Innovens. Wall-hung gas condensing boilers MCA 25/28 BIC. Installation and Service Manual

Similar documents
MCA 15 - MCA 25 MCA 25/28 MI

Innovens Pro. Wall-hung gas condensing boilers MCA Installation and Service Manual A

EMC-M 24 EMC-M 24/28 MI EMC-M 30/35 MI EMC-M 34/39 MI

After Sales Service Guide

CALORA TOWER GAS 15S EX CALORA TOWER GAS 25S EX CALORA TOWER GAS 35S EX

C 330 ECO - C 630 ECO

WHE 2.24 / WHE 2.24 FF

MCR 24 MCR 24/28 MI MCR 30/35 MI MCR 34/39 MI

Vivadens. Wall-hung gas condensing boilers MCR 24/28 BIC. User Guide B

isense Pro DIN - AD280

WALL-HUNG GAS CONDENSING BOILERS MCR-P 24/28 BIC. HOMOLOGATION B 23P - C 13x - C 33x - C 93x -C 53 - C 43x - C 83x *

NANEO EMC-M WALL-HUNG GAS CONDENSING BOILERS

DTG Eco / V130

PMC-M WALL-HUNG GAS CONDENSING BOILERS

AWHP-2 MIT-IN-2 isystem

ZENA PLUS EASYLIFE WALL-HUNG GAS BOILERS

GAS 610 ECO PRO. The new Remeha. Condensing Boiler Range REMEHA GAS 310/610 ECO PRO

PRODUCT CATALOGUE

Quinta Pro Range. The New Remeha. Condensing Boilers REMEHA QUINTA PRO RANGE. High efficiency wall hung condensing boiler with ultra low NOx emission

MCR-P 24 MCR-P 24/28 MI MCR-P 30/35 MI MCR-P 34/39 MI

1 VICTRIX ZEUS Superior kw I features

4FLOOR-STANDING GAS CONDENSING BOILERS

Operating instructions

Operating instructions

VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power

SOLNEO SGC 24 SOL. User Guide. Gas fired condensing boiler C

MCA 15 - MCA 25 MCA 25/28 MI

NANEO EMC-M EASYLIFE WALL-HUNG GAS CONDENSING BOILERS

Great Britain en. Installation, user and service manual. Control panel HMI Gas 310/610 ECO PRO

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A

C 230 ECO. Control panel. DIEMATIC-m3 (GV6) Installation and Service Manual E

WELCOME TO REMEHA, THE EXPERT CHOICE INTRODUCING THE REMEHA GAS 310/610 ECO PRO RANGE FEATURES AND BENEFITS

Operating instructions

Remeha. Fuel oil/gas boilers P 420. Installation and Service Manual

Oil-fired condensing boiler GTU C 330. User Guide B

VICTRIX Superior kw Export VICTRIX Superior kw X Export

HIGH POWER. VICTRIX PRO 2 ErP. High power, wall-hung condensation boiler

Operating instructions

C Tahiti. condensing

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A

WALL HUNG GAS BOILER FOR C.H. AND PREDISPOSTION FOR INSTANTANEOUS D.H.W. PRODUCTION (with optional kit) MODELS 34,8 kw (depotenziata) 50 C

Gas-fired boilers DTG 230. User Guide D

8FUEL OIL CONDENSING BOILERS

VICTRIX 50 1 SPECIFICATIONS. Wall mounted condensing boilers

Power X High Power Condensing Wall-Hung Boilers

BSC...E - BSP...E - BESC...E

FLOOR STANDING GAS CONDENSING BOILERS CONDITION OF USE CLASSIFICATION

ENERGY TOP. Condensing boiler solutions

12.0 Servicing. Electrode Position Fig Annual Servicing Inspection (Cont) 4 ±0.5

Condensing, pre-mixed, wall-hung gas boilers with water tank

Superior. A Compact Floor Standing Gas Fired, High Efficiency Condensing Hot Water Boiler. Outputs 120, 160, 200, 240, 280 kw

USERS MANUAL FOR GAS BOILERS

DIEMATIC VM isystem WALL-MOUNTED CONTROL SYSTEM. DIMENSIONS Length: 320 mm Height: 260 mm Depth: 130 mm. POWER SUPPLY 230 V, 50 Hz, 6 A

Power X High Power Condensing Wall-Hung Boilers

Clyde Alkon 90. Floor standing condensing boilers. Natural Gas. 90 kw. LP Gas. 90 kw

INSTALLATION, USER AND SERVICE MANUAL

ECONOFLAME R6000 GAS FIRED CONDENSING HOT WATER HEATER SUPPLEMENT

Operating Guide. Termix Solar A+/B+ 1.0 Table of Contents. 1.0 Table of Contents

Gas fired condensing boiler C 230 ECO. User Guide C

E-COMBI EVO E-SYSTEM EVO

Sirius FS Working towards a cleaner future. Floor Standing Condensing Gas Boilers. Installation, Operation & Maintenance Manual

TopGas Cascade Condensing Gas Boilers Technical Information and Assembly Manual Output range 60 to 720 kw /17 Subject to modification

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit

The competent brand for energy saving systems NEW. Gas-combi boiler CGG-1K-24/28

MPX 24/28 MI Compact MPX 28/33 MI Compact CONDITIONS OF USE HOMOLOGATION. B 23 - C 13x - C 33x - C 53x - C 93x - C 83x* B 23p - B 33 - C 43x

Wall hung combination boilers. This is a CAT II2H3+ appliance USER, INSTALLATION AND SERVICING INSTRUCTIONS SUPPORTED BY

GB24 & GB30. User Manual

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

AVIO kw Export 1 FEATURES. Wall-mounted with storage tank

24/31-28/35-33/40 kw Premix System Condensing - ErP Combi Gas Boilers. Enerwa / EnerwaPlus.

AGUAdens TM 100% residential condensing D.H.W. wall-mounted water heaters ( litres) AISI 316 D.H.W. WORKING PRESSURE TITANIUM CONDENSING

Remeha. Fuel oil/gas boilers P 320. Installation and Service Manual

IST 03 C ELBA DUAL INSTALLATION, USE AND MAINTENANCE

Mikrofill Ethos Condensing combination boiler. Maintenance Instructions 24cc

GT 220 PROJECT CAST IRON FLOOR-STANDING FUEL OIL-/GAS-FIRED BOILERS

Divacondens D Plus Atmospheric condensation wall-mounted boilers, with instant domestic hot water production

CAST IRON PREMIX HIGH EFFICIENCY GAS FIRED BOILER kw BRILEY DESIGN MANUAL

Installation, operating and servicing instructions

RinNOVA. User manual and installation instructions

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM

SPECIFICATIONS - NIKE

TAHITI CONDENSING KR 55 - KR 85

WALL-MOUNTED CONDENSING BOILERS WH 46 WH 65 INSTALLATION, OPERATION AND MAINTENANCE MANUAL

5 YEAR ADVANCE PLUS WARRANTY. High efficiency condensing combi and system boilers

LIBRA DUAL INSTALLATION USE AND MAINTENANCE. Italian product. High quality IST 04 C

INSTALLATION AND OPERATING INSTRUCTIONS AVANTTIA

24V dc Terminals X4. 230Vac Terminals X V dc Electrical connections Volt free Room thermostat on/off

WOLF GAS CONDENSING BOILERS COMFORTLINE

INSTALLATION AND OPERATING INSTRUCTIONS EVOLUTION EV HFM

Aluminium range of condensing boilers. Works every time. Designed to meet carbon reduction targets. Lifetime service and support

/2010 US/CA

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual.

