Propane Conversion kit instructions

Similar documents
CAUTION! Before putting the boiler into operation read this manual carefully. WARNING!

GB162 Concentric Horizontal Vent Kit

Side by side. Cascade Venting System for RTG 199HE. Extension Set for units 3 or Installation instructions

Back to back. Cascade Venting System for RTG 199HE. Basic Set for units 1 and Installation instructions

Conversion Instructions Logano G234X. Gas boiler. Please read carefully before installing and servicing. Gas boiler

/2010 US/CA

Operating Instructions

Operating instructions

Residential Gas Condensing Boiler Greenstar combi 100 p / 151 p ZWB28-3A... ZWB42-3A...

Ignition Burner Maintenance

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A...

Logamax plus GB142. Applications Manual. Gas condensing boiler

Logamax plus. Notice! This manual is available in the English and French language. This manual must be retained for future reference.

User manual. Logano GC 124 II. Gas boiler

USER S INFORMATION MANUAL

CONVERSION TO PROPANE MANUAL M-Series Condensing Boiler. Wall-Mounted, Gas-Fired Boiler

Service Instructions. Logamax plus GB kw/100 kw. Condensing gas boiler. For the contractor

Bosch 80% AFUE Gas Furnace BGS80 Model

Outdoor kit. Models: RTG 199HE / RTG 199ME. Installation Instructions

Installation instructions

STOP! Read this notice. STOP! Read before proceeding. These instructions are for gas conversion of the Evergreen boiler only.

Installation and Service Instructions LoganoUS/CA GC 144 II

Operating instructions

O. Gas boiler. Gaz 6000 W WBN H-E-N/L-S2400. Operating instructions for the end customer (2017/09) en

Installation instructions. Pump Group. For wall hung gas-fired condensing boiler GB162-50/65/80/ TD UK/IE (2014/09)

INSTALLATION GUIDE Dual Fuel Ranges

Installation and Service Instructions Logano G234X

Operating instructions

Connecting cable. Installation instructions (2018/04) US

LGB Gas fired boiler

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

Installation instructions Logamax plus. GB162-L.B. 80 kw GB162-L.B. 100 kw. Read carefully before carrying out installation and maintenance.

Installation Instructions T 9822 Gas Dryer. en - US, CA. To prevent accidents

User s Information Manual

Indirect gas-fired air heater

Installation and maintenance instructions

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

Operating instructions

Operating instructions

Installation instructions for the T 9820 Gas Dryer

VSL II QUICK START GUIDE

TO DO IF YOU SMELL GAS

HX Field Replacement Kit

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

Operating instructions

Models CHB/CCB APPLICATION GUIDE WALL MOUNTED GAS BOILER

Servicing manual. 600 Series - 11S / 19S / 24S / 24C. Wall-mounted condensing gas boiler. For trade use

Servicing manual. Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C /2002 GB(EN) For trade use

Multi-Function Cooktop

95M-200. Gas-Fired Direct Vent Modulating Hot Water Boiler. Control Manual And Troubleshooting Guide. P/N , Rev.

Bosch Buderus SSB1000TL/TL2/TL3/TL4 Stainless Steel Condensing Boiler

USER'S INFORMATION MANUAL

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-200 INDIRECT FIRED SPACE HEATERS

CYLINDER NOT INCLUDED

INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS BG 2000-S (V13) RU PL DE IT ES NL EN 1 662Y0600 A

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER

P.O. Box , Dallas, TX USER'S INFORMATION MANUAL Single-Stage Warm Air Gas Furnaces

prestige Condensing Water Boiler SERVICE TECHNICIAN S TROUBLE SHOOTING GUIDE TSG-SOLO-9/04

Installation and maintenance instructions

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

Bosch Buderus SSB800/1000/1000TL Stainless Steel Condensing Boiler

Corr/Guard PRESSURE RATED VENTING SYSTEM IMPORTANT: DO NOT INSTALL WITHOUT FIRST READING THESE INSTRUCTIONS VERY CAREFULLY.

USER'S INFORMATION MANUAL

Using it in an enclosed space can kill you.

Columbia Boiler Company

USER S INFORMATION MANUAL Model: HSE 125 N/P, HSE 145 N/P Gas-fired, Condensing Boiler and Instantaneous Water Heater

INSTALLATION AND MANINTENANCE INSTRUCTIONS

T-CLASS GAS-FIRED UNIT HEATERS Separated Combustion - Direct Vent - Horizontal - 60 HZ. Thermal Efficiency - up to 82% Input - 40,000 to 300,000 Btuh

Operating instructions

ASX7-4-IOM-6 J

Replacement parts. WM97+ gas-fired water boiler Boiler Manual. OBTAIN PARTS ONLY THROUGH WEIL-McLAIN THE BOILER CONTAINS CERAMIC FIBER MATERIALS

INSTALLATION AND OPERATING INSTRUCTIONS TABLE OF CONTENTS IMPORTANT

Owner s Information Manual

LGB. Control Supplement. Gas fired boiler. Universal Control System. Series 2 Propane gas. Contents

VSL II QUICK START GUIDE

prestige Condensing Water Boiler SERVICE TECHNICIAN S TROUBLE SHOOTING GUIDE TSG-PRESTIGE Date revised: 11/10/08

Intelligent cascading kit

Water Boilers ME10EN, ME15EN. Table of Contents

Mighty Venter Power Vent System

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

ZG Shown READ ALL INSTRUCTIONS IN THIS MANUAL AND RETAIN FOR FUTURE REFERENCE WARNING

INSTALLATION INSTRUCTIONS FOR FLUE KIT

Aqua Balance. User s Information Manual. WMB-155C Wall Mount Gas-Fired Combination Boiler Heating and Domestic Hot Water

Tankless Water Heater

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

E-COMBI EVO E-SYSTEM EVO

Operating instructions

Service Manual. Condensing Boiler. Getting Service

A/23 MFFI - A/27 MFFI

INSTALLATION OF DURAVENT POLYPRO SINGLE WALL POLYPROPYLENE VENTING SYSTEMS

Weil-McLain part numbers are found in Weil-McLain Boilers and Controls Repair Parts Lists.

