HOT GAS GENERATOR INSTALLATION, OPERATING AND MAINTENANCE MANUAL

Similar documents
MONOBLOCK NG SERIES GAS BURNERS INSTALLATION, OPERATING AND MAINTENANCE MANUAL

DUOBLOCK DUAL FUEL (GAS-HEAVY OIL) BURNERS INSTALLATION, OPERATING AND MAINTENANCE MANUAL

MONOBLOCK GAS BURNERS INSTALLATION, OPERATING AND MAINTENANCE MANUAL

MONOBLOCK HEAVY OIL BURNERS INSTALLATION, OPERATING AND MAINTENANCE MANUAL

MONOBLOCK DUAL FUEL (GAS-LIGHT OIL) BURNERS INSTALLATION, OPERATING AND MAINTENANCE MANUAL

CONDENSING BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

ROOF TOP SERIES CONDENSING BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

CONDENSING BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

HG 675 CX 60 HG 675 CN 60 HG 675 CW 60

Light oil / kerosene burner

MULTIPLEX SELF RECUPERATIVE gas burner

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A

INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL

Kyung Dong Oil Boiler. Contents. 1. General Warnings Safety Warnings

It is critical to maintain the Beech Oven and associated equipment on a regular basis, to avoid the possibility of a serious fire or malfunction.

General safety precautions English

USER'S INFORMATION MANUAL

High Pressure Washer - SAFETY INSTRUCTIONS

1. GENERAL SAFETY RULES

MJC Cartridge Filter Unit Operation & Maintenance

Installation & Maintenance Manual

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

Light oil burners. One stage operation

Installation/Instruction Manual

Oil burners Brûleurs fioul Stookoliebranders

BlueHeat AirTop 2000 Heater

JUMBO INDIRECT FIRED DIESEL HEATER OPERATING INSTRUCTIONS

INSTRUCTION MANUAL FOR OIL BURNER MODELS

General safety precautions English

GUF-100RDH3. Model name The picture is shown GUF-50RDH3. Notice: The term of validity is for a year from the issued date.

Operating Instructions

OPERATION AND MONTAGE MANUAL ROOF FANS

USER'S INFORMATION MANUAL

AHU INSTALLATION & OPERATION MANUAL

POWER VENTER SYSTEM. Model: PVO-300, PVO-600

15 20 kw kw kw

INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN

Light oil - kerosene burner

Corn Flame Energy Corn Stove Model 3000

HEAT RECOVERY AIR HANDLING UNIT

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY

OPERATION AND MONTAGE MANUAL ROOF FANS

INSTRUCTION MANUAL FOR OIL BURNER MODELS

DH-Direct Fired Poultry Farm Diesel Heater

User s Manual WS-4830SS WS-4836SS NOTE: PLEASE INSPECT HOOD IMMEDIATELY UPON RECEIVING. CLAIM OF DAMAGE AFTER 7 DAYS OF DELIVERY WILL BE DENIED.

F900 SERIES BOILING PAN G9781. User, installation and servicing instructions. Read these instructions before use T REV.

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80

INSTRUCTION MANUAL FOR OIL BURNER MODELS

User s Manual WALL MOUNT SERIES TABLE OF CONTENTS RA7730SS/RA77B30SS RA7736SS/RA77B36SS RA7742SS/RA77B42SS RA7748SS/RA77B48SS.

USER S MANUAL. VKP Series INLINE FAN

Parts Available from

Indirect gas-fired air heater

AirStar Clinical Air Compressor AS60, AS90 and AS120. Installation & Operating Instructions

AUTOMATIC GRANULAR ICE FLAKER

User s Manual ISLAND SERIES TABLE OF CONTENTS RA-7630SS RA-7636SS RA-7642SS RA-7648SS. Table of Contents. Safety Information...

RIELLO 40 GS/M SERIES

User s Information Manual

CODE MODEL TYPE PRESS 60 N 616 T PRESS 60 N 616 T80

Propane Flame Projector Safety instructions and operating manual

Air handling unit. BlauAir RH USER S MANUAL

Operating instructions

Single stage operation oil burner

Handling or using the product improperly and in disregard of the instructions with this mark might result in serious bodily injury or death.