Aluminium range of condensing boilers. Works every time. Designed to meet carbon reduction targets. Lifetime service and support

ARIES DUAL MAINTENANCE MADE IN ITALY IST 04 C

INSTALLATION AND MANINTENANCE INSTRUCTIONS

FLOOR-STANDING GAS CONDENSING BOILERS FROM 3.4 TO 35.9KW. by 160 litre enamelled calorifier with coil placed CONDITIONS OF USE HOMOLOGATION

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM OD (FOR EXTERNAL USE)

Remeha Avanta Plus. Remeha Avanta Plus. Installation and service manual. Remeha Avanta Plus 28c. Remeha Avanta Plus 35c. Remeha Avanta Plus 39c

HT V2 HT Split

VELA COMPACT INSTALLATION USE AND MAINTENANCE

Transcription:

Innovens EN Wall-hung gas condensing boilers MCA 5/8 BIC Installation and Service Manual 300059-00-0

EG declaration of conformity The device complies with the standard type described in the EG declaration of conformity. It was manufactured and commissioned in accordance with European directives. The original of the declaration of compliance is available from the manufacturer. EG - VERKLARING VAN OVEREENSTEMMING EC - DECLARATION OF CONFORMITY EG - KONFORMITÄTSERKLÄRUNG DÉCLARATION DE CONFORMITÉ CE Fabrikant/Manufacturer/Hersteller/Fabricant : Remeha B.V. Adres/Address /Adresse : Kanaal Zuid 0 Stad,Land/City,Country/Land,Ort/Ville, pays : Postbus 3, NL-7300 AA Apeldoorn verklaart hiermede dat de toestel(len) : MCA../.. (MI) (BIC) this is to declare that the following product(s) : erklärt hiermit das die Produk(te) : déclare ici que les produit(s) suivant(s) : op de markt gebracht door : De Dietrich Thermique distributor : 57, rue de la Gare, F-67580 Vertreiber : Commercialisé (s) par : voldoet/voldoen aan de bepalingen van de onderstaande EEG-richtlijnen: is/are in conformity with the following EEC-directives: den Bestimmungen der nachfolgenden EG-Richtlinien entspricht/entsprechen: répond/répondent aux directives CEE suivantes: EEG-Richtlijn: 009/4/EC toegepaste normen: EEC-Directive: 009/4/EC tested and examined tothe following norms: EG-Richtlinie: 009/4/EG verwendete Normen, normes appliquées: CEE-Directive: 009/4/CE EN 97(994*), 483(999*), 677(998*) 9/4/EEG 9/4/EEC 9/4/EWG 9/4/CEE 006/95/EEG EN 5065(997*), EN 60335-(994*) 006/95/EEC EN 60335--0(004*) 08 006/95/EWG 006/95/CEE 004/08/EEG EN 5065(997*) 004/08/EEC EN 5504-(997*), EN 5504-(000*), 004/08/EWG EN 6000-3-(000*), 6000-3-3(995*) 004/08/CEE 97/3/EEG (art. 3, lid 3) 97/3/EEC (article 3, sub 3) 97/3/EWG (Art. 3, Abzats 3) 97/3/CEE (art.3 section 3) *) inclusief (eventuele) aanvulling, including (if any) completion einschließlich (falls vorhanden) Vervollständigung, y compris (le cas échéant) complément Apeldoorn, february 00 W.F. Tijhuis Approval manager 703/0/0/3 R000300-A

Contents Introduction...6. Symbols used...6. Abbreviations...6.3 General...7.3. Manufacturer's liability...7.3. Installer's liability...7.4 Homologations...7.4. Certifications...7.4. Equipment categories...8.4.3 Additional Directives...8.4.4 Factory test...8 Safety instructions and recommendations...9. Safety instructions...9. Recommendations...9 3 Technical description... 3. General description... 3. Main parts... 3.3 Operating principle... 3.3. Skeleton Diagrams... 3.3. Shunt pump... 3.3.3 Water flow rate...3 3.4 Technical specifications...3 3.4. Sensor characteristics...4 4 Installation...5 4. Regulations governing installation...5 4. Package list...5 4.. Standard delivery...5 4.. Accessories...5 4.3 Choice of the location...6 4.3. Data plate...6 4.3. Location of the boiler...6 4.3.3 Ventilation...7 4.3.4 Main dimensions...8 5/06/ - 300059-00-0

Contents 4.4 Installing the mounting frame...9 4.5 Positioning the boiler...9 4.6 Hydraulic connections...0 4.6. Flushing the system...0 4.6. Connection of the heating circuit... 4.6.3 Connection of the water circuit for domestic use... 4.6.4 Connecting the expansion vessel... 4.6.5 Connecting the condensate discharge pipe...3 4.7 Gas connection...3 4.8 Flue gas system connections...4 4.8. Classification...4 4.8. Lengths of the air/flue gas pipes...5 4.8.3 Additional Directives...6 4.9 Installing the outside sensor...7 4.9. Choice of the location...7 4.9. Connecting the outside sensor...7 4.0 Electrical connections...8 4.0. Control unit...8 4.0. Recommendations...9 4.0.3 Position of the PCBs...30 4.0.4 Accessing the connection terminal blocks...3 4.0.5 Connecting a direct heating circuit...33 4.0.6 Connecting two heating circuits...34 4.0.7 Hot water storage tank connection (Type PS)...35 4.0.8 Pool connection...37 4.0.9 Connecting the options...38 4. Electrical diagram...40 4. Filling the system...4 4.. Water treatment...4 4.. Filling the siphon...4 4..3 Filling the system...4 5 Commissioning...44 5. Control panel...44 5.. Description of the keys...44 5.. Description of the display...45 5..3 Access to the various browsing levels...48 5..4 Browsing in the menus...49 5. Check points before commissioning...50 5.. Preparing the boiler for commissioning...50 5.. Gas circuit...5 5..3 Hydraulic circuit...5 5..4 Electrical connections...5 5/06/ - 300059-00-0

5.3 Commissioning the boiler...5 5.4 Gas settings...5 5.4. Adapting to another gas type...5 5.4. Setting the air/gas ratio (Full load)...53 5.4.3 Setting the air/gas ratio (Part load)...54 5.4.4 Basic setting for the gas/air ratio...56 5.5 Checks and adjustments after commissioning...56 5.5. Displaying the parameters in extended mode...56 5.5. Setting the parameters specific to the installation...57 5.5.3 Naming the circuits and generators...6 5.5.4 Setting the heating curve...6 5.5.5 Finalizing work...64 5.6 Reading out measured values...65 5.7 Changing the settings...66 5.7. Language selection...66 5.7. Calibrating the sensors...66 5.7.3 Professional settings...68 5.7.4 Configuring the network...75 5.7.5 Return to the factory settings...78 6 Switching off the boiler...80 6. Installation shutdown...80 6. Frost protection...80 7 Checking and maintenance...8 7. General instructions...8 7. Chimney sweep instructions...8 7.3 Customising maintenance...8 7.3. Maintenance message...8 7.3. Contact details of the professional for After Sales Support...83 7.4 Standard inspection and maintenance operations...83 7.4. Checking the hydraulic pressure...84 7.4. Checking the expansion vessel...84 7.4.3 Checking the ionization current...84 7.4.4 Checking the transfer capacity...84 7.4.5 Checking the tightness of the flue gas evacuation and air inlet connections...84 7.4.6 Checking combustion...85 7.4.7 Checking the automatic air vent...86 7.4.8 Checking the safety valve...86 7.4.9 Checking the siphon...86 5/06/ - 300059-00-0 3

