Extrusion Walkthrough

Similar documents
SHR3D IT. Version 1.0 November English user guide

Drying of Difficult Resins

Soliflex PRO Recycling trial

Activity Sheet Chapter 1, Lesson 1 Molecules Matter

This presentation is courtesy of

Customers. The core of our innovation. Feeding&Conveying. Drying Dosing Temperature Control Refrigeration Granulation

Section N. Application Information. Thermal Manufacturing Solutions. Extrusion N-1. Injection Moulding N-2 N-3. Other N-4

NOTE: READ THE SAFETY PRECAUTIONS BEFORE OPERATING THIS MACHINE.

Domestic Elementalism: hints and walkthrough

Owner s Manual. Van Ho Pug Mill Power Plus 160 Series

Owner s Manual. Van Ho 1HP Pug Mill Power Plus 130 Series

Owner s Manual. Van Ho Pug mill Power Plus 200 Series

GENERAL SAFETY NOTES Know your equipment Carefully read the instruction manual. Learn the use and limitations of the equipment.

Extrusion of single- and multi-lumen catheter tubes with thermoplastic materials

Technology Bulletin. Granulators and Shredders Have More. By Vincent Carpentieri, Size Reduction Sales Manager, The Conair Group

K&W Permanent Metallic Block Seal

Cistern Connections. Overview: Active rainwater collection systems can be comprised of a few simple and inexpensive components.

SELF-ADHESIVE FILM INSTALLATION GUIDE

Part 1 Pre-16 Conducting plastics and shape changing polymers

Eastman Provista copolymers. Extrusion of tubes and profiles

Virtus Manufacturing Plant in Shanghai China

Filabot EX6 Extruder. Operation Manual. CAUTION! Read Carefully. Filabot Vermont, USA, Earth

9.3. Inks Closures and Liners Recycle- friendly Problematic Handles and Sport Caps Household Chemical PET

desiccant dryers hot air dryers mould drying

VISHU SHAH TEL : D West Lambert Road FAX : Brea, CA PCS CORPORATION CHINA.

Save Money by Conserving Water!

Extrusion Blow Molding Resin or Color Change: Performance Tips

Extrusion Profile Resin or Color Change: Performance Tips

Processing Guidelines

Garbage Disposal. The University of Akron. Madison Popa Tyler Miller

Mechanical Paper Shredder

Wrangler JK Engine Cooling

UNIVERSAL SERIES COMBINATION SHREDDER-FEEDER-EXTRUDER X:GRAN.

New Developments in Shredding & Recycling of Post-Industrial and Post-Consumer Carpet

LESSON CLUSTER 8 Explaining Evaporation and Boiling

MSDS for TECH-G (PETG) taulman3d,llc St Louis, MO. taulman3d,llc

One Easy Strategy for Savings, Sustainability, and Productivity

European PET Bottle Platform

Throughput of a thousand kilos and more GETECHA heavy-duty granulators

Heating and Molecular Action

Mylar Bags: The Inexpensive Do-It-Yourself Long-Term Food Storage Solution

Introduction Drying Drying equipment Drying conditions Dryer diagram and troubleshooting Common dryer problems...

CLEACOM Engineered System Solutions. Established 24/7 technology for the separation of dust and fume during compounding processes

173 Index of Materials

ERE North America. Inc. 23 Old Right Road - Unit #2 Ipswich. MA 01938

The Injection Molding of High-Quality Molded Parts Preparing the Material: Drying

2 nd Grade Lesson Plan: Plant Life Cycle

Old style propeller New style propeller

Processing guidelines for DS2000/DS2010 polymer

LESSON CLUSTER 9 Explaining Condensation and the Water Cycle

Creating a Passive Solar Water Heating System

PackardInfo.com. HOW TO: Rebuild a Trico Mag Nu Matic Vacuum Washer Pump. Introduction

Green deeds come in empty packages

ECOR 1010 INTRODUCTION TO ENGINEERING REDESIGNED WATER BOTTLE CAP

Syllabus Structure for Certificate Course in

How To Make Lando Water Chillers? Leading the way of innovation. Here is the instruction to know more us how to

Manual Physical Vapour Deposition System

Part Nos.: Laminators

E C O C L E A N Cleaning emulsion

Krones Bottle to Bottle Recycling: Technology for Purity

VACUUM & PRESSURE PRODUCTS. Plastics Industry

Desiccant Breathers: A Front Line Defense in the War on Contamination

Injection Molding Cold Runner/Conventional Resin or Color Change: Performance Tips

Injection Molding Hot Runner Systems Resin or Color Change Mold Closed: Performance Tips

D Series Technical Data

Solving Venting Problems on Twin-Screw Compounding Extruders

LESSON 8: Recycling OVERVIEW

Drying Solvay Specialty Polymers Resins

There are a few tips to follow, and I will definitely go into more detail on them. But, first the TIPS!

