Invasive Plant Removal, Slope Stabilization, and Native Planting Manual

Similar documents
Rain Garden Maintenance Manual

Rain Garden Maintenance Manual

John F. Kennedy STEM High School Green Infrastructure Information Sheet

Vailsburg Park Green Infrastructure Information Sheet Location: 112 S Munn Avenue, Newark, NJ Site Use: Park

Homeowners Guide to Stormwater BMP Maintenance

Green Infrastructure Overview

Stormwater and Your Rain Garden

STORMWATER TOOL. Rain Garden

Tips for Maintaining and Enhancing Stormwater Management Areas

Lesson 2: Stormwater Best Management Practices (BMPs)

4.6. Low Impact and Retentive Grading

GREEN INFRASTRUCTURE DESIGNS RAIN GARDEN

Rain Gardens. A Welcome Addition to Your Landscape

Use of Best Management Practices

Pavement Removal Fact Sheet

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

Small Project Guidance Document

Inspection and Maintenance of Stormwater Best Management Practices

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

A couple of hours to pull weeds and fertilize with compost

Green City, Clean Waters

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Green Infrastructure Recommendations For Parks and Public Spaces

Rain Garden Fact Sheet

Conservation in South Jersey Being Creative with Restoration

Kittson Parkway / Watershed Park Parking Lot

Conservation Landscaping Spot Check Inspection Checklist

Erosion Control for Home Builders in the. City of Jacksonville

Rain Garden Site Selection and Installation

Building a Rain Garden in Colorado. Created By:

USDA Rain Garden Video fluid_planet.html

Bioretention and Permeable Pavement Maintenance

Planning, Design, and Construction of Green Infrastructure.

2

Plants for Rain Gardens and Pond Edges

5.0 Storm Water Landscape Guidance Introduction

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5

BIORETENTION FACILITY

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

Soil Health Practices in the Landscape

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Rain Gardens: Are They the Answer? Holmdel Homeowner Education Program. Holmdel, NJ October 9, 2010

SMALL PROJECTS SIMPLIFIED APPROACH

4. CONCEPT PLAN DEVELOPMENT

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

OPERATIONS & MAINTENANCE MANUAL STORMWATER CONTROL STRUCTURE DRY DETENTION POND

Town of Essex Small Site Erosion Control Guide

WQ-07 INFILTRATION TRENCH

Raingardens. Conserving and Protecting Water L

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Inventory and Assessment of Stormwater Infrastructure

WET PONDS INSPECTION & MAINTENANCE CHECKLIST

Stormwater Control Plan: Small (Tier 1) Land Development Project

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

Certain areas of your yard or property may not represent a good location for your rain garden. Don t plant your rain garden:

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

Save Time and Money and Have a Greener, Healthier Yard!

Brian Friedlich, PE. Jeremiah Bergstrom, LLA

Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Rain Gardens: Capturing our local water. Martha Berthelsen The Watershed Project

J. Paul Guyer, P.E., R.A.

Keeping the Rain from the Drain

State of Rhode Island Stormwater Management Guidance for Individual Single-Family Residential Lot Development

C-10. Disconnected Impervious Surface

2.1.4 Roof Downspout Rain Gardens

Monitoring Flow and Quality for Stormwater Control Measures

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

Municipal Stormwater Management: Does Your Town Need More than the Minimum?

All About Rain Gardens

RAIN GARDENS. Task: PART 1 (60 minutes) Student Directions: Steps you will be following: Directions for beginning: Source Information:

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Green Stormwater Infrastructure Maintenance Manual

Raingardens and Bioretention Tree Pits MAINTENANCE PLAN. EXAMPLE June 2008

Chapter 14. Stormwater Quality Introduction

Templates for Maintenance Documents

West Norriton Township

Residential Rain Gardens. Dr. Cathy Neal Extension Specialist Landscape Horticulture

Williamsburg Boulevard Green Streets Project. April 27, 2011 Williamsburg Middle School

Green Infrastructure Stormwater Management Options in an Ultra-Urban Redevelopment. Sandy Doyle-Ahern

