Summer 2016 Summer 2017

Similar documents
WLAC Facilities Committee Meeting. September 18, 2017

WLAC Facilities Committee Meeting. May 15, 2017

4/8/2015 Item #10D Page 1

Dundas Place Flexible Street Public Information Centre

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE JANUARY 25, 2018 PUBLIC MEETING

Oconomowoc Area School District Facility Construction Update August 25, 2017

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

Pre-Bid Meeting Minutes 2018 A & E RFP February 6, :00 a.m.

Attachment 5 -- PowerPoint. Item 6C- Attach 5- PPT Presentation Page 1 of 15

Brunswick-Glynn County Joint Water & Sewer Commission

Facilities Planning & Construction Report nd Quarter Ending December 31, 2016

Leadership This is currently a multi-disciplinary effort, led by the following students:

Middlebury RS 0174(8)

9/23/ :47 AM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement

NEW WATER CONNECTION PROCEDURES FOR HOPE AND EDENVILLE TOWNSHIP RESIDENTS

UNIVERSITY OF NORTHERN IOWA

Re-Engineering Votey Hall:

ADDENDUM NO. 1. PREPARED BY: Justin Scott DATE PREPARED: 05/25/2018. PROJECT: Centerville-Washington Park District Park Operations Facility

UNIVERSITY OF NORTHERN IOWA

They were just terrific in working thru what proved to be a complicated design and renovation project.

Item No Halifax Regional Council February 7, 2017

City of Richland Stormwater Management Plan

Board of County Commissioners Agenda Request

SUMTER COUNTY BOARD OF COMMISSIONERS EXECUTIVE SUMMARY

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website.

Air Handler Unit (AHU) Equipment Purchase and Delivery Invitation to Bid

Corridor Management Committee. September 29, 2017

LOCATION At the corner of Brawley School Road & Williamson Road in Mooresville, North Carolina

Site Evaluation. for. Oregon School for the Deaf. 999 Locust Street Northeast Salem, OR BE15178

Qualified Boiler Inspectors Can Have a Positive Impact On a New Installation or Retrofit

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

RFP P College-wide HVAC Service and Maintenance

Doing Business with Bartlett Cocke General Contractors

TOWN OF NEW CASTLE - Master Plan Update

Environmental Health & Safety

MUNICIPAL SEPARATE STORM SEWER SYSTEM 2008 ANNUAL REPORT

Capital Improvement Program Monthly Status Report

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM

Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: ,

Fall 2017 Construction Update

AVAILABILITY AND RELIABILITY OF CERN CRYOPLANTS

Old Jail HVAC Replacement Feasibility Report

NEW WATER CONNECTION PROCEDURES

Capital Improvement Program Monthly Status Report

REQUIRED CONTRACT DETAIL. $2, , Direct DC Fuel Cell Power System, Stationary PACE Power output < 40 kw

UNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES. for. Williams Fieldhouse - Phase I

Temporary HVAC Equipment, Oil-Free Air Compression and Power Generation

STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY)

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

City of La Palma Agenda Item No. 5

University of Texas Project Schedule Narrative February 17, 2009 Page 1

MASTER PLAN KICK-OFF Open House #1A, April 28, 2015

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

Pre-Qualification of Contractors for Road Pavement Rehabilitation Program

SMALL WORKS PROJECT REQUEST FOR SEALED BIDS

Tender Document. MR 193/ Design, Supply & Commission New Control Panel for Ruston 16RK270 Generator

MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE

Burton Station Village Community Meeting February 26, 2014

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX

Subject: Addendum #3 IFB No CNG Gas Detection Repair and Maintenance

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

Cork County Energy Agency

SECTION Fire Pumps

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan

Brine Generation Study

Campus Wide Fire Alarm Repairs

White Street Area Sewer Separation, Project ID Date Issued: June 8, 2015

Grangegorman Update. College of Engineering & Built Environment 29 November 2013

MUNICIPAL SEPARATE STORM SEWER SYSTEM 2009 ANNUAL REPORT

4 August Islington Fire Protection Transpower NZ Limited

City of Sacramento City Council 915 I Street, Sacramento, CA,

Monroe Street Reconstruction. Final Corridor Design Presentation & Open House August 16, 2017