Crown Boiler Company

FLANGED CORR/GUARD CORR/GUARD INSTALLATION INSTRUCTIONS

TRONIC 6000C. Tankless electric whole house water heaters. Models: WH17 / WH27. [en] Installation Manual and Operating Instructions

Installation and maintenance instructions

Installation Instructions Dual Fuel Ranges

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-400 INDIRECT FIRED SPACE HEATERS

User s Information Manual

Installation and Servicing Instructions

Transcription:

Propane Conversion kit instructions Condensing gas boiler Required Input Rates Logamax plus GB162-(L.B)80 kw Logamx plus GB162-(L.B.)100 kw 270,000 btu/hr 315,000 btu/hr his kit and instructions are for converting the GB162 model boilers from Natural Gas to Liquid Propane. WARNING! his conversion kit shall be installed by a qualified service agency in accordance with the manufacturer s instructions and all applicable codes and requirements of the authority having jurisdiction. he information in these instructions must be followed to minimize the risk of fire or explosion or to prevent property damage, personal injury or death. he qualified service agency is responsible for the proper installation of this kit. he installation is not proper and complete until the operation of the converted boiler is checked as specified in the manufacturer s instructions supplied with the kit. CAUION! he gas supply shall be shut off prior to disconnecting the electrical power, before proceeding with the conversion. Notice! Save these instructions for later use. 6720615152-001.1D Logamax plus GB162-80 kw GB162-100 kw GB 162-L.B. 80kW GB 162-L.B. 100kW For the contractor Please read these instructions carefully 6 720 615 033 (11/2010) US/CA

Contents Contents 1 Safety considerations 3 1.1 Application purpose 3 1.2 Hazard definitions 3 1.3 Observe the following warnings 3 1.4 Additional symbols 3 2 Parts list for converting the boiler to propane 4 3 Liquid Propane conversion 5 3.1 Shut down the boiler 5 3.2 Changing the gas valve assembly 5 3.3 esting for gas leaks 7 3.4 Inlet gas pressure 8 3.5 Checking and adjusting the gas/air ratio 9 3.6 Carrying out a tightness test in operating conditions 9 3.7 Measuring the CO content 9 3.8 Lighting Instructions 10 4 Operating Instructions 11 2 Logamax plus GB162-80 kw/100 kw - We reserve the right to make any changes due to technical modifications!

Safety considerations 1 1 Safety considerations For use in Canada the conversion kit shall be carried out in accordance with the requirements of the provincial authorities having jurisdiction and in accordance with the requirements of the CAN/CGA-B149.1 and CAN/CGA-B149.2 Installation Code. See also E.I.V. Please observe the following safety instructions. 1.1 Application purpose his kit and instructions are for converting the Logamax plus GB162-(L.B.)80 kw/100 kw from Natural gas to Liquid Propane. 1.2 Hazard definitions he following defined terms are used throughout the documentation to bring attention to the presence of hazards of various risk levels. Notices give important information concerning the operation of the product. DANGER: Indicates the presence of hazards that will cause severe personal injury, death or substantial property damage. 1.3 Observe the following warnings DANGER: due to explosion of gas. B Work only on gas components when you have a license to do so. B Note that the assembly of gas and vent connections, the initial start-up, the electrical connections, the maintenance and service can only be performed by a licensed service contractor or technican. DANGER: Electric shock. Live components are present inside the boiler. B Isolate the electrical mains supply before working on the boiler. B Lock-out the mains supplies to prevent accidental activation. 1.4 Additional symbols WARNING: Indicates the presence of hazards that can cause severe personal injury, death or substantial property damage. Symbol B Function Sequence of steps Cross-reference to other points in this document or to other documents CAUION: Indicates presence of hazards that will out cause minor personal injury or property damage. Listing/list entry Listing/list entry (2nd level) ab. 1 Additional symbols CAUION: Indicates presence of hazards due to electric shock. Indicates special instructions on installation, operation or maintenance that are important but not related to personal injury or property damage. Logamax plus GB162-80 kw/100 kw - We reserve the right to make any changes due to technical modifications! 3

2 Parts list for converting the boiler to propane 2 Parts list for converting the boiler to propane Conversion kit propane for the GB162-80 kw/100 kw # 7746900499 includes: assembly # 774601703A 1 gas valve propane venturi orifice # 774600958A orifice # 871860872A (> 8.000ft.) 1 label 80 kw 1 label 100 kw 1 O-ring fan-venturi 1 sealing gas pipe 1 sealing gas flange 1 orx key x25 1 orx key x30 1 orx screw 3 Screw M 5x12 thread 4 these instructions 1 4 Logamax plus GB162-80 kw/100 kw - We reserve the right to make any changes due to technical modifications!

Liquid Propane conversion 3 3 Liquid Propane conversion o convert the boiler to liquid propane, the following instructions must be adhered to: DANGER: Risk of explosion. B Work on gas appliances must be carried out by competent registered personnel. 3.2 Changing the gas valve assembly B Loosen the screw connection on the gas valve ( fig. 3, [1]) and pull the plugs ( fig. 3, [2]) from the gas valve. 1 2 2 If the boiler is installed above 8,000 ft (2,440 m). altitude, the orifice needs to be changed with orifice 5.00" (1,97 mm) part nr: 871860872A. 3.1 Shut down the boiler B urn off the gas supply underneath the boiler. B Switch off the boiler using the main switch ( fig. 1, [1]). B Disconnect the electrical power to the boiler. B Set the thermostat or other operating control to lowest setting. 100 90 Eco 0 110 120 Aut 130 140 90 0 110 130 Aut 150 170 190 6720615033-004.1D Fig. 3 Undoing the connections to the gas valve B Pull both plugs from the fan unit ( fig. 4, [1]). 0 1 Reset 1 1 1 6720615033-002.1D Fig. 1 Main switch B Open the boiler door by turning the vent key through ¼ rotation anti-clockwise( fig. 2). 6720615033-005.1D 1. 2. Fig. 4 Removing the connectors from the fan B Pull the air suction tube from the fan ( fig. 5). 3. 6720615033-003.1D Fig. 2 Opening the boiler door Fig. 5 Pulling the air suction tube from the fan 6720615033-006.1D Logamax plus GB162-80 kw/100 kw - We reserve the right to make any changes due to technical modifications! 5

3 Liquid Propane conversion B Loosen both retaining clips on the burner cover ( fig. 6). B ake the gas valve and venturi from the conversion kit # 7746900499. B If the boiler is installed above 8,000 ft (2,440 m). altitude, the orifice needs to be changed. Follow the instructions below. Otherwise, go to the next step Undo the 4 screws ( fig. 9, [1]) and remove the gas valve from the venturi (fig. 9, [2]). 1 6720615033-007.1D Fig. 6 Opening the retaining clips B Remove the burner cover together with the fan unit and the gas valve ( fig. 7). 2 6720615033-010.1D Fig. 9 Removing the gas valve Change the 4.70 (0.185") orifice for the 5.00 (0.197"), ( table 2), ( fig. 10). 6720615033-008.1D Fig. 7 Removing the burner cover with the gas/air unit B Undo the 3 screws ( fig. 8, [1]) and remove the gas valve with the venturi from the fan unit ( fig. 8, [2]). 2 hermal power gas boiler GB162-80 kw/ 100 kw ab. 2 ype of gas supply Natural gas LPG P Altitude ft. (m) 0-4,000 (0-10,200) 0-8,000 (0-2,440) LPG P 8,000-10,200 (2,440-10,200) Gas orifice diameter Gas orifice diameter inch (mm) Venturi article number 8.40(0.331) 73983 4.70(0.193) 7746900499 5.00(1,97) 871860872A 1 Fig. 8 6720615033-009.1D Removing the screws and gas valve with venturi Fig. 10 Changing the orifice 6720615033-011.1D 6 Logamax plus GB162-80 kw/100 kw - We reserve the right to make any changes due to technical modifications!