RL/1 SERIES. One Stage Light Oil Burners FIRING RATES LIGHT OIL RL 34/1 MZ kw

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59

Safety. Operating instructions Ionization pilot burners ZAI, ZMI, ZKIH DANGER. Contents WARNING CAUTION Edition 12.11

BUILT-IN / TABLE TOP HOB GAS COOKER USER MANUAL

UV Flame Supervision System

VF/VG700 Jumbo. Construction Heater. Installation and Maintenance Manual

CENTRIFUGAL FAN IN SCROLL CASING. Helix S-Vent OPERATION MANUAL

BUILT-IN GLASS HOB MODEL: EGH-G8592G(BK) EGH-G8593G(BK) Owner s Manual Please read this manual carefully before operating your set.

1 VICTRIX ZEUS Superior kw I features

Operation Manual R205BV, R209BV

INSTALLATION OPERATION - MAINTENANCE MANUEL FANS WITH CABINET

MODULAR AUTOMATIC GRANULAR ICE FLAKER

LFE50. UV Flame Safeguard. Building Technologies Division DETACTOGYR

User s Manual WS-62N30SS WS-62N36SS NOTE: PLEASE INSPECT HOOD IMMEDIATELY UPON RECEIVING. CLAIM OF DAMAGE AFTER 7 DAYS OF DELIVERY WILL BE DENIED.

ULTRA LOW TEMPERATURE FREEZER. User Manual

USER'S INFORMATION MANUAL

Operating Instructions

USER S MANUAL. VCU/VCUN Series CENTRIFUGAL FAN IN SCROLL CASING

CRISTAL Built-in Dish Sterilizer Instruction Manual

VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power

U tube models PTU 09, 12, 15, 25, 30, 35, 40, 45. single linear tube models PTS 09, 12, 15, 25, 30, 35, 40, 45

AUTOMATIC ICE-CUBE MAKER - INSTRUCTIONS AND WARNINGS

CentroPelet ZV14 TECHNICAL INSTRUCTIONS HEATING TECHNIQUE. for regulation, use and maintenance of pellet stove

Proline GAS HOB Model TCG40IX Instruction Book

Detailed Cleaning Instructions

BIX B-One 100 kw INSTALLATION GUIDE

User s Manual WS-63TB36SS WS-63TB42SS NOTE: PLEASE INSPECT HOOD IMMEDIATELY UPON RECEIVING. CLAIM OF DAMAGE AFTER 7 DAYS OF DELIVERY WILL BE DENIED.

Original instructions. Operation Manual & Cautions

Far-infrared Oil Heater Owner's manual

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO

INSTALLATION INSTRUCTIONS & USE & CARE GUIDE 06E Series Model 06E Series Model RANGE HOOD LOCATION 1. The range hood must be installed just above the

Installation Manual. For Australian refrigerator models: N304M.3 (93 liter 3-way operation with LP gas, 240 volts AC, or 12 volts DC )

Installation & Operation Manual Models:

Installation instructions Combined fridge-freezer for integrated use, door-on-door

INTRODUCTION THIS MANUAL INCLUDES IMPORTANT SAFETY INFORMATION

Forced draught gas burner

Importance of a Draught Regulator

Transcription:

HOT GAS GENERATOR INSTALLATION, OPERATING AND MAINTENANCE MANUAL SHG 25 SHG 50 SHG 75 SHG 100 SHG 150 SHG 200 SHG 250 SHG 500 SHG 750 SHG 1000 SHG 1500 SHG 2000 SHG 2500 SHG 3000 www.ecostar.com.tr

DEAR USER, ECOSTAR SHG 25, SHG 50, SHG 75, SHG 100, SHG 150, SHG 200, SHG 250, SHG 500, SHG 750, SHG 1000, SHG 1500, SHG 2000, SHG 2500, SHG 3000 hot gas generators are prepared and manufactured according to the latest technical developments and safety rules. It is easy to use for our customers. We recommend that you read this manual and safety warnings thoroughly before the use of the device in order to ensure safe, cost effective and environmental-friendly use. If you encounter any issue that is not explained clearly in this manual or you could not understand, please contact with our service department. We thank you for choosing ECOSTAR brand. This Operating Manual is an integral part of the hot gas genarator and must be maintained in a plastic dossier and hung at a clearly visible place in the burner room. TERMO ISI SİSTEMLERİ SAN.VE TİC.A.Ş. Esentepe Mah.Milangaz Cad. No:75 K:3 Kartal Monumento Plaza Kartal/İSTANBUL/TÜRKİYE Tel: +90 216 442 93 00 Fax: +90 216 370 45 03 www.ecostar.com.tr e-mail:servis@ecostar.com.tr 15.12.2017 Rev.00 1