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

Post Construction BMPs

Low Impact Development in Northern Nevada: Bioretention

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

Development of LID Design Guide in Edmonton

Weston s Wetlands, Stormwater, & Open Space

Tree Pits Construction Guide

Landscape Rebate: Rainwater Harvesting Rain Garden Installer Guidelines

A Property Management Model for Green Infrastructure Site Maintenance. #ProjectCleanLake

Homeowners Guide to Stormwater BMP Maintenance

Rain Gardens. A better way to manage stormwater. Thinking Globally and Acting Locally

ATTACHMENT A STORMWATER MANAGEMENT TECHNIQUES Cahill Associates Environmental Consultants

The following general requirements will be met for all planter box installations:

n1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions.

Bioretention Area Inspection and Maintenance Checklist

Horsley Witten Group Sustainable Environmental Solutions. Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com

Stormwater Low Impact Development - A Natural Solution

Transcription:

Invasive Plant Removal, Slope Stabilization, and Native Planting Manual Stockton Street Phillipsburg Warren County New Jersey July 2018 Contents Rain Garden Description 1 Responsible Owner Information 1 Preventative and Corrective Maintenance 2 Equipment, tools, and supplies 3 Maintenance Schedule 3 Estimated Costs 3 Maintenance and Inspection Checklist 3 Construction and Planting Plan 3 Attachments 4

Rain Garden Description A rain garden is a landscaped, shallow depression that captures, filters, and infiltrates stormwater runoff. The rain garden removes nonpoint source pollutants from stormwater runoff while recharging groundwater. A rain garden has two main goals. The first goal is to serve as a functional system to capture, filter, and infiltrate stormwater runoff at the source, and the second goal is to be an aesthetically pleasing garden. Rain gardens are an important tool for communities and neighborhoods to create diverse, attractive landscapes while protecting the health of the natural environment. Rain gardens: capture stormwater runoff reducing erosion and sedimentation and the amount of water that flows to our streams and waterways during rain storms protect water quality by filtering out and breaking down pollutants infiltrate runoff and thereby recharge groundwater supplies and provide baseflow to nearby streams and waterways provide the opportunity to establish native plant communities to promote biodiversity and habitat for beneficial wildlife integrate necessary soil improvements and native plants adapted to periodic wet and dry periods mimicking our New Jersey natural landscape To a certain extent, a traditional landscaped bed or flower garden can provide functions similar to a rain garden. But, to provide all the benefits of a rain garden including capturing, filtering, and infiltrating stormwater runoff, a shallow basin must be dug and planted slightly below-grade to store water. Ideally, a rain garden is planted with a variety of grasses, wildflowers, and woody plants that are adapted to the soil, precipitation, climate, and other specific site conditions. Using native plants with deeper root systems facilitates infiltration and also sustains the landscape through periods of drought. (SOURCE: Rain Garden Manual of New Jersey, Rutgers Cooperative Extension) Responsible Owner Information The following individual/s are responsible for preventative and corrective maintenance of the rain garden installed on the property located at the intersection of Stockton Street and Pine Alley. NAME: Lawrie Morello ADDRESS: 119 Sitgreaves Street, Phillipsburg, NJ 08865 PHONE NUMBER: 908-454-7557 EMAIL: lawriesgarden@gmail.com NOTE: Responsibility for maintaining the rain garden shall remain with the owner of the property Rain Garden Maintenance Manual Page 1

