Comprehensive Development Guide

Similar documents
The transportation system in a community is an

C. Westerly Creek Village & The Montview Corridor

COLVER ROAD INDUSTRIAL CONCEPT PLAN

Planning Districts INTRODUCTION

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

Hockessin Community Redevelopment Plan

Olde Towne Vision Plan

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

9 th Street Sub Area Plan

Downtown Dubuque...it s a great time.

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

I-35 CORRIDOR VISION PLAN INTRODUCTION. Purpose. Background

E c o n o m i c D e v e l o p m e n t

Planning & Zoning Board Meeting. DRAFT Comprehensive Transportation Plan Update, February 23, 2018 version

POCKET COMMUNITY PLAN

APPENDIX C SPECIAL PLANNING AREAS

BUILDER LOTS FOR SALE

CHAPTER 7: Transportation, Mobility and Circulation

Status Update (2006 vs. Now) Citizen s Advisory Committee February Plan for Prosperity

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

Gloucester County s Comprehensive Plan. The Community Connection

Strategic Growth Area #1 Northampton Boulevard Corridor Area

WELCOME TO OPEN HOUSE TWO November 28, 2018

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK

SUSSEX COUNTY COMPREHENSIVE PLAN COUNTY PLANNING AND ZONING COMMISSION WORKSHOP

Further input invited as Colchester Growth Strategy nears final phase

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

WATERFORD Plan of Preservation, Conservation and Development Supplement Part 1 - Policy Element

The West Vaughan Employment Area Secondary Plan Policies

Environmental: Urban land..51 acre wet (.30%); 1.01 acres/.59% within a 100 year floodplain; no other environmental indicators limit development.

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

Existing Transportation System 5-1

4. INDUSTRIAL 53 CASTLE ROCK DESIGN

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

IH35 Corridor Plan Amendment to the Comprehensive Plan

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017

Transportation. Strategies for Action

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

CITY OF PUYALLUP. Background. Development Services

Brian Madigan, RLA, CPESC Director Land Planning & Design

Plan Overview. Manhattan Area 2035 Reflections and Progress. Chapter 1: Introduction. Background

Implementation Guide Comprehensive Plan City of Allen

City of Heath. Town Center Concept

University Parkway Corridor Plan. Public Workshop Sept. 18, 2017

Warren County/Bowling Green Focus 2030 Comprehensive Plan VOLUME 1 INDEX

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

A Growing Community Rural Settlement Areas

8implementation. strategies

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

BUDGETING FOR OUTCOMES TRINITY RIVER CORRIDOR

Elm Fork Land Use. Trinity River Corridor Project Committee May 13, 2013

Sherri Ferguson. President/CEO Portland Chamber of Commerce. Tennessee Certified Economic Developer Capstone Project

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018

Mavis Road Class Environmental Assessment

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

IH35 Corridor Plan Amendment to the Comprehensive Plan

Right-of-Way Acquisitions and Relocations Technical Memorandum

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

Living in Albemarle County s Urban Places

Employment and Commercial Review Analysis of Policy Directions

Preliminary Subdivision Plan

LAND USE AMENDMENT CORNERSTONE (WARD 3) 60 STREET NE AND COUNTRY HILLS BOULEVARD NE MAP 26NE BYLAW 22D2017

LAND USE DESIGNATIONS AND ZONING CLASSIFICATIONS

In surveys, Dallas residents say what they want to change most

Chapter 5: Natural Resources and Environment

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

CITY OF COLWICH COMPREHENSIVE PLAN LAND USE LAND USE 1

The Floyds Fork Area Study A Framework for Growth

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

LAND USE ELEMENT. Purpose. General Goals & Policies

Sustainable Growth. Sustainable Growth

Ten Mile Creek Planning Area

Land Use. Hardware Street Vendor Mixed-Use

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

CHAPTER VIII Implementation

Gratigny Parkway East Extension Project Development & Environment (PD&E) Study

Chapter 10 IMPLEMENTATION RECOMMENDATIONS

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

INDEPENDENCE BOULEVARD AREA PLAN. June 24, 2008

Municipal Development Plan Update Urban Service Area and Hamlets

EXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY

MODEL ACCESS MANAGEMENT PLAN MINNESOTA TRUNK HIGHWAY 7 COMPREHENSIVE PLAN AMENDMENT (HUTCHINSON SEGMENT)

