National Gallery of Australia. New Entrance and Indigenous Australian Galleries

Similar documents
The John Kaldor Family Gallery. Art Gallery NSW

Program Summary: A ,000 SF Program Statement: $46.41 $11,000,000 August 2013

BALTIMORE MUSEUM OF ART MAJOR RENOVATIONS

Jury Comments Good Design Awards 2017

CCS Bard Hessel Museum Annandale-on-Hudson, New York In 1990, Goettsch Partners and Nada Andric were asked to design a new building at Bard College th

History of the Foundation Buildings and Landscapes

Introduction. Founded in 1977 Open Eye is an independent not-forprofit photography gallery based in Liverpool.

PASSENGER RAIL NETWORK LIGHTING OF STATION ENVIRONMENT TO COMPLY WITH DISABILITY STANDARDS FOR ACCESSIBLE PUBLIC TRANSPORT

SMG Rocks. The MINI brand has, over the years, been associated with a fresh, young, vibrant and PROJECT

Schematic Design Presentation December 15, 2006 David Smith

Wesfarmers Reconciliation Action Plan For more information visit

Urban Design 9Identity

Museo Reina Sofía. Venue Hire

Museum Selections.

WINDSOR GLEN DESIGN GUIDELINES

ILLUSTRATIVE MASTERPLAN

No.2 Whitehall Riverside, Leeds July 2013

Past, Present and Future

Campus Identity & Design Guidelines

Design & Access Statement

Learning Places Fall 2016 Chin/Swift. SITE REPORT 2 [Part A: Manhattan, NY] LINCOLN CENTER

Contact details Kedleston Hall, Derby DE22 5JH T: E: Points to note. Arrival & Parking Facilities

University of Pennsylvania, Neural and Behavioral Sciences Building

C O V E R S T O R Y Tamar Development

Workplace DESIGN & BUILD MADE SIMPLE 1

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site

Jamie Devenger Senior Thesis Princeton University Sherrerd Hall 1 Lighting Proposal Memo September 11, 2009

HARRY RANSOM HUMANITIES RESEARCH CENTER

This Is The High Point Public Library Prior To Expansion

Grand Auditorium of the Maison De La Radio By AS Architecture Studio

Enterprising thinking

CENTER FOR GREAT LAKES ECOLOGY 3

Gensler. San Diego, California. Case Study

Aquatics Center- Design and Precedents Essay Carolyn Fearman

Contact details Lacock Abbey, Lacock, Chippenham, SN152LG T: E:

Welcome THE SITE PHASE 1 EXCLUSION ZONE.

Design Development. Interim Report - 31/03/2017. Proposed Community Hub. Including Information Centre, Library and Town Council Chamber

Urban Institute for Contemporary Arts

Metro Station in Riyadh

DREAM DESIGNERS COMPETITION ENTRY BOOKLET

CALADENIA 1228 Q02 LOT WIDTH 12.5M+ LOT DEPTH 28M+ TOTAL AREA 239.6m 2

SMUD Utility Commissions Original Architect, Dreyfuss + Blackford, to Renovate and Expand Historic Sacramento Mid-Century Headquarters

Nu Skin Innovation Center. Location: Provo, Utah Lot Size: 435,600 GSF Building Size: 168,000 GSF Project Type: Commercial LEED Gold Certified

Waterside Shopping Centre, Lincoln

Register of Significant Twentieth Century Architecture

Bloomberg s New European headquarters launched in the City of London

New pockets of a city. Three Elizabeth line stations London

ANU FACILITIES AND SERVICES SFITOUT INNOVATIONS O BUILDING. Final Sketch Plans 09 th December 2010

Ovolo Nishi Events 25 Edinburgh Ave Canberra

Parcel 5. Level 1 Application March 12, Design Submittal POST ROAD RESIDENTIAL

APPENDIX MATAKANA COMMERCIAL URBAN DESIGN GUIDELINES

WELCOME. Welcome to this public exhibition about the future of the Aylesham Shopping Centre.

1.4 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community design

The Australian Institute of Architects welcomes the opportunity to provide comment on the DA Submission for this important project.

