NBSeries Installation Operation & Maintenance

Similar documents
TCPSeries Installation Operation & Maintenance

GREEN. Boilers. Furnaces. Hot Water Heaters. Stack Economizers. Flue Drains SOLUTION FOR NEUTRALIZATION. Your

GREEN. Boilers. Furnaces. Hot Water Heaters. Stack Economizers. Flue Drains SOLUTION. Your

NBSeries Installation Operation & Maintenance

JMSeries Installation Operation & Maintenance

JMSeries Installation Operation & Maintenance

NBTSeries Installation Operation & Maintenance

Outdoor kit. Models: RTG 199HE / RTG 199ME. Installation Instructions

RS Chimney Fan For Gas & Oil Applications. Installation & Operating Manual USA CAN

EXTREME HP-1 Reverse Osmosis System

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-200 INDIRECT FIRED SPACE HEATERS

Fully Automatic Water Filters

ALDRICH COMPANY THREE PASS FIRETUBE BOILER CLASSIC SERIES OPERATING & MAINTENANCE MANUAL

EXTREME 1 Reverse Osmosis System

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-400 INDIRECT FIRED SPACE HEATERS


Iron Air Charge MangOx 2510 SXT Installation & Start Up Guide

Handling the Condensate. Trap Requirements

MODEL A18 SOLVENT RECOVERY SYSTEMS (EXPLOSION PROOF UNITS)

DOMESTIC WATER HEATER OIL FIRED

CONVERSION TO PROPANE MANUAL M-Series Condensing Boiler. Wall-Mounted, Gas-Fired Boiler

INSTALLATION AND OPERATION MANUAL GAS SKILLETS MODELS: GTS-30 GTS-40

INSTALLATION INSTRUCTIONS & USE & CARE GUIDE 06E Series Model 06E Series Model RANGE HOOD LOCATION 1. The range hood must be installed just above the

E-Z Zone Pack 3+1 And 5+1 Boiler Manifold System

RS Chimney Fan for Solid Fuel Applications

CMO32 CMO50 DOMESTIC WATER HEATER OIL-FIRED. Models: CMO32 CMO50

Mighty Venter Power Vent System

INSTALLATION INSTRUCTIONS TXV Horizontal Slab Coils WLSH

NT1-P CONDENSATE NEUTRALIZATION TANK WITH PUMP INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS

TECHNICAL INSTRUCTIONS

GPC PASTA PRO INSTALLATION & USER OPERATION MANUAL

READ AND SAVE THESE INSTRUCTIONS DE-SCALING SOLUTION. Humidifier De-scaling Solution and Neutralizer. Usage Instructions

southbend A MIDDLEBY COMPANY INSTALLATION AND OPERATION MANUAL CG214 (E) CG314 (E) CG414 (E) CG220 (E) CG320 (E) CG325 (E) GAS BOILERS MODELS:

BEFORE OPERATING THE MACHINE: WARNING

Revolving Oven Gas Wood Model 140

8-SERIES (S,W) OIL FIRED BOILER ELECTRICAL WIRING DIAGRAMS

Installation Guide. Inline Chlorinator TM. Vitasalus, Inc Rankin Drive Troy, Michigan USA

Fleck 5600 Carbon Filter Installation & Start Up Guide

ELECTRONIC FIREPLACE DAMPER

INSTALLATION INSTRUCTIONS TXV Horizontal Duct Coils EHD

INSTALLATION & OPERATION MANUAL

Installation Instruction

Weil-McLain part numbers are found in Weil-McLain Boilers and Controls Repair Parts Lists.

CAUTION All safety information must be followed as provided in this Technical Sheet and in Service Manual RS

TECHNICAL DATA. Wet 26a. February 22, 2009

ADVANTAGE-100H-SC EXTRACTOR

ELECTRONIC FIREPLACE DAMPER

EBC 10 Fan Control USA CAN. Product Information. ... Chapter 1+2. Mechanical Installation. ... Chapter 3. Electrical Installation. ...