Contents 7.4.0 Checking the burner and cleaning the heat exchanger...87 7.5 Specific maintenance operations...88 7.5. Replacing the ionization/ignition electrode...88 7.5. Cleaning the plate exchanger...89 7.5.3 Replacing the boiler tanks...90 7.5.4 Replacing the 3-way valve...9 7.5.5 Replacing the non-return valve...9 7.5.6 Assembling the boiler...93 8 Troubleshooting...94 8. Anti-hunting...94 8. Messages (Code type Bxx or Mxx)...94 8.3 Message history...97 8.4 Faults (Code type Lxx or Dxx)...97 8.4. Deletion of sensors from the memory in the PCB...06 8.5 Failure history...06 8.6 Parameter and input/output check (mode tests)...07 8.6. Control system sequence...0 9 Spare parts... 9. General... 9. Spare parts... 9.. Casing... 9.. Heat exchanger and burner...3 9..3 Fan...4 9..4 Control panel...5 9..5 Connecting pipes...6 9..6 Spare parts list...7 5/06/ - 300059-00-0 4

5/06/ - 300059-00-0 5

. Introduction MCA 5/8 BIC Introduction. Symbols used In these instructions, various danger levels are employed to draw the user's attention to particular information. In so doing, we wish to safeguard the user's safety, obviate hazards and guarantee correct operation of the appliance. DANGER Risk of a dangerous situation causing serious physical injury. WARNING Risk of a dangerous situation causing slight physical injury. CAUTION Risk of material damage. Signals important information.. Abbreviations ¼ Signals a referral to other instructions or other pages in the instructions. 4 3CE: Collective conduit for sealed boiler 4 DHW: Domestic hot water 4 Hi: Lower heating value LHV (Nett) 4 Hs: Higher heating value HHV (Gross) 4 PPS: Polypropylene hardly inflammable 4 PCU: Primary Control Unit - PCB for managing burner operation 4 PSU: Parameter Storage Unit - Parameter storage for PCBs PCU and SU 4 SCU: Secondary Control Unit - control panel PCB 4 SU: Safety Unit - Safety PCB 4 3WV: 3-way valve 6 5/06/ - 300059-00-0

MCA 5/8 BIC. Introduction.3 General.3.. Manufacturer's liability Our products are manufactured in compliance with the requirements of the various applicable European Directives. They are therefore delivered with [ marking and all relevant documentation. In the interest of customers, we are continuously endeavouring to make improvements in product quality. All the specifications stated in this document are therefore subject to change without notice. Our liability as the manufacturer may not be invoked in the following cases: 4 Failure to abide by the instructions on using the appliance. 4 Faulty or insufficient maintenance of the appliance. 4 Failure to abide by the instructions on installing the appliance..3.. Installer's liability The installer is responsible for the installation and inital start up of the appliance. The installer must respect the following instructions: 4 Read and follow the instructions given in the manuals provided with the appliance. 4 Carry out installation in compliance with the prevailing legislation and standards. 4 Perform the initial start up and carry out any checks necessary. 4 Explain the installation to the user. 4 If a maintenance is necessary, warn the user of the obligation to check the appliance and maintain it in good working order. 4 Give all the instruction manuals to the user..4 Homologations.4.. Certifications CE identification no PIN 0063BT3444 NOx classification 5 (EN 97 pr A3, EN 656) Type of connection Chimney: B 3 (), B 3P (), B 33 () IP0 Flue gas outlet: C 3(x), C 33(x), C 43(x), C 53, C 63(x), C 83(x), C 93(x) 5/06/ - 300059-00-0 7

. Introduction MCA 5/8 BIC.4.. Equipment categories Gas category Gas type Connection pressure (mbar) II ESi3P Natural gas H (G0) 0 Natural gas L (G5) 5 Propane (G3) 37 The boiler is preset in the factory to operate on natural gas H (G0). ¼ For operation on another type of gas, see chapter: "Adapting to another gas type", page 5..4.3. Additional Directives Apart from the legal provisions and Directives, the additional Directives described in these instructions must also be observed. For all provisions and Directives referred to in these instructions, it is agreed that all addenda or subsequent provisions will apply at the time of installation. WARNING Installation of the appliance must be done by a qualified engineer in accordance with prevailing local and national regulations..4.4. Factory test Before leaving the factory, each boiler is set for optimum performance and tested to check the following items: 4 Electrical safety 4 Adjustment (CO ) 4 Water tightness 4 Gas tightness 4 Parameter settings 8 5/06/ - 300059-00-0

MCA 5/8 BIC. Safety instructions and recommendations Safety instructions and recommendations. Safety instructions DANGER If you smell gas:. Do not use a naked flame, do not smoke, do not operate electrical contacts or switches ( doorbell, light, motor, lift, etc..).. Shut off the gas supply. 3. Open the windows. 4. Trace possible leaks and seal them immediately. 5. If the gas leak is before the gas meter, contact the gas supplier. DANGER If you smell flue gases:. Switch the appliance off.. Open the windows. 3. Trace possible leaks and seal them immediately.. Recommendations WARNING 4 Installation and maintenance of the boiler must be carried out by a qualified professional in compliance with prevailing local and national regulations. 4 When working on the boiler, always disconnect the boiler from the mains and close the main gas inlet valve. 4 After maintenance or repair work, check all installations to ensure that there are no leaks. CAUTION The boiler must be installed in a frost-free environment. Keep this document close to the place where the boiler is installed. Casing components 5/06/ - 300059-00-0 9

. Safety instructions and recommendations MCA 5/8 BIC Only remove the casing for maintenance and repair operations. Put the casing back in place after maintenance and repair operations. Instructions stickers The instructions and warnings affixed to the appliance must never be removed or covered and must remain legible during the entire lifespan of the appliance. Immediately replace damaged or illegible instructions and warning stickers. Modifications Modifications may only be made to the boiler after the written permission of De Dietrich Thermique to do so. 0 5/06/ - 300059-00-0

MCA 5/8 BIC 3. Technical description 3 Technical description 3. General description Wall-hung gas condensing boilers 4 High efficiency heating. 4 Low pollutant emissions. 4 Top of the range electronic DIEMATIC isystem control panel. 4 Installation and connection facilitated by the mounting frame delivered with the appliance. 4 Flue gas discharge via a forced flue, chimney, bi-flow or 3CE type connection. 4 Heating and domestic hot water production with integrated DHW tank. 3. Main parts 7 Flue gas discharge pipe Casing/air box 3 4 5 6 7 8 9 0 6 5 4 3 0 9 8 3 Flue gas measuring point 4 Mixer pipe 5 Heating flow hose 6 Air intake silencer 7 Box for the control PCBs 8 Combined venturi and gas valve unit 9 Flow end hydroblock 0 Safety valve outlet pipe Siphon Control panel 7 3 Tank drainage valve 6 4 Expansion vessel (DHW circuit) 3 4 5 T0096-D 5 Tank hydroblock 6 Shunt pump (DHW circuit) 7 Shunt pump (Heating circuit) 8 Return end hydroblock 9 Plate heat exchanger (DHW circuit) 0 3-way valve Condensate receiver tank Fan 5/06/ - 300059-00-0

