B. Water shall be clean and free from acid, salt, oil, and other organic matter.

Similar documents
a. Section includes planting soils specified by composition of the mixes.

DIVISION 32 EXTERIOR IMPROVEMENTS SECTION TURF AND GRASSES

SECTION CONCRETE PAVING

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

EXTERIOR IMPROVEMENTS PLANTING. .02 Lawns and Grasses. A. General. 1. Intent:

1. Division 2 Section "Earthwork" for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials.

SECTION SEEDING

B. Finish Grade: Elevation of finished surface of planting soil.

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 32 EXTERIOR IMPROVEMENTS

SECTION SOIL PREPARATION

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3

SECTION 900 TURF ESTABLISHMENT

A. Finish Grade: Elevation of finished surface of planting soil.

ITEM 164 SEEDING AND EROSION CONTROL BLANKET

SECTION CONCRETE PAVING JOINT SEALANTS

HVA C, Roofing, Interior & Exterior Renovations -Missouri Hills Youth Center SECTION TURF AND GRASSES

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

Section Seeding

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TURF AND GRASSES

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING

SECTION FINE GRADING AND SOIL PREPARATION

SECTION SODDING

B. Finish Grade: Elevation of finished surface of planting soil.

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

SECTION TURF AND GRASSES

SECTION HYBRID TURF SYSTEM

SITE TOPSOIL & FINISH GRADING

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used

This section covers the planting of seed, sod, trees and vegetation.

SECTION SODDING

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

The following general requirements will be met for all planter box installations:

A Section Subgrade Preparation. A Work shall be in conformance with MoDOT through

SECTION STRUCTURAL SOIL

A. Provide labor and materials necessary for installation of turf sod and other related work as required.

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

EC-11 COMPOST. Greenville County Technical Specification for. 1.0 Compost. 1.1 Description

UNIFIED FACILITIES GUIDE SPECIFICATIONS

A. Surface parking areas shall be constructed of bituminous paving.

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

Public Notice. REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material. June 22, ADDENDUM NO.

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

SECTION SEEDING. C. Seed mix to be used will be as specified in the Bid Schedule.

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006

ATTACHMENT A BIORETENTION SOIL SPECIFICATION

Content. 1. Particular Preambles for Standard Method of Measurement. 2. Particular Specification for Soil Fiber System. 3.

SECTION SEEDING

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

SECTION LANDSCAPING

Turfgrass Sod General

BMP-33. Stabilizing fine-graded disturbed areas by establishing permanent grass stands with sod.

SECTION LANDSCAPING

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

EXTERIOR PLANTS

Section 9 Landscaping and Street Trees

DIVISION II PLANTING SECTION 02950

Getting the Most out of Your Strawberry Soil Test Report. General Information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2009

SECTION TREES, SHRUBS AND GROUNDCOVERS

SECTION GYPSUM PLASTER

LANDSCAPE WORK

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION TREE TRANSPLANTING

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

SECTION 605 PLANTING

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

LAWN RENOVATION & OVERSEEDING

Earthwork Excavating, Backfilling, and Compaction for Utilities Irrigation System Landscaping.

SECTION TOPSOIL AND SEEDING

SECTION LANDSCAPE

LAWNS Chapter 12. Topic Outline. Establishing a Lawn. Establishing a Lawn

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

ACTIVITY: Trees, Shrubs and Vines ES 10

July 17, 2009 Jarman Auditorium Renovation Project Code Little Project No

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

ATTACHMENT L. Provision C.3.c.i.(1)(b)(vi) Specification of soils for Biotreatment or Bioretention Facilities

SECTION LANDSCAPE ESTABLISHMENT

Section Lawn & Grasses Pearl s Premium DRAFT. Pearl s Premium Lawn Grasses are the only acceptable seed / sod choice for this specification.

C. Sod Procurement: Comply with white fringed beetle and fire ants quarantine requirements.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION AMENDED TOPSOIL

2.1.4 Roof Downspout Rain Gardens

Town of Essex Small Site Erosion Control Guide

Why Control and Prevent Erosion?

St. Monica Food Pantry

Soil is the Key (Chapter 3)

University of New Hampshire Scholars' Repository

Specification of Soils for Biotreatment or Bioretention Facilities

5.0 Storm Water Landscape Guidance Introduction

Definitions in Handbook

Assessing and Amending Your Garden Soil Craig Cogger, Soil Scientist Emeritus Washington State University Puyallup

Compost Applications to Sports Fields

SECTION PLANTING SOIL FOR SOIL CELLS (SILVA CELLS)

EC Building a Bluegrass Lawn

DIVISION 32 EXTERIOR IMPROVEMENTS

Section 917. TURF AND LANDSCAPING MATERIALS

Exhibit A. Scope of Work

1. Which of the five checklists in the Municipal Construction Stormwater Site Inspection Toolkit will you use to document this inspection?

Transcription:

32 11 23 - AGGREGATE BASE COURSE PART 1 - GENERAL 1.01 SECTION INCLUDES A. Section includes placing an aggregate base course consisting of a uniform mixture of graded materials on a prepared subgrade. The drawings specify the type of aggregate. B. Drawings and General Provisions of Contract, including General and Special Conditions, apply to this section. 1.02 GENERAL A. Work shall be in conformance with MoDOT 304.1 through 304.3.6. PART 2 - PRODUCTS 2.01 MATERIALS A. Aggregate material shall conform to the following: 1. Type 1 Aggregate (Rolled Stone) MoDOT 1007.2 2. Type 5 Aggregate MoDOT 1007.3 3. Aggregate for Surfacing Grade A or B MoDOT 1006 4. Non-Penetrated Macadam Base: a. Non-penetrated macadam base shall consist of sound, durable particles of limestone or dolomite, and shall not contain deleterious material such as shale or disintegrated stone in excess of 15 percent. b. The crushed stone shall have a percent of wear not to exceed 50 when tested in accordance with AASHTO 96-58(c) (Los Angeles Abrasion). Stone shall meet the following gradation requirements: Percent Passing 3" Square Sieve.........100 Passing 2½" Square Sieve... 90-100 Passing 2" Square Sieve... 35-70 Passing 1½" Square Sieve... 0-15 Passing ¾" Square Sieve... 0-5 B. Water shall be clean and free from acid, salt, oil, and other organic matter. PART 3 - EXECUTION 3.01 GENERAL A. Placement of Aggregate for base shall be in accordance with MoDOT 304.3.3 through 304.3.6. B. Placement of Aggregate for surfacing shall be in accordance with MoDOT 310.3 through 310.3.4. END OF SECTION 32 11 23 Missouri S&T, 111708 32 11 23-1 AGGREGATE BASE COURSE Bid Set October 17, 2012

