Soil Erosion and Sediment Control

Similar documents
Plan Review Checklist

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Guidelines for Streambank Protection

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

PLAN SUBMITTER'S CHECKLIST

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

4.6. Low Impact and Retentive Grading

Section 3 Non-Structural BMPs

Draft Rhode Island Stormwater Design and Installation Standards Manual

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Appendix C. Soil Amendments. Appendix C. C.1 General Description. C.2 Physical Feasibility & Design Applications

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

Buffer Zone (BZ) Stream Protection. The width and plant composition of a buffer zone will determine its effectiveness.

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Caribbean Area PO Box San Juan, PR Page Topics

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

Erosion & Sediment Control Plan Application Form & Checklist

The Low Risk Site Handbook

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Gloucester County PLAN SUBMITTER'S CHECKLIST

EROSION PREVENTION BMP SUGGESTED USES MATRIX

a. Site Topography and Relationship to Surrounding Topography

Vegetated Filter Strips and Buffers

All materials in this presentation are taken from materials produced by:

Vegetated Filter Strips and Buffers

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

EROSION & SEDIMENT CONTROL

SOIL EROSION AND SEDIMENT CONTROL

Zoning Ordinance Chapter 10

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Case Study Bioretention Installation and Maintenance

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Chapter 4 - Preparation of Stormwater Site Plans

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

5.0 Storm Water Landscape Guidance Introduction

NAPA COUNTY PUBLIC WORKS Standards & Specifications

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Erosion Control for Home Builders in the. City of Jacksonville

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES

1.6 IMPLEMENTATION GUIDELINES


A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

Protocol for Sustainable Roadsides

Use of Best Management Practices

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

Soil Reclamation and Site Reinstatement

CHARLES SOIL CONSERVATION DISTRICT PLAN SUBMITTAL GUIDELINES

ARROW BOWEN PIPELINE ENVIRONMENTAL MANAGEMENT PLAN OUTLINE SOIL MANAGEMENT PLAN

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

Baltimore, MD Lt. Gov. Boyd Rutherford

Essential Skills: Reading and Interpreting Maps and Plans

Non-Metallic Mining Reclamation Checklist

Project Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number:

When planning stormwater management facilities, the following principles shall be applied where possible.

Florence County Small Commercial Land Disturbance Permit Application

Table 4.7.1: Swales Potential Application and Storm Water Regulation

Bioretention cell schematic key

POND Construction. Perry L. Oakes, PE State Conservation Engineer Natural Resources Conservation Service

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

Town of Essex Small Site Erosion Control Guide

Rule D Wetland and Creek Buffers

C-10. Disconnected Impervious Surface

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Plan of Development Mountain Valley Pipeline Project. APPENDIX M Winter Construction Plan

Berm and Swale Complex

6.1 Bioretention Areas

Zoning Ordinance Article 3

6.2 Flow-Through Planter

Stormwater Management Resource Type:

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

STREAM BUFFER PROTECTION AND MANAGEMENT

Vegetation. Fe=0.90 (When fully established; lower while vegetation is first growing)

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

Soil Health Practices in the Landscape

Adaptive Management of Erosion and Sediment Control Best Management Practices (BMPs) Presenter: Denis Rushton, P. Eng. Date: May 18, 2016

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Erosion Prevention Practices (EPPs) Activity: Nets and Mats (N and M)

HICKORY NUT FOREST DESIGN GUIDELINES

OFFICE CONSOLIDATION By-law Number 30-92

Stormwater Pollution Prevention Plan Oneonta Heights Oneonta, NY TABLE OF CONTENTS PAGE

Urban Planning and Land Use

Green City, Clean Waters

Nevada Contractors Field Guide for Construction Site Best Management Practices (BMPs)

6.1. INTRODUCTION AND SUMMARY OF FINDINGS

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Transcription:

PDHonline Course C188 (3 PDH) Soil Erosion and Sediment Control Instructor: John Poullain, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org www.pdhcenter.com An Approved Continuing Education Provider

Chapter 3 Erosion and Sedimentation Control Plan Purpose The purpose of an erosion and sedimentation control plan is to define and schedule the control measures that will be used to minimize erosion, detain excess stormwater runoff and prevent off-site sedimentation. A detailed site map displays the location of each practice (see sample map in Appendix A). The Plan The plan should serve as a blueprint for the location, installation and maintenance of practices to control all anticipated erosion, and prevent sediment and increased runoff from leaving the site. The Process Select a land site that has desirable natural drainage and soils with good potential for the intended development. Detailed soil surveys and geological investigations should be made to assess the suitability for the intended development. Designate areas on the site map with severe limitations such as floodplains, steep slopes, drainageways, existing bodies of water and unstable soils to be left undisturbed and used as open space. Designate natural vegetation and trees to be left undisturbed during construction. Existing areas of grass, shrubs and trees help to control soil erosion while enhancing the attractiveness of the project. Design the development plan to the site so that minimum earth grading and other site preparation is required. Plan rough grading in phases to keep disturbed areas small and bare of vegetation for the shortest period of time. Plan for the installation of best management practices (see Practice Installation and Maintenance section) to control overland sheet flow, limit erosion, keep sediment on the site and dispose of increased stormwater runoff caused by the increase in impervious surfaces. Plan for early use of the storm drainage structures by installing protection for stormwater inlets. 13