3. Technical description MCA 5/8 BIC 3 Heat exchanger (Heating circuit) 4 Calorifier tank 5 Ignition/ionization electrode 6 Expansion vessel (Heating circuit) 7 Air intake 3.3 Operating principle 3.3.. Skeleton Diagrams 3 3 0 9 8 Heat exchanger (Heating circuit) Hydroblocks 3 Plate heat exchanger (DHW circuit) 4 Heating flow 5 Domestic hot water outlet 6 Domestic cold water inlet 7 Heating return 8 Shunt pump (DHW circuit) 9 Expansion vessel (DHW circuit) 0 3-way valve Shunt pump (Heating circuit) Calorifier tank 3 Expansion vessel (Heating circuit) 4 5 6 7 T00960-A 3.3.. Shunt pump The boiler is equipped with a circulating pump. This energy-efficient, modulating circulating pump is controlled by the control unit based on ΔT. The graph shows the manometric height at various outputs. H (mbar) 700 600 65 545 500 435 400 300 95 0 kw 5 kw 0 kw 5 kw 00 00 0 0 00 400 437 600 63 800 830 000 037 00 Q (l/h) T00537-B H Q Manometric height central heating circuit Water flow The parameters MIN.PUMP SPEED and MAX.PUMP SPEED are used to modify the pump settings. If flow noise can be heard in the system, it is possible to reduce the maximum pump speed with the parameter MAX.PUMP SPEED (First of all, vent the heating system). If circulation in the radiators is too low or the radiators do not fully heat up, increase the minimum pump speed with the parameter MIN.PUMP SPEED. 5/06/ - 300059-00-0

MCA 5/8 BIC 3. Technical description ¼ See chapter: "Professional settings", page 68. 3.3.3. Water flow rate The boiler's modulating control system limits the maximum difference in temperature between the heating flow and return and the maximum speed at which the flow temperature increases. In this way, the boiler does not require a minimum water flow rate. 3.4 Technical specifications Boiler type MCA 5/8 BIC General Flow rate setting Adjustable Modulating, Start/Stop, 0-0 V Nominal output (Pn) Heating System (80/60 C) Nominal output (Pn) Heating System (50/30 C) Nominal output (Pn) DHW System Nominal input (Qn) Heating System (Hi) Nominal input(qn) Heating System (Hs) Nominal input (Qnw) DHW System (Hi) Nominal input (Qnw) DHW System (Hs) minimum-maximum kw 5,0-4, Factory setting kw 9,4 minimum-maximum kw 5,6-5,5 Factory setting kw 0,5 minimum-maximum kw 5,0-9,9 Factory setting kw 9,9 minimum-maximum kw 5, - 5,0 Factory setting kw 0, minimum-maximum kw 5,8-7,8 Factory setting kw,3 minimum-maximum kw 5, - 9,3 Factory setting kw 9,3 minimum-maximum kw 5,8-3,6 Factory setting kw 3,6 Heating efficiency under full load (Hi) (80/60 C) - % 96,3 Heating efficiency under full load (Hi) (50/30 C) - % 0,0 Heating efficiency under partial load (Hi) (Return temperature 60 C) Heating efficiency under partial load (EN 9/4) (Return temperature 30 C) Data on the gases and combustion gases - % 96, - % 08,0 Gas consumption - Natural gas H (G0) minimum-maximum m 3 /h 0,55-3,0 Gas consumption - Natural gas L (G5) minimum-maximum m 3 /h 0,64-3,6 Gas consumption - Propane G3 minimum-maximum m 3 /h 0, -,0 NOx-Emission per year (n =) mg/kwh 38 Mass flue gas flow rate minimum-maximum kg/h 8,9-49,3 Flue gas temperature minimum-maximum C 30-85 Maximum counter pressure Pa 30 Characteristics of the heating circuit Water content l,8 Water operating pressure minimum kpa (bar) 80 (0,8) Water operating pressure (PMS) maximum kpa (bar) 300 (3,0) Water temperature maximum C 0 Operating temperature maximum C 90 () Front panel removed 5/06/ - 300059-00-0 3

3. Technical description MCA 5/8 BIC Boiler type MCA 5/8 BIC Manometric height central heating circuit ( T = 0K) mbar 95 Characteristics of the domestic hot water circuit Specific hot water flow D (60 C) l/min 7,5 Specific hot water flow D (30 C) l/min 0,0 Domestic water resistance mbar 0 Water content l 40,5 Operating pressure (Pmw) maximum kpa (bar) 800 (8,0) Electrical characteristics Power supply voltage VAC 30 Power consumption - Full load maximum W 6 Factory setting W 7 Power consumption - Part load maximum W Power consumption - Standby maximum W 4 Electrical protection index IPX4D Other characteristics Weight (empty) Total kg 70 Mounting () kg 6 Acoustic level at metre db(a) 44 () Front panel removed 3.4.. Sensor characteristics Outside sensor Temperature in C -0-6 - -8-4 0 4 8 6 0 4 Resistance in Ω 39 088 8 56 34 49 984 84 70 66 58 454 Outlet sensor circuit B+C Domestic hot water sensor System sensor Flow sensor - Return sensor NTC Temperature in C 0 0 0 5 30 40 50 60 70 80 90 Resistance in Ω 304 969 474 0000 8080 537 366 535 794 90 94 4 5/06/ - 300059-00-0

MCA 5/8 BIC 4. Installation 4 Installation 4. Regulations governing installation WARNING Installation of the appliance must be done by a qualified engineer in accordance with prevailing local and national regulations. 4. Package list 4... Standard delivery The delivery includes: 4 The boiler, fitted with a connection cable 4 Mounting frame 4 Mounting template 4 Connection kit 4 Run-off collector for siphon and safety valve 4 Outside sensor 4 Installation and Service Manual 4 User Guide 4... Accessories Various options are available depending on the configuration of the installation: Boiler options Control system options Description package Description package Stand-off frame HR39 RX cable AD34 Pipework kit for stand-off frame HR40 TELCOM voice remote monitoring module AD5 Pipe cover HR4 Flow sensor AD99 Flue gas thermostat HR43 DHW sensor AD adapter 80/5 HR38 Optional PCB for 3-way valve AD49 adapter 80-80 HR46 Hot water storage tank sensor AD50 Exchanger cleaning kit HR44 Outside radio-controlled temperature sensor AD5 Boiler body cleaning kit HR45 Boiler radio module AD5 Radio remote control AD53 Interactive remote control AD54 Room sensor FM5 5/06/ - 300059-00-0 5

4. Installation MCA 5/8 BIC 4.3 Choice of the location 4.3.. Data plate The data plate located on top of the boiler provides important information on the appliance: serial number, model, gas category, etc. T00539-B 4.3.. Location of the boiler 600 min.000 500 min. 50 900 min. 50 T00898-C 4 Before mounting the boiler, decide on the ideal position for mounting, bearing the Directives and the dimensions of the appliance in mind. 4 When choosing the position for mounting the boiler, bear in mind the authorised position of the combustion gas discharge outlets and the air intake opening. 4 To ensure adequate accessibility to the appliance and facilitate maintenance, leave enough space around the boiler. WARNING 4 Fix the appliance to a solid wall capable of bearing the weight of the appliance when full of water and fully equipped. 4 It is forbidden to store inflammable products and materials in the boiler room or close to the boiler, even temporarily. CAUTION 4 The boiler must be installed in a frost-free environment. 4 A connection to the mains drainage system for the discharge of condensate must be available close to the boiler. 6 5/06/ - 300059-00-0

MCA 5/8 BIC 4. Installation 4.3.3. Ventilation min.600 min. 700 () Distance between the front of the boiler and the internal wall of the casing box. () Distance to allow on either side of the boiler. 00 min. () min. 50 If the boiler is installed in a closed casing, respect the minimum dimensions given in the diagram opposite. Also allow openings to obviate the following hazards: 4 Accumulation of gas 4 Heating of the box Minimum cross section of the openings: S + S = 50 cm min. 50 50 () T00899-B 5/06/ - 300059-00-0 7

4. Installation MCA 5/8 BIC 4.3.4. Main dimensions 375 900 40 600 498 40 345 45 57,5 8 349 46 48 7 50 T0096-A i h ê j z x Gas / Gaz y { Connection of the combustion gas exhaust pipe Ø 60 mm Connection of the air intake pipe Ø 00 mm Safety valve outlet pipe Ø 5 mm Condensates discharge Ø 5 mm Heating circuit return G¾" Domestic cold water inlet G½" Gas connection G½" Domestic hot water outlet G½" Heating circuit flow G¾" 8 5/06/ - 300059-00-0

