DESIGN & ACCESS STATEMENT

Similar documents
PHASE III: Reserved Matters Submission

PDP DESIGN & ACCESS STATEMENT

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Kibworth Harcourt. Introduction. Introduction

Public Consultation. Land at Monks Farm, North Grove. Welcome

Welcome to our public exhibition

Welcome to our public exhibition

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

ABOUT CALA HOMES CALA HOMES

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Welcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE

Site north of Hattersley Road West (east of Fields Farm Road), Hattersley

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

LONGDEN VILLAGE DEVELOPMENT STATEMENT

CAERNARFON DEPENDENCY CATCHMENT AREA

Welcome to our exhibition

Welcome to our public exhibition

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

CALA HO ME S WELCOME

DESIGN & ACCESS STATEMENT

DESIGN & ACCESS STATEMENT

THANK YOU FOR TAKING THE TIME TO VISIT OUR PUBLIC CONSULTATION WEBSITE.

Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

8.0 Design and Form of Development 43/

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Poolbeg West SDZ Draft Planning Scheme

Warren Farm, Ampthill

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

INTRODUCTION. Land south of Bishopswood Lane, Tadley

OKEFORD FITZPAINE NEIGHBOURHOOD PLAN

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Director of Development Services

A VISION FOR BLAIRGOWRIE

ERECTION OF 120 DWELLINGS AND ALL ASSOCI, LAND TO THE WEST OF AUDLEM ROAD, AUDLEM ROAD, AUDLEM, CHESHIRE, CH3 OHE

Derry City and Strabane District Council Planning Committee Report

Welcome to our Public Consultation

Land at Rampton Road. Cottenham

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

Welcome to our exhibition

Harrow Lane, St Leonards-on-Sea, East Sussex, TN37 7JZ ERECTION OF 113 DWELLINGS TOGETHER WITH ESTATE ROADS (DETAILED SUBMISSION)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

Newcourt Masterplan. November Exeter Local Development Framework

WELCOME. Olney Road, Lavendon INTRODUCTION. The Site. The Application. The Need for Housing. A Sustainable Location LAVENDON TURVEY OLNEY ROAD

Introduction. Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton.

DEVELOPMENT MANAGEMENT REPORT

Application Recommended for Approval Hapton with Park Ward

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

Mortimer NDP, Principles, Vision and Policies

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand.

Welcome to our public consultation

Persimmon Homes Thames Valley Date received: 2 nd April week date(major): 2 nd July 2014 Ward: Nascot

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT TRETHURFFE LADOCK, TRURO Design & Access Statement

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES

Blandford Forum Town Council, Blandford St Mary Parish Council and Bryanston Parish Council

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Land Adj. 63 Sunny Bank Road, Sutton Coldfield, Birmingham, B73 5RJ

Site off Hattersley Road West (bound by Hattersley Road West to the north west and Sandy Bank Avenue to the south and west), Hattersley

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

DESIGN & ACCESS STATEMENT. REVISION A Residential Development, Neon Social Club, Nairn Street, Jarrow.

University Park, Worcester Non Technical Summary December 2011

Land North of Hall Road, Rochford. Rochford District Council. Planning Application Index. Prepared on behalf of Bellway Homes Ltd

1. Local Plan Context

Linden Homes Proposals for land off Ringwood Road, Verwood

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Design Guidance. Introduction, Approach and Design Principles. Mauritius. November Ministry of Housing and Lands. .. a

Briefing Document of CNP. June 2017

MID SUFFOLK DISTRICT COUNCIL DEVELOPMENT CONTROL COMMITTEE A - 09 November (1) The application site is owned by Mid Suffolk District Council.

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation.

LDF. Development Management DPD: Preferred Policy Options Document. Local Development Framework. Rochford District Council

Residential Development at Menehay Farm, Bickland Water Road, Falmouth Design and Access Statement

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Welcome - Halse Yard, Honiton

25 Clarry Drive, Sutton Coldfield, Birmingham, B74 2QT

PROPOSED RESIDENTIAL DEVELOPMENT MAWNAN SMITH CORNWALL Design & Access Statement

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

Wallingford Neighbourhood Plan

Land off Arbour Close and Cotswold Edge Mickleton, Gloucestershire. Design and Access Statement Mickleton, Gloucestershire

INTRODUCTION. Land West of Main Road, Stanton Harcourt THE SITE. Why is the Site Suitable for Development?

Land at Pirton Fields. South Churchdown, Innsworth Design and Access Statement Addendum

New Homes at Winton East

MATURE SUBURBS RESIDENTIAL DEVELOPMENT GUIDELINES

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham

Land East of Cromwell Lane

DESIGN & ACCESS STATEMENT

GREENBANK DEVELOPMENT MASTERPLAN

WELCOME. Welcome and thank you for visiting today.