Charles River Skate Park Project

Center for Biosphere Restoration Research (CBRR) Bowman-Oddy Laboratories and Wolfe Hall Renovations

Help Us Help YOU! A Guide to Requirements for. Commercial Electrical Permit Applications in the City of Winnipeg

CONTENTS. B. System Design and Performance Requirements

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

Cryogenics. Overview of the Jefferson Lab 12GeV Upgrade. J. Creel, K. Dixon, P. Knudsen, J. Wilson Jr.

NTSP 2005 International Telecommunications Safety Conference St. Louis, Missouri September 13-15, 2005

Capital Improvement Program Monthly Status Report

Analogue to Digital Telecare. Technical Advisory Board. 21 st June 2017 Work Stream 3 Procurement

Leaside to Main Infrastructure Refurbishment Project

SCADA / Electrical Refurbishment Construction Contract. Tommy B. Strowd, P.E., Director Operations & Maintenance

REPORT TO COUNCIL City of Sacramento

Thames Hall Modernization. Town Hall Meeting December 3, 2018

Maintenance Road Show

Grandview area secondary school FAQ

Majis Industrial Services SAOC TENDER NO. MISCP/09/2014

Request for Bid Proposal For Repair of Sprinkler Systems Iowa Veterans Home Marshalltown, Iowa

2010 Fire Log Fire Log. Annual Fire Safety Report

DOCUMENT ADVERTISEMENT FOR BIDS

PIP PCTPA001 Testing of Process Analyzer Systems

Christmas Decoration Aerpuerto Internacional Reina Beatrix

Higher Education Energy Efficiency Partnership Program BEST PRACTICES AWARDS

Ames City Hall Campus: Stormwater Improvements

Transcription:

Summer 2016 Summer 2017

Why? 4800kv transformer failure outside Thurston Hall

Overview - This is the 4th and final phase of the large, complex multi year campus wide site utilities infrastructure upgrade (the stuff that no one cares about until it doesn't work). - Water main replacements - Various water main building connection replacements - Storm sewer replacement - Various catch basin replacements - Underground electrical duct bank replacement - Site restoration of various locations - Phase 4 will specifically address the deteriorating underground campus electrical system - Another objective of phase 4 is to have the entire campus on 12.5kw voltage as opposed to the current mix of 12.5kw and 4800kw voltage so that the campus will be able to have a reliable, redundant power system.

Project Schedule - Phase 4 was in the very early stages of design and planning but was just pushed forward at a very accelerated pace by the State University of New York Construction Fund as a result of available funding. - This project scope met all of the required qualifications and was selected. - A project of this size and complexity would typically be in design and planning for approximately 6 months to 1 year. In order to secure the funding this phase needs to be designed by August of this year so that it can start construction in the summer of 2016. - After the design and planning is complete the project will be bid for approximately 1 month (September) - Bids are then received by the FUND and they will go through the award process to the lowest bidder. This process can take up to 4 5 months (February). - Once the low bidder is successfully awarded a contract they can begin to submit the specifications for the material and items they will be using (March). - Once they are approved by the design consultant the contractor can then order the required material, all of which can have lead times of months (June).

Project Schedule - continued - As a result of the complex scheduling and to accommodate campus life and personnel this will be a two summer construction project; Summer of 2016 & Summer of 2017. - The first phase of Phase 4 will run concurrently with the last part of phase 3 in the summer of 2016.