CONTENTS WARNINGS... 3 Warning Symbols and Descriptions... 3 TRANSPORT... 4 Transport of pallets with a forklift... 4 Transport pallets using a crane... 4 Storage Conditions... 5 General Safety Rules... 5 TERMS OF WARRANTY... 7 Out of Warranty Conditions... 7 HOT GAS GENARATOR GENERAL FEATURES... 8 Area of Use-Drying Process... 8 SHG TYPES... 8 1. Direct Type SHG... 8 2. Indirect Type SHG... 9 TECHNICAL SPECIFICATIONS... 9 TECHNICAL DATA... 10 Capacity Table... 10 Hot Gas Generator Dimensions... 11 INSTALLATION... 13 Indirect Type SHG... 13 Direct Type SHG... 14 GAS FUEL APPLICATION... 15 Gas Line Equipment s Required in Gas Line... 16 LIQUID FUEL APPLICATION... 17 COMMISSIONING... 18 General Controls... 18 Combustion Adjustment... 18 Final Checks... 19 MAINTENANCE... 20 Weekly Maintenance... 20 Monthly Maintenance... 20 Seasonal Maintenance... 20 AFTER-SALES SERVICES... 21 NOTES... 22 15.12.2017 Rev.00 2

WARNINGS Warning Symbols and Descriptions Symbols Symbol Descriptions Important information and useful hints. Warning of danger to life or property. Warning of electrical voltage. Product handling information. Carry in an upright position. Fragile Item. Protect against water. 15.12.2017 Rev.00 3

TRANSPORT Transport of pallets with a forklift Packages which are delivered on pallets can be transported with a forklift under the following conditions: The forklift must be designed for the weight of the package, The driver must be allowed to drive the forklift, Insert the forks to an extend that they stand out on the other side, Ensure that the pallet cannot tip when the center of gravity is not in the middle of the pallet, Transport pallets using a crane Packages which are delivered on pallets can be transported using a crane under the following conditions, Crane and lifting equipment must be designed for the weight of the package, The operator must be authorized to operate the crane, Verify that the package is not damaged by the sling gear. If necessary, use other different sling gear. 15.12.2017 Rev.00 4

Storage Conditions Store the hot gas generators, accessories and spare parts under the following conditions: Never keep outdoors, Store in dry and dust free condition, Do not expose to any corrosive substances, Protect the equipment from mechanical damage, Storage temperature 0 C-60 C, Relative humidity: max %60, When storing for longer than 3 months, regularly check the condition of all parts and the packaging. If necessary refresh or replace the conservation. General Safety Rules All personnel engaged in installation, disassembly, commissioning, operation, control, maintenance and repair should have received the necessary training and fully read and understood this manual. No changes that might damage the safety of the burner unit must be made by persons and/or organizations on the burner unit. All operation, commissioning and installation works (except for burning adjustment) should be carried out when the burner is not operating and after disconnecting the power supply. Noncompliance with these rules may lead to serious bodily injuries and even death by electrical shocks or uncontrolled flame formation. Repairs concerned with safety elements should be carried out only by the manufacturing company. The device should never be used by children, mentally handicapped and inexperienced persons. Children must not be allowed to play with the device. Keep the device away from explosive and flammable materials. Device must intake air, ventilation and air discharge holes must not be closed. If you sense gas leakage; Shut down valves of all gas devices. Open all doors and windows. Do not turn on electric devices or do not turn them off if they are working. Do not use burner derived tools such as match and lighter. Inform the gas company. 15.12.2017 Rev.00 5

Do not store any inflammable materials in boiler room. Wear hearing protectors if there is noise in boiler room. In case of fıre or other emergency; Switch off the main switch Close the main fuel shut-off valve outside the plant. Take appropriate actions The burner installation must be carried out in accordance with the instructions. Vibration can damage the burner and its components. Keep boiler doors closed while starting burner and during burner operation. During the first commissioning of the burner or in case of any revision carried out in the electrical system or motor cables by any reason, direction of the fan rotation must certainly be checked by the authorized technical service. 15.12.2017 Rev.00 6

