Neighborhood Conservation (NC) Program CONCEPT DESIGN REVIEW MEETING NOTES

Similar documents
WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

SITE PLAN REVIEW PROCESS

Rezoning Petition Zoning Committee Recommendation August 1, 2017

February 17, Sara Ullman Planner I. Sincerley,

Cottage Grove Road Reconstruction. City of Madison Engineering

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015

SITE PLAN SUBMISSION AND APPROVAL GUIDELINES

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT. TO: Parking and Public Improvements Commission

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS

PRELIMINARY CONDITIONAL USE SUBMITTAL CHECKLIST REQUIREMENTS

DESIGN PUBLIC HEARING APRIL 24, 2018 MUNICIPAL OFFICE BUILDING HARDWICK, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

Chain Bridge Road Sidewalk Improvements Citizen Council Work Session

September 28, 2017 Wentworth Avenue (CR 8) Sidewalk Improvements Open House

Project phasing plan (if applicable) 12 copies of site plan

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

PLANNING COMMISSION Work Session Meeting Agenda

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

Major Development Plan

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

SECTION 4(f) DE MINIMIS DOCUMENTATION

CITY OF NORWALK ZONING COMMITTEE. November 13, 2012

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

CITY COUNCIL STAFF REPORT

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

November 2, 2015 at 5:15pm City Council Chambers, 3rd Floor, City Hall, 1737 Main Street Columbia, South Carolina 29201

CITY OF BIDDEFORD PLANNING DEPARTMENT PLANNING BOARD REPORT. Larry Patoine, Chair & Members of the Biddeford Planning Board

The petition proposes the development of five townhomes on a vacant parcel between Charlotte Latin School and Providence Presbyterian Church.

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm

DRIVEWAY APRON REPLACEMENT WITH STREET RECONSTRUCTION

December 1, 2014 (revised) Preliminary Report -- Thomas Jefferson Site Evaluation

Charles P. Johnson and Associates. Annapolis Landscape Architects

ARTICLE 17 SITE PLAN REVIEW

November 21, Planning Commission Charter Township of Lyon Grand River Ave. New Hudson, MI 48165

Planning Commission Staff Report June 5, 2008

The Arlington County Park and Recreation Commission and Department of Parks, Recreation and Cultural Resources. PEG APPLICATION FORM Fiscal Year 2012

VILLAGE OF SPRING LAKE PLANNING COMMISSION. MINUTES REGULAR MEETING April 28, :00 PM

(APN: );

III - design standards

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

Capital Projects impacting Odenton Town Center

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08)

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

APPLICATION FORM SITE PLAN REVIEW REGULATIONS TOWN OF CONWAY, NH

City Development Department 9500 Civic Center Drive Thornton, Colorado FAX

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

CHAPTER BEAUTIFICATION AND LANDSCAPE MANAGEMENT

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Ref: March 21, Ms. Jody Kablack Director of Planning and Community Development Town of Sudbury 278 Old Sudbury Road Sudbury, MA 01776

The City of Boynton Beach

Fall 2017 Construction Update

NOTICE TO INTERESTED PARTIES OF COMMUNITY MEETING

RECEIVE AN UPDATE ON THE ALMOND GROVE PHASE II PROJECT

Responses to Dustin s Completeness Review: Application and Plan Requirements

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT. Single Family Residential, Townhomes

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)

BUSINESS OF THE PLANNING COMMISSION OF THE CITY OF HALF MOON BAY AGENDA REPORT

APPENDIX G: TOWN ORDINANCE REVIEW

Speedway Mall Project Frequently Asked Questions

PROJECT SHOWING MINUTES

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

DESIGN SCENE SUBJECT INDEX

CND Committee Meeting April 10, 2018

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Planned Washington Boulevard Bus Stop Improvements

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

Public Information Report

TOWN OF BETHLEHEM MEETING SUMMARY LOCAL WATERFRONT REVITALIZATION PROGRAM UPDATE

GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

Subdivision Staff Report

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

DIVISION 32 EXTERIOR IMPROVEMENTS

I-84 Karcher Interchange to Franklin Blvd Interchange Summary of Community Workshop #1 December 13, 2017

Statement of Intent Proposed Development Five Forks Athletics Scuffletown Rd, Greenville SC

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area

Revocable Street Privilege

DESIGN CRITERIA PACKAGE

Major Development Order Approval Process. Introduction. In This Handout. Pre-Application Meeting. Meetings

ARLINGTON COUNTY, VIRGINIA

MINUTES FROM THE SEVENTH MEETING OF THE MAIN STREET MARKHAM COMMITTEE IN City of Markham Canada Room - Civic Centre. September 17, 2014

DESIGN REVIEW COMMITTEE AGENDA ITEM

CRESCENT RESOURCES INC.

