINGS AND DRIVES A. Bearings: Self-aligning, grease lubricated, ball bearings with lubrication fittings extended to exterior of casing with copper tube and grease fitting rigidly attached to casing. Grease to be compatible with Brown Trades grease product used for preventive maintenance. Minimum rated ABMA 9 L 50 bearing life to be: 1. 100,000 hours under 1,800 cfm 2. 200,000 hours 1,800 cfm and above B. Shafts: Solid, hot rolled steel, ground and polished, with key-way, and protectively coated with lubricating oil. C. Fan Drive: Sheaves to be dynamically balanced, bored to fit shafts, and keyed. Provide adjustable pitch motor sheave to obtain required rpm with sheaves set at mid-position as recommended by manufacturer. On systems 4,000 cfm and over, replace adjustable sheaves with fixed sheaves of size determined during TAB to provide design airflow rate. Provide matched V-belts, with drive rated minimum 1.5 times nameplate rating of motor. D. Fan motor: Three phase for motors 1/2 horsepower and larger, NEMA design B, continuously rated at 40 degrees C, high efficiency, with integral overload protection where available, and permanently lubricated bearings rated ABMA 9 L 50 100,000 hours as a minimum. 1. Motors to be totally enclosed. Open drip-proof motor acceptable only where totally enclosed motor is not available as standard from manufacturer. Provide explosion proof motor where required by application. E. Belt Guard: Fabricate to SMACNA standard. F. Variable Frequency Drive: 1. Required for units serving VAV distribution systems over 4000 cfm. 2. Furnished for supply fan, and return fan where provided. 3. See Sections 23 09 00 and 23 09 03 - HVAC BAS Systems. 23 70 00-5 of 8 Air Handling Units

2.4 COILS 4. Control from duct static pressure by unit-mounted controller. Static pressure sensed by duct-mounted sensor(s). Engineer to determine and show sensor location on mechanical plan. 5. Furnish field adjustable duct high limit safety control to protect ductwork from excessive duct pressure. A. General Selection Criteria: Coils shall be selected for 400 fpm face velocity. Coils shall not be more than four row. Coils with more than 10 fins per inch shall not be deeper than three row. Provide additional coils or coil sections as required. B. Freeze Protection: Cooling coils shall have non-trapping circuits to facilitate seasonal drainage. In research buildings, provisions to eliminate need for drainage shall be made. Steam preheat coils shall be freeze proof type tube in tube. C. Casing: Provide access to both sides of coils. Enclose coils with headers and return bends fully contained within casing. Slide coils into casing through removable end panel with blank off sheets and sealing collars at connection penetrations. D. Water Coils: 1. Certify capacities, pressure drops, and selection procedures in accordance with ARI 410. 2. Tubes: Minimum 1/2-inch OD seamless copper expanded into fins, brazed joints. 3. Fins: Aluminum. 4. Casing: Die formed channel frame of galvanized steel. 5. Headers: Cast iron, seamless copper tube, or prime coated steel pipe with brazed joints. 6. Configuration: Drainable, with threaded plugs for drain and vent. E. Steam Heating Coil: 1) Use only where medium temperature hot water is not available. 2) Headers: Cast iron with tubes expanded into header, seamless copper tube with silver brazed joints, or prime coated steel pipe with brazed joints. 3) Configuration: Drainable, with threaded plugs for drain and vent, threaded plugs in return bends and in headers opposite each tube, sloped within frame to condensate connection. F. Refrigerant Coils: 1) Thermostatic expansion valves required. 23 70 00-6 of 8 Air Handling Units

2) Headers: Seamless copper tubes with silver brazed joints. 3) Liquid Distributors: Brass or copper venturi distributor with seamless copper distributor tubes. 4) Configuration: Down feed with bottom suction. G. Electric Coils: 1. Not allowed, except with written permission of Brown Project Manager. 1) Where exception is permitted: a) Coil: Enclosed copper tube, aluminum finned element. b) Controls: built-in SCR controller furnished under this Division. 2.5 HUMIDIFIERS A. Humidifier shall be located in straight runs of duct, three duct widths before change in duct direction or reduction in duct size. Provide humidification in supply trunk if unit location does not permit three duct widths before first change in duct direction. B. Steam Grid Humidifier: See Steam Humidifier Section. 2.6 FILTERS A. See Section 23 00 10 HVAC Design Criteria. 2.7 DAMPERS A. Mixing Boxes: Section with factory mounted outside and return air dampers of galvanized steel with vinyl bulb edging and edge seals in galvanized frame, with galvanized steel axles in self-lubricating brass bearings, in parallel blade arrangement with damper blades positioned across short air opening dimension. Furnish removable, full width support for freeze-protection thermostat, with removable end panel to permit support removal. B. Damper Leakage: Maximum 2 percent at 4-inch wg differential pressure when sized for 2000 fpm face velocity. C. Damper Actuators: Furnish factory installed electric damper actuators for outside air, return air, and exhaust air dampers, face and bypass dampers. Actuators shall be external to unit housing, rated for minimum 100,000 cycles. 2.8 ECONOMIZER 23 70 00-7 of 8 Air Handling Units

A. Furnish fully modulating economizer from 0 to 100 percent outside air with adjustable minimum position control and spring return motor for outside air damper closure during unit shutdown or power interruption. PART 3. EXECUTION 3.1 INSTALLATION A. Install flexible connections between unit and inlet and discharge ductwork. Install metal bands of connectors parallel with minimum 1 inch flex between ductwork and fan while running. Refer to Division 23. B. Install vibration isolators. Install isolated fans with resilient mountings and flexible electrical leads. Install restraining snubbers as required. Adjust snubbers to prevent tension in flexible connectors when fan is operating. Refer to Section 23 05 48 - Mechanical Sound, Vibration, And Seismic Control. C. Install floor mounted units on concrete housekeeping pads at least 4 inches high and 6 inches wider than unit. Refer to Section 03 30 00 Cast In Place Concrete. D. Refrigerant Coils: Install sight glass in liquid line within 12 inches of coil. E. Insulate coil headers located outside airflow. Refer to Section 23 07 19 Mechanical Piping Insulation. F. Installation Hot Water Heating Coil: 1) Make connections to coils with unions or flanges. 2) Connect water supply to leaving airside of coil (counter flow arrangement). 3) Locate water supply at bottom of supply header and return water connection at top. 4) Install water coils to allow draining and install drain connection at low points. END OF SECTION 23 70 00-8 of 8 Air Handling Units