TERMS OF WARRANTY Main and auxiliary equipment and all components used in ECOSTAR hot gas genarators are guaranteed for 1 year by TERMO ISI SİST. A.Ş starting from the date of commissioning under the maintenance, adjustment, operating conditions and relevant mechanic, chemical and thermal effects explained herein. Please note that this warranty is only valid if the device(s) is commissioned and maintained by our authorized services. Our company reserves the right to make any modifications on the product and all instructions thereof for improvement purposes. Out of Warranty Conditions Any damage arising out of or in relation to customers non-compliance to their responsibilities with regards to installation, commissioning, operation and maintenance, Any damage arising out of or in relation to commissioning, repairs and maintenance carried out by unauthorized services, Any damage that may occur during transportation or storage of the product, Not preserving the product in its original packaging until the installation stage, Incorrect and poor electrical connections, Failures due to incorrect voltage applications, frequent repetition of voltage fluctuations, Any damage that may occur as a result of incorrect fuel usage or, foreign substances in the fuel used or using of the product without any fuel, Any damage that may occur due to foreign particles entered into the product during installation and operation, Failures due to incorrect device selection, Any damage to unit due to natural disasters, Devices without any warranty certificates, Warranty Certificates without the stamp and signature of the authorized dealer or service, Devices with any falsification on the warranty certificate or without an original serial number. The risks during transportation of device under the responsibility of customer belong to the customer. Presence of misuse faults are indicated in the reports issued by authorized service stations or our authorized agent, dealer, representative or our factory in case of unavailability of authorized service stations. Customers may apply consumer protection arbitrator committee with regards to this report and request for an expert report. 15.12.2017 Rev.00 7

HOT GAS GENARATOR GENERAL FEATURES ECOSTAR direct and indirect type hot gas generators are provided an outlet temperature up to 1000 ºC, and designed to operate with natural gas, fuel oil and light oil with a capacity range between 250.000 kcal/h 30.000.000 kcal/h. Area of Use-Drying Process Soil Industry: Artificial drying chambers of brick plants. Sand drying rotary furnaces. Gypsum Block- Gypsum Panel drying kilns. Chemical Industry: Detergent manufacturing towers. Fertilizer Industry: Rotary fertilizer drying kilns. Sugar Industry: Pulp drying kilns. Paper Industry: Continuous paper drying. Packaging Industry: Print paste drying. Metal Industry: Stress relief furnaces. Cement Industry: Raw meal drying, coal and slag drying. This device must never be operated with open flame! SHG TYPES 1. Direct Type SHG 2. Indirect Type SHG 1. Direct Type SHG Direct type hot gas generators are used to produce the hot gas needed in processes in various fields of use. In the high temperature resistant material manufactured combustion chamber, the exhaust gas of the fuel burned by the burner is either directly blown into the air or mixed with air in the mixing chamber to obtain hot gas. The efficiency of the fuel burned in the combustion chamber is higher when it is transferred directly to the hot air to be heated. Such SHGs are used where the process gas of the exhaust gas is not inconvenient. 15.12.2017 Rev.00 8

2. Indirect Type SHG Indirect type hot gas generators are used to produce the hot gas needed in processes in various fields of use. In the high temperature resistant material manufactured combustion chamber, the exhaust gas of the fuel burned by the burner is discharged from a separate hull without being mixed with fresh air (secondary air). The secondary air is supplied at the desired temperature and clean as the process. Such SHGs are generally used to heat areas where food processes, industrial processes where sensitive production is occurring, and living things. TECHNICAL SPECIFICATIONS Durable, solid construction, High operating safety, Easy installation-operation and low maintenance, Reduced overhead thanks to low pressure losses of the combustion and mixture air, Elimination of transfer losses and increase of efficiency in direct type hot air generators by direct mixing of burnt gases with fresh air in the mixing chamber without any heat transfer item in between, Total increase in efficiency with low flue loss, Minimization of heat losses between the body coated with insulation material and the environment, Allows exhausting from the explosion cap on the mixture chamber in case of gas jam, and also provides easy access into the generator by service personnel for maintenance-inspection, Provides increase in efficiency by heating the combustion air up to 100-120 C by recovery, Design resistant to high temperature and temperature stresses in brick hot air generators, achieved with the refractory material used to cover the combustion chamber, and by heating the combustion air passing around the combustion chamber, 15.12.2017 Rev.00 9

