- Phase. Project. areas using. project from. Project Type: Project is

Similar documents
Project. Project Type:

Syme Residence Hall Rain Garden

Emory. Project. models to. Based on. Project Type: would be. a proactive

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

1 STORMWATER MANAGEMENT STRATEGIES: Grey, Green, LID & Hybrid

When planning stormwater management facilities, the following principles shall be applied where possible.

Green Infrastructure & Low Impact Development

Importance of Master Planning Marcy Colclough

City of Waco Stormwater Management Regulations

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

Introducing Green Infrastructure for Coastal Resilience

Cost Effective Low Impact Development

Green Infrastructure and Low-Impact Development Technologies

engineer. Valley Park Photo: Fox Project Valley Park District Fox Valley River, the to the need acquisition

USF System Campus Master Plan Updates Goals, Objectives and Policies

Stormwater & South Carolina. A Case for Low Impact Development

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

BE WATER WISE. Managing Your Onlot Stormwater. Sept. 23, 2006 Watershed Weekend

What Can We Do to Reduce the Impact of Floods? Joe Barron, P.E. Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

Why a new Food & Farm Ordinance?

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

Stormwater Management at The University of New Orleans

National Association of Conservation Districts. Kris Hoellen Vice President, Sustainable Programs The Conservation Fund September 19, 2013

GUIDELINES FOR ECOLOGICAL PERFORMANCE

Using Green Infrastructure To Protect Water Quality

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

The Benefits and Challenges Associated with Green Infrastructure Practices

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

Draft Rhode Island Stormwater Design and Installation Standards Manual

Green Infrastructure Overview

Staff will be providing an overview of the project need, purpose and intent for consideration as part of the Amendment cycle.

Managing Stormwater Naturally. July 17, 2013

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Regional Freshwater Issues: Stormwater Management and Green Infrastructure April 16, 2011

RESPONSES TO PUBLIC CONCERNS AND QUESTIONS

Gaining Consensus for Green Infrastructure Rain to Recreation

Selecting Least Cost Green Infrastructure. James W. Ridgway, PE September 29, 2015

Green Infrastructure

Adopting the Manual of Best Management Practices for Stormwater Quality. Facts for Communities

DEALING WITH STORM WATER MANAGEMENT

Swatara Township Stormwater Program. 1. There are no storm sewers on or near my property. Why should I pay a fee?

Riparian Buffer on the Bushkill Creek. Policies

Climate Smart Communities Green Infrastructure Case Studies

Harvesting the Rain: Green Infrastructure for a Healthier Rahway River Watershed

Tale of Two Cities: Exploring How Two Communities are Using Green Infrastructure to Reduce Flood Risk

Nature-based Solutions. Exploring nature-based mitigation, including post-disaster solutions and their impact.

Appendix E: Illustrative Green Infrastructure Examples

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

Stormwater Low Impact Development - A Natural Solution

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Mainstreaming Green Infrastructure. Township Council Byram Township April 19, 2016

Flood Attenuation Opportunities In the Binghamton Area (Broome County, NY)

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Does Green Infrastructure Pay? WASHOE COUNTY COMMISSION CHAMBERS RENO, NEVADA

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Green Infrastructure Basics

NAI Principles In Gwinnett County

We provide exceptional solutions to help our clients achieve success.

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Regional Stormwater Management Program

One County s Success in Linking Watershed Protection and Land Use Planning

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

The Restoration of Reading Creek & Model Stream Buffer Ordinances/ Zoning Regulations for Alabama Streams

Melissa Bernardo Hess, PE, CFM February 18, 2016

New Development Stormwater Guidelines

Modeling Cumulative LID Features for Floodplain Impacts in an Urban Watershed in Houston, TX

Lesson 2: Stormwater Best Management Practices (BMPs)

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

4. CONCEPT PLAN DEVELOPMENT

Getting the Locals to Go Along. Keys to Tulsa s Successful Floodplain Management

Green Infrastructure Recommendations For Parks and Public Spaces

Working Group Meeting

Billing Code: DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-6072-N-01]

Stormwater Prevention and Control

Going Green with the NYS Stormwater Design Standards

COASTAL MANAGEMENT ELEMENT. Last amended December 6, 2016 as part of the 2016 EAR

Lafitte Greenway Sustainable Water Design

FLOOD ISSUE 62 INTRODUCTION

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

WASHINGTON COUNTY OREGON

Richton Park Western Development Corridor Green Infrastructure Development Plan August 18, 2017

Design Around Waterways and Wetlands

Appendix E Preliminary Location Hydraulic Study

Case studies. B1.1 Lloyds Crossing, Portland (USA)

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

Green Gables. April 24, 2013

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Permeable Interlocking Concrete Pavement A Low Impact Development Tool Training for Developers