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

I539. Smales 2 Precinct

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

Atlanta BeltLine. Subareas 9 & 10. Master Plan Updates. March 26, Washington Park Jamboree 1

Downtown Huntersville in 2030

Issues Requiring Future Study

Rezoning Petition Final Staff Analysis October 2, 2018

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

Transcription:

INDUSTRIAL ELEMENT Comprehensive Development Guide 1 Industrial Element

7.1 Hardin County Industrial Overview BG PKWY Fort Knox Industrial Corridor Comprised of 11 parcels totaling 720 acres of land 68 acres zoned I-1* 653 acres zoned I-2 ** Primary transportation arteries are: 1. KY 313 2. KY 434 3. KY 251 Urban Industrial Corridor Comprised of 55 parcels from both the Elizabethtown and Radcliff Urban Areas totaling 666 acres 6 acres zoned I-1 261 acres zoned I-2 399 acres in I-H *** Primary transportation arteries are: 1. I-65 2. US 31W 3. Bluegrass PKWY 4. US 62 5. KY 1600 6. KY 1357 Western KY PKWY Industrial Corridor Comprised of 53 parcels totaling 1769 acres 240 acres zoned I-1 261 acres zoned I-2 1508 acres in I-H Primary transportation artery: 1. Western Kentucky Parkway 2. US 62 WK PKWY Interstate 65 Industrial Corridor Comprised of 13 parcels totaling 2004 acres 71 acres zoned I-1 143 acres zoned I-2 456 acres in I-H 1551 acres for single site manufacturing Primary Transportation arteries are: 1. I-65 2. US 31W 3. CSX Railroad 2 Industrial Element

A. Interstate 65 Industrial Corridor PVA: 190-30-00-012 3 Acres Zoned I-2 Developed - Fertilizer Storage CSX R/R KY 1136 1 5 PVA: 207-00-00-042.03 10 Acres Zoned I-1 Vacant - Industrial Park I-65, US 31W 2 Glendale Industrial Site 1551 Acres Zoned I-2 Vacant CSX R/R, I-65, KY 222, KY 1136 PVA: 207-00-00-042.02 208-00-00-018 60.6 Acres Zoned I-1 Vacant - Proposed Industrial Park I- 65, US 31W 6 7 PVA: 208-00-00-022 29.19 Acres Zoned I-H Vacant I-65, US 31W, KY 1136 3 PVA: 192-00-00-008 173 Acres Zoned I-H Vacant CSX R/R, I-65 4 PVA: 197-00-00-013, 014 139 Acres Zoned I-2 Developed - Quarry Transportation; CSX R/R, I-65, US 31W 8 PVA: 208-00-00-023 82.50 Acres Zoned I-H Vacant I-65, US 31W 9 PVA: 210-00-00-001 76Acres Zoned I-H Vacant CSX R/R, I-65 * See Appendix A-5 for complete Industrial Profile Listing and Current Industrial Inventory. 3 Industrial Element

B. Fort Knox Industrial Corridor 11 PVA: 198-00-00-005, 006, 007 199-00-00-006.01 620 Acres Zoned I-2 Developed Site: Quarry KY 434 PVA: 216-00-02-006 3 Acres Zoned I-1 Developed - Freight Terminal KY 251 KY 313 10 16 PVA: 251-00-00-005 2 Acres Zoned I-2 Developed KY434 PVA: 229-00-00-039, 039.03, 039.04 62.7 Acres Zoned I-1 Partially Developed KY 434 15 PVA: 216-00-00-006.01, 006.07 33 Acres Zoned I-2 Developed - Asphalt Plant KY 434 KY 251 12 13 PVA: 216-00-00-038.05 7.2 Acres Zoned I-1 Developed Machine Shop KY 251 KY 434 PVA: 229-00-00-021 4 Acres Zoned I-1 Developed Warehouse Transportation KY 434 14 27 PVA: 162-00-00-042, 043, 044 247.5 Acres Zoned I-H Vacant KY 313 US 31W * See Appendix A-5 for complete Industrial Profile Listing and Current Industrial Inventory. 4 Industrial Element

