CERTIFICATE of Product Conformity (QAL1 )

Similar documents
CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1)

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1 )

Certificate: / 9 February 2011

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1)

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1)

CERTIFICATE of Product Conformity (QAL1 ) Certificate No.: _03. V-CEM5100 for waste gas velocity. TÜV Rheinland Energy GmbH

CERTIFICATE of Product Conformity (QAL1 )

Certificate: _01 / 22 March 2013

CERTIFICATE of Product Conformity (QAL1 )

Certificate: / 29 April 2014

Certificate: _01 / 29 April 2014

Certificate: _01 / 22 March 2013

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE. on Product Conformity (QAL 1) Number of Certificate: _02

CERTIFICATE. EN tested QAL 1 certified TUV approved Annual inspection. The certificate is valid until: 19July2017. Köln, 17 August2012

Certificate: _02 / 9 September 2014

Certificate: _01 / 2 February 2015

Certificate: _01 / 20 August 2013

Certificate: _02 / 22 March 2013

CERTIFICATE. EN tested QAL 1 certified TUV approved Annual inspection. The certificate is valid until: 28 July 2016

CERTIFICATE of Product Conformity (QAL1)

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE. on Product Conformity (QAL 1) Number of Certificate: ENDA-5000 with analysing module CMA-5800 for NOx. S0 2, CO, co2 and 02

CERTIFICATE of Product Conformity (QAL1)

CERTIFICATE of Product Conformity (QAL1 )

Certificate: / 9 September 2014

CERTIFICATE. about Product Conformity {QAL 1) Number of Certificate: _02

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1 )

_03 / 28 July 2015

Certificate: _01 / 19 August 2011

CONFIRMATION of Product Conformity (QAL1)

Certificate: / 29 April / /D1 of 07 July 2006 Addendum 936/ /C of 20 September 2013

Certificate: / 29 April 2014

CERTIFICATE of Product Conformity (QAL1 )

PRODUCT CONFORMITY CERTIFICATE

PRODUCT CONFORMITY CERTIFICATE

PRODUCT CONFORMITY CERTIFICATE

PRODUCT CONFORMITY CERTIFICATE AR500 Open Path Monitor with ER120

PRODUCT CONFORMITY CERTIFICATE

International comparison of validation methods for dust concentration measurement

PRODUCT CONFORMITY CERTIFICATE

PRODUCT CONFORMITY CERTIFICATE

Test reports for the determination of B 10d values for emergency stop switches of families 800F, 800H, 800T and D7 of Rockwell Automation

Proforma for Surveillance of Recognized Environmental Laboratory under the Environment (Protection) Act, 1986

PRODUCT CONFORMITY CERTIFICATE

PRODUCT CONFORMITY CERTIFICATE

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005

Automation, Software und Informationstechnologie

continuous emissions monitoring Combustion & Environmental Monitoring

Emissioni convogliate in atmosfera: Sistemi di monitoraggio in continuo delle emissioni SME

OPTISENS TUR 2000 Technical Datasheet

including the locations according to annex

Flexible Schedule of Accreditation. SIRA CERTIFICATION SERVICE Unit 6, Hawarden Industrial Park, Hawarden, CH5 3US.

Flexible Schedule of Accreditation. SIRA CERTIFICATION SERVICE Unit 6, Hawarden Industrial Park, Hawarden, CH5 3US.

This document is a preview generated by EVS

NO NO 2 NO x SO 2 CO CO 2 O 2

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

THEORY OR OPERATION 2 SENSOR UNIT - MECHANICAL 6 SENSOR UNIT - ELECTRICAL 8 CONTROL UNIT - MECHANICAL 9 CONTROL UNIT - ELECTRICAL 9 OPTIONS 11

Dust Alert 75. *shown with optional external keypad and display

PSA Series. Particle Size Analyzer

The new generation of Multi-Gas measurement. Dipl.- Ing (FH) Andreas Hester, SIGAS Corp. Environment protection Personal safety Process control

Certificate of EC type-examination of a measuring instrument Number: UK/0126/0077 Revision 1

OJ L 239, , p. 1. OJ L 239, , p. 83, OJ L 239, , p. 136.

This SOP and the B.C. Field Sampling Manual are available at: www2.gov.bc.ca.