THIS PAGE INTENTIONALLY LEFT BLANK

32 12 16 - ASPHALTIC CONCRETE PAVING PART 1 - GENERAL 1.01 SECTION INCLUDES A. Placement of asphaltic concrete, in one or more courses, on a prepared base or underlying course in conformity with the line, grade, thickness, and typical cross section shown on the drawings. B. Drawings and General Provisions of Contract, including General and Special Conditions, apply to this section. 1.02 RELATED SECTIONS A. Section 32 15 00, Prime and Tack Coats PART 2 - PRODUCTS 2.01 MATERIALS A. Materials and composition of Plant Mix Bituminous Base, BP-1, and BP-2 shall conform to MoDOT 401.2 through 401.4.5 inclusive. B. Materials and the composition of mixtures for surface leveling (wedge course) shall conform to MoDOT 402.2 through 402.3.3. PART 3 - EXECUTION 3.01 EQUIPMENT A. Equipment shall meet the requirements of MoDOT 403.7 through 403.9. 3.02 WEATHER LIMITATIONS A. Asphaltic concrete shall not be placed: 1. When either the air temperature or the temperature of the surface on which the mixture is to be placed is below 50 F for the surface course or below 40 F for subsurface courses 2. On any wet or frozen surface 3. When weather conditions prevent the proper handling or finishing of the mixture 3.03 APPLICATION OF PRIME COAT OR TACK COAT A. Apply the prime coat or tack coat as set forth in Section 32 1500. 3.04 SPREADING AND FINISHING A. Spreading and finishing shall conform to MoDOT 403.13 through 403.16.2. 3.05 SPOT WEDGING AND LEVELING COURSE A. Spot wedging and surface leveling shall conform to MoDOT 402.10.4 through 402.10.9. 3.06 SURFACE TOLERANCES A. The surface of each layer shall be substantially free from waves or irregularities. END OF SECTION 32 12 16 Missouri S&T, 111708 32 12 16-1 ASPHALTIC CONCRETE PAVING Bid Set October 17, 2012

THIS PAGE INTENTIONALLY LEFT BLANK

32 13 13 - PORTLAND CEMENT PAVING PART 1 - GENERAL 1.01 SECTION INCLUDES A. Construction of Portland Cement Concrete Flatwork. B. Drawings and General Provisions of Contract, including General and Special Conditions, apply to this section. 1.02 RELATED SECTIONS A. Section 32 13 73 Concrete Pavement Joint Sealer B. Section 03 30 00 Structural Concrete 1.03 SUBMITTALS A. Certifications 1. Manufacturer s Certification that materials meet specification requirements. 2. Ready Mix delivery tickets: ASTM C94 1.04 QUALITY ASSURANCE A. Compressive strength testing per ASTM C94: by Owner B. Thickness Tolerance per MoDOT 502.10: by Owner if desired PART 2 - PRODUCTS 2.01 MATERIALS A. Forms and equipment shall conform to MoDOT 502.3 through 502.3.6 B. Curing compound shall conform to MoDOT 1055. C. Joint Sealer for sidewalks and driveways shall conform to Section 32 13 73, Concrete Pavement Joint Sealer. D. Pre-formed fiber expansion joint filler shall conform to AASHTO M213 E. F. Portland cement concrete shall conform to MoDOT 501 and 1005 with the following modifications: 1. All portland cement concrete shall be air entrained with 6% (± 1%) minimum air content. 2. Do not use or include calcium chloride. 3. The allowable slump for pavement shall be 2.5 in.; for sidewalk shall be 2-4 in.; and for storm drainage structures shall be 4 in. 4. The minimum 28-day compressive strength requirements shall be 4,000 psi for Class A-1, B, B-1, B- 2, and Pavement. Compressive strength shall be 3,000 psi for Seal Class. 5. Aggregate: a. The combined maximum weight of flint and chert shall be 1% of the weight of coarse aggregate. b. The maximum weight of lignite shall be 0.07% of the weight of the fine aggregate. G. Reinforcing bars 1. ASTM A615: 60 ksi yield grade, plain finish. 2. ASTM A36 - For tie rods, turn buckles, plates, and nuts. H. Steel Wire: ASTM A82, plain, cold-drawn steel. Missouri S&T, 111708 32 13 13-1 PORTLAND CEMENT PAVING Bid Set October 17, 2012