C. Western Kentucky Parkway Industrial Corridor 19 PVA: 106-00-00-041, 041.01,.41.02,.41.03 139.40 Acres Zoned I-2 Developed - Quarry Transportation US 62 20 PVA: 128-00-00-024, 024.05, 026 97 Acres Zoned I-2 Development - Quarry WK PKWY PVA: 128-00-00-026 3.5 Acres Zoned I-2 Developed - Slaughter House County Road 21 18 PVA: 089-00-00-119 0.40 Acres Zoned I-1 Developed Manufacturing US 62, WK PKWY 22 PVA: 169-00-00-024, 025 21.45 Acres Zoned I-1 Developed County Road 23 PVA: 187-00-00-023, 024, 025 1507 Acres Zoned I-H Partially Developed Paducah / Louisville RR, WK PKWY, Ring Road 17 PVA: 073-00-00-046 12 Acres Zoned I-1 Developed - Sawmill Paducah / Louisville RR, US 62 * See Appendix A-5 for complete Industrial Profile Listing and Current Industrial Inventory. 5 Industrial Element

D. Urban Industrial Corridor 28 PVA: 182-10-00-025 24 Acre Zoned I-1 Developed US 31 W 29 PVA: 243-00-07-000 238 Acres Zoned I-2 Industrial Park Partially Developed I-65 US 62 30 PVA: 253-00-00-066 24 Acres Zoned I-1 Developed US 62 24 PVA 235-10-00-018.02 22 Acres Zoned I-2 Developed KY 61 25 PVA: 234-00-00-059, 061, 062.01 127.59 Acres Zoned I-H Partially Developed Transportation Illinois Central RR KY 567 26 PVA: 231-40-00-053 0.88 Acres Zoned I-1 Developed US 62 * See Appendix A-5 for complete Industrial Profile Listing and Current Industrial Inventory. 6 Industrial Element

7.2 Strategic Industrial Analysis: Glendale Industrial Site The Glendale Industrial Site offers unique opportunities to (See Figure 1): 1. Expand the economic industrial base of Hardin County 2. Spawn economic development for the Glendale Area as well as Hardin County 3. Create a regional employment center that will strengthen the employment base of Hardin County and the Commonwealth of Kentucky as a whole. Figure 1 Comprehensive Development Guide Commission developed a series of public town forums that were held in Glendale s East Hardin Middle School. Entailed in these forums were group break out sessions, mapping exercises, brain storming activities, question and answer sessions, design surveys and land use preference surveys. These forums yielded valuable information which helped to cultivate the following proposals regarding the Glendale Industrial Site and the impacts on the Glendale Community. A. Map Amendments involving parcels directly adjacent to and in close proximity of the Glendale Industrial Site The Glendale town forums yielded much of the information that led to this proposal of Map Amendments. Specifically, mapping exercises identified areas of growth which concerned those who attended the forums. These concerns were then developed further by surveys which asked for land use preferences for identified areas of growth. Of primary concern were the areas directly to the south and east of the Glendale Industrial Site. Figure 2 I n recognition of the above unique opportunities Adjacent to the Glendale Industrial Site to the available to the south are parcels which have a strong likelihood for citizens of Hardin development based on the relative undeveloped County, the Hardin nature of the land, the close proximity to the County Planning and industrial site and on anecdotal information gathered Development from some of the owners. Based on the preferences 7 Industrial Element

of the surveyed Glendale residents to have the land developed as industrial rather than residential (See Figure 2), the commission supports amending the land use map to reflect I-2 (Heavy Industrial) for those parcels directly adjacent to the Glendale Industrial Site to the south. In addition, those Figure 3 parcels located further south (to the Nolin River) should be considered I-H (Industrial Holding) which would allow for both the option of industrial development as well as low d e n s i t y residential. In addition to the area south of the Glendale Industrial Site, parcels to the east are of strong development importance. When the Glendale residents were asked about this area, there was a near even split, with 44% favoring Industrial development and 56% in favor of Commercial development (See Figure 3). This proposal adapts the wants of the community with what would be a desirable planning outcome for those parcels east of the site. Those parcels adjacent to Interstate 65 and the west side of US 31W are Figure 4 encouraged to be amended to reflect Industrial development, while those parcels adjacent to US 31W to the east, (See Figure 4) should reflect Commercial development This proposal is in line with the following goals from the Hardin County Comprehensive Development Guide: GOAL #1: TO IMPROVE HARDIN COUNTY AS A PLACE OF RESIDENCE GOAL #5: TO ENCOURAGE THE LOCATION AND DEVELOPMENT OF DIFFERENT LAND USES IN THE MOST APPROPRIATE MANNER GOAL #6: TO IMPROVE AND PROMOTE HARDIN COUNTY AS A PLACE FOR COMMERCE AND INDUSTRY GOAL #11: TO DEVELOP, ADOPT, AND USE LAND USE REGULATIONS AND POLICIES WHICH WILL ACT TO IMPLEMENT THE COMPREHENSIVE PLAN, WHILE INSURING FAIRNESS, STANDARDIZATION AND CONSISTANCY GOAL #13: TO CREATE A SYSTEM WHICH WILL PLAN AND ESTABLISH THE BEST RELATIONSHIP BETWEEN LAND USES WITHIN HARDIN COUNTY WHICH PERMITS FLEXIBILITY WHILE PROVIDING A VEHICLE FOR ADVICE FROM OUR CITIZENS B. Implementation of an Overlay District to the south and east of the Glendale Industrial Site The considerable investment the county and state made in the Glendale Industrial Site requires considerable care in determining how best to maintain its viability for a single large scale manufacturing facility. The creation of an Overlay District is the best tool at the Commission s disposal which would work to maintain the integrity of no just the site itself, but also its surrounding area. 8 Industrial Element