Housing Development at Balloonagh Tralee Co Kerry

PROPOSAL FOR NEW HOMES ON LAND OFF WALTON ROAD

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Hengrove Park Phase 1. BUDF Briefing. Kier Living. Stride Treglown job no Prepared by Checked by Date January 2017 Revision -

Land at Weather Oaks, Harborne, Birmingham, B17 9DD. Erection of 11 new dwellings and associated infrastructure, parking and landscaping

HARDWICK GREEN, King s Lynn. Welcome to our Exhibition. What are your views? Introduction to the site and proposals. About us

CLEVE PARK, THORNBURY

PLANNING COMMITTEE. 14 October 2014

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

Transcription:

DESIGN & ACCESS STATEMENT January 2016

Contents Introduction section 1 Section 1 - Introduction Section 2 - Assessment Section 3 - Involvement Section 4 - Evaluation Section 5 - Design Section 6 - Layout Section 7 - Conclusion This statement has been produced by RDC on behalf of Bletsoes The statement has been produced in full accordance with the DCLG Circular 01/2006 requiring applications to be submitted with and accompanying Design and Access Statement. We have also referred to CABE s guidance on the preparation of design and access statements Design and Access Statements how to write, read and use them The purpose of this statement is to explain the design principles and concepts that have been applied to the proposed development and how issues relating to the development have been addressed. The site comprises parcel SA 5.9 allocated for residential development. 3no. farm cottages to be demolished and additional available land. Vision To produce a living environment of high quality. The development will provide a balanced mix of high quality dwellings and open space To create a safe, attractive and secure neighbourhood, promoting social interaction. Provide movement routes which are safe for pedestrians and cyclists. To create a development that will integrate into its village edge setting To enhance this area of Thorney as a place to live, incorporating aspects of local character, landscape, visual amenity and biodiversity. Page 3

Assessment section 2 Physical The proposed residential developement site is located approx 1000m from the village centre. It extends to around 4.8 hectares (13.4 acres), the extent of which is shown on the Master Plan. The site is currently arable land. To the northern boundary lies Smithfield with its bungalows backing onto a small triangle of POS that immediately abuts the site. Also on the northern boundary of the residential parcel lies a detached farm cottage and two semi detached properties, these are in the ownership of the farm and are rented to tenants. To the far north lies Wisbech Road. To the eastern and southern boundaries there is open countryside and arable fields. To the western boundary lies existing housing backing onto the site behind a thick hedge The site is currently accessed from the existing farm access from Sandpit Road Right: Location Plan Page 4

Assessment Existing farm cottage Entrance from Sandpit Road Overlooking site from Sandpit Rd Entrance to Smithfield, next to the site Existing farm cottages Sandpit Road Dwellings on Smithfield backing onto existing Public Open Space Page 5

Assessment Social The scheme will bring many benefits to Thorney The development will enable the creation of a new diverse community on the edge of Thorney bringing new people to the village Children will benefit from newly available open spaces and enhanced play opportunities The Affordable Housing will offer the opportunity for people to be housed in new up to date, modern dwellings. The Affordable housing will bring the opportunity for people to take their first steps on the housing ladder through shared ownership. Economic The construction phase of the development will provide employment opportunities for local tradesmen and suppliers and there will be a knock on effect to the local economy from the investment being made. As a result of the development first time buyers will be able to invest in their own properties, the large range of family housing will enable families to relocate or move to more suitable properties and there will also be opportunities for investors and the private rented market. Involvement section 3 A pre-application submission was made in December 2013 with comments being received in January 2014. The comments from the case officer were positive and the overall proposed number of plots (73) was accepted. At the time the access was proposed to be taken from Sandpit Road and Highways were supportive of this. At the centre of the scheme was an area of POS that was sited adjacent to the existing play area to the rear of Smithfield. Following the pre-application response, it was suggested by PCC that the access could be taken from Wisbech Road with open space being created alongside this. As part of this revised scheme it was suggested that access be provided to the play area to the rear of Smithfield so that this could also be developed. This resulted in an increased number of plots (95) as the POS was relocated to adjacent the access road. The scheme was redesigned to incorporate these comments and a second pre-application submission was made in November 2014. Comments were received in January 2015. Again the comments from the case officer were positive and it was acknowledged that the revised access arrangements would be of benefit to the residents of Sandpit Road and may also enable further land parcels to be developed. The emergency access onto Sandpit Road was accepted. It was recommended that further investigations should be carried out into bats and a geophysical investigation into archaeological anomalies that were found during trial trenching. Comments were received from the Police on isolated bungalows and this issue has now been addressed. A public exhibition was held in August 2015 and was well attended. Page 6