TECHNICAL DATA Capacity Table TYPE Capacity (kcal/h) NATURAL GAS (Nm³/h) FUEL CONSUMPTION LPG GAS (Nm³/h) LIGHT OIL (kg/h) HEAVY OIL (kg/h) SHG 25 250.000 30,3 11,1 24,5 25,9 SHG 50 500.000 60,6 22,2 49,0 51,8 SHG 75 750.000 90,9 33,3 73,5 77,7 SHG 100 1.000.000 121,2 44,4 98,0 103,6 SHG 150 1.500.000 181,8 66,7 147,1 155,4 SHG 200 2.000.000 242,4 88,9 196,1 207,3 SHG 250 2.500.000 303,0 111,1 245,1 259,1 SHG 500 5.000.000 606,1 222,2 490,2 518,1 SHG 750 7.500.000 909,1 333,3 735,3 777,2 SHG 1000 10.000.000 1212,1 444,4 980,4 1036,3 SHG 1500 15.000.000 1818,2 666,7 1470,6 1554,4 SHG 2000 20.000.000 2424,2 888,9 1960,8 2072,5 SHG 2500 25.000.000 3030,3 1111,1 2451,0 2590,7 SHG 3000 30.000.000 3636,4 1333,3 2941,2 3108,8 H u Natural Gas =8250 kcal/nm 3 H u LPG=22500 kcal/nm 3 H u Heavy Oil = 9650 kcal/kg H u Light Oil = 10200 kcal/kg 15.12.2017 Rev.00 10

Hot Gas Generator Dimensions Type Capacity (kcal/h) Dimensions (mm) L B H SHG 25 250.000 2500 1450 2250 SHG 50 500.000 2750 1700 2500 SHG 75 750.000 3000 1950 2750 SHG 100 1.000.000 3250 2200 3000 SHG 150 1.500.000 3500 2700 3500 SHG 200 2.000.000 3750 3200 4000 SHG 250 2.500.000 4000 3450 4250 SHG 500 5.000.000 5000 3700 4500 SHG 750 7.500.000 6000 3950 4750 15.12.2017 Rev.00 11

Type Capacity (kcal/h) Dimensions (mm) L H SHG 1000 10.000.000 6900 3000 SHG 1500 15.000.000 8300 3200 SHG 2000 20.000.000 9900 3450 SHG 2500 25.000.000 10900 3700 SHG 3000 30.000.000 11900 3950 A special design application is made for the hot air generators for the capacities which are not indicated on the capacity table The dimensions in the guide are for informational purposes only. Depending on the process temperature and the outlet temperature, the dimensions may vary. 15.12.2017 Rev.00 12

INSTALLATION Indirect Type SHG 1. Secondary fan 2. Combustion air fan 3. Burner 4. Hot gas generator 5. Temperature measurement probe 6. Hot gas outlet pipe 7. Secondary air damper 8. Flue 15.12.2017 Rev.00 13

Direct Type SHG 15.12.2017 Rev.00 14

GAS FUEL APPLICATION BV : BALL VALVE GF : GAS FILTER HV : PRESSURE COCK VALVE M R : PRESSURE GAUGE : GAS REGULATOR PSV : GAS SAFETY DISCHARGE VALVE GP : GAS PRESSURE SWITCH SV : GAS OPERATING VALVE SSV : GAS SAFETY VALVE SM : COMBUSTION AIR DAMPER Pbr : GAS IMPULSE TT : TERMOCOUPLE (TEMPERATURE CONTROL) 15.12.2017 Rev.00 15

Gas Line Equipment s Required in Gas Line Pe < 300 mbar Pe > 300 mbar Pe < 300 mbar Pe > 300 mbar Q<1200kW Q<1200kW Q>1200kW Q>1200kW 1- Compensator 1- Compensator 1- Compensator 1- Compensator 2- Ball valve 2- Ball valve 2- Ball valve 2- Ball valve 3- Gas filter 3- Gas filter 3- Gas filter 3- Gas filter 4- Inlet manometer + valve 4- Inlet manometer + valve 4- Inlet manometer + valve 4- Inlet manometer + valve 8 Multi-block (safety and operation solenoids) 5- Regulator 8 Multi-block (safety and operation solenoids)) 5- Regulator 10- max. gas pressure switch 6- Outlet manometer + valve 9- Sealing Control Set 6- Outlet manometer + valve 11- min. gas pressure switch 7- Safety discharge valve 10- max. gas pressure switch 7- Safety discharge valve 8 Multi-block (safety and operation solenoids) 10- max. gas pressure switch 11- min. gas pressure switch 8 Multi-block (safety and operation solenoids) 9- Sealing Control Set 11- min. gas pressure switch 10- max. gas pressure switch 11- min. gas pressure switch 15.12.2017 Rev.00 16

