September 2017 Proposed Resort at plot bearing gut No. 31/3, 35/1B,109/19,110/1 Mauje Chandranagar, Tal: Dapoli, Dist: Ratnagiri. By Shri Sunil jain Executive Summary Submitted to MCZMA Environmental Consultant Submitted by Building Environment (India) Pvt. Ltd Dakshina Building, 401, 4 th Floor, Plot No. 2, Sector -11, Near Raigad Bhavan, CBD Belapur, Navi Mumbai 400614 Shri Sunil Jain Director Dajikaka Gadgil Developers Pvt Ltd 101, Amelia, Lakaki Road, near Hotel Ambassador, Model Colony, Pune 411016 September 2017
1.1 Location of the project: The project is located in village Chandranagar, Tal Dapoli, Dist: Ratnagiri. Proposed resort is situated on Plot bearing gut No. 31/3,35/1B,109/19,110/1 mauje Chandranagar, Tal: Dapoli, Dist: Ratnagiri. Village Chandrangar is a coastal village in Dapoli taluka of Ratnagiri district which lies between Lat 17 44'55.94"N 73 07'37.51"E The Ratnagiri District stands along the western coast of India. It is situated at south side of the coastline of the Maharashtra state, known as south konkan. Ratnagiri district lies between Latitude : 16.990215 N and Longitude : 73.3120233 E. It has north-south length of about 180 km and average east-west extension of about 64 km. Sahyadri hills surround it in the east beyond which there are Satara, Sangli and Kolhapur districts, Raigad district in the north, the Arabian Sea in the west and Sindhudurg district in the south. 0
1
1.2 Connectivity: Village Chardranagar is situated in Dapoli taluka of Ratnagiri district of the Konkan Coast of Maharashtra. The village has Gram panchayat and has local geographical area around 742 Hectares. From From Head Quarter Ratnagiri From Dapoli Camp Distance 99 Km 4 Km From Mumbai 169 Nearby villages Karde ( 3 KM ), Gavhe ( 3 KM ), Asud ( 3 KM ), Pangar Wadi ( 4 KM ), Dapoli Camp ( 5 KM) 2
Nearby Talukas Nearby Tourist places Mandangad Taluka towards North, Khed Taluka towards East, Guhagar Taluka towards South, Mhasala Taluka towards North. Murud Karde Harnai Anjanvel Guhaghar Harihareshwar Dapoli By Air: Nearby Airport is Lohegoan Airport which is around 138 km from the village Chandranagar. By Rail: Chandranagar has no Railway Station. Nearby Railway Station to reach Chandranagar is Khed Rail Way Station which is 31 km from the project site. Ratnagiri Rail Way Station is major railway station 95 KM near to Chandranagar. By Road: The project site at Chandranagar is accessible from State Highway- 4 and Murud ladghar Major District Road 08. There is an internal road network developed and maintained by the Grampanchayat chandranagar. Road widths are of about 16 m and well maintained. 3
Project details: The central ideal behind the development of the resort is to build with nature. Keeping in mind the unique coastal ecology of the project site which is having hill sloppy and flat terrain, overseeing the majestic view of the Arabian Sea. The resort is planned to be built with wooden structures supported by the RCC piles, so that it will have lesser footprint on the ground. Wooden frame structure for the resort, instead of Solid concrete construction, will be environmentally sustainable and will add to aesthetics of the environment of the project site. The purpose behind the project are: To build the eco-friendly resort which is environmentally sustainable. It would be one of its kind in Konkan Coast. To meet the growing demands of tourism in Konkan Coast To create an environment that could support the good standard of living environment; To enhance the surroundings with greenery, landscaping and pleasing aesthetics; and To implement the policy of water conservation (STP and Rain Water Harvesting), renewable energy (Use of Solar Energy), recycling of waste (Use of Organic Converter). The design of the layout has taken into consideration the state of art design features for residential space, living atmosphere and arrangements of open space so as to create a pleasant living and working environment. Adhering to provisions of the CRZ Notification, 2011, the development of 4
the resort is proposed beyond the 200 m to 500 m from the HTL of the Arabian sea, as per the guidelines stipulated in CRZ Notification, 2011. The proposed development of resort will involve site formation works and construction of wooden resort villas, access wooden roads, drains and sewer connections. The villas are proposed to locate on a sloppy terrain. Details of the proposed structure in Resort 1 are as follows: Reception restaurant and kitchen Villa 03-51 Nos Villa 04-24 Nos The FSI and Height of the resort is well within the permissible limit i.e 0.33.and 9m respectively, as stipulated in CR Notification, 2011. Total Plot Area: 85100 Sqm Deduction: 3860 Sqm. Plot area after deduction: 81240 Sqm Net plot area (90)%- 73116 Sqm Total built up area 15403.43 Sqm FSI consumed: 0.21 Paved area/ pathway: 8718.34 Sqm Green Area: 8520 Sqm. All the development is proposed between 200 m to 500 m from the HTL of the Arabian sea, as per the guidelines stipulated in CRZ Notification, 2011. Layout of the project superimposed on google image: 5
Project details: Sr No. Particulars Details 1 Type of project Resort 2 Total Project area 85100 Sqm 3 Total Built up Area 15403.43 Sqm 4 Fresh Water Requirement 21 KLD 5 Total Water Demand 51 KLD 6 Waste Water Generation 41 KLD Rainwater Harvesting by way of installing Storage Tanks of capacity 10,000 litre at each villa is proposed. 6
7 Sewage Treatment Plant Capacity 41 KLD 8 Solid Waste Generation Bio-degradable- 112.5 kg/day Recyclable- 75 kg/day 9 Power Requirement 993. 75 KWH Provision of Organic Waste Convertor is made. 10 Energy efficient system Energy Efficient Lighting using LEDs in Common Areas of villas and toilet. 11 DG set Requirement 250 KVA 1 set 12 Green Land Development 8520 Sqm 13 Paved area 8718.38 Sqm Solar Street Lights along pathways and open spaces 14 Parking As per requirement, parking provision is proposed along the road: Car- 47 Nos. Scooter- 84 Nos. Cycle- 84 Nos. 1.3 Land Use: The proposed project site of irregular shape and the land is agricultural land, however, since long time, the land is not under cultivation. Toposheet is attached along. 7
1.4 CONCLUSION The proposed project is resort development by Amit Kamat. The Environmental Impact Assessment (EIA) will be based on one season environmental monitoring data. The EIA will be carried out as per the EIA guidelines and requirements of Ministry of Environment and Forests. The impacts from the proposed project will be investigated by establishing baseline conditions, identification, prediction and evaluation of impacts of the component of the project. 8