Project Scope - Phase 4 will affect a large amount of campus buildings and as a result campus personnel. - Thru-out the summer of 2016 and 2017 each building listed below will need to be without power for about 2 weeks while the new electrical service is installed, energized and tested. - Kunsela Hall Catskill Hall Russell Hall O Connor Hall Murphy Hall Gerry Hall Dubois Hall MacDonald Hall Alumni Hall Wall Service Complex - Farrell Hall Foreman Hall Farnsworth Hall Evenden Tower Sanford Hall Smith Hall Bush Hall Thurston Hall South Hall North Hall

Project Scope - continued - Some of the above mentioned buildings will also require disruptive exterior site work in order to install new exterior building transforms, new exterior building switches and new buried concrete electrical duct bank. - As we mentioned these buildings will need to be without power for approximately 2 weeks while work is being performed. It is understood that all of the above buildings must maintain some level of power during the project. - In order to accommodate buildings requiring various stages of power thruout the shut down the contract can call for separate standalone generators supplied and hooked up by the contractor. - Even with standalone generators there will still be a small window, several hours, where the building will lose all power while the generator is disconnected and the new service is connected. This work can possibly be done on weekends.

This is where we need your HELP! - We need your input to help us schedule what buildings can be taken offline in the summer of 2016 and the summer of 2017. - In addition we need to know what buildings need minimal power and what that minimal power requirement is for.

Building Information - We have spoke to a number of building stake holders to gather this information but we are still missing pieces. We also want to make sure that everyone is understanding and on the same page with the timing of the building work. - The following slides are what we have gathered thus far and assembled. You will also see plans of the buildings that have the more extensive site work: - There is also a spreadsheet for you to take that shows the overall campus plan. - As we go through these slides and the spreadsheet please make suggestions as to dates, conflicts, etc. as you see them.

Kunsela Hall - Window of opportunity to cut power is the month of June in the summer of 2016 - All life safety equipment will have to remain with power as well as the pool pump humidity control. - Cutover from generator to new electrical service to happen on a weekend Catskill Hall - Window of opportunity to cut power is the July 10th July 24th - All life safety equipment will have to remain with power as well as the Res. Life offices, custodial managers office, data rack.

Russell Hall

Russell Hall - continued - Window of opportunity to cut power is the summer of 2016, July 18th August 1st - All life safety equipment will have to remain with power as well as the 2 RD apartments and the data rack.

O Connor Hall - Window of opportunity to cut power is the summer of 2017 - All life safety equipment will have to remain with power as well as the RD apartment Murphy Hall - Window of opportunity to cut power is July 4th July 18th in the summer of 2016 - All life safety equipment will have to remain with power as well as the RD apartment.

Gerry Hall - Window of opportunity to cut power is June 26th July 10th in the summer of 2017 - All life safety equipment will have to remain with power as well as the RD apartment and data rack (this data rack is critical as it is a campus hub) Dubois Hall - Window of opportunity to cut power is June 20th July 4th in the summer of 2016 - All life safety equipment will have to remain with power as well as the feed to North Hall.

MacDonald Hall - Window of opportunity to cut power is July 11th 25th in the summer of 2016 - All life safety equipment will have to remain with power.

Foreman Hall / Alumni Hall

Forman Hall - Window of opportunity to cut power is the month of July in the summer of 2016 and the month of July in the summer if 2017 - All life safety equipment will have to remain with power. - It would be scheduled that duct bank installation and HVAC work would be completed in July of 2016 and the power cut off would be during July of 2017 Alumni Hall - Window of opportunity to cut power is July 10th July 17th in the summer of 2017 - All life safety equipment will have to remain with power.

Farrell Hall - Window of opportunity to cut power is June 20th July 4th in the summer of 2016 - All life safety equipment will have to remain with power as well as the data center Farnsworth Hall - Window of opportunity to cut power is July 18th August 1st in the summer of 2016 - All life safety equipment will have to remain with power as well as the animal locations. Critical area being the monkeys. - Cutover from generator to new electrical service to happen on a weekend

Evenden Tower - Window of opportunity to cut power is July 17th July 24th in the summer of 2017 - All life safety equipment will have to remain with power. Sanford Hall - Window of opportunity to cut power is June 12th June 26th in the summer of 2017 - Data rack must remain with power as it feeds Thurston Hall & South Hall. The central heating plant must also remain with full power.