Preventative and Corrective Maintenance Proper and timely maintenance is important for continuous, effective function of the rain garden. Access to the rain garden from surrounding lawn areas should be maintained at all times. The following maintenance actions are required to keep the rain garden functioning properly. WATERING Water is essential for the survival of a newly installed rain garden. The garden should be watered regularly during the first three months and as needed throughout the future in times of drought. Plants should be watered every day for the first week they are in the ground and then once a week after that, unless there is substantial rainfall. In hot weather or times of drought, the rain garden will need water one to two times a week to prevent the loss of plants, even if the garden is already established. WEEDING Remove unwanted weeds from the garden by hand. Pull them from the base of the weed to remove the roots. As the garden becomes established, the rain garden plants will spread and out-compete unwanted weeds. MULCHING Mulch is used to prevent weeds and retain moisture in the rain garden. During the first year the garden is growing, maintain a 3-inch layer of mulch between plants. As the rain garden plants spread and become denser, you may find mulching the garden more difficult. Mulching beyond the first year is optional. Please be careful not to excessively mulch the garden, and keep mulch away from any drain inlets and outlets. INSPECTING AND CLEANING INLETS/OUTLETS Inspect the rain garden s inlets monthly, and be sure to remove any leaves, trash, or debris that may prevent water from passing through. Observe the inlet during rainstorms to make sure stormwater is flowing into the rain garden. After rainstorms, please check the garden to be sure drainage outlet paths are clear and that water is not ponding for more than 48 hours. All structural components should be inspected at least once each year. MOWING DO NOT mow or use a line-trimmer inside of the rain garden. This damages the plants and can destroy the rain garden. VEGETATION AND PLANTINGS During rain garden establishment, vegetation should be inspected bi-weekly. Vegetated areas must be inspected at least once each year for erosion, scour and unwanted growth. Unwanted growth should be removed from the rain garden. Remove and replace any dead plants in the garden as needed. Rain Garden Maintenance Manual Page 2

PRUNING Prune overgrown material in the garden annually when the plants are dormant. Remove dead plant material and deadhead flowers. This will encourage dense, new vegetative growth. DRAINAGE The rain garden is to be inspected twice each year to determine if permeability of the bed has decreased. The rain garden is designed to infiltrate all stormwater runoff within 48 hours. No standing water should be visible 48-72 hours after a storm event. If standing water remains in the rain garden after 72 hours corrective actions will be needed. Equipment, tools, and supplies No specialized equipment is needed for routine rain garden maintenance. A garden shovel, rake, pruning shears, and water hose are all that is required to keep the rain garden working and healthy. Maintenance Schedule Each month and following storm events, the rain garden should be inspected. A schedule with specific inspection notes is attached. It is recommended that photographs be taken during inspections to document conditions. Estimated Costs Regular maintenance activities can be completed by the property owner at no additional cost. Below are estimated costs for plants and materials that may be needed as the rain garden matures and develops: Replacement perennial plantings (1 gallon pots) Replacement shrub plantings (3 gallon pots) Triple-shredded hardwood mulch $7.00 - $10.00/plant $25.00 - $40.00/plant $15.00 - $25.00/cubic yard Maintenance and Inspection Checklist In addition to the schedule, a maintenance and inspection checklist is attached to assist in documenting the condition, function, and establishment of the rain garden. In addition to completing the form, it is recommended that photos be taken and kept on file. Construction and Planting Plan For reference purposes a copy of the construction plans and final planting plan are attached as part of the maintenance plan. These documents provide guidance to all components of the rain garden and the plantings that were installed when the system was constructed. Rain Garden Maintenance Manual Page 3

ATTACHMENTS Maintenance Schedule Maintenance and Inspection Checklist Construction and Planting Plans Rain Garden Maintenance Manual Page 4