EXTREME 2 Reverse Osmosis System

INSTALLATION AND OPERATION MANUAL STEAM COIL BASE CONVECTION STEAMER MODEL SCX-16

Installation & Operation Manual Models:

Description Model Weil-McLain part number. Vent Termination Kit for 3" Stainless Steel All

RS Chimney Fan for Solid Fuel Applications

User s Information Manual

Installation Instruction. Puritan Bennett. Wall Air Water Trap For 800 Series Ventilator Basic Cart. Pla

DESIGN CLASS FUNCTION

Operator Manual Autofill System

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

Clean Water Made Easy

SERVICE FACTS WARNING M801-SF-1C. Gas Furnaces Upflow & Downflow Induced Draft 1 Stage Heat Models: DISCONNECT POWER BEFORE SERVICING M801P040AU24AA

SuperStor Ultra Stainless Steel Storage Tank

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-214(C) Series 61 Low Water Cut-Off OPERATION

Residential Gas Hybrid Water Heater

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners

Installation, Operation and Service Manual

Isolux Arsenic Removal Systems Central Treatment Systems Operation and Maintenance Manual

CAUTION WARNING INSTALLATION INSTRUCTIONS FOR HEALTHY CLIMATE WHOLE HOME DEHUMIDIFIER MODEL HCWH-065 (Y3013) DEHUMIDIFIERS

Columbia Boiler Company

OWNERS MANUAL MODEL DO110 & DO180 IS CERTIFIED TO: Unit Serial # Purchased From Company Address

Installation Guide. 5 Series VGC and VGSU Built-In Gas Cooktops

FRYMASTER TCF. Chicken Fryer

NCC199CDV Commercial Water Heating System Installation Manual

User s Information Manual

Gas Fired Residential Combi Boiler Floor and Wall Mount Models

5900e Neutralizer Installation & Start Up Guide

EcoSmart Troubleshooting Guide

AGITATOR V DO NOT OPERATE THE MACHINE UNTIL YOU HAVE READ ALL SECTIONS OF THESE INSTRUCTIONS IMPROPER USE OF THE MACHINE WILL VOID THE WARRANTY

INDUSTRIAL VACUUM CLEANER WITH AUTO START/STOP

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

INSTALLATION INSTRUCTIONS TXV Horizontal Duct Coils EHD

MG SERIES GAS OPERATED BOILERS INSTALLATION - OPERATION - MAINTENANCE M24G M36G MODELS

Crown Boiler Company

Clean Water Made Easy

Suggested Specifications Prestige Excellence 110

USER'S INFORMATION MANUAL

EUTECTIC EC-10DV Series

SuperStor Glass Lined Storage Tank

installation Guide

Universal Fire Tube Boiler Wall Mount Models

VSL II QUICK START GUIDE

Humidifier De-scaling Solution. and Neutralizer. Usage Instructions. IMPORTANT: Read and save these instructions. Before

8070 Mytee Lite. Instructions for. Please read before use. Register your product at support/register.

Owner s Guide Installation & Operation

FLOOD KING 120V. 2. Keep all filters clean. Do not operate the machine if the filters are clogged.

INSTALLATION INSTRUCTIONS

PRE-INSTALLATION PROCEDURE

IMPORTANT SAFETY INFORMATION READ ALL...

Single stage operation oil burner

User s Information Manual

INSTALLATION INSTRUCTIONS Cased N Coil, Horizontal ENH4X

Transcription:

Revised - March, 208 NBSeries Installation Operation & Maintenance Models: NB-6-P Acidic Condensate ph Treatment Tank/Pump Coleman Ave. Westfield, MA 0085-527-89 690 Island Way Unit 206, Clearwater, FL 767-27-7 jjmboilerworks.com