Instruction Manual. Laser Attachment. Valid for Hardware SN 100 and higher

Complete Gas Analysis

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Product Overview. Ordering Information DM-LK-D10 DM-LK-D10-C. Dust & Opacity Meter Complete Set Controller Unit. Sender Receiver SDS-V5 SDR-V4 HPB-82S

EN - english. Instructions for installation and operation. Mobile humidity meter DP 207

Title: Standard Operating Procedure for Measurement of Total Hydrocarbon Using a Flame Ionization Detection

Specifications. Table of contents. 2:Specification. 3:Composition. 4:Instruments outside figure

WIO200 Water In Oil measuring instrument

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

PUBLIC SUMMARY REPORT OF THE EGOLF EN 13823

PED Workshop Nicosia, 3-5 October, 2005

Building Capacities for the Improvement of the Air Quality

PRODUCT CONFORMITY CERTIFICATE

CERTIFICATE. Conformity of the Factory Production Control CPR TÜVRh

Product data sheet Palas Fidas 200 S

Datasheet: K-22 LO Sensor

Supertron Sensing Pte Ltd Certificate No. : LA C Blk 16 Kallang Place #07-04 Issue No. : 4 Singapore Date : 04 February 2015

The European Radio Equipment Directive 2014/53/EU

Understanding total measurement uncertainty in power meters and detectors

EMC TEST REPORT for HUIZHOU FREEWAY ELECTRONIC CO., LTD. Car DVD/Navigation Player

ei DG UV Test EC-Type Examination (Module B) Certificate A.1/3.27 a Penetrations through "B" Class divisions (electric cable transits)

Certificate Surveillance audit

Transcription:

ATÜVRheinland{ ' Precisely Föght CERTIFICATE of Product Conformity (QAL1 ) Certificate No.: 0000038496_01 AMs designation: Manufacturer: Test Laboratory: PCME QAL 181 fortotaldust PCME Ltd. 60 Edison Road St. lves Cambs PE273 GH United Kin TÜV Rheinland Energy GmbH This is to certify that the AMS has been tested and certified according to the standards EN 15267-1: 2009, EN 15267-2: 2009, EN 15267-3: 2007 and EN 14181: 2004 Ceriification is awarded in respect of the conditions stated in this certificate (this certificate contains 7 pages). Suitabi li'ty Tested EN 15267 QALI Cem.fied Regular Surveillance ww.tuv.com ID 0000038496 Publication in the German Federal Gazette (BAnz) of 05 March 2013 German Federal Environment Agency D#auu.#Mar#2018 Dr, Marcel Langner Head of Section 114.1 ww\a/.umwelt-tuv.eu tre@umwelt-tuv.eu Phone: + 49 221 806-5200 This ceriificate will expire on: 04 March 2023 TÜV Rheinland Energy GmbH Cologne, 04 March 2018 D b, fi3ek 4'.j ppa. Dr. Peter Wilbring TÜV Rheinland Enengy GmbH Am Grauen Stein 51105 Köln Test institute accredited to EN ISO/lEC 17025:2005 by DAkks (Geman Accreditation Body). This accreditation is limited to the accreditation scope defined in the enclosure to the ceriificate D-PL-11120-02-00. qall.de info@qall.de Page 1 of 7

Test Report: 936/21220334/A dated 28 September 2012 Initial certification: 05 March 2013 Expiry date: 04 March 2023 Certificate: Renewal (of previous certificate 0000038496 dated 22 March 2013 valid until 04 March 2018) Publication: BAnz AT 05.03.2013 B10, chapter I no. 1.1 Approved application The tested AMS is suitable for use at combustion plants according to EC Directive 2001/80/EC (13 th BImSchV), at waste incineration plants according to EC Directive 2000/76/EC (17 th BImSchV), the 27 th BImSchV, the 30 th BImSchV and TA Luft. The measured ranges have been selected so as to cater for as broad a field of application as possible. The suitability of the AMS for this application was assessed on the basis of a laboratory test and a three-month field test at cement plant. The AMS is approved for an ambient temperature range of -20 C to +50 C. The notification of suitability of the AMS, performance testing and the uncertainty calculation have been effected on the basis of the regulations applicable at the time of testing. As changes in legal provisions are possible, any potential user should ensure that this AMS is suitable for monitoring the limit values relevant to the application. Any potential user should ensure, in consultation with the manufacturer, that this AMS is suitable for the installation at which it will be installed. Basis of the certification This certification is based on: Test report 936/21220334/A dated 28 September 2012 issued by TÜV Rheinland Energie und Umwelt GmbH Suitability announced by the German Federal Environment Agency (UBA) as the relevant body The ongoing surveillance of the product and the manufacturing process qal1.de info@qal1.de Page 2 of 7