Smith Hall

Smith Hall - Window of opportunity to cut power is June 13th June 27th in the summer of 2016, May 29th June 5th in the summer of 2017 and June 12th July 3rd in the summer of 2017 - All life safety equipment will have to remain with power as well as the data center Bush Hall - Window of opportunity to cut power is June 12th July 24th in the summer of 2017 - Building will remain with full power

Thurston Hall

Thurston Hall - Window of opportunity to cut power is June 6th July 25th in the summer of 2016 - All life safety equipment will have to remain with power as well as the grounds shop. - Cutover from generator to new electrical service to happen on a weekend South Hall - Window of opportunity to cut power is June 6th August 15th in the summer of 2016 & May 29th August 14th in the summer of 2017 - All life safety equipment will have to remain with power.

Wall Service Complex

Wall Service Complex - Window of opportunity to cut power is anytime during the summer of 2016 or summer of 2017. - Building will remain with full power

Questions, comments, concerns.. As with all construction jobs all of the information that you just saw may be changed, null and void or changed by the contractor and/or construction FUND at any given minute without your or our knowledge or approval

Buildings Kunsela Hall Building power requirements Summer The week Summer 2016 23 May 30 May 6 Jun 13 Jun 20 Jun 27 Jun 4 Jul 11 Jul 18 Jul 25 Jul 1 Aug 8 Aug 15 Aug 2017 22 May 29 May 5 Jun 12 Jun 19 Jun 26 Jun 3 Jul 10 Jul 17 Jul 24 Jul 31 Jul 7 Aug 14 Aug Life Safety, Pool Pump Humidity control Alumni Approved by Bob Backus Catskill Life Safety/ Power to Res Life offices,custodal office Data Rack Will need power to RD appartment/ Res Life Offices Russell Life Safety, Data Rack Will need power to RD appartment O'Connor Life Safety Will need Rats LHB NYSACAC Murphy Life Safety Will need power to RD appartment Rats LHB NYSACAC Gerry Life Safety Power to Data Rack is a campus hub Will need NYSACAC Life Safety, Power to North Hall Dubois UPD Will need Best program @ North Hall NYSACAC MacDonald Life Safety Public Health LHB Girl Golf camp LHB Alumni Back up Data Center, Need to Wedding Ladies Wedding June Farrell Power Data Arae & Life safety Public Health H.B. 12,13,14 Tenitive work dates NYSSSA All of July to Aug 6 LHB NYSSSA All of July to Aug 6 Foreman Life Safety Duct bank & HVAC work Farnsworth Life Safety, HVAC Animal side Rats 24 28 Rats 24 28 Evenden Human Anatomy and Physiology Micro Bio Human Anatomy and Physiology 6 wks Human Anatomy and Physiology Micro Bio Human Anatomy and Physiology 6 wks Sanford Data rack feeds thurston south boiler room LHB Best Program NYSSSA All of July to Aug 6 LHB Best Program NYSSSA All of July to Aug 6 Smith Life Safety LHB LHB Bush Full Power LHB LHB Thurston South Wall Service Life Safety Power to Grounds shop Life Safety Full power Excavation Work & New Duct Bank * Life Safety power is Fire Alarm,and Emergency Panel(s) corridor Emergency lighting Available Shutdown Work Schedule: 2016 Summer 11 12 weeks 2016/2017 Winter Holiday 3 4 weeks 2017 Summer 11 weeks * Farrell, Gerry & DuBois require short term shutdown. ** Depending on Bid/Award Schedule, Winter 2015/2016 3 4 weeks. Color Key Event listed Event scheduled no power shut down Power shut down is ok only life safety needed power shut down with partial building being feed with power and life Safety, cut overs on weekends Full Power supplied to building cut overs on weekends