I. Welded Wire Fabric (WWF): ASTM A185, in flat sheets, plain finish; 12 maximum wire spacing. Use WWF 6x6-W10xW10 unless otherwise noted. J. Supports for Reinforcement: Provide wire bar-type supports for reinforcement including bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire fabric in place. All devices shall be plastic-coated or hot-dipped galvanized steel, sized and shaped as required. 2.02 USE OF FLY ASH IN CONCRETE MR SP-31 A. Fly ash may be in the concrete production in accordance with this specification. B. General: Approved Class C fly ash may be used to replace a maximum of 15 percent of Type I or II cement on a pound for pound basis in all concrete, except concrete designed for high early strength. Fly ash shall not exceed 15 percent by weight of the total cementitious material (fly ash and cement). C. Fly ash may replace Type III, IP, or I (PM) cement, provided the various classes of concrete meet or exceed the strength requirements. D. Changing the class or source of fly ash used in concrete structures requires the written approval of the Owner s Representative. Only use fly ash resulting in concrete of the same color in any individual unit of the structure. E. Do not use fly ash in pavement concrete placed between October 15 and April 15. F. All proportioning, air entraining, slump, maximum mixing water requirements, mixing, sampling, measurement of materials, transporting of concrete, and all materials except fly ash shall be in accordance with MoDOT 501. G. All fly ash shall conform to MoDOT 1018, Fly Ash for Concrete. H. When fly ash is used, an adjustment in design mix proportions will be required to correct the volume yield of mixture. Submit a copy of the mix design and a certification from the supplier the concrete meets the requirements of this specification and MoDOT 501 for all classes of concrete. Obtain the Owner s Representative approval prior to changing a mix design or proportions. I. Base the maximum mixing water as specified in MoDOT 501 on total cementitious material. A sack or bag of cementitious material is ninety-four pounds. The quantity of mixing water in the concrete after proper allowance for aggregate absorption is the net quantity. J. Special Requirements for the use of Fly Ash 1. Fly ash shall be stored in a separate enclosed storage silo during batching operations. 2. Measure the fly ash in the same manner and with the same accuracy as cement. If weighing the fly ash on the same scale beam with the weigh the cement separately first. 3. Consider fly ash in the same manner as cement when measuring mixing time. 4. When using an allowed commercial mixture of concrete that includes fly ash, notify the Owner s Representative of the class, source, and quantity of fly ash proposed in addition to the other requirements of MoDOT 501. The fly ash shall be from an approved source and the quantity shall not exceed 15%, by weight, replacement of cement. PART 3 - EXECUTION 3.01 GENERAL A. Surface finish for pavement patches shall match the adjacent pavement. Sidewalks and driveways shall generally receive a light broom finish. B. Control Joints: 1. Saw joints to the depth shown on the drawings and outlined in these specifications. 2. Saw control joints as soon as possible after the concrete has set, but no greater than 18 hours. Raveled joints are not acceptable. Missouri S&T, 111708 32 13 13-2 PORTLAND CEMENT PAVING Bid Set October 17, 2012

3. Seal all driveway, parking lot, and sidewalk joints per Section 32 13 73, Concrete Pavement Joint Sealer. 4. Seal street and highway pavement joints per MoDOT 502.5.4. 3.02 PAVEMENTS A. Construction of pavements shall conform to MoDOT 502.4.1 through 502.7 and 502.9. 3.03 SIDEWALKS A. Construction of sidewalks shall conform to MoDOT 608.1 through 608.3.8. END OF SECTION 32 13 13 Missouri S&T, 111708 32 13 13-3 PORTLAND CEMENT PAVING Bid Set October 17, 2012

THIS PAGE INTENTIONALLY LEFT BLANK

32 13 73 - CONCRETE PAVEMENT JOINT SEALANT PART 1 - GENERAL 1.01 SECTION INCLUDES A. Section includes sealing control and expansion joints in concrete sidewalks, parking lots, and driveways. B. Drawings and General Provisions of Contract, including General and Special Conditions, apply to this section. 1.02 WORK INCLUDED A. Work under this section includes providing all labor, material, and equipment to seal the contraction, control, and expansion joints in concrete sidewalk and driveway pavements. PART 2 - PRODUCTS 2.01 EXPANSION JOINT MATERIAL A. Expansion joint material shall be 1/2 thick, full depth, pre-molded non-bituminous joint material, with the top 1/2" perforated for removal prior to sealing operations. 2.02 JOINT FILLER A. One or two component polysulfide polymer sealant or a one or two component polyurethane prepolymer sealant B. Color: Gray 2.03 BACKER ROD A. Closed cell polyethafoam sealant backer rod; sized as required PART 3 - EXECUTION 3.01 PREPARATION A. Saw control joints in accordance with the drawings and specifications. B. Seal joints following the sawing operation or as soon as possible thereafter. 3.02 GENERAL A. Manufacturer's recommendations on the joint sealer shall be strictly adhered to with the following additions: 1. Leave joint sealant approximately 1/16" below the pavement surface level to prevent tracking. 2. Sprinkle fine silica sand, as needed, to reduce tracking of the joint sealer. B. Maintain pedestrian traffic on sidewalks as follows unless the Owner s Representative authorizes closure. Prevent ANY tracking of the joint material. 1. One-half the sidewalk width may be closed off to pedestrian traffic while sealant cures. 2. A board may be placed, notched on the bottom side with the notch centered over the joint and held securely in place with sandbags. 3.03 INSTALLATION A. Remove the perforated portion of the expansion joint material prior to placing the joint sealant. B. Clean all loose material from the joints with compressed air. C. In contraction joints, place a polyethafoam sealant backer rod of 5/16" to 3/8" below the surface elevation of the sidewalk. Install the backer rod at uniform depth. Missouri S&T, 111708 32 13 73-1 CONCRETE PAVEMENT JOINT SEALANT Bid Set October 17, 2012

D. Install expansion and construction joint sealant to approximately 1/16" below the sidewalk surface level. END OF SECTION 32 13 73 Missouri S&T, 111708 32 13 73-2 CONCRETE PAVEMENT JOINT SEALANT Bid Set October 17, 2012