Publication in the German Federal Gazette: BAnz AT 05.03.2013 B10, chapter I no. 1.1, UBA announcement dated 12 February 2012: AMS designation: PCME QAL 181 for total dust Manufacturer: PCME Ltd., St. Ives, United Kingdom Field of application: For plants requiring official approval and for plants according to the 27 th BImSchV Measuring ranges during performance testing: Component Certification range Supplementary range Unit Dust 0 15 0 100 mg/m³ Software versions: Controller Software 7.90 Sensor Software 1.5D Restrictions: None Notes: 1. As a result of a temporary peak in the dust concentration at the measurement site, a measuring range of 0 to 85 mg/m³ was determined during the manual calibration of the measuring system at a set measuring range of 0 to 100 mg/m³. 2. The maintenance interval is four weeks. 3. During performance testing in accordance with EN 15267-3, the requirement for the determination coefficient R 2 of the calibration function was not fulfilled. 4. The dust concentration is determined in wet flue gas under operational conditions. 5. Supplementary testing (migration to standard EN 15267) as regards Federal Environment Agency (UBA) notices of 12 September 2006 (BAnz p. 6715, chapter I no. 1.2) and of 23 February 2012 (BAnz p. 920, chapter V notification 9). Test Report: TÜV Rheinland Energie und Umwelt GmbH, Cologne Report no.: 936/21220334/A dated 28 September 2012 qal1.de info@qal1.de Page 3 of 7

Publication in the German Federal Gazette: BAnz AT 14.03.2016 B7, chapter V notification 25, UBA announcement dated 18 February 2016: 25 Notification as regards Federal Environment Agency (UBA) notice of 12 February 2013 (BAnz AT 05.03.2013 B10, chapter I number 1.1) The current software versions of the PCME QAL 181 measuring system for total dust manufactured by PCME Ltd. are: Controller Software: 8.41 Sensor Software: 2.6 Opinion stated by TÜV Rheinland Energie und Umwelt GmbH dated 22 October 2015 Certified product This certification applies to automated measurement systems conforming to the following description: The PCME QAL 181 measuring system is a dust monitor which uses the scattered light principle (forward scattering) to determine dust concentrations. The sensor probe is mounted directly at the waste gas duct. Particles entering the measurement flow at the end of the probe will scatter light emitted by the laser beam. The forwardscattered light cone is transmitted to the detector s electronics at the far end of the probe outside the waste gas duct via a quartz rod. The instrument is continually supplied with purge air in order to prevent dust molecules from entering the instrument. The PCME QAL 181 analyser is equipped with automatic zero point, span point and contamination checks. The control unit records results of these checks. For span checks, a scattering body is automatically entered into the laser beam in order to test the sensor response to scattered light directly. A Pro-Scatter audit unit, which is optionally available, is required for linearity tests of the instrument (AST and QAL2). The current software version is: Controller software: 8.41 Sensor software: 2.6 The current manual version is: Version 5, dated 02/2016 qal1.de info@qal1.de Page 4 of 7

