SITING CONSIDERATIONS

Similar documents
SITING CONSIDERATIONS

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

2.1.4 Roof Downspout Rain Gardens

2008 SWMM, 2010 Revision City of Tacoma

Appendix D - Technical Design Criteria for BMPs

New Development Stormwater Guidelines

Volume 6 - Low Impact Development. Table of Contents

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

FACT SHEET: Pervious Pavement with Infiltration

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

Selecting Appropriate Stormwater Control Measures for Your Development Project

Stormwater and GSI - Setting the Stage and Rain garden and cistern sizing

Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012

Background on LID in Western WA

WQ-07 INFILTRATION TRENCH

Chapter 2 Roof Downspout Controls

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

6.2 Flow-Through Planter

Urban Watershed Mentors

Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State. City of Sacramento Sacramento State Facilities Management

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Urban Water Management and Soils (ESRM 311 & SEFS 507)

6.1 Bioretention Areas

Attachment 2: Permeable Pavement Design Guidelines

SMALL PROJECTS SIMPLIFIED APPROACH

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

Third Ave CSO Integrated Green Infrastructure

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

ANSWER KEY MGSFlood v WWHM2012 (released 5/15/2015)

Green Stormwater Infrastructure Handbook. Kristin Kerr, P.E. EOA / SCVURPPP November 29, 2018

Post Construction BMPs

Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure

Draft Rhode Island Stormwater Design and Installation Standards Manual

Technical Guidance for Stormwater Treatment and Site Design Measures

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

Seattle s Natural Drainage Systems and Complete Streets

Structural Stormwater Best Management Practices

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Before you build: Locating and Planning

Site Evaluation and Considerations for Design and Review of Bioretention. Jay Dorsey & John Mathews ODNR-DSWR June 18, 2014

RESIDENTIAL STORM WATER PERMIT & CREDIT APPLICATION WORKSHEET AND CHECKLIST

1/31/2017 INSTRUCTORS AGENDA. introduction. hydrologic modeling basics. performance standards. BMP modeling specifics. wrap up

Sustainable Stormwater Retrofit Best Practices

9/23/2014 AGENDA INSTRUCTORS CHRIS WEBB, PE LEED FELLOW

Case Study: Dallas Green Infrastructure for Stormwater

Bioretention cell schematic key

3/26/2011. David Dods URS Corp., Overland Park, KS. Year 5. Photos: David Dods

Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater. Laura Prickett, EOA, Inc.

Green City, Clean Waters

Stormwater Drainage Assessment For Single Family Residence

03/10/2015 PROGRAM OVERVIEW OVERVIEW OF PROGRAM

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

Table 4.7.1: Swales Potential Application and Storm Water Regulation

2/10/2017 INSTRUCTORS WESTERN WASHINGTON. REBECCA DUGOPOLSKI, PE Senior Engineer Key project experience: Stormwater monitoring,

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

2012 Saginaw Bay Watershed Conference

Post-Construction Infiltration Practices Table 4b

BIORETENTION HYDROLOGIC PERFORMANCE OF TEN FACILITIES LOCATED THROUGHOUT THE PUGET SOUND BASIN

City of South Portland Stormwater Manual

FLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION. Thomas M. Evans, AECOM Cleveland, Ohio

Design and Construction of Bioretention Areas

Homeowners Guide to Stormwater BMP Maintenance

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

Charles County, MD Low Impact Development (LID)/ Environmental Site Design (ESD) Ordinance & Design Manual

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Types and Basic Design of Post-Construction BMPs

Michael Clark, P.E. & Michael Moonan, RLA Weston and Sampson Engineers & David Lachance Woodbury Ridge Developer

Brian Friedlich, PE. Jeremiah Bergstrom, LLA

Old Mill Community Association Bioretention Facility

INFILTRATION TRENCH - LEAKY PIPE

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA. February 21, 2018

Guidelines and Princi les FINANCIAL ACTION SUMMARY

Green Infrastructure and the Urban Forest: Thinking Outside the Planter Box

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

Development of LID Design Guide in Edmonton

Public Works Department 104 W. Magnolia Street, Suite 109 Bellingham, WA (360)

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016

Appendix I. Checklists

Rebecca Dohn October 13, 2017

Chapter 4 - Preparation of Stormwater Site Plans

Chapter 3 Site Planning and Low Impact Development

MSD Project Clear s Rainscaping Program - Neighborhood Scale Rain Gardens

The following general requirements will be met for all planter box installations:

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region

5/22/2012. Low Impact Development through NPDES Permits TAKE AWAY MESSAGES. Municipal Stormwater NPDES Permits

Going Green with the NYS Stormwater Design Standards

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Pennsylvania Stormwater Best Management Practices Manual

Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street

Low Impact Development. Charlene LeBleu Auburn University Landscape Architecture (334)

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

ROOFTOP DISCONNECTION VERSION 1.5

Transcription:

Bioretention: Siting and Applications Presentation Overview Siting Considerations Native Soil Characterization Lessons Leaned Feasibility & Performance Applications ALICE LANCASTER, PE alancaster@herrerainc.com April 10, 2012 SITING CONSIDERATIONS LID Principles Infiltration Restrictions & Setbacks Other Considerations LID LOT LAYOUT, DRAFT 2012 LID MANUAL LID PRINCIPLES Manage rain where it falls Distribute LID practices across site Smaller facilities, managing water from smaller areas Minimize concentrating flows Use hydrology to guide site layout Retain natural drainage features/patterns Locate infiltrating BMPs in areas with best soils Preserve SW management functions of site Minimize disturbance to vegetation and soil Preserve trees 1

INFILTRATION SITING CONSIDERATIONS When do they apply? Small vs. large-scale infiltration Infiltration restrictions Infiltration setbacks INFILTRATION SITING CONSIDERATIONS WHEN DO THEY APPLY? All bioretention facilities: infiltrate water through bioretention soil for treatment PLANTER WITH UNDERDRAIN BIORETENTION WITH UNDERDRAIN INFILTRATION SITING CONSIDERATIONS WHEN DO THEY APPLY? Infiltration siting considerations apply to facilities that ALSO: infiltrate water into underlying native soils BIORETENTION 2

INFILTRATION SITING CONSIDERATIONS LARGE SCALE VS SMALL-SCALE Large-scale infiltration BMPs: infiltration basins, dry wells and injection wells concentrate stormwater flows and infiltrate large volumes at discrete points with high infilt. rates Bioretention: should be small and distributed across a site with a hydrologic regime closer to a natural vegetated condition INFILTRATION SITING CONSIDERATIONS RESTRICTIONS (SOURCE: DRAFT PHASE II PERMIT) Infiltration not permitted in: Landslide hazard areas Steep slopes (and setback above slope) Geotechnical evaluation deems imprudent erosion, slope failure, flooding Insufficient vertical separation from bottom of facility to the underlying water table, bedrock, etc 1 foot clearance if the contributing area is less than: 5,000 square feet of pollution-generating impervious surface 10,000 square feet of impervious area ¾ acres of lawn and landscaped area 3 foot clearance for larger contributing areas INFILTRATION SITING CONSIDERATIONS SETBACKS (SOURCE: DRAFT PHASE II PERMIT) Infiltration not permitted within: Setbacks from on site and off site structures: Ex. 5 ft from structure w/o basement and 10 ft from structure w/ basement for small sites* Structure shall not intersect with a 1:1 slope from the bottom edge of facility for larger sites (no less than small site setback)* 100 ft contaminated site or landfill 100 ft of drinking water supply wells or springs 10 ft of septic systems or drain fields 10 ft of USTs Groundwater protection area* 5 ft from property lines (without neighbor agreement)* *Seattle Criteria 3

INFILTRATION SITING CONSIDERATIONS OTHER CONSIDERATIONS Understand fate of infiltrated water Intent is to infiltrate to native underlying soil Arterial ROW with dense underground infrastructure (preferential pathway utility trenches) Potential for excessive shallow interflow emerging at slopes, development cuts, or in basements Use engineering controls Ex. Trench water stops to prevent reinfiltration to pipes Ex. Liners to protect adjacent infrastructure OTHER SITING CONSIDERATIONS Tree preservation Site Slopes Cross & Longitudinal Slopes Positive Drainage from drainage area to BR to overflow Setbacks (e.g., utilities & other infrastructure) May require presettling Public acceptance/ participation (retrofits) LOT LAYOUT, DRAFT 2012 LID MANUAL NATIVE SOIL CHARACTERIZATION Why soils affect siting Soil variability Short-term infiltration rates Design infiltration rates 4