University Park Subdivision Street Assessment Report

MAJOR SITE PLAN APPLICATION COVER SHEET

26/Old Dominion Task Force

STANDARD DETAILS QUICK REFERENCE

Citizen s Advisory Committee

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

VEHICULAR AND PEDESTRIAN CIRCULATION

ARLINGTON COUNTY, VIRGINIA

I.T.S. PLAN ALONG I-95 INSTALL FIBER OPTIC LINE PROJECT SHOWING Tuesday, June 18, 2013, 1:30pm Ashland Residency Conference Room

Glenn Highway MP DSR. Landscape Narrative

Transcription:

Neighborhood Conservation (NC) Program CONCEPT DESIGN REVIEW MEETING NOTES PROJECT NAME: PROJECT #: DATE: TO: FROM: 13 th St N Z098 April 8, 2015 (Meeting date March 26 th at 7:00pm) Arlington County Conference Room 710A Residents along 13 th St N, N. Kirkwood Rd & N. Johnson St/N. Jackson St Carlos Stern, Block Representative Shelly Snook, NC Representative Angela Marshall, Neighborhood Conservation Planner/Project Manager MEETING GOAL: Present concept plan to property owners in preparation for NC s Spring 2015 funding round. ATTENDANCE: County Staff: Tim McIntosh, NC Coordinator Angela Marshall, NC Planner/Project Manager Valeria Shepeleva, DES Engineer Matthew Trout, DES Engineering Supervisor Jill Yutan, Landscape Architect Anne Guillette, DES Bio-retention Planner Residents & LVCA Residents: NAME ADDRESS PHONE AND/OR EMAIL 1 V. Price 1406 N. Johnson St 2 Carlos Stern 1406 N. Johnson St carlosstern@verizon.net 3 John Huerta 3301 13 th St N keena1st@hotmail.com 4 Amber Kwasniewski 3301 13 th St N amberkwasniewski@gmail.com 5 Edwin Hall 1126 N. Johnson St Edwin.hall@comcast.net 6 Rhea Neville 1126 N. Johnson St teresa.neville@comcast.net 7 Shellty Snook 1414 N. Hudson St sheldonsnook@gmail.com 8 Kathy & David Haines 1202 N. Jackson St ddh.kbh@gmail.com 9 Tom Herman 1207 N. Johnson St mhherman@gmail.com 10 Saloman Gomez 1210 N. Johnson St sgab7@verizon.net 11 Kara Moran 1410 N. Johnson St kara.d.moran@gmail.com 12 John Lutostanski Bowman Consulting johnl@bowmancg.com Page 1 of 5

DESCRIPTION OF PROPOSED DESIGN: Pedestrian safety and street improvement project is proposed to include curb, gutter and a 4-ft wide sidewalk on the south side of 13 th St N from N. Kirkwood Rd to N. Johnson St, extending up to property at 1210 N. Johnson St, curb and gutter only on the north side of 13 th St N., and a 4-inch mountable header curbs at the back of properties at 1302 and 1306 N. Jackson St, including possible retaining walls at properties 1301, 3301, 3316 and 1221. Improvements will include ADA compliant pedestrian ramps and driveway apron upgrades. A 6-ft wide pedestrian sidewalk refuge in the south side median on N. Kirkwood Rd and 13 th St N, including a potential bio-retention in the median, ramp upgrade at the southwest corner of 13 th St N and N. Kirkwood Road. A drainage analysis will be performed during the final design and storm sewer structures and mains may be added accordingly. Full depth roadway replacement may occur as needed throughout the project limits and as determined through the detailed design. Milling and paving of the roadway will be completed where needed in all other areas within the project limits. Due to the topography of 13 th St N and the limited right of way, signs warning about Narrow Street ahead will be designated at 13 th St N and N. Kirkwood Rd, N. Johnson St and 13 th St N and at 13 th St N and on the SE corner of N. Johnson St. Parking on either side of 13 th St N. will not be permitted. BACKGROUND INFORMATION: 13 th St N has a long history Prior to 2003, N. Johnson St and 13 th St N have moved through various petitioning efforts and failed or did not have all required elements included to qualify and move forward for funding. Pass design iterations failed due to property owners not wanting to provide permanent easements and/or owners were not reachable, etc. Carlos Stern, who lives at 1406 N. Johnson St has been the neighborhood block representative and a strong advocate for sidewalks on 13 th St N for over 20 years. Currently, the roadway is in poor condition and is in need of major reconstruction. The roadway is also somewhat dangerous as it curves between Kirkwood Road and Johnson St and has a change in elevation. This is the third submission of 13 th St N as LVCA first priority NC project. MEETING NOTES: The meeting began with a welcome and overview by Angela Marshall, NC Planner/Project Manager at which time introductions of County Staff and attendees were made. Carlos Stern, volunteer block representative provided the history of 13 th St N and why and when the project got started. This was the first concept design review meeting for residents of 13 th St N. However, only three property owners attended the meeting. Most of the attendees were LVCA residents that are not directly affected. Shelly Snook, NC Representative for LVCA was present and he provided some history as well and indicated that 13 th St N has been on the CA radii for funding for quite some time. The concept design was then shared with the group by the Department of Environmental Services (DES) Engineering Supervisor, Matthew Trout. Matt described the design in full detail. Page 2 of 5