Comprised in this Overlay District are two parts; one is the restriction of certain uses that might limit the ability for this sites potential to be fully realized and the second is the implementation of design and development standards that will help to protect the integrity of the area. Limiting the uses which may occur in this Overlay District is essential to the viability of the site. The following uses have been found undesirable by manufacturing facilities in the past and have been determined that they might deter certain facilities from locating on the Glendale Industrial Site: Tire Manufacture Glass Recycling Stone Quarry Fiberglass Production Carbon Production Petroleum Refining Asbestos Production Power Plants Sexually Oriented Businesses In conjunction with limiting the use of the land contained in this Overlay District, there shall also be development standards, such as the following, incorporated in this Overlay: Comprehensive Development Guide Dumpster and Waste Material Screening Parking Regulations Enhanced Development Plan Standards As is illustrated in the graphic, Figure 5, the Overlay District will be limited to the areas within 1000 feet of the Right of Way Line from: Interstate 65 US 31W Gilead Church Rd (KY 1136) The limited boundaries of this zone will work to protect only those areas which will have the greatest impact on the Glendale Industrial Site and will further work to enhance the ability to attract the best possible tenant for the site. This proposal is consistent with the following goals from the Hardin County Comprehensive Development Guide: GOAL #1: TO IMPROVE HARDIN COUNTY AS A PLACE OF RESIDENCE. GOAL #2: TO PROVIDE ADEQUATE RECREATIONAL FACILITES AND OPEN SPACE FOR THE CITIZENS OF HARDIN COUNTY. Figure 5 Building Setback Limits Green Space Areas Landscaping Requirements Display Area Limitations Outdoor Storage Area Standards GOAL #4: T O ENCOURAGE DEVELOPMENTS TO BE SENSITIVE TO T H E ENVIRONMENTAL CONSTRAINTS AND N A T U R A L CONDITION OF ITS SITE. GOAL #5: T O ENCOURAGE THE LOCATION AND DEVELOPMENT OF DIFFERENT LAND USES IN THE MOST APPROPRIATE MANNER. GOAL #6: TO IMPROVE AND PROMOTE HARDIN COUNTY AS A PLACE FOR COMMERCE AND INDUSTRY. 9 Industrial Element