BENJAMIN. Trend report 2017 RESTAURANTS HOTELS SCHOOLS OFFICES RESIDENTIAL. Special report HOSPITALITY DESIGN. Conference review DESIGNMENA SUMMIT

REVIEW OF ENVIRONMENTAL FACTORS HUDSON LIBRARY FIT OUT FOR MERIDEN SCHOOL, STRATHFIELD NSW

Little Moreton Hall Access Statement

Little Moreton Hall Access Statement

Perspectives of Sustainability A Cross-Disciplinary Conference

AIA Albuquerque 2016 Design Awards

Horwood Map of London, Westminster & Southwark First edition

UK-GBC Project Case Study Smithfield, Manchester

DESIGN GUIDELINES. Oakdene Estate at Ocean Grove Grubb Road, Ocean Grove

PRINCE GEORGE LIBRARY NEW ENTRANCE REPORT Patricia Boulevard Prince George, BC V2L 3V9

36 TFG Design Centre. In keeping with the spirit of TFG s (The Foschini Group) vision of becoming a leading clothing PROJECT

7 TH WINTER SEMESTER NTUA - SCHOOL OF ARCHITECTURE C E N T E R O F CONTEMPORAR Y AR T I N PI R E AU S INTRODUCTION TEACHING STAFF GROUPS:

TITANIC TRIUMPH MARCON DOES THE DOUBLE IN LONDON

Welcome. Who are we? The Site. ZM Land and Capital and Plutus Estates (WGC) Ltd. Metropolitan

Shah s Residence, Bharuch. Dipen Gada & Associates. Client: Mr. Vinay Shah Area: 6856 Sq. Ft. Photo Credits: Mr. Tejas Shah Year Of Completion: 2015

Case study for Heritage Counts Theme demonstrated by How heritage is cared for and managed at the local level

Design Development Theming Fit Out Creative. Theming Specialists

event spaces at the spectacular new Design Museum in Kensington

INTRODUCTION. +44 (0) onemoorgateplace.com Follow us on Find us on

THE FOLGER SHAKESPEARE LIBRARY ANC 6B Meeting

A detailed Access Guide to The Museum of The Gorge

a new home life a new

THE SCULPTED CITY 3D MAPS

MIAD MAJORS AND TYPES OF JOBS

Lighting Existing Conditions and Design Criteria Report

Laban. 1. Project Basics:

Memo. B R A Y H e r i t a g e

Arrival & Parking Facilities

CASE STUDY: MCGREGOR COXALL SYDNEY, AUSTRALIA. McGregor Coxall

Surface Materials Strategy Reference Images

QUESTION 8: What are your Public Realm priorities for implementation? What would you like to see happen first? TELL US WHAT YOU THINK

ATLANTA-FULTON PUBLIC LIBRARY SYSTEM CENTRAL LIBRARY RENOVATION

Hatchlands Park Access Statement

putting your meeting center stage. The address

OLEARIA 1528 Q01 LOT WIDTH 15M+ LOT DEPTH 28M+ TOTAL AREA 281.5m 2

CYPRESS 1228 Q01 LOT WIDTH 12.5M+ LOT DEPTH 28M+ TOTAL AREA 179.4m 2

(DC1) Direct Development Control Provision DC1 Area 4

Museum of Fine Arts, Boston unveils Design Concepts of Master Site Plan

Access Statement. Royal Botanic Garden Edinburgh Access Statement January 1, 2014

RELAXED URBAN LIVING AMONGST FRIENDLY FACES

B. PROPOSED REFINEMENTS POTENTIALLY AFFECTING URBAN DESIGN AND VISUAL RESOURCES

SOCIAL SUSTAINABILITY RESPONSE POST ON GEORGIA 349 W GEORGIA ST REZONING APPLICATION REV 2 - UDP ADDENDUM

HARRY RANSOM HUMANITIES RESEARCH CENTER

A New St Mary s Music School

Wilshire Grand Reaching New Heights

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS

Transcription:

National Gallery of Australia New Entrance and Indigenous Australian Galleries

This is the most significant development to the National Gallery of Australia since it opened in 1982. This is the first increase in our permanent collection space since the gallery opened, and these are the first galleries specifically designed for the display of different kinds of Aboriginal and Torres Strait Islander art. Ron Radford AM Former Director, National Gallery of Australia

Introduction The National Gallery of Australia - New Entrance and Indigenous Australian Galleries is a major addition to the existing gallery in Australia s capital city, Canberra. The project provides a new identity for the institution without diminishing the character and integrity of the existing gallery building. At ground level, the extensions incorporate a large foyer, new cloaking, reception and bookshop areas, a fully serviced function room opening to landscaped gardens, escalator and lift connections to the original building and improved disabled access to all public levels. The upper level includes Australia s first purpose-built galleries for the display of Indigenous art. These range in scale and character from large daylit spaces to small rooms for the display of more sensitive works.