WHY NATIVE SOIL AFFECTS SITING Important for Infiltrating facilities ONLY Infiltrating facilities sized based on infiltration rates Minimum rate? Maximum rate for treatment is 12 in/hr (achieved with BRS) Locate infiltrating BMPs in areas with best soils Native soils meet treatment criteria: cation exchange capacity, organic content NATIVE SOILS CAN VARY WIDELY!!!!! SOIL VARIABILITY Site 3 Site 1 Site 2 BROADVIEW GREEN GRID, SEATTLE, WA SOIL VARIABILITY SITE 1: LOAM BROADVIEW GREEN GRID, SEATTLE, WA 5

SOIL VARIABILITY SITE 2: BEACH SAND BROADVIEW GREEN GRID, SEATTLE, WA SITE 3: GLACIAL TILL (HIGH CLAY CONTENT) SOIL VARIABILITY BROADVIEW GREEN GRID, SEATTLE, WA SHORT-TERM INFILTRATION RATES ESTIMATE BY SOIL PROPERTIES Not Recommended USDA Soil Textural Classification ASTM Gradation Testing Being eliminated in draft permit Only accepted for soils unconsolidated by glacial advance in draft permit 6

IN-SITU FIELD MEASUREMENT SHORT-TERM INFILTRATION RATES Small Scale (typically not accepted by Ecology) EPA Falling Head Double ring infiltrometer test Small-Scale Pilot Infiltration Test (PIT) 2012 draft Ecology manual Small-Scale method for project with drainage area < 1 acre Seattle Modified Pilot Infiltration Test (PIT) Shorter test period than PIT Appendix E of manual Recommended METHODS (DRAFT 2012 MANUAL) ECOLOGY SMALL-SCALE PIT Excavate Pit Depth ~ surface elevation of native soil (before BSM placement) Bottom area ~ 12 to 32 sf Install Vertical Measuring Rod Install Splash Plate Reduce side wall erosion and disturbance of bottom (clogging) Fill Pit for Pre-Soak Period Standing water for 6 hours Adjust Flow Rate for Steady State Period Constant water depth (0.5 to 1 ft) for 1 hour Turn off Water and Record Rate of Infitlration Until Empty METHODS (CONTINUED) ECOLOGY SMALL-SCALE PIT Depth to Groundwater Over excavate pit to check for hydraulic restrictive layers (e.g., bed rock, till/clay lenses) or groundwater PIT Timing Test between December 1 and April 1 Number of PITs Recommend one PIT at each bioretention site For long narrow facilities, one PIT every 50 feet (unless borings indicate consistent soil characteristics) 7

PIT EXAMPLE PILOT INFILTRATION TEST Hydrant Fire Hose Flow Meter To Pit Regulate flow (Ex. Ball Valve) Garden Hose PIT EXAMPLE Vertical Measuring Rod PILOT INFILTRATION TEST Pit (lay back side slopes) 5 gal. Bucket (energy dissipation) Water level recorded every 15 minutes PIT EXAMPLE PILOT INFILTRATION TEST 8

PIT EXAMPLE PILOT INFILTRATION TEST 1.5 in/hr 0.25 in/hr CALCULATE FROM SHORT-TERM RATES DESIGN INFILTRATION RATES Design rate is long-term rate Correction factors applied to short-term rate based on: Site variability and number of locations tested Uncertainty of test methods (draft manual) Potential for clogging due to long-term siltation and bio-buildup (degree of maintenance & influent control) For soil underlying imported bioretention soil no correction required for clogging! ADDITIONAL SITE CHARACTERIZATION Seasonal High Groundwater Monitoring well or excavated pit Assess during wet season Groundwater Mounding Analysis For drainage area > 1 acre contributing to one facility Soil Characterization/Testing Grain size analysis Native soils meet treatment criteria: cation exchange capacity, organic content 9

SITE CHARACTERIZATION LESSONS LEARNED BALLARD ROADSIDE RAIN GARDENS, SPU Bioretention pilot for CSO control Funded by stimulus money fast timeline Many rain gardens not draining Poorly infiltrating soils Perched/mounded groundwater Springs What went wrong: Communication/Public Involvement Strategy Site Characterization Design Construction Practices Final geotech report not complete until after 90% design SITE CHARACTERIZATION LESSONS LEARNED SITE CHARACTERIZATION LESSONS LEARNED LESSONS FROM SPU Be aware of the level of data required vs risk and costs Consider potential of GW mounding on top of glacial till Indicators of high seasonal GW: seeps, wet pavement, saturated planting strips Ask community about evidence of GW springs, basement flooding Timing of subsurface evaluation Clearly communicate risks of accelerating schedule Include formal geotech review at 30% design Leave time for 2 nd round of tests if 1 st round indicates high variability Measured infiltration rate < 0.75 in/hr conduct more in-depth subsurface evaluation 0.25 0.75 in/hr redundant design (e.g., underdrains) <0.25 in/hr infiltrate? 10