Liquid Propane conversion 3 Install a new O-ring ( fig. 11). 6720615033-012.1D Fig. 11 Placing a new O-ring on the gas valve Install the venturi and gas valve of the conversion kit on the fan unit using a new O-ring ( Fig. 11) and follow the instructions above in reverse order. 6720615033-015.1D Fig. 14 Installing a new seal on the gas pipe B Replace the seal from the gas pipe with a new seal ( fig. 14). B Refit all parts in reverse order. When re-installing the burner plate, make sure that the notch is on the right-hand side ( fig. 15). 6720615033-013.1D Fig. 12 Placing a new O-ring on the fan unit B Install the gas flange from the natural gas assembly on the new gas valve ( fig. 13, [1]). 1 2 6720615033-014.1D Fig. 13 Installing the gas flange B Replace the seal under the gas flange with a new seal ( fig. 13,[2]). 6720615033-016.1D Fig. 15 Re-installing the burner plate B Carry out the start-up activities and complete a new start-up report. B Check all joints and gaskets affected by the installation activities while carrying out the tightness test in operating conditions. B Place a new sticker underneath the existing rating plate sticker indicating the type of gas supply installed. B Fill out the required information on the conversion label. B Close the boiler door and lock the fastener by turning the vent key through ¼ rotation in a clockwise direction. 3.3 esting for gas leaks Prior to start-up of the boiler you must check the external tightness of the gas supply valve and confirm this in the start-up report. Logamax plus GB162-80 kw/100 kw - We reserve the right to make any changes due to technical modifications! 7

3 Liquid Propane conversion DANGER: Risk of explosion B Check for leaks before working on gascarrying components. CAUION: due to a short circuit. B Cover damageable parts before leak testing. B Do not spray the leak detection agent onto cables, plugs or electrical connection lines. Do not allow it to drip onto them either. 1 2 B Disconnect the boiler from the power supply. B Check the exterior tightness of new conduit sections up to and including the direct sealing point on the gas burner fitting. he maximum test pressure allowed on the input of the gas burner fitting is 60 " W.C. (150 mbar). B Check the input rates after converting the boiler to LPG to the values on the front page. Fig. 16 Measuring the gas supply pressure B Press on the control panel cover to open it. 6720615033-017.1D 3.4 Inlet gas pressure NOICE B Contact the relevant gas utility company if the required inlet gas pressure is not available. B Install a gas pressure regulator before the gas burner fitting if the supply pressure is too high. B Open at least 1 thermostatic radiator valve if present to allow water to flow through the boiler. Do not switch on the boiler. B Close the gas shut-off valve. Loosen the screw plug on the inlet gas pressure testing nipple by 2 turns ( fig. 16, [1]). B Connect the pressure gauge connection hose to the testing nipple ( fig. 16, [2]). B Slowly open the gas shut-off valve. he boiler and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 60 " W.C. (150 mbar). he boiler must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 60 " W.C. (150 mbar). 6720615033-018.1D Fig. 17 Opening the control panel B Switch on the boiler by setting the main switch to position 1 ( fig. 1, page 5). B Press the Chimney Sweep d button and hold it for approx. 2 seconds until the display shows a decimal point. B Measure the gas connection pressure as soon as the Burner LED lights and enter this value in the start-up report. he inlet gas pressure must be: for natural gas - min. 7.0 to 10.5 " W.C. (17.4 to 26.1 mbar), nominal supply pressure 8.0" W.C. (19.9 mbar). for LPG - min. 8.0 to 13.0" W.C. (19.9 to 32.3 mbar), nominal supply pressure 11.0" W.C. (27.4 mbar). B Press repeatedly the Service e button until the temperature indication is displayed. B Press the Chimney Sweep d button to end the measurement procedure. B Close the gas shut-off valve. B Remove the connection hose again and tighten the screw plug on the testing nipple. B Open the gas shut-off valve again. 8 Logamax plus GB162-80 kw/100 kw - We reserve the right to make any changes due to technical modifications!

Liquid Propane conversion 3 3.5 Checking and adjusting the gas/air ratio B Switch off the boiler using the main switch. B Loosen the screw plug on the measuring nipple for the burner pressure by 2 rotations ( fig. 18 [1]). B Set the pressure gauge to 0. B Use a hose to connect the plus terminal of the pressure gauge to the burner pressure measuring nipple ( fig. 18, [2]). B Adjust the gas/air ratio, if not correct, using the adjustment screw ( fig. 19, [1]). he adjustment screw is located behind the cover screw. 1 1 6720615033-020.1D Fig. 18 Checking the gas/air ratio B Switch on the boiler using the main switch. B Press the Chimney Sweep d button and hold it for approx. 2 seconds until the display shows the decimal point. B Press and hold the Chimney Sweep d and Service e button, for approx. 5 seconds, until the display shows (e. g. ). B Set the boiler to partial load (ab. 3). altitude ft. (m) 0-4,000 ft. (0-1,220) 4,000-10,200 (01,220-10,200) ab. 3 Partial load set. Display setting GB162-80 kw Display setting GB162-100 kw B Pressing the Chimney Sweep d button for higher values or the Reset c button for lower values. B Read out the differential pressure. he differential pressure (p Gas p Air ) must be -0.04" W.C. (-10 Pa) (±0.02 " W.C. = ± 5 Pa) (read-out on pressure gauge: -0.06-0.02" W.C. = -15-5 Pa). B Enter the value measured in the start-up report. 2 6720615033-019.1D Fig. 19 Setting the gas/air ratio B Press repeatedly the Service e button until the temperature indication is displayed. B Press the Chimney Sweep d button until the decimal point is cleared from the display. B Switch off the boiler using the main switch. B Remove the measurement set-up, tighten the screw in the burner pressure measuring nipple. B Switch on the boiler using the main switch. 3.6 Carrying out a tightness test in operating conditions CAUION: due to a short circuit. B Cover damageable parts before leak testing. B Do not spray the leak detection agent onto cables, plugs or electrical connection lines. Do not allow it to drip onto them either. B Check all gaskets and joints in the burner gas circuit for leaks while the burner is operational, using a leak detection agent. 3.7 Measuring the CO content B Measure the CO content on the flue gas sampling point ( fig. 20, [1]). he CO values in an air-free condition must be below 400 ppm or 0.04 vol. %. Values of 400 ppm and up indicate that the burner adjustment may be wrong, the gas burner fitting or the heat exchanger are dirty or that there may be burner faults. Logamax plus GB162-80 kw/100 kw - We reserve the right to make any changes due to technical modifications! 9