32 15 00 - PRIME AND TACK COATS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Section includes application of prime coat or tack coat to a prepared surface prior to placement of asphalt pavement. B. Drawings and General Provisions of Contract, including General and Special Conditions, apply to this section. PART 2 - PRODUCTS 2.01 MATERIALS A. Materials shall conform to the following specifications: 1. Type RC Liquid Asphaltic Materials: MoDOT 1015.4.2 2. Type MC Liquid Asphaltic Materials: MoDOT 1015.4.3 3. Emulsified Asphalt: MoDOT 1015.4.4 2.02 EQUIPMENT A. Equipment for placement of Tack Coat shall conform to MoDOT 407.3. B. Equipment for placement of Prime Coat shall conform to MoDOT 408.3. PART 3 - EXECUTION 3.01 APPLICATION OF TACK COAT A. Apply a tack coat to existing asphalt and concrete pavements prior to placement of asphaltic concrete overlays. B. Placement of tack coat shall conform to MoDOT 407.4.1 through 407.4.2.1. Submit the proposed application rate to the Owner s Representative for approval. The Owner s Representative Rate may require a rate adjustment to match field conditions. 3.02 APPLICATION OF PRIME COAT A. Apply a prime coat to an aggregate base prior to placement of asphaltic concrete or chip and seal surfaces. 1. The Prime Coat is not required when placing 4 of plant mix bituminous base on an aggregate base. B. Placement of prime coat shall conform to MoDOT 408.4.1 through 408.4.2.2. Submit the proposed application rate to the Owner s Representative for approval. The Owner s Representative Rate may require a rate adjustment to match field conditions. END OF SECTION 32 15 00 Missouri S&T, 111708 32 15 00-1 PRIME AND TACK COATS Bid Set October 17, 2012

THIS PAGE INTENTIONALLY LEFT BLANK

32 17 23 - PAVEMENT MARKINGS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Section includes painting pavement marking of all types. B. Drawings and General Provisions of Contract, including General and Special Conditions, apply to this section. 1.02 WORK INCLUDED A. Cleaning and preparation of surfaces to receive paint striping with a high pressure water sprayer. Only the surfaces for striping require cleaning. B. Painting in parking lines, safety zones, handicap zones, loading zones, no parking zones, in parking lots indicated on drawings. C. Protecting adjacent surfaces from paint drips, spatters and over spray D. Protect wet paint from vehicular and pedestrian traffic. PART 2 - PRODUCTS 2.01 PAINT A. Paint for temporary striping shall be preformed pavement marking tape conforming to MoDOT 1048.4 or approved equal. B. Paint shall be manufactured by Pratt and Lambert, Glidden, Cook, Sherwin-Williams, Pittsburgh, Benjamin Moore, or approved equal C. Epoxy Pavement Marking material conforming to MoDOT 1048.90 or approved equal. D. Chlorinated Rubber Paint shall conform to TT-P-115F, or approved equal. E. Paint type must be compatible with the surfaces to be painted. 2.02 COLORS A. The Owners Representative will select color and finish from the submittal. Paint shall be applied per the following color code: 1. White: Parking space lines, stop bars, curbs, cross walks, and directional arrows 2. Yellow: Loading zones, safety zones, no parking zones, curbs, and median edges 3. Blue: Accessible parking lines and symbols 4. Red: Fire Lanes 2.03 MATERIALS A. Materials shall include standard commercial grade masking materials, scrapers, cleaning solvents, and other materials required for the work. B. Use only materials specified by manufacturer's direction label on container. 2.04 DELIVERY AND STORAGE A. Deliver materials to the site in original containers with seals unbroken and labels intact. B. Protect all paint from freezing. C. Do not allow paint to settle, cake, or thicken in the container. Readily stir with a paddle to a smooth consistency. D. Paint shall arrive on the job color-mixed except for tinting of undercoats and possible thinning. E. Insure that all colors match the color selected by the Owner's Representative prior to application. Missouri S&T, 111708 32 17 23-1 PAVEMENT MARKINGS Bid Set October 17, 2012

PART 3 - EXECUTION 3.01 PROTECTION A. Prior to beginning cleaning or painting operations, protect all items or surfaces not included in area to be painted. Protect vehicles, equipment, structures, or other items from paint spatters, over spray, or damage. B. Provide fencing, barricades, signage, and other devices to protect all painted areas from pedestrian and vehicular traffic until achieving sufficient drying time. 3.02 JOB CONDITIONS A. Do painting immediately after final surfacing as practical unless instructed otherwise by the Owner s Representative. B. Adequate illumination shall be available. C. Carefully examine surfaces to receive paint for defects, which might prevent satisfactory striping results. 1. Do not paint over rust, scale, grease, oil, fuel, dust, moisture, or conditions otherwise detrimental to paint adhesion. 2. Remove grease, oil, or fuel on any surface before painting. 3. Correct all surface defects before painting. D. Examine areas to be painted. Notify the Owner's Representative in writing of conditions that might delay timely completion of the work. 3.03 WEATHER CONDITIONS A. Painting shall not be performed when the ambient temperature is less than 55 F., while the surface is damp, or in rainy. B. The surface must be five degrees or more above the dew point temperature during painting operations and while paint is drying. C. Avoid painting surfaces exposed to direct sunlight. 3.04 APPLICATION A. Areas to be painted shall receive one coat of paint not less than 25 mils thickness wet per MoDOT 620.9 through 620.9.3.4.2. 1. In locations requiring multiple coats, prior coat shall be dry to manufacturer's recommendations before applying succeeding coat. B. Finished work shall be uniform, of approved color, free of runs, drips, defective brushing, spraying, and clogging. 1. Parking lines and symbols shall be neat and well defined. 2. Only skilled applicators shall apply paint. 3. Owner s Representative shall approve application techniques. 3.05 QUALITY CONTROL A. Remove paint splatter from adjacent areas or areas not designated to receive paint. B. Repair or touch up any surfaces if exposed to vehicular and pedestrian traffic, to the satisfaction of the Owner's Representative, at no additional cost to the Owner. C. When color, dirt, stains, existing paint, etc., show through the final coat, repaint the surface until the film is uniform in finish, coverage, color, and appearance. END OF SECTION 32 17 23 Missouri S&T, 111708 32 17 23-2 PAVEMENT MARKINGS Bid Set October 17, 2012