MCA 5/8 BIC 4. Installation 4.4 Installing the mounting frame The boiler is delivered with a mounting template.. Position the mounting template to the wall with adhesive tape. CAUTION Using a spirit level, check that the mounting axis is perfectly horizontal.. Drill 3 holes with a Ø of 0 mm. 4 3 Additional holes are provided in case one or other of the standard locating holes prevents the correct location of the plugs. 3. Put the plugs in place. 4. Secure the mounting frame to the wall using the 3 hexagonal headed screws provided for this purpose. 4.5 Positioning the boiler T00869-A. Remove the protective caps from all of the hydraulic inlets and outlets on the boiler. T00870-A 5/06/ - 300059-00-0 9

4. Installation MCA 5/8 BIC. Fit a fibre gasket to each joint on the valve plate. T0067-A 3. Position the boiler above the plumbing fixtures plate and locate it against the mounting frame. Gently lower the boiler. 4. Tighten the valve nuts on the boiler. T0087-A 4.6 Hydraulic connections 4.6.. Flushing the system Installation must be carried out in accordance with the prevailing regulations, the codes of practice and the recommendations in these instructions. Installing the boiler in new installations (installations less than 6 months old) 4 Clean the installation with a universal cleaner to eliminate debris from the appliance (copper, hemp, flux). 4 Thoroughly flush the installation until the water runs clear and shows no impurities. Installing the boiler in existing installations 4 Remove sludge from the installation. 0 5/06/ - 300059-00-0

MCA 5/8 BIC 4. Installation 4 Flush the installation. 4 Clean the installation with a universal cleaner to eliminate debris from the appliance (copper, hemp, flux). 4 Thoroughly flush the installation until the water runs clear and shows no impurities. 4.6.. Connection of the heating circuit { z Connection by internal brazing mm Connection by internal brazing mm. Connect the heating water outlet pipe to the heating flow connection.. Connect the heating water return pipe to the heating return connection. T0065-A 4 The boiler is factory fitted with a safety valve mounted on the left hydroblock. CAUTION 4 The heating pipe must be mounted in accordance with prevailing provisions. T00633-B 4.6.3. Connection of the water circuit for domestic use. Connect the cold water inlet pipe to the domestic cold water connection.. Connect the domestic hot water outlet pipe to the domestic hot water connection. 5/06/ - 300059-00-0

4. Installation MCA 5/8 BIC x y Connection by internal brazing 6 mm Connection by internal brazing 6 mm CAUTION 4 The domestic water pipes must be connected in accordance with prevailing provisions. 4 If using synthetic pipes, follow the manufacturer's (connection) instructions. T0066-B 4.6.4. Connecting the expansion vessel The boiler is fitted as standard with an -litre expansion vessel. If the water volume is greater than 50 litres or the static height of the system exceeds 5 metres, an additional expansion vessel must be fitted. Refer to the table below to determine the expansion vessel required for the installation. Conditions of validity of the table: 4 3-bar safety valve 4 Average water temperature: 70 C Supply temperature: 80 C Return temperature: 60 C 4 The filling pressure in the system is lower than or equal to the initial pressure in the expansion vessel Initial pressure of the expansion vessel Volume of the expansion vessel depending on the volume of the installation (in litres) 00 5 50 75 00 50 300 > 300 0.5 bar 4,8 6,0 7, 8,4 9,6,0 4,4 Volume of the installation x 0,048 bar 8,0 0,0,0 () 4,0 6,0 0,0 4,0 Volume of the installation x 0,080.5 bar 3,3 6,6 0,0 3,3 6,6 33,3 39,9 Volume of the installation x 0,33 () Factory configuration It is possible to fit the boiler with an expansion vessel for DHW (package option HG77) under the integrated expansion vessel for heating. 5/06/ - 300059-00-0

MCA 5/8 BIC 4. Installation 4.6.5. Connecting the condensate discharge pipe. Mount a standard drainage pipe, Ø 3 mm or more, leading to the mains drainage system.. Mount the flow collector. 3. Into this, insert the condensate collector hose coming from the siphon j and the safety valve ê. 4. Into this, insert the discharge hose from the disconnector. 5. Mount a trap or a siphon in the discharge pipe. CAUTION Do not make a fixed connection owing to maintenance work on the siphon. T00873-C 4 Do not plug the condensate discharge pipe. 4 Set the discharge pipe at a gradient of at least 30 mm per metre, maximum horizontal length 5 metres. 4 Do not drain condensation water into a roof gutter at any time. 4 Connect the condensate discharge pipe in accordance with prevailing standards. 4.7 Gas connection The diameters of the pipes must be defined in accordance with the standards in force in your country. g Connection by internal brazing 8 mm. Connect the gas inlet pipe. WARNING T006-A 4 Close the main gas valve before starting work on the gas pipes. 4 Before mounting, check that the gas meter has sufficient capacity. To do this, you should keep in mind the consumption of all domestic appliances. 4 If the gas meter has too low a capacity, inform the energy supply company. CAUTION 4 Ensure that there is no dust in the gas pipe. Blow into the pipe or shake it before mounting. 4 We recommend installing a gas filter on the gas pipe to prevent clogging of the gas valve unit. 4 Connect the gas pipe in accordance with prevailing standards and regulations. 5/06/ - 300059-00-0 3

4. Installation MCA 5/8 BIC 4.8 Flue gas system connections 4.8.. Classification B 33 C 33(x) C 43(x) C 83(x) 4 5 7 C 3(x) C 33(x) B 33 B 3P C 43(x) C 83(x) 3 4 5 7 C 53 B 3P C 93(x) C93(x) C 33(x) C 43(x) C 83(x) 6 8 9 4 5 7 C00339-C Configuration B 33 Connection to a collective pipe via a concentric pipe (combustive air taken from the boiler room) All of the pressurised parts of the appliance are surrounded by air. Configuration B 3 - B 3P Connection to a chimney using a connection kit (combustive air taken from the boiler room) 3 Configuration C 3(x) Air/flue gas connection by means of concentric pipes to a horizontal terminal (so-called forced flue) 4 Configuration C 33(x) Air/flue gas connection by means of concentric pipes to a vertical terminal (roof outlet) 5 Configuration C 43(x) Air/flue gas connection to a collective conduit for watertight boilers (3CE P system) 6 Configuration C 53 Air and flue gas connection separated by means of a biflow adapter and single pipes (combustive air taken from outside) 7 Configuration C 83(x) Flue gas connection to a collective conduit for sealed boilers. The air supply is individual via a terminal coming from outside the building. 4 5/06/ - 300059-00-0