NOT SOLUTION FOR EVERY SITE FEASIBILITY Slopes 15% (or 8% within ROW) Positive grade from drainage to BMP to overflow Bioretention with infiltration also subject to: Infiltration restrictions and setbacks Minimum vertical separation to GW/impermeable layer* * Draft permit feasibility criteria: Vertical separation of 3 feet for larger contributing areas is only allowed as proof of infeasibility when contributing area cannot reasonably be broken down into smaller areas STANDARDS PERFORMANCE Flow Control: Non Exempt Receiving Water (Most Creek Basins)- Ecology requirement to match the peaks and duration to predeveloped condition (usually forest) Combined Sewer or Capacity Constrained Basins- Local requirements are typically peak-control based Water Quality: Infiltrate 91 percent of the total runoff volume through soil meeting Ecology treatment criteria CAPABILITIES PERFORMANCE Bioretention with Infiltration Full Flow Control (with permeable soils) Full Treatment (with 18 BRS)* Bioretention without Infiltration (e.g., underdrain & liner/impermeable reservoir) Partial Flow Control Full Treatment (with 18 BRS)* * Meets basic & enhanced treatment when infiltrates through soil meeting Ecology treatment soil requirements BIORETENTION PLANTER WITH UNDERDRAIN 11

SETTINGS Residential Parcels Landscaped areas Planters Right-of-Way Planting strip Curb bulbs Medians APPLICABILITY Commercial Parcels Landscaped areas Planters Parking Lots RAINGARDENS SINGLE FAMILY STORMWATER PLANTERS SINGLE FAMILY Inflow Conveyance Overflow 12

SEATTLE SEASTREETS RESIDENTIAL RIGHT-OF-WAY Before After SEATTLE SEASTREETS RESIDENTIAL RIGHT-OF-WAY CURB BULBS RESIDENTIAL RIGHT-OF-WAY NE Siskiyou Green Street Portland, OR 23rd Ave SE & 171st Pl SE 13

MULTI FAMILY DEVELOPMENTS HIGH POINT, SEATTLE, WA BLOCK-LEVEL DESIGN MULTI FAMILY DEVELOPMENTS HIGH POINT, SEATTLE, WA BLOCK-LEVEL DESIGN MULTI FAMILY DEVELOPMENTS HIGH POINT, SEATTLE, WA 14

BLOCK-LEVEL DESIGN MULTI FAMILY DEVELOPMENTS HIGH POINT, SEATTLE, WA COMMERCIAL PARCELS CONVEYANCE COMMERCIAL PARCELS Downtown CSO Demand Management, Seattle, WA 15

PARKING LOTS COMMERCIAL PARCELS Northgate Mall, Seattle, WA PARKING LOTS TELESCOPE SWALE DETAILS COMMERCIAL PARCELS Northgate Mall, Seattle, WA PARKING LOTS COMMERCIAL PARCELS Curb Cut Inflow Beehive Structure Overflow NORTHGATE MALL, SEATTLE, WA 16

PARKING LOTS COMMERCIAL PARCELS Lewis Creek Park, Bellevue, WA Combining Landscape Requirements with Bioretention PARKING LOTS COMMERCIAL PARCELS Combining Conveyance with Bioretention Bagley Elementary, Seattle, WA RAIN GARDENS COMMERCIAL PARCELS YMCA Silverdale, WA Villanova Campus 17

STORMWATER PLANTERS COMMERCIAL PARCELS DOWNTOWN CSO DEMAND MANAGEMENT, SEATTLE, WA PORTLAND S GREEN STREETS RIGHT-OF-WAY SW 12TH AVENUE GREEN ST NEW SEASONS MARKET, PORTLAND Photos courtesy of Kevin Perry, BES CONTACT INFORMATION ALICE LANCASTER, PE alancaster@herrerainc.com http://www.herrerainc.com/ phone: 206-441-9080 18