GOING GREEN! NEWBURYPORT S PLAN FOR THE FUTURE

2.1 Principles & Objectives

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Evaluating Urban Stormwater Retrofits in the SE US Coastal Plain

Improve Neighborhood Design and Reduce Non Point Source Water Pollution

Ben Powell, Clemson Extension

Transcription:

Model Community Watershe ed Development - Phase I / Marais des Cannes Location: Lafayette Parish / Scott, LA Client: State of Louisiana / Office of Community Development Disaster Recovery Unit Design Firm(s): Lafayette Consolidated Government, Traffic & Transportation Department, Comprehensive Planning Division Landscape architect/project contact: Cecilia Gayle Email: cgayle@lafayettela.gov ASLA Chapter: None Project Specifications Project Description n: The pilot MCWD is proposed to contain a regional stormwater retention- with elevated on-site areas using excavated dirt from lakes for amenities. The retention and detentionn lakes would reduce the risk of flooding in downstream areas by containing excesss stormwater until it can be recharged into the aquifer or control-released when over-burdened infrastructure can accept it. Some amenities may be located in the floodplain, floodway, and/or wetlands, requiring regulatory permits for the project from Federal Emergency Management Administrations (FEMA), The Federal Insurance and Mitigation Administration (FIMA) and its detentionn facility several hundredd acres in size designedd for high storm water storage capacity, National Flood Insurance (NFIP) program for Lafayette Parish, US Corps of Engineers as well as other state and local agencies. Project Type: The Marais des Cannes is Phase 1 of the Model Community Watershed Development (MCWD) Project is located in Lafayette Parish near the City of Scott in South Louisiana. Part of a new development Design features: Bioretention facility, rain garden, bioswale, cistern, rain barrels, downspout removal, porous pavers, curb cuts, and Coulee By-Passs structures. These divert water from existing coulee (stream) when it reaches flood stage. The water is then transported to storage areas in proposed regional facility. Design of slopes: (2-Stage Ditch concept: shelves / ledges that slows dow.

e 2 This project was designed to meet the following specific requirements or mandates: County ordinance, to meet funding criteria, the funds aree to be used for: 1. Activities associated with assembling, surveying, and reviewing existing planning and zoning documents 2. Activities associated with assembling, surveying, and reviewing existing floodplain maps, utility maps, forecasting. Impervious area managed: greater than 5 acres Amount of existing green space/open space conserved or preserved for managing stormwater on site: greater than 5 acres. Summary of Southern / Phase I Planning Area / Marais des Cannes 382 acres, 80 ac. combined area of Lakes, 48 ac. of constructed wetland, 1.5 ac. of By-Pass Coulee, 47 ac. of dry retention, 1.1 ac. of community garden, 6 miles of bicycle/walk trail, 216 4 story townhouse units, totaling: 175.5 ac. of lake, wetland, detention, and coulee 216 units on 382 acres =.5 units per acre, 45% lake / retention area /open space 55% elevated land / upland woods. The regulatory environment and regulator was supportive of the project. Did the client request that other factors be considered, such as energy savings, usable green space, or property value enhancements? In a parish with 60 inches of rainfall per year, land elevations near sea level, changing weather patterns, increased development and reduced pervious area, damage from flooding and costs for repair and primary concerns. Land value increasess when land elevation is increased. Greenwayss increase the value of adjacent properties as an amenity to residential community developments. Greenways between retention facilities allow for increased recreational opportunities. Greenways connect communities, promote interactionn and the potential increase of land value. Cost & Jobs Analysis Estimated Cost of Stormwater r Project: >$ $5,000,000 (Public funding: State, local - the funds ($381,608) for Planning of this project are provided through LCG from The State of Louisiana, Division of Administration, Office of Community Development Disaster Recovery Unit for a Category 1 of the Comprehensive Resiliency Grant Program. ) Related Information: The funds ($381,608) for Planningg of this project are provided through LCG from The State of Louisiana, Division of Administration, Office of Community Development Disaster Recovery Unit for a Category 1 (Gustav/ Ike Disaster Recovery Community Development Block Grant (CDBG) funds) of the Comprehensive Resiliency Grant Program. An additional ($45,000) will be contributed as a match from Lafayette Consolidatedd Government. This program is designed to provide comprehensive nonstructural recovery tools to some of our most at-risk communities. The grant funds will be used to pay a significant amount of LCG Staff time over a period of three years.