3 Liquid Propane conversion B Establish and resolve the cause. he boiler must be operational when you do this. 1 Fig. 20 Measuring the CO content 3.8 Lighting Instructions For your safety, read before lighting. 6720615033-021.1D DANGER: What to do if you smell gas: B No open fire! Do not smoke! B Avoid formation of sparks! Do not touch any electric switch, phone, electric plug or bell! B Shut off main gas supply. B Open windows and doors! B Notify all occupants B Leave the building! B Immediately call your gas supplier, heating contractor or fire department from a phone outside the building! WARNING: due to not following these instructions. B If you do not follow these instructions exactly, a fire or explosion may result causing property damage, personal injury or loss of life. B Follow these operating instructions. his boiler is equipped with an ignition device which automatically lights the pilot. Do not try to light the pilot by hand. Check for smell of gas around the boiler area. Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor. Do not use this boiler if any part has been under water. Immediately call a qualified service technician to inspect the boiler and to replace any part of the control system and any gas control which has been under water. 10 Logamax plus GB162-80 kw/100 kw - We reserve the right to make any changes due to technical modifications!

Operating Instructions 4 4 Operating Instructions Start up the boiler SOP! Read the safety precautions on page 10 of this manual. B Wait 5 minutes to clear out any gas. hen smell for gas, including near the floor. If you smell gas, SOP and see the safety information on page 10. If you do not smell gas, go to the next step. B Install the casing again. B Open the gas shut-off valve. B Set the thermostat or other operation control to desired setting. B Connect the boiler to the power supply. B Switch on the boiler using the main switch ( fig. 21). 100 110 120 90 110 130 150 90 Eco 0 130 140 Aut 0 170 190 Aut 0 1 Reset 1 6720615033-022.1D Fig. 21 Mains switch Logamax plus GB162-80 kw/100 kw - We reserve the right to make any changes due to technical modifications! 11

6720615033 0005

Bulletin Number: BG-31 Model: Buderus GB162 Series Boiler echnical service bulletin Low Water Cut Off & Manual Reset High Limit Introduction Each GB162 boiler is equipped with several internal safety sensors and a controller that prevents boiler operation when it is unsafe to do so. Local jurisdictions may require the installation of additional safety devices external to the boiler that meet certain requirements. his bulletin describes the recommended location, installation and wiring for the low water cut off (LWCO) and manual reset high limit (MRHL). GB162 Cascade piping diagram

Bulletin Number: BG-31 Low Water Cut Off & Manual Reset High Limit echnical service bulletin GB162 Low water cut off & manual reset high limit detail piping and MRHL GB162 Casade wiring diagram Installation Required components: 1 x3/4 Reducer 3/4 ee (two) MRHL and 3/4 well 3/4 elbow Straight piping Air vent Remove the 1 plug from the back of the manifold. Install the reducer and tee. hread the well from the back into the tee and slide in the MRHL probe. Route piping to the end of the cascade and up the side of the last boiler. At the height of the top of the heat exchanger install the tee, the air vent at the top, and the LWCO on the side. esting the MRHL: urn the MRHL threshold below the setting on the boiler dial and run the boiler. he burner will shut off as soon as the threshold is reached. esting the LWCO: Follow the device s instructions on how to test its performance without draining fl uid from the system. Wiring LWCO and MRHL are wired in series with the EV terminal of the respective boiler. Upon activation the MRHL or LWCO will open their normally closed (NC) contacts and interrupt the EV terminal which will immediately shut off the burner. Power to the boiler remains and the pump may continue to run. Data subject to change without notice BC 432002104 A 04.2012 Bosch hermotechnology Corp. 50 Wentworth Ave Londonderry, NH 03053 el: (800) 283-3787 Fax: (603) 965-7581 www.buderus.us Buderus

CAUION! Before putting the boiler into operation read this manual carefully. WARNING! Improper installation, adjustment, alteration, service or maintenance can cause injury, loss of life or property damage. Refer to this manual. For assistance or additional information consult a qualified installer, service agency or the gas supplier. CAUION! he operating manual is part of the documentation that is delivered to the installation's operator. Go through the information in this manual with the owner/operator and make sure that he or she is familiar with all the necessary operating instructions.

7

7

7

7

high temp manual reset -see note 5 reset button boiler pump group GB162 AM10 single boiler low loss header PK pump low water cut-out (LWCO) - see notes 3 & 4 Supply Return high temp heating circuit 1 Notes: 1. Contractor to furnish and install LWCO and High emp Manual Reset devices as require by local codes. 2. Do not install any type of valve or check valv in between LWCO and Boiler. 3. Refer to the manufacturer s instructions whe installing the low water cut-out (LWCO). 4. LWCO must be located above the highest point of the boiler heat exchanger. 5. Hi emp Manual Reset remote sensing bulb must be in the boiler supply. Back of Pump Group -Remove plug 1" NP Female to connect LWCO stand pipe. 7

Legend Pump Low loss Header Outside emp Sensor High emp Heating Circuit GB162 #1 ORG BLU GRN GRY RED L BLU GRN GRY PUR WH low water cut-out (LWCO) high temp manual reset N.C. N.C. AM10 WH RED BLU FA Valve Check Valve hermostat Notes: 1. Installing activity shall furnish and install LWCO and high temp. manual reset per local codes. 2. Jumper across EV must be removed prior to wiring in LWCO and high temp manual reset. PK 7

7

MCM10 Front Panel 1 2 3 4 5 1 GRN Off: No power / internal error MCM10 On: Standard operation 2 GRN Off: Pump off On: Pump on 3 RED! Off: Switching contact not activated Blinking: System fault (example : system pressure too low or error in the heating appliance(s)) 4 GRN Off: No communication On: Communication between MCM10 and the previous MCM10. Communication between MCM10 and a Heating Controller (e.g. RC35) 5 GRN Off: No heat demand, heating appliance stand by On: Heat demand, heating appliance in operation 7