Stockton Street Project, Stockton Street Schedule for Maintenance and Inspection First Quarter (Jan-Mar) Second Quarter (Apr-June) Third Quarter (July-Sept) Fourth Quarter (Oct-Dec) Year 1 Conduct monthly inspection of plantings. Inspect & clean outlet structures after each significant storm event (> 1"). Conduct annual pruning and removal of dead vegetation. Add mulch as desired. Inspect and clear all gutters, downspouts, and Conduct monthly inspection of plantings. Inspect and clean outlet structures after each significant storm event (> 1"). Repair erosion and replace plantings as needed. Conduct monthly inspection of plantings. Inspect and clean outlet structures after each significant storm event (> 1"). Remove invasive species/weeds if needed. Inspect and clear all gutters, downspouts, and Conduct monthly inspection of plantings. Inspect and clean outlet structures after each significant storm event (> 1"). Repair erosion if necessary. Year 2 inspection of plantings. outlet structures. Conduct annual pruning and removal of dead vegetation. Add mulch as desired. Inspect and clear all inspection of plantings. Inspect and clean inlet and outlet structures. Repair erosion and replace plantings as needed. inspection of plantings. outlet structures. Remove invasive species/weeds if needed. Inspect and clear all inspection of plantings. outlet structures. Repair erosion if necessary. Year 3 inspection of plantings. outlet structures. Conduct annual pruning and removal of dead vegetation. Add mulch as desired. Inspect and clear all inspection of plantings. Inspect and clean inlet and outlet structures. Repair erosion and replace plantings as needed. inspection of plantings. outlet structures. Remove invasive species/weeds if needed. Inspect and clear all outlet structures. Repair erosion if necessary. Year 4 outlet structures. Conduct annual pruning and removal of dead vegetation. Add mulch as desired. Inspect and clear all Repair erosion and replace plantings if necessary. outlet structures. Remove invasive species/weeds if needed. Inspect and clear all outlet structures. Repair erosion if necessary. Year 5 & Beyond outlet structures. Conduct annual pruning and removal of dead vegetation. Add mulch as desired. Inspect and clear all outlet structures. Remove invasive species/weeds if needed. Inspect and clear all

William Penn Foundation Green Infrastructure Maintenance Report Form GENERAL INFORMATION Name(s) of person inspecting the green infrastructure system: Location (address and cross streets/site location name): Date: Property Owner / Tax Parcel Block & Lot: Property owner contact information: Type of green infrastructure system: EXISTING CONDITIONS Description of the current site conditions and specific condition of the system: GENERAL OBSERVATIONS 1) Any reports of the system not functioning? YES NO COMMENTS 2) Are there any unauthorized or malfunctioning structures located in the system? 3) Is the system overgrown with vegetation or contain excessive debris/trash? 4) Is there standing water or evidence of standing water? 5) Signs of breakage, damage, corrosion or rusting of any structures or components? 6) Debris or sediment accumulation clogging the system? 7) Signs of erosion, disturbance, or vandalism? 8) Is vegetation healthy and thriving? 9) Is there evidence that anyone has maintained the system in the recent past?

William Penn Foundation Green Infrastructure Maintenance Report Form ADDITIONAL OBSERVATIONS RECOMMENDED MAINTENANCE NEEDS Circle all that apply: 1) Remove litter/debris 2) Remove sediment 3) Manage vegetation (weed, prune, water, edge) 4) Clean inlet and/or outlet 5) Vacuum or power wash 6) Replace: mulch - stone - plants 7) Winterize system - spring set up (cisterns/planter boxes) 8) Repairs needed: (indicate specific requirements) MAINTENANCE SUMMARY 1) Were all recommended maintenance activities noted above completed? Indicate how many staff and how much time was spent to complete all maintenance activities. 2) Were new materials placed or installed? (Plants, mulch, or stone). Indicate how much material and/or specific plantings used. Attach invoice or purchase order. 3) Are there any indications of the system not functioning properly or any components that need to be repaired or replaced? 4) Is there evidence of significant damage due to vandalism that should be noted and addressed with the owner and/or the authorities? Additional notes for maintenance: Description: Description: Description: Description:

William Penn Foundation Green Infrastructure Maintenance Report Form SUMMARY AND NOTES (briefly describe work completed, effort required, and any contact with property owner, questions, or site specific recommendations for future maintenance): Be sure to photograph the system before and after maintenance activities!