MCA 5/8 BIC 4. Installation 8 Configuration C 93(x) Air/flue gas connection by concentric pipes in the boiler room and single pipes in the chimney (combustive air in counter current in the chimney) 9 Configuration C 93(x) Air/flue gas connection by concentric pipes in the boiler room and single flex in the chimney (combustive air in counter current in the chimney) WARNING 4 Only factory components are authorised for connecting the boiler and the terminal. 4 The clear section must comply with the standard. 4 The chimney must be swept before the installation of the evacuation conduit. 4.8.. Lengths of the air/flue gas pipes For configurations B3 and C93, the lengths given in the table are valid for horizontal conduits with a maximum length of metre. For each additional metre of horizontal conduit, subtract. m from the vertical length Lmax Type of air/flue gas connection Diameter Maximum length in metres MCA 5/8 BIC B 33 Collective conduit To determine the dimensions of such a system, refer to the supplier of the collective conduit. B 3 B 3P C 3(x) C 33(x) Chimney (rigid or flexible duct in chimney, combustive air taken from the premises) Concentric pipes connected to a horizontal terminal Concentric pipes connected to a vertical terminal C 43(x) Collective conduit for sealed boiler (3 CEP) C 53 Bi-flow adapter and separate single air/ flue gas ducts (combustive air taken from outside) PPS 80 mm (Rigid duct) 40.0 80 mm (Flexible duct) 40.0 Alu or PPS 60/00 mm 4. 80/5 mm 0.0 Alu or PPS 60/00 mm 5.5 80/5 mm 0.0 To determine the size of such a system, consult the supplier of the 3 CEP conduit. Alu 60/00 mm x 80 mm C 83(x) Collective conduit for sealed boiler To determine the dimensions of such a system, refer to the supplier of the collective conduit. C 93(x) Concentric pipes in the boiler room Single conduits in the chimney (combustive air in counter-current) Concentric pipes in the boiler room Flexible single conduit in the chimney Alu or PPS PPS 60/00 mm 60 mm (Rigid duct) 60/00 mm 80 mm (Flexible duct) 40.0 9.0 0.0 5/06/ - 300059-00-0 5

4. Installation MCA 5/8 BIC WARNING Maximum length = lengths of the straight air/flue gas ducts + equivalent lengths of other components The max length in the flue gas pipe (configurations C 93, B 3P ) of the elbow bracket at the outlet must not exceed: 4 30 m for rigid PPS 4 5 m for flexible PPS If longer lengths are used, holding clamps must be added per sections of 5 or 30 metres. For the list of flue gas system accessories and the equivalent lengths, refer to the current price list. 4.8.3. Additional Directives 4 Please refer to the manufacturer's instructions for the material in question when installing the flue gas discharge and air supply materials. If the flue gas discharge and air supply materials are not installed according to the instructions (e.g. they are not leakproof, not clamped in place etc.), this may cause hazardous situations and/or result in bodily injury. After assembly, check at least all flue gas and air carrying parts for tightness. 4 Connection of the combustion gas exhaust directly to the buildings brick chimneys or flues is forbidden for condensation reasons. 4 Always clean the ducts thoroughly in cases where lining pipes are used and/or a connection of the air-supply. 4 It must be possible to inspect the flue or chimney. 4. 4 For long, aluminium, combustion-gas exhaust pipes it is initially necessary to consider the relatively high quantity of corrosive products which are brought together with the condensate from the exhaust pipe. The siphon on the equipment requires regular cleaning or, preferably, an additional condensate collector can be installed above the equipment. 4 The combusted gas discharge pipe must be sufficiently inclined towards the boiler (at least 50 mm per metre) and an adequate condensate collection tank and discharge system constructed (at least m before the boiler opening). The elbows fitted must be at more than 90 to guarantee the provision of an adequate gradient and tightness on the lip rings. 6 5/06/ - 300059-00-0

MCA 5/8 BIC 4. Installation 4.9 Installing the outside sensor 4.9.. Choice of the location It is important to select a place that allows the sensor to measure the outside conditions correctly and effectively. Advised positions: 4 on one face of the area to be heated, on the north if possible 4 half way up the wall in the room to be heated 4 under the influence of meteorological variations 4 protected from direct sunlight 4 easy to access A B H Z Recommended position Possible position Inhabited height controlled by the sensor Inhabited area controlled by the sensor 8800N00-C Positions to be avoided: 4 masked by a building element (balcony, roof, etc.) 4 close to a disruptive heat source (sun, chimney, ventilation grid, etc.) 8800N00-C 4.9.. Connecting the outside sensor Mount the sensor using the screws and dowels provided. 5/06/ - 300059-00-0 7

4. Installation MCA 5/8 BIC A Z Inserts Ø4 wood screw ¼ For the connection of the outside temperature sensor, refer to the chapter "Electrical Connections". 8800N003-C 4.0 Electrical connections 4.0.. Control unit The boiler is fully pre-wired. The mains supply is made via the cable C connected to the mains. All other external connections can be made to the connection connectors (low voltage). The main characteristics of the control unit are described in the table below. Power supply voltage Rating of the main fuse F (30 VAC) Fuse rating F (30 VAC) Fan-DC 30 VAC/50Hz 6.3 AT AT 7 VDC CAUTION Keep to the polarity shown on the terminals: phase (L), neutral (N) and earth *. CAUTION The following components of the appliance are at a voltage of 30 V: 4 Boiler pump (Heating circuit). 4 Boiler pump (DHW circuit). 4 Combined venturi and gas valve unit. 4 3-way valve. 4 The majority of components in the control panel and the terminal box. 4 Power supply cable. 8 5/06/ - 300059-00-0

MCA 5/8 BIC 4. Installation 4.0.. Recommendations WARNING 4 Only qualified professionnals may carry out electrical connections, always with the power off. 4 The boiler is entirely pre-wired. Do not modify the connections inside the control panel. 4 Earth the appliance before making any electrical connections. Make the electrical connections of the boiler according to: 4 The instructions of the prevailing standards. 4 The instructions on the electrical diagrams provided with the boiler. 4 The recommendations in the instructions. CAUTION 4 Separate the sensor cables from the 30 V cables. 4 Outside the boiler: Use pipes or cable guides at least 0 cm apart. 5/06/ - 300059-00-0 9

4. Installation MCA 5/8 BIC 4.0.3. Position of the PCBs SCU SU PCU PSU SCU PCU C TS + C AUX On/off 0-0V S AMB C S AMB B S AMB A + - 4 3 OT BL RL Tout Tdhw 3 B TS + B A S SYST + TA - S ECS S EXT S DEP C S DEP B C0099-F A Z E Do not connect anything to the terminal block. Optional PCB (Package AD49) Do not connect anything to the terminal block. 30 5/06/ - 300059-00-0

MCA 5/8 BIC 4. Installation 4.0.4. Accessing the connection terminal blocks To access the connection terminal blocks, proceed as follows:. Unscrew the screws under the front panel by a quarter turn.. Remove the front panel. C0035-C 3. Open the holding clips located on the sides. 4. Tilt the control panel forward. 3 4 3 C0036-B 5/06/ - 300059-00-0 3

4. Installation MCA 5/8 BIC 5. Lift the clip located in front of the control panel. 6. Lift the control panel cover. 6 5 6 C0037-B 7. Unclip the PCB cover. 7 C00330-C 3 5/06/ - 300059-00-0

MCA 5/8 BIC 4. Installation 4.0.5. Connecting a direct heating circuit SCU PCU On/off 0-0V S AMB C S AMB B S AMB A + - 4 3 OT BL RL Tout Tdhw 4 B TS + B A S SYST + TA - S ECS S EXT S DEP C S DEP B C00304-M 3 A Z E R Do not connect anything to the terminal block. Connect the outside temperature sensor. Connect a safety thermostat if the heating circuit is for underfloor heating. 4 Remove the bridge. 4 Connect the wires from the safety thermostat to the connector. Do not connect anything to the terminal block. Settings to be made for this type of installation Parameters Access Settings to be made See chapter INSTALLATION If safety thermostat is connected to BL on the connection terminal block: IN.BL Installer level #SYSTEM menu Installer level #PRIMARY INSTAL.P menu EXTENDED STOP HEAT ¼ "Displaying the parameters in extended mode", page 56 ¼ "Professional settings", page 68 5/06/ - 300059-00-0 33