GOAL #8: TO PROMOTE CONSERVATION AND EFFICIENT UTILIZATION OF EXISTING COMMUNITY RESOURCES. GOAL #11: TO DEVELOP, ADOPT, AND USE LAND USE REGULATIONS AND POLICIES WHICH WILL ACT TO IMPLEMENT THE COMPREHENSIVE PLAN, WHILE INSURING FAIRNESS, STANDARDIZATION AND CONSISTANCY. GOAL #12: TO PRESERVE THE LIFESTYLE, HISTORY AND NATURAL SURROUNDINGS OF THE PEOPLE OF HARDIN COUNTY. GOAL #13: TO CREATE A SYSTEM WHICH WILL PLAN AND ESTABLISH THE BEST RELATIONSHIP BETWEEN LAND USES WITHIN HARDIN COUNTY WHICH PERMITS FLEXIBILITY WHILE PROVIDING A VEHICLE FOR ADVICE FROM OUR CITIZENS. GOAL #14: TO ASSURE THAT HARDIN COUNTY S NONRENEWABLE RESOURCES ARE DEVELOPED IN A MANNER WHICH WILL BEST SERVE THE COUNTY. C. Transportation Improvements to specific Arterial and Collector roads surrounding the Glendale Industrial Site Comprehensive Development Guide utilizing as many existing roads as possible. By utilizing existing roadways, it is possible to preserve more agricultural land and lessen the impact on the countryside of the county. This proposal is consistent with the following goals from the Hardin County Comprehensive Development Guide: GOAL #1: TO IMPROVE HARDIN COUNTY AS A PLACE OF RESIDENCE. GOAL #4: T O E N C O U R A G E DEVELOPMENTS TO BE SENSITIVE TO THE ENVIRONMENTAL CONSTRAINTS AND NATURAL CONDITION OF ITS SITE. GOAL #6: TO IMPROVE AND PROMOTE HARDIN COUNTY AS A PLACE FOR COMMERCE AND INDUSTRY. GOAL #8: TO PROMOTE CONSERVATION AND EFFICIENT UTILIZATION OF EXISTING COMMUNITY RESOURCES. GOAL #10: TO IMPROVE THE TRANSPORTATION SYSTEM OF HARDIN COUNTY SO THAT IT ENCOURAGES THE SMOOTH FLOW OF TRAFFIC THROUGH- OUT THE COUNTY. The occupancy of the Glendale Industrial Site will have a major impact on traffic flow in the area surrounding the Glendale Industrial Site. That, in conjunction with concerns voiced at several of the Glendale Town Forums, has prompted the following transportation improvement proposals. While working with the Metropolitan Planning Organization, we have been able to discuss the transportation needs of this area and have been able to help identify these needs as priorities for the county. In developing the proposed improvements, Figures 6 and 7, consideration was given to GOAL #12: TO PRESERVE THE LIFESTYLE, HISTORY AND NATURAL SURROUNDINGS OF THE PEOPLE OF HARDIN COUNTY. 10 Industrial Element

TRANSPORTATION IMPROVEMENT PLAN GLENDALE INDSTRIAL SITE Comprehensive Development Guide Figure 6 A New interchange with Interstate 65 south of the present overpass of Gilead Church Road. B Reconstruction and realignment of Gilead Church Road (KY 1136) to four lanes from new I- 65 interchange to railroad. C Construction of a new road from the new I-65 interchange to Lincoln Parkway D Elevated railroad crossing at Gilead Church Road (KY 1136). E Upgrade of Gilead Church Road from railroad to new intersection with Smith Mill Road and upgrade Smith Mill Road from Gilead Church Road to KY 222. F Extension of Smith Mill Road from Glendale Hodgenville Road (KY 222) to New Glendale By-pass. G Construction of New Glendale By-pass from Mud Splash Road to present location of the railroad crossing at New Glendale Road (KY 1136). H Upgrade existing railroad crossing for new Glendale By-pass. I New intersection of New Glendale Road (KY 1136) and New Glendale By-pass. J (A) Construction of New Glendale By-pass from upgraded railroad crossing west to present intersection of Glendale Hodgenville Road (KY 222) and Bacon Creek Road (KY 1904). (B) Close current section of Glendale Hodgenville Road KY 222 from Bacon Creek Road (KY 1904) to Smith Mill Road closing existing bridge over Valley Creek. K Construction of new bridge over Valley Creek for New Glendale By-pass. L Construction of Western Kentucky Parkway interchange at Glendale Hodgenville Road (KY 222). M Upgrade I-65 interchange with Glendale Hodgenville Road (KY 222) and widen lanes. Figure 7 11 Industrial Element