General remarks This certificate is based upon the equipment tested. The manufacturer is responsible for ensuring that on-going production complies with the requirements of the EN 15267. The manufacturer is required to maintain an approved quality management system controlling the manufacturing process for the certified product. Both the product and the quality management systems shall be subject to regular surveillance. If a product of the current production does not conform to the certified product, TÜV Rheinland Energy GmbH must be notified at the address given on page 1. A certification mark with an ID-Number that is specific to the certified product is presented on page 1 of this certificate. This document as well as the certification mark remains property of TÜV Rheinland Energy GmbH. Upon revocation of the publication the certificate loses its validity. After the expiration of the certificate and on request of TÜV Rheinland Energy GmbH this document shall be returned and the certificate mark must no longer be used. The relevant version of this certificate and its expiration date are also accessible on the internet at qal1.de. Certification of the PCME QAL 181 measuring system is based on the documents listed below and the regular, continuous surveillance of the manufacturer s quality management system: Basic testing: Test report: 936/21204255/A dated 07 July 2006 TÜV Rheinland Immissionsschutz und Energiesysteme GmbH, Cologne Publication: BAnz. 14 October 2006 no. 194, p. 6715, chapter I no. 1.2 UBA announcement dated 12 September 2006 Notifications: Statement issued by TÜV Rheinland Immissionsschutz und Energiesysteme GmbH dated 10 October 2008 Publication: BAnz. 11 March 2009, no. 38, p. 899, chapter IV notification 11 UBA announcement dated 19 February 2009 (Name changed for QAL 181) Statement issued by TÜV Rheinland Immissionsschutz und Energiesysteme GmbH dated 31 March 2009 Publication: BAnz. 25 August 2009 no. 125, p. 2929, chapter III notification 14 UBA announcement dated 3 August 2009 (New software version) qal1.de info@qal1.de Page 5 of 7

Statement issued by TÜV Rheinland Immissionsschutz und Energiesysteme GmbH dated 16 October 2009 Publication: BAnz. 12 February 2010 no. 24, p. 552, chapter IV notification 17 UBA announcement dated 25 January 2010 (Design) Statement issued by TÜV Rheinland Energie und Umwelt GmbH dated 12 October 2011 Publication: BAnz. 02 March 2012 no. 36, p. 920, chapter V notification 9 UBA announcement dated 23 February 2012 (New software version and optics) Initial certification according to EN 15267 Certificate no. 0000038496: 22 March 2013 Expiry date of the certificate: 04 March 2018 Test report: 936/21220334/A dated 28 September 2012 TÜV Rheinland Energie und Umwelt GmbH, Cologne Publication: BAnz AT 05.03.2013 B10, chapter I no. 1.1 UBA announcement dated 12 February 2013 Notifications in accordance with EN 15267 Opinion stated by TÜV Rheinland Energie und Umwelt GmbH dated 22 October 2015 Publication: BAnz AT 14.03.2016 B7, chapter V notification 25 UBA announcement dated 18 February 2016 (New software version) Renewal of the certificate Certificate no. 0000038496_01: 05 March 2018 Expiry date of the certificate: 04 March 2023 qal1.de info@qal1.de Page 6 of 7

Calculation of overall uncertainty according to EN 14181 and EN 15267-3 Measuring system Manufacturer PCME Ltd. Name of measuring system QAL 181 Serial number of the candidates 25141 / 31192 / 25142 / 32012 Measuring principle Scattered light Test report Test laboratory Date of report 936/21220334/A TÜV Rheinland 2012-09-28 Measured component Staub Certification range 0-15 mg / m³ Calculation of the combined standard uncertainty Tested parameter u² Standard deviation from paired measurements under field conditions * u D 0.249 mg / m³ 0.062 (mg/ m³)² Lack of fit u lof 0.029 mg / m³ 0.001 (mg/ m³)² Zero drift from field test u d,z 0.035 mg / m³ 0.001 (mg/ m³)² Span drift from field test u d,s -0.069 mg / m³ 0.005 (mg/ m³)² Influence of ambient temperature at span u t 0.100 mg / m³ 0.010 (mg/ m³)² Influence of supply voltage u v 0.015 mg / m³ 0.000 (mg/ m³)² Uncertainty of reference material at 70% of certification range u rm 0.121 mg / m³ 0.015 (mg/ m³)² * The larger value is used : 2 u c u max, j "Repeatability standard deviation at span" or "Standard deviation from paired measurements under field conditions" Combined standard uncertainty (u C) 0.31 mg / m³ Total expanded uncertainty U = u c * k = u c * 1.96 0.60 mg / m³ Relative total expanded uncertainty U in % of the ELV 10 mg/m³ 6.0 Requirement of 2000/76/EC and 2001/80/EC U in % of the ELV 10 mg/m³ 30.0 Requirement of EN 15267-3 U in % of the ELV 10 mg /m³ 22.5 qal1.de info@qal1.de Page 7 of 7