120 VAC YEL YEL GRN RED 120V PE N L 120V PE N L PE N L NO C NC Printed Circuit Board Input Mains Supply Output Mains Supply to following MCMC10 System Pump Alarm / Error output 120V 120V PE N L 120V PE N L PE N L NO C NC 0... 10V - + 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 BRN BLU RED GRN WH ORG 0... 10V - + 13 14 3 4 5 6 7 8 9 10 11 12 Line voltage Low voltage Do not use Outdoor emperature Sensor External On/Off brake Control contact (safeguard) 0-10 Volt Signal MM10, WM10 & continue to modulating control AM10 or RC35 GRY BLK WH WH WH WH 13 14 15 16 17 18 19 20 21 22 23 24 Communication between this MCM10 and heating control Communication between this MCM10 and following MCM10 Heating Appliance 1 Heating Appliance 2 Heating Appliance 3 Heating Appliance 4 7

WM10 7

high temp manual reset -see note 4 reset button OA Supply Return MCM10 EMS Bus Notes: 1. See page 48 for details on where to connect LWCO standpipe to pump group. 2. LWCO and high temp manual reset are furnished and installed by others per local code. 3. LWCO must be located above the highest point of the boiler heat exchanger. 4. Hi emp Manual Reset remote sensing bulb must be located in the boiler supply. RC35 EMS Bus RC35 EMS Bus EMS Bus high temp manual reset -see note 4 reset button low water cut-out (LWCO) -see notes 2 & 3 PH FV PH FK Supply Return AU 7

Legend Pump Motor emp Sensor Mixing Valve Low loss Header Low emp Heating Circuit High emp Heating Circuit Valve RC 35 room control unit EX WM10 MM10 MCM10 YEL YEL GRN RED 120V PE N L 120V PE N L PE N L NO C NC BRN BLU RED GRN WH ORG 0... 10V - + 1 2 3 4 5 6 7 8 9 10 11 12 GRY BLK WH WH WH WH 13 14 15 16 17 18 19 20 21 22 23 24 120 V /60Hz Line In Notes: 1. Jumper(s) must be removed prior to wiring the LWCO and high temp. manual reset. GB162 #1 GB162 #2 ORG BLU GRN GRY RED L BLU GRN GRY PUR WH ORG BLU GRN GRY RED L BLU GRN GRY PUR WH 120 V /60Hz Line In 120 V /60Hz Line In low water cut-out (LWCO) high temp manual reset high temp manual reset N.C. N.C. N.C. 7

Supply Return 3rd Party Controller Supply Return 7

Legend Pump Motor emp Sensor Low loss Header Low emp Heating Circuit High emp Heating Circuit Valve hird Party Controller Mixing Valve Outdoor emp sensor MCM10 120V YEL YEL GRN RED PE N L 120V PE N L PE N L NO C NC BRN BLU RED GRN WH ORG 0... 10V - + 1 2 3 4 5 6 7 8 9 10 11 12 GRY BLK WH WH WH WH 13 14 15 16 17 18 19 20 21 22 23 24 120 V /60Hz Line In 0-10 VDC signal GB162 #1 GB162 #2 ORG BLU GRN GRY RED L BLU GRN GRY PUR WH ORG BLU GRN GRY RED L BLU GRN GRY PUR WH 120 V /60Hz Line In 120 V /60Hz Line In 7

MCM10 RC35 Supply Return Supply Return RC35 AU PZ 7

Legend Pump Motor emp Sensor Mixing Valve Low loss Header Indirect Storage ank DHW Outlet WM10 RC 35 room control unit EX Outdoor emp sensor 120 V /60Hz Line In MCM10 PZ 120V YEL YEL GRN RED PE N L 120V PE N L PE N L NO C NC BRN BLU RED GRN WH ORG 0... 10V - + 1 2 3 4 5 6 7 8 9 10 11 12 GRY BLK WH WH WH WH 13 14 15 16 17 18 19 20 21 22 23 24 PS PH system pump GB162 #1 GB162 #2 ORG BLU GRN GRY RED L BLU GRN GRY PUR WH ORG BLU GRN GRY RED L BLU GRN GRY PUR WH 120 V /60Hz Line In 120 V /60Hz Line In 7

MCM10 RC35 Supply Return RC35 Supply Return AU 7

Legend Pump Low loss Header emp Sensor High emp Heating Circuit Valve Outdoor emp sensor WM10 YEL YEL GRN RED 120V PE N L 120V PE N L PE N L NO C NC 20 V /60Hz ne In GB162 #1 ORG BLU GRN GRY RED L BLU GRN GRY PUR WH 120 V /60Hz Line In RC 35 room control unit EX MCM10 BRN BLU RED GRN WH ORG GRY BLK WH WH WH WH 0... 10V - + 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 GB162 #2 ORG BLU GRN GRY RED L BLU GRN GRY PUR WH 120 V /60Hz Line In 7

RC35 Supply Return MCM10 MCM10 RC35 AU Supply Return 7

Legend Pump emp Low loss Header Outdoor emp sensor Sensor RC 35 room control unit EX YEL YEL GRN RED 120V PE N L 120V PE N L PE N L NO C NC BRN BLU RED MCM10 (primary) GRN WH ORG 0... 10V - + 1 2 3 4 5 6 7 8 9 10 11 12 GRY BLK WH WH WH WH 13 14 15 16 17 18 19 20 21 22 23 24 120 V /60Hz Line In from WM10 WM10 YEL YEL GRN RED 120V PE N L 120V PE N L PE N L NO C NC BRN BLU RED MCM10 (secondary) GRN WH ORG 0... 10V - + 1 2 3 4 5 6 7 8 9 10 11 12 GRY BLK WH WH WH WH 13 14 15 16 17 18 19 20 21 22 23 24 120 V /60Hz Line In o MCM10 primary Line In GB162 #1 ORG BLU GRN GRY RED L BLU GRN GRY PUR WH 120 V /60Hz Line In GB162 #2 GB162 #4 ORG BLU GRN GRY RED L BLU GRN GRY PUR WH ORG BLU GRN GRY RED L BLU GRN GRY PUR WH 120 V /60Hz Line In 120 V /60Hz Line In GB162 #3 GB162 #5 ORG BLU GRN GRY RED L BLU GRN GRY PUR WH ORG BLU GRN GRY RED L BLU GRN GRY PUR WH 120 V /60Hz Line In 120 V /60Hz Line In 7