D. Creation of a Neighborhood Development Plan for the village of Glendale to help the community plan and respond to the impact of the industrial site. Yielded from the multiple Glendale Town Forums was the idea that a Neighborhood Development Plan needed to be created for the Village of Glendale. The unique qualities of this area are of the utmost importance to both the residents of the village as well as Hardin County. The purpose of this plan is to create a document that will help guide the development of Glendale when the infusion of money, people and traffic occurs due to the Glendale Industrial Site. This Neighborhood Development Plan will contain; GOAL #2: TO PROVIDE ADEQUATE RECREATIONAL FACILITES AND OPEN SPACE FOR THE CITIZENS OF HARDIN COUNTY. GOAL #3: TO PROVIDE THE CITIZENS OF HARDIN COUNTY WITH ADEQUATE PUBLIC SERVICE AND COMMUNITY FACILITIES. GOAL #4: T O E N C O U R A G E DEVELOPMENTS TO BE SENSITIVE TO THE ENVIRONMENTAL CONSTRAINTS AND NATURAL CONDITION OF ITS SITE. Figure 8 both current and future land use information, design standards for development, historic preservation aspects, and identification and prioritization of both streetscape and infrastructure improvement projects. Support for the development and implementation of a plan can be found in numerous development, land use and design related questions that were asked on numerous surveys and questionnaires. Furthermore, this proposal is consistent with the following goals from the Hardin County Comprehensive Development Guide: GOAL #1: TO IMPROVE HARDIN COUNTY AS A PLACE OF RESIDENCE. GOAL #5: TO ENCOURAGE THE LOCATION AND DEVELOPMENT OF DIFFERENT LAND USES IN THE MOST APPROPRIATE MANNER. GOAL #6: TO IMPROVE AND PROMOTE HARDIN COUNTY AS A PLACE FOR COMMERCE AND INDUSTRY. GOAL #7: TO ENCOURAGE THE RECOGNITION AND RESTORATION OF HISTORICALLY IMPORTANT SITES. GOAL #8: TO PROMOTE CONSERVATION AND EFFICIENT UTILIZATION OF EXISTING COMMUNITY RESOURCES TRAFFIC THROUGH-OUT THE COUNTY. 12 Industrial Element

GOAL #11: TO DEVELOP, ADOPT, AND USE LAND USE REGULATIONS AND POLICIES WHICH WILL ACT TO IMPLEMENT THE COMPREHENSIVE PLAN, WHILE INSURING FAIRNESS, STANDARDIZATION AND CONSISTANCY. GOAL #12: TO PRESERVE THE LIFESTYLE, HISTORY AND NATURAL SURROUNDINGS OF THE PEOPLE OF HARDIN COUNTY. GOAL #13: TO CREATE A SYSTEM WHICH WILL PLAN AND ESTABLISH THE BEST RELATIONSHIP BETWEEN LAND USES WITHIN HARDIN COUNTY WHICH PERMITS FLEXIBILITY WHILE PROVIDING A VEHICLE FOR ADVICE FROM OUR CITIZENS. GOAL #14: TO ASSURE THAT HARDIN COUNTY S NONRENEWABLE RESOURCES ARE DEVELOPED IN A MANNER WHICH WILL BEST SERVE THE COUNTY. 13 Industrial Element

7.3 Strategic Corridor Analysis Analyzing the industrial land in Hardin County was accomplished by identifying trends that caused, or help to cause, industrial growth and development in the county. By tracking the industrial development trends, the following four Industrial Corridors were identified. A. Fort Knox Industrial Corridor The Fort Knox Industrial Corridor has characteristics which have been identified as positive for future industrial development. Within this corridor the Kentucky 313 Sector is identified due to its proximity to the Fort Knox Artillery range. The noise from Fort Knox makes this area less suitable for dense residential development and was identified as a target area for future commercial and industrial growth. That, in conjunction with the presence of strong transportation routes such as the Joe Prather Highway (KY 313) and Battle Training Road (KY 434), makes this a strong corridor for future industrial development. development of the Glendale Industrial Site, might work to increase the industrial development in this area. D. Urban Industrial Corridor The development of industrial growth in the Urban Corridor occurred primarily because of the availability of urban amenities in close proximity. Directly outside the city limits of Elizabethtown, Radcliff and Vine Grove are industrial sites which have developed not due to similar transportation corridors found in other Industrial Corridors, but rather due to the common trait of its proximity to Hardin County s three largest cities. B. Interstate 65 Industrial Corridor The I-65 Industrial Corridor is anchored by the 1500 acre Glendale Industrial Site which is pocketed by Gilead Church Road (KY 1136) to the south, I-65 to the east KY 222to the north and the CSX Railroad to the west. In addition to this site, the presence of US 31W has prompted the location of industrial development along this North/South corridor. Additionally, the purchase of this Industrial Site has produced proposals which have been outlined in the Strategic Industrial Analysis: Glendale Industrial Site. C. Western Kentucky Parkway Industrial Corridor The Western Kentucky Parkway is identified as a corridor which runs in a southwesterly direction of Elizabethtown and has seen industrial development sprout up along its transportation route. The presence of this roadway, in conjunction with the availability of land primes this location as an industrial area which has potential for growth. In addition to the current characteristics, the 14 Industrial Element