Development History 01 1971 National Capital Development Commission (NCDC) proposed plan for the Parliamentary Zone 02 Sketch by original architect, the late Col Madigan 03 Aerial view of original design 04 The High Court and NGA National Place bridge link In 1971, the National Capital Development Commission (NCDC) proposed a new plan for the Parliamentary Zone, placing a 400m 2 called the National Place within the central lakeshore area. This was to be flanked by the National Library to the west and the High Court and National Gallery of Australia (NGA) to the east, to create a strong axial link between the National Library and the NGA. The designs for both the High Court and NGA were won by the firm of Edwards Madigan Torzillo and Briggs, and the entry levels of the buildings were determined by the proposed National Place. In 1975, the NCDC abandoned the plan for the National Place. This left the entry levels for the buildings five metres above the natural ground level and without the connection to a National Place, Parliament, or the National Library. In 1978, the NCDC changed the access roads from a one-way to a two-way road system, together with the construction of a surface car park to the south of the NGA. This meant that most visitors approached the gallery from the rear side of the building. 1 The construction of the National Gallery of Australia commenced in 1973 and the building opened in 1982. The original building design was developed to display 1,000 works of art, however the NGA art collection grew to in excess of 140,000 works. There had been no significant additional permanent display space since the building was completed. The High Court and NGA National Place bridge link was not utilised by most visitors to the gallery. Generally, visitors arrived past the south facade of the building, not from the north as originally intended. From the car park visitors had to pass by service areas, dock roads and car park ramps to find a path to the building entrance. This was confusing and inappropriate for the entrance to a major national institution. 3 4 2

New Entrance and Indigenous Australian Galleries THE ENTRANCE The entrance is marked by a lofty porch of concrete structural elements opening out to the path to the south and vehicular approach to the west. A new stair and lift provides access to this point from the existing underground car park, which is reserved for the public. Further parking for staff and visitors is provided by a temporary surface car park to the east of the building. THE ABORIGINAL MEMORIAL The first impression of the building is a view of a major Indigenous work of art, the Aboriginal Memorial, seen through a lofty glazed screen adjacent to the entry porch. CAFÉ An outdoor café is provided adjacent to the entrance, with outdoor seating, sun umbrellas and a water feature providing a welcoming ambiance to the new south entrance, where visitors to the gallery can enjoy the passing public. THE ENTRANCE LOBBY From the new south entrance door, a lobby leads to escalators which transports visitors to the principal level of the building. An information desk, shop, cloaking and toilets are located in an orderly sequence. Upon arrival, there is a view over the Aboriginal Memorial, setting a theme that this building is located in Australia s national capital. The memorial is located under a conical light shaft sitting in a drum clad in timber. Partly into the lobby, a lofty colonnade of paired columns and light shafts leads to the function room to the right. THE MULTI-PURPOSE FUNCTION ROOM The multi-purpose function room is a subdivisible, multi-purpose space suitable for a wide range of activities including banquets for 320 people, large cocktail parties and meetings of a variety of sizes. This space is served by a kitchen and associated equipment storage facilities.