PLAN NOTES: 1. CONTRACTOR SHALL SCHEDULE MEETING WITH ENGINEER AND PROPERTY OWNER PRIOR TO MOBILIZATION AND CONSTRUCTION. 2. CONTRACTOR SHALL VERIFY ALL INFORMATION INCLUDING ELEVATIONS AND UTILITIES PRIOR TO CONSTRUCTION. 3. CONTRACTOR SHALL VERIFY ALL PROPOSED MATERIALS WITH PROPERTY OWNER AND ENGINEER PRIOR TO CONSTRUCTION. 4. CONTRACTOR SHALL STAKE OUT LOCATIONS OF PROPOSED RAIN GARDENS, STONE CHANNELS, AND TRENCH DRAIN AND OBTAIN APPROVAL FROM ENGINEER PRIOR TO INSTALLATION. 5. CONTRACTOR SHALL INSTALL CONVENTIONAL ASPHALT AS SHOWN ON PLAN. THE ASPHALT AND CONCRETE MIXING PLANT, HAULING AND PLACING EQUIPMENT, AND INSTALLATION SHALL BE IN CONFORMANCE WITH NAPA IS 131 AND THE NJDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, 2007 OR LATEST VERSION. 6. CONTRACTOR SHALL GRADE SITE AS SHOWN ON PLAN. CUT SOIL SHALL BE REUSED ON SITE FOR FILL LOCATIONS. 7. CONTRACTOR SHALL HAUL EXCESS SOIL OFF SITE UNLESS OTHERWISE NOTED BY PROPERTY OWNER. 8. ALL FINISHED ELEVATIONS SHALL MATCH ADJOINING PAVEMENT ENSURING SMOOTH TRANSITIONS AND NO TRIPPING HAZARDS. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL AREAS DISTURBED DURING CONSTRUCTION TO ORIGINAL CONDITIONS. NOTE 1: STONE SHALL BE COMPRISED OF 3"-5" DIAMETER CLEAN, WASHED RIVER STONE. ALL AREAS OF EROSION PROTECTION STONE SHALL BE UNDERLAIN WITH GEOTEXTILE FABRIC (GEOTEX 801 BY PROPEX OR APPROVED EQUIVALENT). NOTE 2: UNDERDRAIN TO ONLY BE IMPLEMENTED IF INFILTRATION IS INADEQUATE AT THE SITE. or UNDERDRAIN TO BE IMPLEMENTED IF TESTED INFILTRATION IS INADEQUATE AT THE SITE. CHRISTOPHER C. OBROPTA, Ph.D., P.E. PROFESSIONAL ENGINEER - NJ LICENSE # 37532 DATE 05/26/17 DATE 05.26.17 APPROVED CCO CHECKED MAL DRAWN ESN 214' SLOPE STABILIZATION (330 SF) EXISTING GARDEN MAINTAINED BY RESIDENTS EXISTING BILLBOARD REVISIONS No. DATE DESCRIPTION PARKING LOT STOCKTON STREET PROJECT GREEN INFRASTRUCTURE PROJECTS STOCKTON STREET, PHILLIPSBURG WARREN COUNTY, NJ PROPOSED SITE PLAN N 0 5' 10' SCALE 1" = 5'-0" SITE PLAN SHEET NAME P-2

RA N STOCKTON STREET PROJECT GREEN INFRASTRUCTURE PROJECTS STOCKTON STREET, PHILLIPSBURG WARREN COUNTY, NJ PLANTING PLAN BA, CL, and PD REVISIONS No. DATE DESCRIPTION CHRISTOPHER C. OBROPTA, Ph.D., P.E. PROFESSIONAL ENGINEER - NJ LICENSE # 37532 DATE 05/26/17 DRAWN ESN CHECKED MAL APPROVED CCO PLANTING SCHEDULE PLANT SPECIES QUANITITY TYPE KEY BOTANICAL NAME COMMON NAME COUNT PERENNIALS BA Baptisia australis BLUE FALSE INDIGO 25 1 QUART CL Coreopsis lanceolata LANCE-LEAFED COREOPSIS 25 1 QUART PD Penstemon digitalis FOXGLOVE BEARDTONGUE 25 1 QUART SHRUBS RA Rhus Aromatica FRAGRANT SUMAC 6 #2 CONT. SIZE 0 1' 2' SCALE 1" = 1'-0" SHEET NAME PLANTING PLAN P-3 DATE 05.26.17

Concept Drawing Stockton Street, Phillipsburg, NJ

Before Stockton Street, Phillipsburg, NJ Invasive Plant Removal and Slope Stabilization Stockton Street, Phillipsburg, NJ