4. Installation MCA 5/8 BIC 4.0.6. Connecting two heating circuits SCU PCU C TS + C AUX 5 On/off 0-0V S AMB C S AMB B S AMB A OT BL RL Tout Tdhw + - 4 3 0 B TS + B A S SYST + TA - S ECS S EXT S DEP C S DEP B C003036-A 4 3 6 8 9 7 A Z Do not connect anything to the terminal block. CAUTION Do not connect anything to the DHW pump outlet as the reversal valve is connected to the PCU PCB in the boiler. E R T Connect the outside temperature sensor. Connect a safety thermostat if the heating circuit is for underfloor heating. 4 Remove the bridge. 4 Connect the wires from the safety thermostat to the connector. Connecting an additional circuit to the AD49 option. 34 5/06/ - 300059-00-0

MCA 5/8 BIC 4. Installation Y U I O P Connect the heating pump (circuit A). If underfloor heating is being used, put a safety thermostat in place after the heating pump. The safety thermostat will shut down the heating pump in the event of overheating. Low loss header. Connect the heating pump (circuit B). Connect the 3-way valve (circuit B). Do not connect anything to the terminal block. 4.0.7. Hot water storage tank connection (Type PS) SCU PCU On/off 0-0V S AMB C S AMB B S AMB A + - 4 3 OT BL RL Tout Tdhw 7 B TS + B A S SYST + TA - S ECS S EXT S DEP C S DEP B A00088-A 3 5 6 4 A Z Do not connect anything to the terminal block. Connect the heating pump (Circuit A). 5/06/ - 300059-00-0 35

4. Installation MCA 5/8 BIC E R T Y U Connect the DHW tank anode. If the tank is not fitted with an impressed current anode, put the simulation connector in place (delivered with the DHW sensor - package AD). PS storage tank. Solar sensor probe. Connect the solar station to the solar collectors. Do not connect anything to the terminal block. Settings to be made for this type of installation Parameters Access Settings to be made See chapter INSTALLATION I.SYST () P.DHW: () Installer level #SYSTEM menu Installer level #SYSTEM menu Installer level #SYSTEM menu EXTENDED STORAGE TANK PUMP () The parameter is only displayed if INSTALLATION parameter is set to EXTENDED ¼ "Displaying the parameters in extended mode", page 56 ¼ "Setting the parameters specific to the installation", page 57 If, during DHW loading, the temperature of the storage tank falls below the primary DHW set point (parameter PRIM.TEMP.DHW), the boiler maintains the latter at temperature to guarantee the loading of the DHW tank The heating zone is maintained at the set temperature calculated according to the outside temperature. The zone is reheated when the heating buffer temperature sensor falls -6 C below the calculated set temperature. Reheating in the heating zone stops when the heating buffer temperature rises above the calculated set temperature. 36 5/06/ - 300059-00-0

MCA 5/8 BIC 4. Installation 4.0.8. Pool connection SCU PCU On/off 0-0V S AMB C S AMB B S AMB A + - 4 3 OT BL RL Tout Tdhw 6 B TS + B A S SYST + TA - S ECS S EXT S DEP C S DEP B 4 C0098-i 3 5 A Z E R Connect the secondary swimming pool pump. Connect the swimming pool sensor. Plate heat exchanger. Pool heating cut-off control When the parameter I.TEL: is on 0/ B, the swimming pool is no longer heated when the contact is open (factory setting), only the antifreeze continues to be active. The contact direction can still be adjusted by the parameter CT.TEL. T Y Connect the primary swimming pool pump. Do not connect anything to the terminal block. Settings to be made for this type of installation Parameters Access Settings to be made See chapter INSTALLATION CIRC. B: If I.TEL: is used I.TEL: MAX. CIRC. B Installer level #SYSTEM menu Installer level #SYSTEM menu Installer level #SYSTEM menu Installer level #SECONDARY LIMITS menu EXTENDED SWIM.P. 0/ B Set the value of MAX.CIRC.B to the temperature corresponding to the needs of the exchanger ¼ "Displaying the parameters in extended mode", page 56 ¼ "Setting the parameters specific to the installation", page 57 ¼ "Professional settings", page 68 5/06/ - 300059-00-0 37

4. Installation MCA 5/8 BIC Controlling the pool circuit The control system can be used to manage a swimming pool circuit in both cases: Case : The control system regulates the primary circuit (boiler/ exchanger) and the secondary circuit (exchanger/pool). 4 Connect the primary circuit pump (boiler/exchanger) to the MB outlet on the connection terminal block. The temperature MAX.CIRC.B is then guaranteed during comfort periods on programme B in summer and winter alike. 4 Connect the swimming pool sensor (package AD) to the S DEP B inlet on the connection terminal block. 4 Set the set point of the pool sensor using key C in the range 5-39 C. Case : The pool has already a regulation system that is to be kept. The control system only regulates the primary circuit (boiler/exchanger). 4 Connect the primary circuit pump (boiler/exchanger) to the MB outlet on the connection terminal block. The temperature MAX.CIRC.B is then guaranteed during comfort periods on programme B in summer and winter alike. The swimming pool can also be connected to circuit C by adding the AD49 option: 4 Make the connection to the terminal blocks marked C. 4 Set the parameters for circuit C. Hourly programming of the secondary circuit pump The secondary pump operates during programme B comfort periods in summer and winter alike. Stopping To prepare your pool for winter, consult your pool specialist. 4.0.9. Connecting the options For example: TELCOM voice remote monitoring module, remote controls for circuits A and B 38 5/06/ - 300059-00-0

TELCOM AL AL PRG 3 ALP 5 6 9 3 7 0 4 8 # V V SET 0 4 6 8 0 4 6 8 0 4 MCA 5/8 BIC 4. Installation SCU PCU C TS + C AUX On/off 0-0V S AMB C S AMB B S AMB A OT BL RL Tout Tdhw + - 4 3 6 B TS + B A S SYST + TA - S ECS S EXT S DEP C S DEP B 4 MODE 3 5 0 4 6 8 0 4 6 8 0 4 MODE A00088-A A Z E R T Y Do not connect anything to the terminal block. Alarm indicator Connect the TELCOM remote vocal monitoring module (depending on its availability in your country). Connecting the BUS cascade, VM Connect the remote control (Package AD54/FM5). Do not connect anything to the terminal block. Settings to be made for this type of installation Parameters Access Settings to be made See chapter INSTALLATION O.PUMP A () Installer level #SYSTEM menu Installer level #SYSTEM menu EXTENDED FAILURE () The parameter is only displayed if INSTALLATION parameter is set to EXTENDED ¼ "Displaying the parameters in extended mode", page 56 ¼ "Setting the parameters specific to the installation", page 57 5/06/ - 300059-00-0 39

4. Installation MCA 5/8 BIC 4. Electrical diagram X X X3 X4 X5 X6 X7 X8 X9 4 3 3 4 5 3 3 3 4 3 3 3 3 4 5 BR BL BL GN/ GN/YW YW BR BR BL BL BR GN/ YW GN/ YW BR BL GY BK BL GN/ YW GN/ YW WH BL RD WH BK GN/ YW BR BL BK BK BK BK BK BK K 3 3 3 3 3 5 3 3 4 5 SCU-C X5 4 X8 X X X X4 X7 X9 S PUMP B IT GB DV PUMP A FAN L N P 30V, 50Hz HLS E X0 X X 8 9 0 4 5 7 6 3 3 4 5 6 3 4 5 6 7 8 9 0 BK BK BL RD BK BK 3 BK BK BK BK 3 4 BK BK OR YW WH RD GY GN X X3 WS X X4 X5X6 X7 X8X9 X80 X4 X5 X X X6 X0 X PSU PWM PUMP SCU-C TS RTS FTS PS DIS X4 X3 X T00963-D P Power supply DV 3-way valve PS Pressure sensor SCU-C control panel PCB PUMP A Shunt pump (Central heating) PSU Parameter storage for PCBs PCU and SU S On/Off switch HLS Safety thermostat PWM PUMP Modulation signal from the boiler pump PUMP B Shunt pump (DHW) FAN Fan DIS Display IT Ignition transformer TS Temperature sensor WS DHW sensor E Ignition power relay RTS Return sensor GB Combined venturi and gas valve unit FTS Flow sensor 40 5/06/ - 300059-00-0