MS&T Geothermal System 111708 SECTION 329200 TURF AND GRASSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Seeding. 2. Sodding. B. Related Sections: 1.3 DEFINITIONS 1. Division 31 Section "Site Clearing" for topsoil stripping and stockpiling. 2. Division 31 Section "Earth Moving" for excavation, filling and backfilling, and rough grading. 3. Division 32 Section "Planting Irrigation" for turf irrigation. A. Duff Layer: The surface layer of native topsoil that is composed of mostly decayed leaves, twigs, and detritus. B. Finish Grade: Elevation of finished surface of planting soil. C. Manufactured Topsoil: Soil produced off-site by homogeneously blending mineral soils or sand with stabilized organic soil amendments to produce topsoil or planting soil. D. Pesticide: A substance or mixture intended for preventing, destroying, repelling, or mitigating a pest. This includes insecticides, miticides, herbicides, fungicides, rodenticides, and molluscicides. It also includes substances or mixtures intended for use as a plant regulator, defoliant, or desiccant. E. Pests: Living organisms that occur where they are not desired or that cause damage to plants, animals, or people. These include insects, mites, grubs, mollusks (snails and slugs), rodents (gophers, moles, and mice), unwanted plants (weeds), fungi, bacteria, and viruses. F. Planting Soil: Standardized topsoil; existing, native surface topsoil; existing, in-place surface soil; imported topsoil; or manufactured topsoil that is modified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant growth. G. Subgrade: Surface or elevation of subsoil remaining after excavation is complete, or top surface of a fill or backfill before planting soil is placed. TURF AND GRASSES 1-12 JUNE 22, 2012

H. Subsoil: All soil beneath the topsoil layer of the soil profile, and typified by the lack of organic matter and soil organisms. I. Surface Soil: Soil that is present at the top layer of the existing soil profile at the Project site. In undisturbed areas, the surface soil is typically topsoil, but in disturbed areas such as urban environments, the surface soil can be subsoil. 1.4 SUBMITTALS Pesticides and Herbicides: Include product label and manufacturer's application instructions specific to this Project. A. Certification of Grass Seed: From seed vendor for each grass-seed mixture stating the botanical and common name, percentage by weight of each species and variety, and percentage of purity, germination, and weed seed. Include the year of production and date of packaging. B. Certification of each seed mixture for turf grass sods. Include identification of source and name and telephone number of supplier C. Pesticides and Herbicides: Include product label and manufacturer's application instructions specific to this Project D. Qualification Data: For qualified landscape Installer. E. Product Certificates: For soil amendments and fertilizers, from manufacturer. F. Material Test Reports: For existing native surface topsoil, existing in-place surface soil and imported or manufactured topsoil. G. Maintenance Instructions: Recommended procedures to be established by Owner for maintenance of turf and meadows during a calendar year. Submit before expiration of required initial maintenance periods. 1.5 QUALITY ASSURANCE A. Installer Qualifications: A qualified landscape Installer whose work has resulted in successful turf and meadow establishment. 1. Professional Membership: Installer shall be a member in good standing of either the Professional Landcare Network or the American Nursery and Landscape Association. 2. Experience: Five years' experience in turf installation in addition to requirements in Division 01 Section "Quality Requirements." 3. Installer's Field Supervision: Require Installer to maintain an experienced fulltime supervisor on Project site when work is in progress. 4. Personnel Certifications: field supervisor shall have certification in one of the following categories from the Professional Landcare Network: a. Certified Landscape Technician - Exterior, with installation, maintenance specialty area(s), designated CLT-Exterior. Turf and Grasses 2-12 2-0329200

b. Certified Turf grass Professional, designated CTP. c. Certified Turf grass Professional of Cool Season Lawns, designated CTP-CSL. 5. Maintenance Proximity: Not more than one hours normal travel time from Installer's place of business to Project site. 6. Pesticide Applicator: State licensed, commercial. B. Soil-Testing Laboratory Qualifications: An independent laboratory or university laboratory, recognized by the State Department of Agriculture, with the experience and capability to conduct the testing indicated and that specializes in types of tests to be performed. C. Soil Analysis: For each unamended soil type, furnish soil analysis and a written report by a qualified soil-testing laboratory stating percentages of organic matter; gradation of sand, silt, and clay content; cation exchange capacity; sodium absorption ratio; deleterious material; ph; and mineral and plant-nutrient content of the soil. 1. Testing methods and written recommendations shall comply with USDA's Handbook No. 60. 2. The soil-testing laboratory shall oversee soil sampling, with depth, location, and number of samples to be taken per instructions from Architect. A minimum of six representative samples shall be taken from varied locations for each soil to be used or amended for planting purposes. 3. Report suitability of tested soil for turf growth. a. Based on the test results, state recommendations for soil treatments and soil amendments to be incorporated. State recommendations in weight per 1000 sq. ft. or volume per cu. yd. for nitrogen, phosphorus, and potash nutrients and soil amendments to be added to produce satisfactory planting soil suitable for healthy, viable plants. b. Report presence of problem salts, minerals, or heavy metals, including aluminum, arsenic, barium, cadmium, chromium, cobalt, lead, lithium, and vanadium. If such problem materials are present, provide additional recommendations for corrective action. D. Pre-installation Conference: Conduct conference at Project site. 1.6 DELIVERY, STORAGE, AND HANDLING A. Seed and Other Packaged Materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and indication of conformance with state and federal laws, as applicable. B. Sod: Harvest, deliver, store, and handle sod according to requirements in "Specifications for Turf grass Sod Materials" and "Specifications for Turf grass Sod Transplanting and Installation" in TPI's "Guideline Specifications to Turf grass Sodding." Deliver sod in time for planting within 24 hours of harvesting. Protect sod from breakage and drying. Sod to be covered and protected from wind during transportation. Turf and Grasses 3-12 3-0329200