ALL JJM NEUTRALIZING PRODUCTS! WARNING JJM neutralizers are sized by BTU input to establish a flow rating. Job site conditions will determine neutralizer design. See GPH chart below. How much fireside condensate will my equipment develop? Hot water heaters / Boilers / Furnaces / Economizers Equipment Efficiency GPH Condensate 90%.725 / Per 00,000 BTU Input 9%.7 / Per 00,000 BTU Input 92%.7 / Per 00,000 BTU Input 9%.750 / Per 00,000 BTU Input 9%.758 / Per 00,000 BTU Input 95%.766 / Per 00,000 BTU Input 96%.77 / Per 00,000 BTU Input 97%.782 / Per 00,000 BTU Input 98%.790 / Per 00,000 BTU Input 99%.798 / Per 00,000 BTU Input Multiple Boiler Common Flue drains:.% of total BTU input of connected equipment. Example: () Boilers @ 00,000 BTU Input would need a ph treatment kit rated @ 00,000 BTU for the stack drain and a flow rate of.725 to.798 depending on efficiency. Consider the following when choosing a neutralizer for less maintenance during operation of your heating equipment.. Your location in relation to weather (Very Cold, Cold, Moderately Cold) 2. System Design (Process, Radiate, Snow Melt, Heating, etc.). Yearly Operating Hours. ph level out of heating equipment (.2 to.0 is normal) 5. If ph out of the heating equipment is below.2 ph contact the factory for sizing. 6. Abnormally low ph out of the equipment condensate drain can be caused by the following: A. Improper Combustion B. Contaminated Combustion Air C. High Sulfur Content in Gas Supply D. ph below 2.0 is considered hazardous waste by EPA. Contact JJM Technical Service at -27-7 or -527-89 JJM highly recommends operating your heating equipment for 2-8 hours prior to connecting a neutralizer so as to flush out dirt, grease, and oils from connected piping and the heater. This is also the best time to check the heater condensate ph level for sizing your neutralizer.

Maintenance! DANGER Indicates a condition or hazard which will cause severe personal injury, death or major property damage.! NOTICE Indicates special attention is needed, but not directly related to potential injury or property damage.! WARNING Indicates a condition or hazard which may cause severe personal injury, death or major property damage.! CAUTION Indicates a condition or hazard which will or can cause minor personal injury or property damage. Install all electrical wiring in accordance with the National Electrical Code and local requirements.! NOTICE This unit when installed must be electrically grounded in accordance with the requirements of the authority having jurisdiction or, in the absence of such requirements, with the current edition of the National Electrical Code, ANSI/ NFPA 70 and/or the Canadian Electrical Code, Part, CSA C22., Electrical Code.! CAUTION Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing. Inspect frequently Installer Instruct the building owner to frequently inspect the NB neutrazlier and all condensate connections. The owner must notify a qualified technician if any problems are noticed. Replacement parts Contact JJM Boiler Works, your local wholesaler or manufacturer s representative for replacement parts and refill kit. Pump Model 8025-2-26. GPH open flow, EPDM Valves, Santoprene Description: Diaphragm, 60 PSI Demand Switch, /8 NPT Femail Ports, Poly Housing, Voltage 5 VAC PSI 20 0 60 Bar. 2.8. GPM.26.08 0.92 L/min.8..5 Amps 0.0 0.9 0.57 Tubing Connection /2 I.D. 2

Overview Read before proceeding Failure to comply with these guidelines could result in severe personal injury, death or substantial property damage. Tank and lines must be wet Before operating the boiler or furnace, fill the NB tank and traps with tap water. NEVER operate with tanks or P-Traps dry.! DANGER Application restrictions Flue gas condensing boilers, furnaces, hot water heaters and flue pipe condensate drains only DO NOT exhaust flue gases through NB tank, is not rated for boiler or furnace flue gases. Operating NB tanks as exhaust vents can cause injury or death from carbon monoxide. Gas traps must be installed between the boiler, vent drains, hot water heaters and furnace condensate outlet and the inlet of all NB tanks. NB tanks must be installed below sysem P-traps, boiler, furnace, and breeching condensate drains. Combined piping options Flue pipe condensate drains Boiler/furnace condensate drain/hot water hearter and flue condensate drain can be commonly piped to a neutralizer tank. Also, the flue pipe must be terminated so rain water cannot enter the flue pipe. Recharge tanks regularly Tanks should be recharged when ph level moves below 5.0. The ph should be checked regularly (at least twice during the first year of operation) to determine the required recharging schedule. What is ph? The ph measurement of a fluid is an indicator of the acidity or alkalinity. Neutral fluids have ph of 7.0. Acid fluids have ph below 7. And alkaline fluids have ph above 7 (up to ). The ph can be easily measured using digital pocket ph probe Condensate ph from condensing boilers and furnaces is typically around. The condensate ph needs to be increased (made more neutral) to prevent possible damage to cast iron soil pipe, ABS pipe, septic tanks, plants, wastewater treatment plants and other materials handling waste water. NB-series condensate neutralizing tanks increase ph (reduce acidity). NB-series commercial fire-side condensate treatment tanks are designed to raise the ph level of the condensate discharged by high-efficiency boilers and warm air furnaces. Each change of.0 in ph is a 0-times reduction (or increase) in concentration. The ph of condensate is increased by approximately.0 to.0 higher after passing through NB neutralizing tanks. Applying NB-series neutralizing tanks Condensate can be collected from flueways and boiler/furnace/ hot water heater condensate trap outlets. See WARNING section at left for guidelines on application. Match neutralizing tank to boiler/furnace ratings. Use multiple tanks if needed to handle the load. Consider using the next larger size neutralizing tank for boiler systems with domestic hot water heating. Consider your location and operating hours of your heater. Consider your location and operating hours of your heater. Discharge lines may be mounted overhead. Follow the guidelines in this manual, the boiler/furnace manual and all applicable local codes when installing, using and maintaining NB-series Condensate ph treatment tanks. Installation sequence. Before installing boiler or furnace, determine if a mounting pad will be needed to elevate the boiler or furnace so that the condensate connection will be above bottom of the NB tank OUTLET. See Figure 2. 2. Place the NB tank in position. Fill the tank to the maximum fill line with neutralizing agent obtained from JJM Boiler Works only.. Connect PVC piping from appliance or breeching drains to P-traps and then from P-trap outlets to either one of the two NB tank inlets.. Connect the NB tank via the /2 pump outlet lines can be run overhead or on the floor. Vinyl reinforced tubing is recommend. 5. Use Teflon tape on all threaded plastic fittings. 6. NOTE Always consult the local authority regarding any requirements concerning flue gas condensate handling codes.