MCA 5/8 BIC 4. Installation 4. Filling the system 4... Water treatment In most cases, the boiler and the central heating installation can be filled with normal tap water and no water treatment will be necessary. WARNING Do not add chemical products to the central heating water without first consulting a water treatment professional. For example: antifreeze, water softeners, products to increase or reduce the ph value, chemical additives and/or inhibitors. These may cause faults in the boiler and damage the heat exchanger. 4 Rinse the central heating installation with at least 3x the volume of the central heating installation. Flush the DHW pipes with at least 0 times the volume of the pipes. For an optimum functioning of the boiler, the water of the installation must comply with following characteristics: Degree of acidity (water non-treated) Degree of acidity (water treated) Total installed heat output (kw) 70 70-00 00-550 > 550 ph 7-9 7-9 7-9 7-9 ph 7-8,5 7-8,5 7-8,5 7-8,5 Conductivity at 5 C µs/cm 800 800 800 800 Chlorides mg/l 50 50 50 50 Other components mg/l < < < < Total water hardness () f - 35-0 - 5-5 dh 0,5-0,0 0,5 -, 0,5-8,4 0,5 -,8 mmol/l 0, - 3,5 0, -,0 0, -,5 0, - 0,5 () For installations that are heated at constant high temperatures with a total installed heat output; up to 00 kw a maximum total water hardness of 8,4 dh (,5 mmol/l, 5 f) applies and for above 00 kw a maximum total water hardness of,8 dh (0,5 mmol/l, 5 f) applies If a water treatment is necessary, De Dietrich Thermique recommends the following manufacturers: 4 Cillit 4 Climalife 4 Fernox 4 Permo 4 Sentinel 5/06/ - 300059-00-0 4

4 3 4. Installation MCA 5/8 BIC 4... Filling the siphon T0053-B. Remove the siphon.. Fill the siphon with water. This must be filled up to the level markers. 3. Re-assemble the siphon. CAUTION 4 Fill the water siphon before starting the boiler to avoid combustion products escaping from the boiler. 4 Mount the vent hose above the siphon. 4..3. Filling the system CAUTION Before filling, open the valves on every radiator in the installation. T0008-B. Open the cold water inlet and heating outlet valves. T0060-A. Open the disconnector valves (During filling, air can escape from the system via the automatic air vent). T0068-A 4 5/06/ - 300059-00-0

MCA 5/8 BIC 4. Installation bar 3. Close the disconnector valves when the manometer indicates a pressure of bar T0069-A 4. Check the tightness of the water connections. T00507-B 5/06/ - 300059-00-0 43

5. Commissioning MCA 5/8 BIC 5 Commissioning 5. Control panel 5... Description of the keys A000866-A A 0 4 6 8 0 4 6 8 0 4 B bar AUTO C STD D E F A B C D E F Temperature setting key (heating, DHW, swimming pool) Operating mode selection key DHW override key Key to access the parameters reserved for the installer Keys on which the function varies as and when selections are made Rotary setting button: 4 Turn the rotary button to scroll through the menus or modify a value 4 Press the rotary button to access the selected menu or confirm a value modification 44 5/06/ - 300059-00-0

5... Description of the display Key functions > Access to the various menus 0 4 6 8 0 4 6 8 0 4 ( Used to scroll through the menus ' MCA 5/8 BIC 5. Commissioning Used to scroll through the parameters bar AUTO STD C00696-A? The symbol is displayed when help is available f STD b Used to display the curve of the parameter selected Reset of the time programmes Selection of comfort mode or selection of the days to be programmed v Selection of reduced mode or deselection of the days to be programmed j Back to the previous level ESC Back to the previous level without saving the modifications made t Manual reset Flame output level 0 4 6 8 0 4 6 8 0 4 C00705-A The whole symbol flashes: The burner starts up but the flame is not yet present bar Part of the symbol flashes: Output is increasing AUTO STD C00704-A Steady symbol: The required output has been reached C0070-A C00703-A C0070-B Part of the symbol flashes: Output is dropping 5/06/ - 300059-00-0 45

5. Commissioning MCA 5/8 BIC Solar (If connected) 0 4 6 8 0 4 6 8 0 4 u L00000-A The solar load pump is running The top part of the tank is reheated to the tank set point bar AUTO STD L00097-A L0000-A L00098-A The entire tank is reheated to the tank set point The entire tank is reheated to the solar tank set point L00099-A The tank is not loaded - Presence of the solar control system Operating modes 0 4 6 8 0 4 6 8 0 4 p b Summer mode: The heating is off. Domestic hot water continues to be produced WINTER mode: Heating and domestic hot water working bar AUTO STD C00697-B 0 4 6 8 0 4 6 8 0 4 AUTO Operation in automatic mode according to the timer programme x Comfort mode: The symbol is displayed when a DAY override (comfort) is activated bar AUTO STD C00698-B m 4 Flashing symbol: Temporary override 4 Steady symbol: Permanent override Reduced mode: The symbol is displayed when a NIGHT override (reduced) is activated 4 Flashing symbol: Temporary override 4 Steady symbol: Permanent override g Holiday mode: The symbol is displayed when a HOLIDAY override (antifreeze) is activated 4 Flashing symbol: Holiday mode programmed 4 Steady symbol: Holiday mode active m Manual mode 46 5/06/ - 300059-00-0

MCA 5/8 BIC 5. Commissioning System pressure 0 4 6 8 0 4 6 8 0 4 bar Pressure indicator: The symbol is displayed when a water pressure sensor is connected. bar 4 Flashing symbol: The water pressure is insufficient. 4 Steady symbol: The water pressure is sufficient. AUTO STD C00708-A l Water pressure level 4 R : 0,9 to, bar 4 E :, to,5 bar 4 Z :,6 to,9 bar 4 A :,0 to,3 bar 4 l : >,4 bar Domestic Hot Water override 0 4 6 8 0 4 6 8 0 4 A bar is displayed when a DHW override is activated: 4 Flashing bar: Temporary override 4 Steady bar: Permanent override bar AUTO STD C00707-A Other information 0 4 6 8 0 4 6 8 0 4 r The symbol is displayed when domestic hot water production is running. w Valve indicator: The symbol is displayed when a 3-way valve is connected. bar AUTO STD C00699-B M 4 x : 3-way valve opens 4 c : 3-way valve closes The symbol is displayed when the pump is operating. Name of the circuit for which the parameters are displayed. 5/06/ - 300059-00-0 47

5. Commissioning MCA 5/8 BIC 5..3. Access to the various browsing levels User level The information and settings in the User level can be accessed by everyone.. Press the > key. bar 0 4 6 8 0 4 6 8 0 4 AUTO STD SUNDAY :45 C009-D-04 Installer level The information and settings in the Installer level can be accessed by experienced people.. Press the > key. bar 0 4 6 8 0 4 6 8 0 4 AUTO STD SUNDAY :45 0 4 6 8 0 4 6 8 0 4 AUTO TEMP.: 68 STD SUNDAY :45 C009-D-04. Press the - key. It is also possible to access the installer level by pressing only the - key for around 5 seconds. C007-F-04 48 5/06/ - 300059-00-0