Stockpile topsoil, protect it from erosion and later spread it over the areas to be permanently vegetated. Plan for inspection and maintenance when designing permanent erosion control structures and practices; and for removal of temporary measures. Consider maintenance of subdivision common areas in the planning process. Specifying slopes that are 4:1 or flatter and selecting low maintenance practices will reduce the risk of poor maintenance and resulting structural failures. Developing The Plan Determine Grading Limits Determine Drainage Areas Select Specific Control Measures Schedule Construction Activities Grading limits are shown by outlining on the site map all areas where soil will be disturbed or vegetative cover removed. These areas will require one or more temporary or permanent soil stabilization measures. Outline areas to be left undisturbed and the locations of protective fencing. Outline all separate drainage areas that occur on the site. Stormwater draining onto the site from adjacent properties must be included. Identify all locations where stormwater is discharged off the development site. Three areas of concern should be evaluated for each drainage area: soil stabilization, runoff control and sediment control. Specific practices to control these areas are described in Practice Installation and Maintenance. As control measures are selected, identification symbols and a symbol legend should be placed on the site map. Drawings and specifications for all structural practices and vegetation specifications should be included in the plan. The three main items required are a construction schedule, a seeding schedule and an inspection and maintenance schedule. The construction schedule explains in an orderly fashion what will occur from first to last. The sequence of control practices and struc- 14

Chapter 3 tures installation is a critical factor in controlling erosion and sedimentation on the construction site. Phasing of site grading is an important element of the schedule. Sediment basins, diversions and conveyance systems, whether temporary or permanent, should be installed before grading begins or very early in the rough grading process. The sequence of rough grading and temporary stabilization should be indicated for each area to be graded. The schedule should indicate the control practices to be used if grading is suspended for an extended period of time (30 days or more). In areas without sediment traps, temporary structures to divert water from cut and fill slopes, temporary seeding with mulch, tackified mulch or other practices should be used to stabilize the exposed soil surface. After final grading of each area is completed, the planned times and practices, usually vegetation or mulch, for stabilizing the soil surface should be indicated. The seeding schedule shows the allowable times when seeding, sodding or mulching must be done for successful vegetation establishment and soil protection (See Temporary and Permanent Seeding). An example is shown in Table 3.1. It should identify the plant species or variety, seeding dates and seeding rates. If alternate species or times are listed, this chart can be used to schedule soil surface protection activities even if the planned construction schedule falls behind. Areas to be seeded and phasing with the grading schedule should be a part of the construction schedule. 15

Table 3.1 Example of a Seeding Schedule Table Key *Ground must be moistened to cool soil temperatures before sod is laid. Use only fresh, good quality sod. Irrigate to soil depth of 4 inches immediately after installation and for the first 4 weeks, or until sod is well established. The example Seeding Schedule in Table 3.1 provides for permanent stabilization with fescue after final grading is scheduled to be completed. It also provides for temporary stabilization with annual ryegrass or tackified mulch, if grading is unexpectedly suspended and a permanent seeding cannot be established (i.e., in June and July). Finally, it gives the site manager a choice of fescue seeding or sodding during June and July to permanently stabilize sites as housing construction is completed. The inspection and maintenance schedule is a plan for inspection and maintenance for all temporary and permanent erosion, sediment and stormwater control measures. This written plan should specify the inspection programs. It should also include the work materials and equipment to be used. Indicate who is responsible, and when inspections and maintenance will be provided. 16

Chapter 3 Follow-up inspections immediately after each phase of construction and storm event, as well as periodic inspection and maintenance, are necessary to assure the proper functioning of the control measures. Schedule inspections after every rain that produces runoff for practices that detain or store water, practices that convey water and for any structures. Work time should be allowed for in the schedule to make repairs to damaged areas immediately. Schedule inspection and maintenance of structures such as sediment basins and ponds that require cleaning out on a regular basis in order to remain effective. The use of vegetation for erosion control purposes also requires a regularly scheduled maintenance program. A follow-up maintenance program includes repair of seeded, sodded or other vegetated areas where the desired degree of stabilization has not been achieved. Check all seedings for plant emergence and density 2 to 6 weeks after planting. Spring plantings should be inspected again during the summer or early fall so reseeding can be performed as necessary during the fall planting season. Making the Plan Work Even the best erosion and sediment control plan cannot cover the specifics of each situation that will arise on a construction site during the life of a project. It is the contractor s or site operator s responsibility to make sure that the site complies with the goals or intent of the sediment and erosion control plan at all times. The plan will typically show the practices that are to be in place at the start of construction. One person s error can cause considerable damage and regulatory noncompliance. For more information on making the plan work, see Interpreting Site Designs. Additional Resources For a more comprehensive procedure, refer to the Erosion and Sediment Control section of the Urban Conservation Policy Handbook. Contact your local soil and water conservation district for sources of this book. 17

18