Evaluation section 4 Landscape The site is clear of any trees but there are hedgerows to the site s boundaries. These will be retained and enhanced where appropriate. It is proposed that due to the flatness of the landscape and the site s edge of village location that generous landscape buffers will be planted around the eastern and southern boundaries to filter views of the site when viewed from afar. There are no water bodies on the site. The site will be subject to a protected species survey prior to the application. Topology The site is generally even with a 2m fall east to west and a 1m fall north to south Ecology A Phase 1 Habitat and Protected Species survey has been instructed which will be submitted with the Outline Planning Application Views The site is generally well contained from views within Thorney. However it is visible from the A1167 and A47 Bypass and also from across the open countryside from the east and south where the landscape is generally flat. Movement The nearest bus stop is located on Park Crescent (approx 500m from the site) which is served by bus no. 36 (Stagecoach) and runs between Thorney and Peterborough (Queensgate) Local Facilities Thorney is considered a sustainable location for development due to good local facilities which include: a Primary School on Sandpit Road, a pub on Wisbech Road and a shop/post Office on Abbey Place. Noise There are no perceived noise issues in the proximity of the site Drainage Surface water from the site will discharge to the IDB controlled watercourse located to the south and east of the development. The discharge rate will be agreed by the IDB. Foul water will discharge into Anglian Water s sewer located in Sandpit Road. Anglian Water has confirmed that both the sewer and sewage treatment works has capacity to accommodate foul flows from this development. Flooding The residential element is shown to be located within Flood Zone 1 on the Environment Agency s indicative flood map. However, the land accommodating the access from Wisbech Road is located within flood zone 3. There are no flood levels available for the zone 3 area. It is proposed to leave the land levels as they are, should the access road flood then vehicles will be able to use the emergency access to Sandpit Road which lies within flood zone 1. Page 7

Evaluation Neighbourhood Character Assessment The nearest existing housing is located on Sandpit Road and Smithfield and comprises of 1960 s bungalows and 2 storey houses. The nearest vernacular buildings are located on Wisbech Road. These are mainly small Bedford Estate Cottages constructed in the 1800s of varying designs and combine to give great distinctiveness to Thorney. There are older dwellings on Church Street. The materials are mainly locally made buff/brown bricks with slate roofs. There are also examples of pan tiles, plain tiles and stone roofing materials. Building details comprise of parapets to gable ends, corbelling to gables, stone mullion windows, Georgian sash windows, multi bar cottage windows, leaded lights, a number of buildings have hipped ends and there are some 1.5 storey cottages. Although out of the scope of this Outline Application any proposed dwellings would be influenced by the vernacular buildings and from this a flavour of the local vernacular will be distilled into house type details. These will pay regard to the Thorney locality lending the site local distinctiveness. Opportunities and Constraints The site has been assessed in terms of its opportunities and constraints. These have been identified and the plan opposite has been produced to illustrate them. These identified opportunities and constraints have been used in forming the illustrative master plan Page 8

Evaluation Opportunities To provide valuable new housing To provide a bespoke house type designs reflecting the vernacular style of the Duke of Bedford Estate To provide much needed affordable housing in a village location To contribute to local facilities through the community infrastructure levy. To provide a link road through to the south and west, facilitating further development. To improve the entrance to the village through parkland planting to the proposed site entrance. Constraints Exposed southern and eastern boundaries Proximity of bungalows on northern boundary Limited access possibilities Potential requirement for on site storage of surface water. Page 9

Design section 5 Use The development will provide approx 91 no dwellings with associated public open space. The Site comprises parcel SA 5.9, the existing farm cottages, and land to the rear of Park crescent which will accommodate the site access and public open space. Amount The overall site area is 4.8 hectares of which 3.10 nett hectares is residential development and 1.70 hectares is public open space and landscape buffer. The residential mix will provide a range of dwelling sizes from 1 bedroom to 5 bedrooms Affordable housing will be provided, the quantum of affordable housing will be established through discussions with Peterborough City Council Housing Strategy. Site: Number Of Bedrooms Private 1 2 3 4 5 Houses 14 29 15 6 Flats/ Maisonettes Affordable 1 2 3 4 5 Houses 16 5 Flats/ Maisonettes 3 3 Design Concept & Principles The design concept is to provide a new residential development to the edge of Thorney which is attractive and of a high quality with bespoke house types reflecting the vernacular of Thorney. To provide a range of home sizes and tenures and to respond to the site specific constraints and opportunities. The layout principles are:- It is of primary importance to maintain the privacy and amenity of the existing neighbours many of which are bungalows, so careful consideration of levels and distances. The relationship to the open countryside is of the utmost importance. Built form, storey heights, orientation and landscaping have been considered in this regard. The design must create its own identity and be of a high standard. The existing hedgerows to be retained within the site must be safeguarded from harm during and after construction Wildlife interest in the site must be closely monitored to ensure the protection of important species and habitats. The context of the wider movement framework and the impact of development upon it has been considered. The design must have regard to the built form of Thorney and should set opportunities to reinforce local characteristics. It can be seen that these over arching principles are relevant to this parcel and contribute to the design response when considered in conjunction with the specific site constraints and opportunities. Page 10