Thermally Protected -9-0Motor with internal.25 Amp Slow Blow Flow Rate Max. GPM 5. L/min Mfg. Date /9 Max Switch Pressure 60 PSI. Bar 2 Meters Voltage:5 VAC 60 Hz 0.7 Max Amp 8 Watts Model 8025-2-26 Thermally Protected NB-6P Condensate PH Treatment Tank NBseries Acidic Condensate ph Treatment Kits Installation/Operation & Maintenance Rev 0/2/5 Installation L W C C2 Figure NB-6P Condensate Treatment Tank - features, ratings and dimensions O O2 2 H H2 L 2 O O2 W I2 I 2 H H2-9-0Motor with internal.25 Amp Slow Blow Flow Rate Max. GPM 5. L/min Mfg. Date /9 Max Switch Pressure 60 PSI. Bar 2 Meters Voltage:5 VAC 60 Hz 0.7 Max Amp 8 Watts Model 8025-2-26 Note: Float switch is made and activates the pump at the 5 water level from the bottom of the tank. Ratings & Dimensions (in inches) Model MBH GPH L W H H2 O O2 NB-6P 000 0 7 2 6 8 Cap 5 port Inlet port / Outlet /2 /8 port Piping: See figures 2 and. Recharging procedure Use rubber or latex gloves and low level respirator mask when handling all aggregate.. Rinse tank pellets with fresh water 2. Empty new pellets into tank to fill line.. Inspect or clean filter.. Inspect all inlet & outlet lines for obstructions. Failure to comply with these guidelines could result in severe personal injury, death or substantial property damage. ph Treatment condensate tank Fill Instructions Model: NB-6-P ALL WORK MUST BE DONE BY AN EXPERIENCED HEATING TECHNICIAN. Rubber or plastic gloves, eye protection, and a dusk mask must be worn. 2. The ph treatment tank should be recharged at least to a minimum of once a year.. Remove any electrical power from the boiler, hot water heater, or furnace.. Remove the twist of cap from the tank and carefully pour the pellets into the tank as not to damage the float switch. Level off evenly the pellets. Add fresh water into the tank just above the pellets.

Installation Figure 2 Piping for Single Heating Unit C A Boilers / Hot Water Heaters / Furnace Condensate Drains E B B C Flue Drain Flue Vent F D E F NB-6-P ph Treatment Tank Only Remote Drain/Above Floor Pipiing Boilers / Hot Water Heaters / Furnaces A D Note: Contact Factory for ph Treatment Tank Sizing and Pipe Sizing. Figure Piping for Multiple Heating Unit with Common ph Treatment Tank Figure Piping for Multiple Heating Units with Common ph Treatment Tank C F F F F A D E B A Boilers / Hot Water Heaters / Furnace Condensate Drains A Boilers / Hot Water Heaters / Furnace Condensate B Flue Drains B Flue C Drain Common Flue Vent C Common D NB-6-P Flue Vent ph Treatment Tank Only D NB-6-P E Remote ph Treatment Drain/Above Tank Only Floor Pipiing E Remote Drain/Above Floor Piping F Boilers / Hot Water Heaters / Furnaces F Boilers / Hot Water / Furnaces Note: Contact Factory for ph Treatment Tank Sizing and Pipe Sizing. Note: Contact Factory for ph Treatment Tank Sizing and Pipe Sizing 5