Do 06.07. 2008 4:45h Room 71.9 F 1 2 3 4 11 10 9 8 7 6 5 7

Do 06.07. 2008 4:45h Room 71.9 F Standard display Operation modes Switching program Summer/winter threshold Summer/winter time DHW temperature Holiday Party function Pause function hermally desinfection Do 06.07. 2008 4:45h Room 71.9 F + + Quick operation Settings Diagnosis Servicing Reset 7

RC35 ways of controlling: F ( C) 212(100) outside temperature room temperature F ( C) 212(100) Supply temperature 176 (80) 140 (60) 104 (40) 68 (20) 32 (0) 32 (0) Supply temperature 176 (80) 140 (60) 104 (40) 68 (20) 20 15 10 5 0-5 -10-6 -5-4 -3-2 -1 0 1 outside temperature offset room temperature RC35 Outside temperature damping Outside temperature controlled F C 78 (26) 75 (24) 72 (22) 68 (20) 64 (18) 61 (16) 57 (14) 54 (12) 50 (10) 48 (8) Damped outside temperature Current outside temperature 43 (6) 12am 3am 6am 9am 12pm 3pm 6pm 9pm 12am Elapsed ime (Day) 7

RC35 Changing set point Outside temperature controlled 167 F (75 C) Flow temperature 72 F 68 F Setpoint (22 C) Setpoint (20 C) Setpoint 64.4 F (18 C) (20 C) (-10 C) 68 F 14 F Outside temperature 7

RC 35 Max. & min. flow temperature Outside temperature controlled supply temperature max. min. 68 F (20 C) Outside temperature 14 F (-10 C) RC 35 Max. & min. flow temperature Room temperature controlled Supply temperature F 212 176 140 104 68 32-6 -5-4 -3-2 -1 0 1 Offset room temperature max. (e.g. 75 C) 167 F min. (e.g. 25 C) 77 F RC 35 Room influence Room temperature to low Supply temperature Room temperature to high Outside temperature 7

120 L RC 35 room control unit EX Wall Mounting Bracket 18AWG 18AWG Connection to EMS (boiler) * Connection to external room temperature sensor * If room sensor is not used, leave factory installed jumper in place. Ground yel/grn must not be used as a control line. 7

7

120 L 18AWG 120 V 60Hz 14AWG, Max. 5A 14AWG, Max. 5A 18AWG 18AWG 18AWG Main power supply 120 V 60Hz Valve actuator motor run time: Ground yel/grn must not be used as a control line. 7

120 L 14AWG 120 V 60Hz 14AWG, Max.5A 18AWG 18AWG 18AWG Main power 120 V 60Hz zone low loss header Ground yel/grn must not be used as a control line. 7

120 L 14AWG 120 V 60Hz 14AWG, Max. 1A 18AWG 18AWG 18AWG 18AWG Main power 120 V 60Hz tank Ground yel/grn 7

AU GB162 Buderus IMPORAN! 1. RC35 may be installed next to the BC10 when there is only one boiler and one heating circuit. 2. If multiple heating circuits are utilized with two or more boilers or with any other of the modules (WM10, SM10, MM10), the RC35 must be remote mounted from the boiler to operate properly. pump group single boiler low loss header Supply PK pump Return heating circuit 1 7

Legend Pump Outdoor emp sensor GB162 #1 ORG BLU GRN GRY RED L BLU GRN GRY PUR WH 120 V /60Hz Line In * BC10 RC35 Buderus AU * Attach RC35 next to BC10 at front of boiler. 7

GB162 RC35 pump group single boiler low loss header Supply Return unmixed heating circuit 1 mixed heating circuit 2 pump pump WM10 MM10 3 way valve 7

Legend Pump Low loss Header Outside emp Sensor Motor emp Sensor Mixing Valve Low emp Heating Circuit High emp Heating Circuit Valve GB162 #1 ORG BLU GRN GRY RED L BLU GRN GRY PUR WH RC 35 room control unit EX 120 V /60Hz WM10 MM10 7

GB162 RC35 pump group single boiler low loss header Supply Return unmixed heating circuit 1 mixed heating circuit 2 mixed heating circuit 3 pump pump pump WM10 MM10 MM10 3 way valve 3 way valve 7

Legend Pump GB162 #1 ORG BLU GRN GRY RED L BLU GRN GRY PUR WH Motor emp Sensor 120 V /60Hz WM10 MM10 RC 35 room control unit EX Low loss Header Low emp Heating Circuit High emp Heating Circuit MM10 Outside emp Sensor Valve Mixing Valve 7

GB162 RC35 pump group single boiler low loss header Supply Return 4 heating circuits max. unmixed heating circuit 1 mixed heating circuit 2 mixed heating circuit 3 mixed heating circuit 4 pump pump pump pump WM10 MM10 MM10 MM10 3 way valve 3 way valve 3 way valve 7

RC 35 room control unit EX GB162 #1 ORG BLU GRN GRY RED L BLU GRY GRN PUR WH 120 V /60Hz WM10 MM10 Legend Pump Motor emp Sensor MM10 Low loss Header Low emp Heating Circuit High emp Heating Circuit Outside emp Sensor Valve Mixing Valve MM10 7

GB162 RC35 pump group single boiler low loss header Supply Return unmixed heating circuit 1 mixed heating circuit 2 pump pump WM10 MM10 3 way valve mixed heating circuit 3 pump MM10 3 way valve mixed heating circuit 4 pump MM10 3 way valve 7

RC 35 room control unit EX GB162 #1 ORG BLU GRN GRY RED L BLU GRY GRN PUR WH 120 V /60Hz DHW pump DHW recirc pump WM10 MM10 Legend Pump Motor emp Sensor MM10 Low loss Header Low emp Heating Circuit High emp Heating Circuit Outside emp Sensor Valve Mixing Valve MM10 7

RC35 GB162 PZ PSS SM10 pump group single boiler low loss header Supply Return PS unmixed heating circuit 1 mixed heating circuit 2 mixed heating circuit 3 mixed heating circuit 4 pump pump pump pump WM10 MM10 MM10 MM10 3 way valve 3 way valve 3 way valve 7

Legend Pump RC 35 room control unit EX Low loss Header Valve Outside emp Sensor Motor emp Sensor GB162 #1 ORG BLU GRN GRY RED L BLU GRY GRN PUR WH 120 V /60Hz WM10 MM10 o SM10 EMS Mixing Valve Low emp Heating Circuit SM10 MM10 High emp Heating Circuit o WM10 EMS DHW ank Sensor MM10 Collector emp Sensor Solar pump 7

8201052

GB162 Concentric Horizontal Vent Kit FOR BUDERUS GB162 SERIES BOILERS Installation Instructions