Layout section 6 Master Plan Page 11

Layout Development Components The indicative scheme proposes 91no new homes on the residential area of 3.62ha. This equates to a density of around 25 dwellings per hectare. The site will also provide new affordable homes. The quantum of affordable housing and the mix will be agreed with Housing Strategy and will be one that responds to specific local needs. A Section 106 agreement will be entered into by the applicant to secure the delivery of these affordable homes The affordable homes will be arranged in groups at various points across the layout appropriate to the dwelling types and character areas desired. The remaining accommodation mix provides for a range of end user needs or desires from small starter homes to large family properties Affordable homes will be designed to achieve compliance with the Housing Quality Indicators (HQI). This is a system of assessment that evaluates the quality of the design Design Proposals The site benefits from an edge of village location with views over the open countryside. The site has therefore been laid out to take of advantage of these views. The outer edge of the site faces the countryside with open views to the east. In order to prevent the dwellings from presenting a hard edge to the countryside a generous planting buffer has been proposed to visually soften the site edge. Over time the new dwellings will be partially obscured by the buffer offering filtered views in and out of the site. A large area of POS (0.9ha) is positioned adjacent to the site access. This will give the opportunity for a significant landscape asset, incorporating a play area and parkland planting, enhancing the entrance to Thorney. The indicative layout shows how the site could be developed. The Peterborough City Council Allocation states that the site (SA 5.9) can accommodate an estimated 60 dwellings. The affordable homes will be designed to consider the principles detailed in the Lifetime Homes Standards. The Lifetime Homes standards achieve flexibility and adaptability within the designs by incorporating a range of design criteria. These criteria support the changing needs of individuals and families at different stages of life. Secure by Design principles will be respected and considered in the detailed proposal. Secure by Design is a range of criteria that are intended to reduce the risk of crime within new developments. Page 12

Layout Appearance The site is envisaged as a development which has a sense of character and identity relevant to its setting and location. The character of the buildings will make this new development attractive, coherent, legible and appropriate to its location. It will have simplicity of design and form which will integrate with the existing village and landscape setting in a sympathetic manner. The site will have a distinct building and townscape typology inspired principally by the Duke of Bedford vernacular found in and around Thorney. The homes will be predominantly detached with a number of semi detached and/or terraced dwellings. There will be a variety of designs tied together with a palette of architectural and material themes. Landscaping The landscape strategy is an integral component of the development. The objectives in respect of the landscape are outlined below:- To provide attractive open space with a range of functions and uses To buffer the impact of development particularly along the eastern edge To conserve and enhance the flora and fauna of the site To create an area of parkland at the site entrance that will incorporate a new play area. The parkland will create a gateway to the village. The development will provide a large area of parkland that will be dedicated POS in excess of the policy requirements. The common front garden boundary treatment will be shrub and hedge planting. This boundary treatment will provide strong definition between the public and private realm and contribute to the legibility of the development. Scale Building form is 2 storey to respect the edge of village setting and the bungalows to the eastern boundary. This height limit will also ensure that a sensitive response is achieved where new homes abut the existing residential area. Page 13

Layout Access A new site access will be taken from Wisbech road to serve the development. The access road will run through the site to the southern boundary, enabling access to the parcel SA 5.9 and beyond, facilitating further potential development. A 3m wide link will provide emergency access to Sandpit road. Page 14

Conclusion section 7 There is a national housing shortfall. This site is required to ensure the delivery of much need affordable and private housing. The layout is based on analysis of the site s Opportunities and Constraints resulting in a layout that responds to the site s immediate surroundings. The proposal therefore meets the criteria and aspirations set down in The Vision at the beginning of the Design and Access Statement. Page 15

t: 01604 500040 f: 01604 505942 e:info@www.rdcllc.co.uk w: www.rdcllc.co.uk Unit 5, Twigden Barns, Creaton, Northampton, NN6 8NN