e 3 The Department of Traffic and Transportation, Metropolitan Planning Organization and Comprehensive Planning Division will provide the staff professional expertise of project managers as well as a landscape architect, an architect,, an urban designer, several GIS specialists, several urban planners and several civil engineers. Four consultantt specialists hydrologist, ecologist, civil engineer, and economist will be expected to work closely with LCG Staff over the three year period of the grant. Some or alll of the specialists may be from the same firm or ad hoc group of consultants who may applyy separately or as a team. In addition, other departments of LCG may participate in the project. Projected costs for implementation and proposed proprietorship of the project will be developed during the planning process outlined above. Was a green vs. grey cost analysis performed? Yes, we are projecting cost / benefit analysis within the study and willl provide results as the reports are completed. There will be an economicc impact study taking place concurrent with the hydrological, ecological, architectural, and engineering studies. Cost impact of conserving green/open space to the overall costs of the site design/development project: While there is a lot of information about conservation and preservation of green space, there are not many studiess attaching "costs" and " benefits" to green infrastructure. By reducing pollutants before they enter the stormwater system improves pond performance and lowers maintenance costs. Natural buffers or naturalized plantings along streams, bayous, and lake edges protect water quality by filtering out sedimentss and pollutants before they can enter a fresh water body and improve the environment, but specific cost analysis is hard to find. An effective, stormwater pollution preventionn plan involves community members and governmental officials. Street sweeping, leaf collection, fertilizer and pesticide application restrictions, and commercial and industrial pollution prevention all serve to minimize health related hazards, and extend the service life of stormwater coulees and detentionn ponds. These are the concepts that will be incorporated into thee overall plans being created with the Marais des Cannes Phase I. The monitoring of costs to this development will be tracked to further this body of knowledge and to provide a templatee for other communities to replicate. Cost impact of conserving green/open space for stormwater management over traditional site design/site development approaches (grey infrastructure)? Significantly reduced costs (10% or greater savings). It is too soon too indicate the cost savings of green over grey infrastructure, but the concept is in place to prove that this manner of development is ecologically responsible and financially cost effective. For example: : A safety shelf around the perimeter of the detention pond and lake edges will be incorporated to reduce the risk of someonee falling into the permanent pool. This approachh can also create wildlife habitat and an attractive natural shoreline.

e 4 By relating events and programs, stormwater facilities with greenway corridors can be varied, dynamic and provide access to and increases educationn & eco-tourism opportunities and financial benefits. Bringing together varied types of outdoor activities to a stormwater facility district can attract and stimulate investor dollars. A green community with a strong sense of place, unique character = higher demand = more $, and promotes civic ecology. Number of jobs created: Planning contractt to be released will create (3 year) part-time job benefits for 5 multi-disciplinary private sector consultantss (Hydrologist, Ecologist, Permit Compliance Specialist, Economist, Civil Engineer) as well as LCG civil service staff of (2) Pr Job hours devoted to project: Planning and Design: Almost 9,000 hours between 12 private and staff consultants has been proposed in the LRA-MCWD grant Construction: projected # of hours and construction design and implementation costs are pending grant study Annual Maintenance: projected maintenance expenses are pending grant study Performance Measures Stormwater reduction performance analysis: Data is not readily available, but the hydrologist will seekk to provide 100% storage for the first Phase of Marais des Cannes with an estimated additional 20% storage capacity for stormwaters received from upstream developments. Coulee By-Passs Structures will divert water from existing coulee (stream) when it reaches flood stage. The water is then transported to storage areas in proposed regional facility. Research will be directed towards the possibility of an assessment for the utility of off-site stormwater storage. Community & economic benefits that have resulted from the project: As new residences, businesses, roads, parking lots and urban developmentss follow growth, it is our responsibility to prevent drainage problems from occurring to the greatest degree possible. Construction of a retention facility that maintains the pre-development runoff capacity and alleviates downstream flooding when rainfall events overwhelm both natural and manmade drainage systems are a benefit to many people within the community. Centralized lake with greenways also: buffer adjacent land uses, provide recreation, improve water quality, and create wildlife habitat. Lafayette Parish is home to many migratory birds and wildlife enthusiasts. The MCWD will place the south Louisiana culture, and the love for natural environment, high on the scale of importance. A wildlifee refuge that promotes healthy biodiversity, is an ecological and an economical consideration, in this respect. Mixed-use residential, commercial and retail will be another component of the MCWD to be taken through the planning process. The architectural component will demonstratee a selection of products

e 5 with an economic range for market feasibility. Project Recognition Grant award: State of Louisiana, Division of Administration, Office of Community Development Disaster Recovery Unit for a Category 1 of the Comprehensive Resiliency Grant Program; City of Scott, Mayor Purvis Morrison - Enthusiastic approval and committed partnership Additional Information Links to images: http://www.lafayettelinc.net/lincweb/cmp/drain/drain_intro.asp This link will bring you to the Lafayette In a Century (LINC) website, under the Drainage Element of the Comprehensive Plan. On this page you will find a watershed map. It should be noted that the pilot MCWD will not be constructed with funds requested from the LRA grant proposal. The aim of the LRA grant proposal is to develop model tools to initiate the construction of this and other pilot MCWD area projects.. The tools will help clear the environmental, regulatory, and financial hurdles to initiate such a development and will help garner political and public support.