2 Concentric Horizontal Vent Kit Installation Manual Data subject to change Bosch hermotechnology Corp.

Installation Manual Concentric Horizontal Vent Kit 3 able of Contents 1 Explanation Of Symbols 4 1.1 Key o Symbols 4 1.2 Safety Instructions 4 2 Scope Of Delivery 6 3 Installation 7 3.1 Notes On Installation 7 3.2 Appliance Adapter 7 3.3 Elbow and Wall ermination 7 4 Spare Parts 10 Bosch hermotechnology Corp. Data subject to change

4 Concentric Horizontal Vent Kit Installation Manual 1 Explanation Of Symbols 1.1 Key o Symbols 1.2 Safety Instructions Warnings Warnings in this document are identified by a warning triangle printed against a grey background. Keywords at the start of a warning indicate the type and seriousness of the ensuing risk if measures to prevent the risk are not taken. WARNING: Read all instructions before installing. Perform the steps in the indicated sequence. Failure to comply with these instructions can result in severe, possibly fatal, personal injury as well as damage to property and equipment. he following keywords are defined and can be used in this document: DANGER indicates a hazardous situation which, if not avoided, will result in death or serious injury. WARNING indicates a hazardous situation which, if not avoided, could result in death or serious injury. WARNING: Installation and servicing Ensure that only a licensed contractor installs or services the gas appliance. On hot components use only material with adequate temperature rating. CAUION indicates a hazardous situation which, if not avoided, could result in minor to moderate injury. NOICE is used to address practices not related to personal injury. WARNING: Installation and commissioning In the Commonwealth of Massachusetts, the gas appliance must be installed by a licensed plumber. Important information his symbol indicates important information where there is no risk to people or property. DANGER: If you smell flue gas Switch off the appliance. Open windows and doors. Inform a trained and certified installer. DANGER: Insufficient ventilation may cause toxic flue gases to escape posing a risk of flue gas poisoning. Never close off or reduce the size of the air intake and outlet openings. he appliance must not be operated until any obstructions have been removed. Inform the system operator in writing of the problem and the associated dangers. Data subject to change Bosch hermotechnology Corp.

Installation Manual Concentric Horizontal Vent Kit 5 DANGER : Danger from escaping flue gases Ensure all vent pipes and chimneys are not damaged or blocked. WARNING: Do not obstruct the flow of combustion and ventilation air. Connect only one appliance to each vent system or chimney liner. he venting system piping must not feed into another air exhaust duct. Do not route the flue system piping through or inside another air exhaust duct. NOICE: he complete installation must comply with national, state, and local code. he installation instructions in both the gas appliance installation manual and this vent system installation manual must be followed exactly. WARNING: Combustion air Keep the combustion air free of corrosive substances (halogenated hydrocarbons that contain chlorine or fluorine compounds). WARNING: Maintenance Customers are required to: Sign a maintenance and inspection contract with an authorized contractor. Inspect and maintain the gas appliance on a yearly basis or more frequently if required. Service as needed. NOICE: he concentric horizontal vent terminal is intended for installation only with the GB162 series boilers (hereafter referred to as "appliance"): - GB162-80 kw - GB162-100 kw Use only genuine spare parts. DANGER: Fatal accidents! Carbon monoxide poisoning. Carefully plan where you install the gas appliance. Correct combustion air supply and flue pipe installation are very important. If a gas appliance is not installed correctly, fatal accidents can result such as carbon monoxide poisoning or fire. DANGER: Carbon monoxide poisoning. Exhaust gas must be vented to outside using approved vent material. (In Canada use only ULCS636 approved material). Vent and combustion air connector piping must be sealed gas-tight to prevent flue gas spillage, carbon monoxide emissions and risk of fire, resulting in severe personal injury or death. Approved vent terminations must be used when penetrating to the outside. Bosch hermotechnology Corp. Data subject to change

6 Concentric Horizontal Vent Kit Installation Manual 2 Scope Of Delivery he GB162 Concentric Vent Kit comes packaged as described below. 1 9⁷ ₁₆" (240) 3 4 Ø 5⅞" (150) 5⅞"(150) 8¹¹ ₁₆" (220) 8¹¹ ₁₆" (220) 4x 5 4x Ø 6"(150) 30⅜"(772) 23⁵ ₁₆"(592) 7¹ ₁₆"(180) 6 2 Fig. 1 Scope of delivery - dimensions in inches (mm) Fig.1 Legend: Components: 1 90 elbow 2 erminal assembly 3 Inner wall seal 4 Outer wall seal 5 Connecting/securing screws and wall anchors 6 Appliance adapter Needed ools: - Hole saw - ape measure - Phillips screw driver - Drinking water (as lubricant for gaskets) - Weatherproof caulk Data subject to change Bosch hermotechnology Corp.

Installation Manual Concentric Horizontal Vent Kit 7 3 Installation 3.1 Notes On Installation NOICE: It is the installer's responsibility that the appliance is installed according to the manufacturer's installation instructions, this accessory manual, as well as national, state, and local code. 3.2 Appliance Adapter Discard original appliance adapter, vent flange and gasket that was supplied with the boiler. Set the appliance adapter down onto the pipe ensuring that the analyzer ports are facing to the front of the appliance and the adapter screw holes are aligning with those of the appliance. CAUION: he location and orientation of the vent termination must follow those stated in the appliance Installation Manual. Ensure flue discharge does not create a hazard or nuisance. NOICE: he concentric vent kit is approved for zero (0", 0 mm) clearance to combustibles. Fig. 2 Installing adapter Insert the 4 screws, but do not tighten all the way. NOICE: his vent system is ULC-S636 certified for Canada. 3.3 Elbow and Wall ermination DANGER: Ensure the termination is installed at least 12" (300 mm) above the average snow line. If this is not feasible, this termination can not be used. Apply a small amount of clean water as lubricant on all gaskets. Place elbow on top of the appliance adapter and align. Fig. 3 Installing elbow Bosch hermotechnology Corp. Data subject to change