C. Bulk Materials: 1.7 PROJECT CONDITIONS 1. Do not dump or store bulk materials near structures, utilities, walkways and pavements, or on existing turf areas or plants. 2. Provide erosion-control measures to prevent erosion or displacement of bulk materials, discharge of soil-bearing water runoff, and airborne dust reaching adjacent properties, water conveyance systems, or walkways. 3. Accompany each delivery of bulk fertilizers, lime, and soil amendments with appropriate certificates. A. Planting Restrictions: Plant during one of the following periods. Coordinate planting periods with initial maintenance periods to provide required maintenance from date of planting completion. 1. Spring Planting: Coordinate during normal season for installation, weather permitting 2. Fall Planting: Coordinate during normal season for installation, weather permitting B. Weather Limitations: Proceed with planting only when existing and forecasted weather conditions permit planting to be performed when beneficial and optimum results may be obtained. Apply products during favorable weather conditions according to manufacturer's written instructions. 1.8 MAINTENANCE SERVICE A. Initial Turf Maintenance Service: Provide full maintenance by skilled employees of landscape Installer. Maintain as required in Part 3. Begin maintenance immediately after each area is planted and continue until acceptable turf is established but for not less than the following periods: 1. Seeded Turf: Up to day of substantial completion and written approval of established turf area from date of planting completion. a. When initial maintenance period has not elapsed before end of planting season, or if turf is not fully established, continue maintenance during next planting season. 2. Sodded Turf: Up to day of substantial completion and written approval of established turf area from date of planting completion. B. Continuing Maintenance Proposal: From Installer to Owner, in the form of a standard yearly (or other period) maintenance agreement, starting on date initial maintenance service is concluded. State services, obligations, conditions, and terms for agreement period and for future renewal options. Turf and Grasses 4-12 4-0329200

PART 2 - PRODUCTS 2.1 SEED 2.2 SOD A. Grass Seed: Fresh, clean, dry, new-crop seed complying with AOSA's "Journal of Seed Technology; Rules for Testing Seeds" for purity and germination tolerances. B. Seed Species: Seed of grass species as follows, with not less than 95 percent germination, not less than 85 percent pure seed, and not more than 0.5 percent weed seed: 1. Full Sun: Fine Leaf Turf Type Fescue Grass, a minimum of three cultivars. A. Turf grass Sod: Number 1 Quality/Premium, including limitations on thatch, weeds, diseases, nematodes, and insects, complying with "Specifications for Turf grass Sod Materials" in TPI's "Guideline Specifications to Turf grass Sodding." Furnish viable sod of uniform density, color, and texture, strongly rooted, and capable of vigorous growth and development when planted. B. Turf Grass Species: 1. Fine Leaf Turf Type Fescue: a blend of a minimum of three of the latest improved cultivars. 2.3 INORGANIC SOIL AMENDMENTS A. Lime: ASTM C 602, agricultural liming material containing a minimum of 80 percent calcium carbonate equivalent and as follows: 1. Class: T, with a minimum of 99 percent passing through No. 8 sieve and a minimum of 75 percent passing through No. 60 sieve. 2. Class: O, with a minimum of 95 percent passing through No. 8 sieve and a minimum of 55 percent passing through No. 60 sieve. 3. Provide lime in form of ground dolomitic limestone or calcitic limestone. B. Sulfur: Granular, biodegradable, containing a minimum of 90 percent sulfur, and with a minimum of 99 percent passing through No. 6 sieve and a maximum of 10 percent passing through No. 40 sieve. C. Iron Sulfate: Granulated ferrous sulfate containing a minimum of 20 percent iron and 10 percent sulfur. D. Aluminum Sulfate: Commercial grade, unadulterated. E. Perlite: Horticultural perlite, soil amendment grade. F. Agricultural Gypsum: Minimum 90 percent calcium sulfate, finely ground with 90 percent passing through No. 50 sieve. G. Sand: Clean, washed, natural or manufactured, and free of toxic materials. H. Diatomaceous Earth: Calcined, 90 percent silica, with approximately 140 percent water absorption capacity by weight. Turf and Grasses 5-12 5-0329200

I. Zeolites: Mineral clinoptilolite with at least 60 percent water absorption by weight. 2.4 ORGANIC SOIL AMENDMENTS A. Compost: Well-composted, stable, and weed-free organic matter, ph range of 5.5 to 8; moisture content 35 to 55 percent by weight; 100 percent passing through 1/2-inch sieve; soluble salt content of 5 to 10 decisiemens/m; not exceeding 0.5 percent inert contaminants and free of substances toxic to plantings; and as follows: 1. Organic Matter Content: 50 to 60 percent of dry weight. 2. Feedstock: Agricultural residuals; biosolids; yard trimmings; or source-separated or compostable mixed solid waste. B. Wood Derivatives: Decomposed, nitrogen-treated sawdust, ground bark, or wood waste; of uniform texture and free of chips, stones, sticks, soil, or toxic materials. 1. In lieu of decomposed wood derivatives, mix partially decomposed wood derivatives with ammonium nitrate at a minimum rate of 0.15 lb/cu. ft. of loose sawdust or ground bark, or with ammonium sulfate at a minimum rate of 0.25 lb/cu. ft. of loose sawdust or ground bark. C. Manure: Well-rotted, unleached, stable or cattle manure containing not more than 25 percent by volume of straw, sawdust, or other bedding materials; free of toxic substances, stones, sticks, soil, weed seed, and material harmful to plant growth. 2.5 FERTILIZERS A. Bonemeal: Commercial, raw or steamed, finely ground; a minimum of 4 percent nitrogen and 10 percent phosphoric acid. B. Superphosphate: Commercial, phosphate mixture, soluble; a minimum of 20 percent available phosphoric acid. C. Commercial Fertilizer: Commercial-grade complete fertilizer of neutral character, consisting of fast- and slow-release nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous, and potassium in the following composition: 1. Composition: 1 lb/1000 sq. ft. (0.45 kg/92.9 sq. m) of actual nitrogen, 4 percent phosphorous, and 2 percent potassium, by weight. 2. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a qualified soil-testing laboratory. D. Slow-Release Fertilizer: Granular or pelleted fertilizer consisting of 50 percent waterinsoluble nitrogen, phosphorus, and potassium in the following composition: 1. Composition: 20 percent nitrogen, 10 percent phosphorous, and 10 percent potassium, by weight. 2. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a qualified soil-testing laboratory. Turf and Grasses 6-12 6-0329200