Installation Figure 8 NB-6-P Wiring Diagram NB-6-P Wiring / Shurflo Pump FLOAT SWITCH CUSTOMERS 20VAC POWER CONNECTION. PHASE NEUTRAL BLK WHT Remote Panel BLK SERVICE SWITCH AND RECEPTACLE JUNCTION BOX WHT SERVICE SWITCH H N T 2 VOLT ZONE T FIELD WIRING BRING POWER AND CONNECT IN SWITCH BOX. CONNECT TO 5AMP CB GROUND GRN GRN BLK PUMP RECEPTACLE PUMP ZONE SR50 RELAY WHT GRN 20 VOLT FIELD WIRING FACTORY WIRING Install all electrical wiring in accordance with the National Electrical Code and local requirements.! NOTICE This unit when installed must be electrically grounded in accordance with the requirements of the authority having jurisdiction or, in the absence of such requirements, with the current edition of the National Electrical Code, ANSI/NFPA 70 and/or the Canadian Electrical Code, Part, CSA C22., Electrical Code. 6

Installation Maintenance Procedures Getting the most out of your JJM Neutralizer Acidic wastewater neutralizers like all filtering devices need both maintenance and replacing. The average ph level of acidic wastewater produced by today s condensing boilers, hot water heaters, furnaces, flue stack drains, and stack economizers is.2ph. When using a passive Inline Tube, Tank, or Canister the range of ph modification will fall in between 5.0 and 9.5 ph. When the ph falls below 5.0 at the outlet port of any neutralizer the active ingredient must be replaced. Media replacement schedule will depend on several factors including Operating Hours, Efficiency, System Design, and Neutralizer Piping Scheme. The active ingredient in the case of JJM products is Magnesium Hydroxide Pellets. The trade name is ph Power Pellets. Before changing the pellets when the ph level falls below 5.0 you can get the most out of your neutralizer by first agitating the pellets. In the case of an inline tube products try lightly tapping the outer sides of the tube with a rubber mallet several times and then check the ph level once again at the outlet port. You may find that your ph level has risen back into the 5.0 to 9.5pH range. When your neutralizer is a tank product with loose pellets you can simply use a wooded dowel to stir the pellets and again use fresh tap water to flush out the tank. If your neutralizer pellets are incased in a porous pellet bag there are three methods to agitating the pellets:. Remove the pellet bag or bags from the tank and using your hands move the pellets around inside the bags. 2. Using a five gallon bucket filled with fresh tap water, use step one with the bag under water.. Using a fresh water hose slowly pour fresh water over both sides of the pellet bag and also use method one. If the ph level is has not risen back into the safe range of 5.0 to 9.5 ph the pellets must be replaced. If you have our Model V-250 or V-250 Combi vertical canisters try the following method:. Twist off the outer canister to get access to the inner pellet cartridge and over a five gallon pail shake the Cartridge several times to agitate the pellets. 2. Again using a five gallon pail filled with fresh tap water let the cartridge soak for five minutes under water and then drain and hand shake the cartridge to agitate the pellets. Also clean out any sediment which may be held within the outer canister. DURING ALL OF THE ABOVE PROCEDURES THE FOLLOWING SAFETY ITEMS MUST BE USED:. WEAR SAFETY GLASSES 2. WEAR RUBBER OR LATEX PROTECTIVE GLOVES. SHUT OFF ALL ELECTRICAL POWER TO THE HEATING UNIT OR UNITS BEFORE SERVICING YOUR NEUTRALIZERS. The pellets are Non-Hazardous and can be disposed of in your normal refuge. MSDS sheets can be found online at www.jjmboilerworks.com. Any questions can be directed to JJM Boiler Works, Inc. at -527-89 or at www.jjmboilerworks.com George Carney, President, JJM Boiler Works, Inc. Coleman Ave. Westfield, MA 0085-527-89 690 Island Way Unit 206, Clearwater, FL 767-27-7 jjmboilerworks.com Revised - March, 208