8 Concentric Horizontal Vent Kit Installation Manual he appliance adapter can be swivelled around its vertical axis. Extending the concentric pipe length is permissible. he maximum straight vent length allowed is dependant on appliance type and number of elbows used. See tables below. Measure the length of the vent terminal assembly (Fig. 4, [1]) taking into account the thickness of the outside wall [S] and the distance from the outside wall to the end of the vent pipe [L]). It is recommended to keep at least 4" (100mm) clearance from the ceiling or joists for accessibility reasons. 1 4"(100mm) K S Maximum straight vent pipe length allowed for Ø 4" / Ø 6" (Ø 100/150mm) concentric pipe # of 90 elbows used Maximum straight vent pipe length allowed 1 22ft (6.705m) 2 20ft (6.096m) 3 19ft (5.791m) 4 17ft (5.181m) 5 15ft (4.572m) 6 13ft (3.962m) Friction Loss Equivalent for Fittings 1/4" per foot (50 mm per meter) 13³/₁₆" - 20⅞"(335-530mm) L Equivalent Fitting feet m 45 deg 4"/6" (100/150mm), PolyPro Elbow 3.7 1.14 90 deg 4"/6" (100/150mm), PolyPro Elbow 5.6 1.72 Fig. 4 Penetration through the outside wall Select the required diameter [K] of the hole in the wall according to the wall thickness S. Example: Model: GB162-80 90 elbows used: 3 45 elbows used: 0 Maximum straight vent pipe allowed: 19ft (5.791m) Sizing hole penetration Wall hickness S Diameter K 6" - 9 ½" (150-240 mm) 7 1/4" (155 mm) 9 ½" - 16½" (240-420 mm) 7 1/2" (165 mm) 16½" - 20 ⅞" (420-530 mm) 8" (170 mm) Slide the outer wall seal [2] onto the terminal [1] as shown. Cut the hole in the wall while allowing clearance for the required pitch of the air/vent pipe up to a maximum of 3/8" wider than the air supply pipe 1 2 Fig. 5 Data subject to change Bosch hermotechnology Corp.

Installation Manual Concentric Horizontal Vent Kit 9 Position terminal [1] from the outside through the vent opening so rubber thimble [2] is flush against outside wall (Fig. 6). Slide the inner wall seal [3] onto the terminal [1] as shown (Fig. 6). 3 1 2 2. 1. Fig. 6 Inserting termination from the outside Connect the termination to the elbow or to additional concentric pipe if extending the vent length. Fig. 7 Completed adapter and concentric assembly Ensure all components are properly connected and aligned, and that the termination has the proper pitch as shown in Fig. 4. Using screws provided, secure inner and outer wall seals to the wall. Complete installing the appliance per the Boiler Installation Instructions. Bosch hermotechnology Corp. Data subject to change

10 Concentric Horizontal Vent Kit Installation Manual 4 Spare Parts Concentric Vent Kit Components Description Bosch Part Number Concentric Vent Kit PP 100/150, GB162 7738004825 Concentric Adapter GB162 PP 80-100/150 7738004826 Wall Plate pe 150 7738004835 Wall Plate Fire Stop Support alu 150 7738004836 Wall Bracket 150 7738004837 Horizontal Concentric Vent Kit Hardware 7738003237 Additional Concentric Vent Kit Accessories Description Bosch Part Number Extension PP 100/150 x 10 inch 7738004827 Extension PP 100/150 x 20 inch 7738004828 Extension PP 100/150 x 40 inch 7738004829 Extension PP 100/150 x 80 inch 7738004830 Elbow PP 100/150 90 7738004831 Elbow PP 100/150 45 7738004832 PP Inner Seal EPDM 100 7738004833 PP Outer Seal EPDM 150 7738004834 o purchase additional concentric pipe lengths and fittings, please contact Bosch Customer Service at 1-866-642-3198. Data subject to change Bosch hermotechnology Corp.

Installation Manual Concentric Horizontal Vent Kit 11 Notes: Bosch hermotechnology Corp. Data subject to change

United States and Canada Bosch hermotechnology Corp. 50 Wentworth Avenue Londonderry, NH 03053 el: 603-552-1100 Fax: 603-965-7581 www.boschheatingandcooling.com BC 432001102 A / 05.2015

Bulletin Number: BG-28 Model: GB162 series boiler echnical Service Bulletin Cascade Package Flange Sizes Introduction he Buderus GB162 L and R packages all come supplied with fl anges to enable the contractor to connect to the low loss header. Listed below are fl ange sizes and connection information offered with each cascade package. Flange sizes and descriptions GB162 L2 & R2 his package is supplied with two 2½" (63.5 mm) welded fl anges that are located on and already connected to the low loss header, for both system side supply and return connections. Also supplied in the package are two 2" (50.8 mm) NP threaded fl anges. hese can be used as an option but the system pipe sizing may have to be increased at the fl anges to accommodate the system load. Correct pipe sizing to the heating system he sizes of the fl anges supplied are based on the average requirements of a typical heating system, using a 20 degree delta. here may be instances were the contractor will have to increase the secondary pipe sizing based on the system requirements and the heating load. For example, a pipe of a certain diameter will only carry a certain amount of heat from the header, so it may be necessary to increase the pipe sizing after the supplied secondary connections. If a pipe has a reduced diameter, the hydraulic resistance of the system will increase and result in poor flow around the system. he supplied fl anges will be suitable for the majority of systems but it is the experience and knowledge of the contractor that will ultimately determine the correct pipe sizing to the heating system. GB162 L3 his package is supplied with two 2½" (63.5 mm) welded flanges that are located on and already connected to the low loss header, for both system side supply and return connections. GB162 R3, L4, & R4 his package is supplied with two 3" (76.2 mm) welded fl anges that are located on and already connected to the low loss header, for both system side supply and return connections. GB162 R5/6 & R7/8 hese packages are supplied with 4 (101.6 mm) welded fl anges that are located on and already connected to the low loss header, for both system side supply and return connections. Bosch hermotechnology Corp. 50 Wentworth Ave Londonderry, NH 03053 el: (800) 283-3787 Fax: (603) 965-7568 www.buderus.us Data subject to change without notice BC 432002103 B 12.2013 Buderus

Bulletin Number: BG-47 Model: GB142 & GB162 Series Boilers echnical Service Bulletin Heat Exchanger Serial Number Location Introduction his bulletin identifi es the locations of GB142 and GB162 heat exchanger serial numbers. Identifying your product s serial number is essential for customer support and warranty claims. GB162 series boilers Location: he heat exchanger serial number is located in the rating plate on the heat exchanger: GB142 series boilers Location: he heat exchanger serial number is located in labels on the heat exchanger: Serial number location Serial number location GB142-24/30 Serial number location GB162 Heat Exchanger Close-up XXXX-XXX-XXXXXX-XXXXX Boiler serial number GB142-45/60 XXXXXXXXXXXXXXXXXXX GB142 Heat Exchanger Close-up Heat exchanger serial number XXXXXXXX-XX-XXXX-XXXX XXX.XXXXXXXXX XXXX Boiler serial number Heat exchanger serial number XXX.XXXXXXXXX XXXX Bosch hermotechnology Corp. 50 Wentworth Ave Londonderry, NH 03053 el: (866) 642-3198 Fax: (603) 965-7581 www.boschheatingandcooling.com Data subject to change without notice BC 435002111 A 09.2016 Buderus