2.6 PLANTING SOILS A. Planting Soil: Shall be Per Plants 32930 Specification for all soil types and soil installation. 2.7 MULCHES A. Straw Mulch: Provide air-dry, clean, mildew- and seed-free, salt hay or threshed straw of wheat, rye, oats, or barley. B. Compost Mulch: Well-composted, stable, and weed-free organic matter, ph range of 5.5 to 8; moisture content 35 to 55 percent by weight; 100 percent passing through 1-inch sieve; soluble salt content of 2 to 5 decisiemens/m; not exceeding 0.5 percent inert contaminants and free of substances toxic to plantings; and as follows: 2.8 PESTICIDES 1. Organic Matter Content: 50 to 60 percent of dry weight. 2. Feedstock: Agricultural, food, or industrial residuals; biosolids; yard trimmings; or source-separated or compostable mixed solid waste. A. General: Pesticide, registered and approved by EPA, acceptable to authorities having jurisdiction, and of type recommended by manufacturer for each specific problem and as required for Project conditions and application. Do not use restricted pesticides unless authorized in writing by authorities having jurisdiction. B. Pre-Emergent Herbicide (Selective and Non-Selective): Effective for controlling the germination or growth of weeds within planted areas at the soil level directly below the mulch layer. C. Post-Emergent Herbicide (Selective and Non-Selective): Effective for controlling weed growth that has already germinated. 2.9 EROSION-CONTROL MATERIALS A. Erosion-Control Blankets: Biodegradable wood excelsior, straw, or coconut-fiber mat enclosed in a photodegradable plastic mesh. Include manufacturer's recommended steel wire staples, 6 inches long. B. Erosion-Control Fiber Mesh: Biodegradable burlap or spun-coir mesh, a minimum of 0.92 lb/sq. yd. with 50 to 65 percent open area. Include manufacturer's recommended steel wire staples, 6 inches long. C. Proprietary Growing Mix: As submitted and acceptable to Architect. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine areas to be planted for compliance with requirements and other conditions affecting performance. Turf and Grasses 7-12 7-0329200

1. Verify that no foreign or deleterious material or liquid such as paint, paint washout, concrete slurry, concrete layers or chunks, cement, plaster, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, or acid has been deposited in soil within a planting area. 2. Do not mix or place soils and soil amendments in frozen, wet, or muddy conditions. 3. Suspend soil spreading, grading, and tilling operations during periods of excessive soil moisture until the moisture content reaches acceptable levels to attain the required results. 4. Uniformly moisten excessively dry soil that is not workable and which is too dusty. B. Proceed with installation only after unsatisfactory conditions have been corrected. C. If contamination by foreign or deleterious material or liquid is present in soil within a planting area, remove the soil and contamination as directed by Architect and replace with new planting soil. 3.2 PREPARATION A. Protect structures, utilities, sidewalks, pavements, and other facilities, trees, shrubs, and plantings from damage caused by planting operations. 1. Protect adjacent and adjoining areas from hydroseeding and hydromulching overspray. 2. Protect grade stakes set by others until directed to remove them. B. Install erosion-control measures to prevent erosion or displacement of soils and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways. 3.3 TURF AREA PREPARATION A. Limit turf subgrade preparation to areas to be planted. B. Newly Graded Subgrades: Loosen subgrade to a minimum depth of 6 inches Remove stones larger than 2 inches in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property. 1. Apply superphosphate fertilizer directly to subgrade before loosening. 2. Thoroughly blend planting soil off-site before spreading or spread topsoil, apply soil amendments and fertilizer on surface, and thoroughly blend planting soil. a. Delay mixing fertilizer with planting soil if planting will not proceed within a few days. b. Mix lime with dry soil before mixing fertilizer. 3. Spread provided planting soil to a depth of 6 inches but not less than required to meet finish grades after light rolling and natural settlement. Do not spread if planting soil or subgrade is frozen, muddy, or excessively wet. Turf and Grasses 8-12 8-0329200

a. Spread approximately 1/2 the thickness of planting soil over loosened subgrade. Mix thoroughly into top 6 inches of subgrade. Spread remainder of planting soil. b. Reduce elevation of planting soil to allow for soil thickness of sod. Finish grade of sod to be ½ below adjacent pavement and curbs. C. Unchanged Subgrades: If turf is to be planted in areas unaltered or undisturbed by excavating, grading, or surface-soil stripping operations, prepare surface soil as follows: 1. Remove existing grass, vegetation, and turf. Do not mix into surface soil. 2. Loosen surface soil to a depth of at least 6 inches. Apply soil amendments and fertilizers according to planting soil mix proportions and mix thoroughly into top 4 inches of soil. Till soil to a homogeneous mixture of fine texture. 3. Remove stones larger than 2 inches in any dimension and sticks, roots, trash, and other extraneous matter. 4. Legally dispose of waste material, including grass, vegetation, and turf, off Owner's property. D. Finish Grading: Grade planting areas to a smooth, uniform surface plane with loose, uniformly fine texture. Grade to within plus or minus 1/2 inch of finish elevation. Tolerance below 10 straight edge to be 1 max. Roll and rake, remove ridges, and fill depressions to meet finish grades. Limit finish grading to areas that can be planted in the immediate future. Finish grading adjacent to pavement and curbs to be ½ below top of hardscape for seeded areas. E. Moisten prepared area before planting if soil is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil. 3.4 SEED BED PREPARATION A. Before planting, obtain Architect's acceptance of finish grading; restore planting areas if eroded or otherwise disturbed after finish grading. B. Prepare area as specified in "Turf Area Preparation" Article. C. For erosion-control mats, install planting soil in two lifts, with second lift equal to thickness of erosion-control mats. Install erosion-control mat and fasten as recommended by material manufacturer. D. Fill cells of erosion-control mat with planting soil and compact before planting. E. For erosion-control blanket or mesh, install from top of slope, working downward, and as recommended by material manufacturer for site conditions. Fasten as recommended by material manufacturer. F. Moisten prepared area before planting if surface is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil. Turf and Grasses 9-12 9-0329200