01 Indigenous Art Gallery (foreground artwork: Lin Onus Dingoes, 1989) 02 Foyer and bookshop in the new extension 03 The new gallery extension exterior 04 Torres Strait Islander art 05 North view (through the new foyer) 3 1 2 4 5

BACK OF HOUSE FACILITIES New separate loading docks for art and general purpose deliveries with associated back of house facilities improve the day-today functioning of this busy institution. THE PRINCIPAL LEVEL On ascending the escalators to the principal level, visitors coming from the south arrive at the same point as those coming from the north - up the existing monumental stair, or from the West, along the footbridge from the High Court and National Portrait Gallery. The removal of the shop from this location opens up vistas to the north, and east as well as to the south to the new Australian Aboriginal Galleries. Some of this space is used for key works such as the Sydney Nolan Ned Kelly series as well as photography and recent acquisitions. THE NEW GALLERIES The new galleries are generally daylit with supplementary artificial lighting designed with a variety of ceiling heights to suit displays of art objects of diverse scale. Smaller artificially lit spaces are located adjacent to the larger galleries for art works requiring lower lux levels. Showcases for fragile objects are generally located within the depth of walls or between the paired columns of the colonnade element. The circulation of the new galleries is unified by an enfilade of uniform openings and form a circuit from the principal eastwest axis of the existing building.

The Landscape The new extensions are surrounded by landscaped areas that help complete the garden circuit around the building. Skyspace, a major work by an American artist, James Turrell, is located within these gardens and is accessed from the function room and new building entry. The extension draws on the materials palette and iconic forms of the original building; however are articulated from the original structure and clearly identifiable as new work. The building is of a monumental scale and designed to comfortably relate to the adjacent major institutional buildings of the area. It is an important structure in the landscape of the Parliamentary Triangle and the Griffin city plan.

The landscaped gardens incorporate a major installation sculpture Skyspace designed by American artist, James Turrell. PTW liaised with James Turrell and used three-dimensional modelling to document the complex geometric artwork comprising a red ochre pyramid base, partially submerged in the ground, surrounded by water. Construction techniques were developed with the contractor for the iconic artwork.

2 1 5 01 The Aboriginal Memorial, 1987-88 02 Looking across the Australian Garden to the new extension 03 Early Western Desert Paintings Gallery 04 James Turrell, Within without, 2010, installation (within the Skyspace) 05 Bookshop 3 4

Section and Principal Gallery Floor Plan 1 2 7 Ground Floor Plan (Level 2) 9 6 6 (Level 4) 3 1 2 5 4 1 Entrance foyer 2 Aboriginal memorial 3 Cafe 4 Entrance lobby 5 Function room 6 Back of house facilities 7 Indigenous Galleries 8 Existing auditorium 9 Book shop 10 James Turrell, Skyspace 1 8 2 7 7 10

Design Development 01 Hand sketch 02 Computer generated image 03 Physical model 04 Photo realistic render PTW worked closely with the National Gallery of Australia to ensure that the design responded to the highly prescriptive requirements for the movement, treatment and display of highly sensitive works of art. Various tools were used to facilitate this process, initially sketches and simple block models, and as the design progressed, more sophisticated media such as 3D computer models of all structure and services and ultimately, a full scale prototype. 1 3 2 4

Project Recognition What we ve done in this permanent exhibition is really celebrate the diversity of Indigenous art in Australia. AWARDS 2011 Property Council of Australia / Rider Levett Bucknall Innovation and Excellence Award Franchesca Cubillo Senior Curator of Aboriginal and Torres Strait Islander Art, National Gallery of Australia

CLIENT National Gallery of Australia MECHANICAL ENGINEER Steensen Varming ACOUSTICS CONSULTANT Wilkinson Murray LOCATION Canberra, ACT, Australia ELECTRICAL & DATA ENGINEER Steensen Varming AUDIO VISUAL VOS Group ARCHITECT PTW Architects LANDSCAPE ARCHITECT McGregor Coxall LIFT SERVICES Steensen Varming FIRE SERVICES Dysen Pty Ltd KITCHEN CONSULTANT Food Services Essentials ACCESS CONSULTANT Access Australia ptw.com.au SPECIALIST LIGHTING George Sexton & Associates FIRE SAFETY ENGINEERING Defire (ACT) Pty Limited BCA CONSULTANT Philip Chun & Associates CONSTRUCTION MANAGER Manteena Pty Ltd COST PLANNER / QUANTITY SURVEYOR Altus Page Kirkland HYDRAULICS CONSULTANT Hughes Trueman CIVIL/TRAFFIC CONSULTANT Cardno Young PHOTOGRAPHY John Gollings Daniel Beasley Andrew Andersons STRUCTURAL ENGINEER Birzulis & Associates SECURITY SERVICES PSC Pro-Safety