Jill Yutan, NC Landscape Architect discussed the planting and replacement of trees in the median and other areas along N. Kirkwood Road. Once the hardscape component of the project is constructed, Jill will prepare a landscape plan that would be mailed to the residents for comment. The type of trees planted as part of the project will be determined by the Landscape Architect. Jill would also work with affected property owners on any tree or plant restoration due to the construction of the project. Anne Guillette, DES Bio-retention Planner provided an overview of the current DES Storm Water Studies, and the feasibility of constructing a bioretention (rain-garden) in the median on N. Kirkwood Rd and 13 th St N (just behind the 6-ft sidewalk refuge). The bio-retention will be maintained by a county contractor quarterly. The design was well received by residents but there were several comments and questions, which are listed below in no particular order. MEETING SUMMARY: There was an overall concern to not have parking on either side of 13 th St N; a request for stop signs on the SE corner of 13 th St N and Johnson St, and on the NE corner of 13 th St N and Johnson St. Transportation, Engineering & Operations (TE&O) indicated that another stop sign analysis will be conducted after the completion of the project s construction to determine if stop signs are warranted. However, warning signs will be placed at certain points within the project limits indicating Narrow Street ahead. One resident asked about one way, or do not enter signage; TE&O indicated that they reduce roadway connectivity, may increase cut thru traffic on other local roads, and may increase speeding since there is no opposing traffic, thereby reducing safety. Therefore, one way and do not enter signs are not approved for this project. There is a heavy amount of pedestrian activity along 13 th St including children who use 13 th St to cross Kirkwood Road to several public schools on the other side of Kirkwood. Since there are no sidewalks, pedestrians must use the street which increases the already dangerous situation. In addition to neighborhood traffic there is also cut through traffic. Traffic volumes on 13 th St N are somewhat heavy due to it being the only entrance to the Lyon Village neighborhood from Kirkwood Road. Arlington Public School (APS) indicated that a school bus stops at 13 th St and N. Jackson St in the mornings and afternoons; APS will follow-up with staff to provide a map of the bus route. It is also important to note the mature landscaping and trees at 1301 and 3301 and the mature trees and sloping land conditions between 1221 and 3316. Staff will work closely with property owners in replacement of trees and re-grading of yards. There will be no parking on either side of 13 th St N, up to properties 1210 and 1207 N. Johnson St. The multi-family housing units at 1215, 1221 and 3316 have added to the demand for parking in this area, but each unit offers on-site parking, although it s limited. Page 3 of 5

ADDITIONAL INFORMATION: The County will match materials to restore lead walk/steps that need to be replaced during construction to achieve proper grading between the street and private property. Driveway aprons will be replaced within the limits of construction. Wherever possible, sump pump outflow will be connected to existing proximate storm water structures or through the curb into the gutter pan. NC projects are funded by proceeds from a dedicated general obligation bond, approved by the Arlington County voters in County elections held every other year. Proceeds from this bond must be used for Neighborhood Conservation projects (e.g., street improvement projects, neighborhood street lights, park improvement projects, neighborhood beautification) and cannot be used for any other types of County programs or projects. If the project is funded and proceeds to construction, temporary easements will be requested of property owners. Temporary easements allows the County contractor's staff to access private yards to perform construction-related work including the relocation of fences, replacement of disturbed sod, matching-up of grade through cut and fill for the adjacent work within the public right-of-way. For example, when a concrete driveway apron is poured within the public right-of-way, a Temporary Construction Agreement allows construction staff to match the new apron with the existing driveway in a resident's yard. If it is a concrete driveway, it is typical to saw cut the existing driveway at the closest expansion joint to the property line and replace that portion with new concrete in the yard to match the driveway with the new apron. Temporary Construction Agreements become null and void upon completion of construction. The deadline to respond to the meeting notes is Tuesday, April 14 th. NEXT STEPS: Included in this packet is a 30% conceptual design plan subject to change upon final engineering for your review and information. Final petition letter that must be signed by property owners in order to proceed with funding for the project will be mailed on April 15th. Please vote yes or no to the project and return the petition to Angela Marshall (self-addressed postage paid envelope will be included for returns) by Thursday, April 30 th, 2015. If 60% of the linear footage on the street agrees to the project, the project will become eligible for the Neighborhood Conservation Advisory Committee to recommend the project for county funding in the Spring 2015 (June) funding round. Petitions that are not returned are counted as yes votes. If the project becomes qualified and is funded, a final design meeting will be held for property owners when the design is 90% complete. Meeting invitations will be sent out to notify property owners. Page 4 of 5

Any questions or additional information regarding this project or process can be directed to Angela Marshall, Planner in the Neighborhood Conservation Program, at 703-228-3209 or amarshall@arlingtonva.us. Your input and vote is greatly appreciated. Cc: All owners of properties within project limits Shelly Snook, NCAC Representative Carlos Stern, NC Block Representative Valeria Shepeleva, DES Engineering Staff Matthew Trout, DES Design Team Supervisor Jill Yutan, NC Landscape Architect Anne Guillette, DES Bio-retention Planner Tim McIntosh, NC Program Coordinator Encl: 1 Page 5 of 5