3.5 SEEDING A. Sow seed with spreader or seeding machine. Do not broadcast or drop seed when wind velocity exceeds 5 mph. Evenly distribute seed by sowing equal quantities in two directions at right angles to each other. 1. Do not use wet seed or seed that is moldy or otherwise damaged. 2. Do not seed against existing trees. Limit extent of seed to outside edge of planting saucer. B. Sow seed at a total rate of 4 lb/1000 sq. ft min. C. Rake seed lightly into top 1/8 inch of soil, roll lightly, and water with fine spray. D. Protect seeded areas with slopes exceeding 1:4 with erosion-control blankets mesh installed and stapled according to manufacturer's written instructions. E. Protect seeded areas with slopes not exceeding 1:6 by spreading straw mulch. Spread uniformly at a minimum rate of 2 tons/acre to form a continuous blanket 1-1/2 inches in loose thickness over seeded areas. Spread by hand, blower, or other suitable equipment. F. Protect seeded areas from hot, dry weather or drying winds by applying compost mulch within 24 hours after completing seeding operations. Soak areas, scatter mulch uniformly to a thickness of 3/16 inch, and roll surface smooth. 3.6 SODDING A. Sod types shall be installed per Seed/Sod Planting Plan Lay sod within 24 hours of harvesting. Do not lay sod if dormant or if ground is frozen or muddy. B. Lay sod to form a solid mass with tightly fitted joints. Butt ends and sides of sod; do not stretch or overlap. Stagger sod strips or pads to offset joints in adjacent courses. Avoid damage to subgrade or sod during installation. Tamp and roll lightly to ensure contact with subgrade, eliminate air pockets, and form a smooth surface. Work sifted soil or fine sand into minor cracks between pieces of sod; remove excess to avoid smothering sod and adjacent grass. 1. Lay sod across angle of slopes exceeding 1:3. 2. Anchor sod on slopes exceeding 1:6 with wood pegs spaced as recommended by sod manufacturer but not less than 2 anchors per sod strip to prevent slippage. C. Saturate sod with fine water spray within two hours of planting. During first week after planting, water daily or more frequently as necessary to maintain moist soil to a minimum depth of 1-1/2 inches below sod. 3.7 TURF MAINTENANCE A. Maintain and establish turf by watering, fertilizing, weeding, mowing, trimming, replanting, and performing other operations as required to establish healthy, viable turf. Roll, regrade, and replant bare or eroded areas and remulch to produce a uniformly smooth turf. Provide materials and installation the same as those used in the original installation. Turf and Grasses 10-12 10-0329200

1. Fill in as necessary soil subsidence that may occur because of settling or other processes. Replace materials and turf damaged or lost in areas of subsidence. 2. In areas where mulch has been disturbed by wind or maintenance operations, add new mulch and anchor as required to prevent displacement. 3. Apply treatments as required to keep turf and soil free of pests and pathogens or disease. Use integrated pest management practices whenever possible to minimize the use of pesticides and reduce hazards. B. Watering: Install and maintain temporary piping, hoses, and turf-watering equipment to convey water from sources and to keep turf uniformly moist to a depth of 4 inches. 1. Schedule watering to prevent wilting, puddling, erosion, and displacement of seed or mulch. Lay out temporary watering system to avoid walking over muddy or newly planted areas. 2. Water turf with fine spray at a minimum rate of 1 inch per week unless rainfall precipitation is adequate. C. Mow turf as soon as top growth is tall enough to cut. Repeat mowing to maintain specified height without cutting more than 1/3 of grass height. Remove no more than 1/3 of grass-leaf growth in initial or subsequent mowings. Do not delay mowing until grass blades bend over and become matted. Do not mow when grass is wet. Schedule initial and subsequent mowings to maintain the following grass height: 1. Mow Fescue Type Grass to a height of 2 1/2 inches. D. Turf Post fertilization: Apply fertilizer after initial mowing and when grass is dry. 3.8 SATISFACTORY TURF 1. Use fertilizer that will provide actual nitrogen of at least 1 lb/1000 sq. ft. to turf area. A. Turf installations shall meet the following criteria as determined by Architect: 1. Satisfactory Seeded Turf: At end of maintenance period, a healthy, uniform, close stand of grass has been established, free of weeds and surface irregularities, with coverage exceeding 90 percent over any 10 sq. ft. and bare spots not exceeding 5 by 5 inches. 2. Satisfactory Sodded Turf: At end of maintenance period, a healthy, well-rooted, even-colored, viable turf has been established, free of weeds, open joints, bare areas, and surface irregularities. B. Use specified materials to reestablish turf that does not comply with requirements and continue maintenance until turf is satisfactory. 3.9 PESTICIDE APPLICATION A. Apply pesticides and other chemical products and biological control agents in accordance with requirements of authorities having jurisdiction and manufacturer's written recommendations. Coordinate applications with Owner's operations and others in proximity to the Work. Notify Owner before each application is performed. Turf and Grasses 11-12 11-0329200

B. Post-Emergent Herbicides (Selective and Non-Selective): Apply only as necessary to treat already-germinated weeds and in accordance with manufacturer's written recommendations. 3.10 CLEANUP AND PROTECTION A. Promptly remove soil and debris created by turf work from paved areas. Clean wheels of vehicles before leaving site to avoid tracking soil onto roads, walks, or other paved areas. B. Erect temporary fencing or barricades and warning signs as required to protect newly planted areas from traffic. Maintain fencing and barricades throughout initial maintenance period and remove after plantings are established. C. Remove non-degradable erosion-control measures after grass establishment period. END OF SECTION 329200 Turf and Grasses 12-12 12-0329200