LIQUID FUEL APPLICATION 1. Burner 2. Electrical connection panel 3. Filtering & Heating (if it is heavy oil) &Pumping Station 4. Combustion air fan 5. Fuel pump 6. Control panel 7. Hot gas generator 15.12.2017 Rev.00 17

COMMISSIONING General Controls Perform the following checks before commissioning the hot air generator. The hot air generator must be installed in accordance with the installation drawings, The gas and liquid fuel station should be positioned so that the hoses can freely oscillate, and sharp curves do not occur. All pipes and hoses must be cleaned carefully before connecting to the fuel station. Combustion Adjustment Start the burner, Check the flame on the observations glass, Make sure that the external conditions are appropriate for the operation. Observe the ignition process, In cases where the gas flow or the primary air flow must be changed during ignition, adjustment must be made from the control panel. The hot gas generator can be started from the local or central control panel. The start / stop or control of the gas flow can be done from the central control room or from the local control panel. When the burner is in operation, electrical safety must be ensured so that the secondary fan is also active! They must be visually inspected before the burner is started; Combustion air and secondary air ducts must be connected and tightened, The hoses for the burner are connected and the bolts in the flange connection must be tightened, Ignition lances and electrical wiring must be correctly connected. UV-sensor wiring must be correctly connected. The main flame should be formed during the ignition process. For detailed information, please refer to the operating manual of the burner to be used in SHG! 15.12.2017 Rev.00 18

Electrical Connection Perform electrical connections according to the diagram provided with the burner. Follow general security rules during installation of electric wiring and making connections. Connect the earthing terminal in electric panel to the earthing installation. Final Checks Control of a stable flame formation, If necessary, adjust the starting position of the fuel valve to achieve the desired flame characteristics, In the ignition process, the fuel flow must be less than 30% of the maximum flow, When the desired output temperature is reached, the burner is switched off, The burner has been deactivated in the set channel pressure. 15.12.2017 Rev.00 19

MAINTENANCE Weekly Maintenance Check primer and secondary air suckers, clean if necessary, General check (leak check) on burner fuel and air line, Perform the function check according to the operating procedure of the burner. Make visual checks of the shaft of SHG and inner part. Monthly Maintenance Monthly maintenance is a comprehensive process where general checks of burner and peripheral components are performed to prevent possible faults. After completion of maintenance and adjustment processes, make sure to perform an emission analysis. Clean the filters on the main line and multiblock. Check the burner gas tip. Perform insulation measurements of ignition and ionization electrodes; replace electrodes should there be leakage to the body. Check ignition cables and sockets. Check all wiring points. Tighten loose connections. Clean the dust and layers accumulated on the fan and air klappes. Check gas line pressure, it must be the same with the first adjusted pressure, otherwise burner load and emission values will also have changed. Check all bolts of the burner and SHG. Tighten loosened bolts Seasonal Maintenance Comprehensive maintenance work when the burner is re-started after long periods of shut-down or interruptions. After completion of maintenance and adjustment processes, make sure to perform a combustion analysis. Check insulation resistance of electric motor. Replace ignition and ionization electrodes with new ones. Clean air fan and clamps. Check the operating function. Check boiler thermostats. Check cleanliness of combustion chamber inside and clean if necessary. Follow installation directions during maintenance. 15.12.2017 Rev.00 20

AFTER-SALES SERVICES Dear Customer, We believe that providing a good service is as important as providing a good product. Therefore, we continue offering wide range of comprehensive services to our conscious customers. Our contact details for your requests and complaints Esentepe Mah.Milangaz Cad. No:75 K:3 Kartal Monumento Plaza KARTAL/İSTANBUL/TÜRKİYE Tel: +90 216 442 93 00 Fax: +90 216 370 45 03 Factory Contact Details Türkgücü OSB Bülent Ecevit Bulvarı No:11 ÇORLU/TEKİRDAĞ/TÜRKİYE Tel: +90 282 685 44 80-81 Fax: +90 282 685 42 09 Also you can contact with us: Web site : www.ecostar.com.tr E - mail : servis@ecostar.com.tr Please observe the following recommendations. Use the product in accordance with the principles of this manual. For any service demands regarding the product, please contact our Service Center from the abovementioned phone numbers. Upon your purchase, register your warranty certificate during installation. 15.12.2017 Rev.00 21

NOTES Please record and forward your measurements and observations to us www.ecostar.com.tr 15.12.2017 Rev.00 22