Green deeds come in empty packages

Water Station Lab. o!yo+ 0+ H 0 H 0+ HI "~ W-* 0+ H 0+

Fixing my Fisher and Paykel Fridge Active Smart Fridge/Freezer Model E440T

Don't just purge Ultra Purge! (TM) Technical Data Sheet. Ultra Purge Ready-to-use purging compound with Ultra-X technology

Tornado Operations & Maintenance Manual

Application report. Compressed air treatment at a beverage industry plant. Food & beverages. Industry:

Introduction to humidistats

CLEANCUT CONVERTIBLE INSTALLATION GUIDE

Orthopaedic Cast Material Example Book

VENCO - STANDARD PUGMILL ( NON DE-AIR )

1. Which of the following things help to take care of the environment? (Circle 3)

GEOMEMBRANE FIELD INSTALLATION

Granulators Reprocessing Plastic Scrap into Valuable Regrind. world of innovation

Drying of Medical Grade Thermoplastic Polyurethanes POLYMER SOLUTIONS

COMPRESSION WHY BETTER?

liquid heating The density of the liquid changes as its temperature increases. This causes energy to be transferred throughout the liquid.

D.P.E. Enviroliner. geotextile protection layer. covering new ground 2016

Activity Sheet Chapter 2, Lesson 3 Changes of State Condensation

HOW TO SELECT AN INDIRECT THERMAL TECHNOLOGY FOR INDUSTRIAL MATERIALS PROCESSING

WINDSHIELD REPAIR MANUAL SUPER CINCH

THE HOME OF SIZE REDUCTION COMPANY PROFILE

SEPARATING YOUR STREAMS WORKBOOK

Granulator. Features. Soundproof customer engineered products. (A User and Environment Friendly product)

2018 Year 11 Physics Week 8. Thermal Energy Transfer

OPERATIONAL & MAINTENANCE MANUAL SEM Model 5140C/4 (For units Prior to S/N: ) REV: 1

Machine Nozzles Injection Nozzle

Contents. Introduction... A Note About Heatsinks... Precautions...

DuPont Formacel Z-2. Safety and Handling of DuPont Formacel Z-2: Thermoplastic* Foam Extrusion Applications FOAM EXPANSION AGENT TECHNICAL INFORMATION

I. C O N T E N T S T A N D A R D S

Polypropylene. Formolene Polypropylene Single Screw PP Sheet Extrusion

OPERATION MANUAL. Split series room air conditioners Multi system room air conditioners FDBQ25B7V1

Transcription:

Extrusion Walkthrough Our experiences with the extrusion of polyethylene terephthalate (PET). Contents The Extrusion of PET... 2 Shredding PET... 2 Shredding PET... 3 Starting up... 3 Cleaning the extruder... 4 Extrusion results... 5 1. Result 1... 5 results & observations... 6 Conclusion... 6 2. Result 2... 7 results & observations... 7 Conclusion... 8 3. Result 3... 9 results & observations... 9 Conclusion... 9 4. Result 4... 10 results & observations... 10 Conclusion... 11 1

The Extrusion of PET This document shows the recycling process of PET. It explains how PET bottles were shredded into fine regrind with the SHR3D IT Recycler and then the subsequent extrusion in the NEXT Filament Extruder. It covers important things to keep in mind when shredding and extruding PET. Please note that this document is only an indication on PET extrusion, different grades of PET may require different settings. Material Polyethylene Terephthalate Melting point [ C] 225 Drying time [hours] 4-5 Drying temperature [ C] 160 Table 1: Thermal properties Shredding PET The PET bottles need to be shredded before they can be extruded. Startung off with cleaning the bottles, because it is important that the shredding is done with clean PET bottles without any present contaminants! The cleaning is done with hot water, scrubs and brake cleaning fluid to get rid of all the labels and the glue. When the bottles are fully cleaned, there are two final things to remove from the bottle: the cap and the safety seal. The safety seal is removed by cutting it and pulling it off the bottle (shown in figure 1). After the cleaning of the bottles is done, they left to dry (shown in figure 2). Figure 1: Removing the safety seal The bottles in their original shape are too big to be shredded in the SHR3D IT. In figure 3, 4 and 5 is shown how a vacuum pump is used to shrink the bottles. The bottles are put on punctured foam block. The opening is connected to the pipe of the vacuum pump. When the bottle is shrunk to its smallest size, it Figure 2: Drying is slightly heated to let it keep its form. The heating is only done for a few seconds on 200 C. Sometimes after this is done, the bottles can be a little bit too wide. It s easy to fold the bottles once more by putting a lot of pressure on it to let the bottle keep its folded form. Figure 3: Placing the bottle Figure 4: Shrinking the bottle Figure 5: Heating the bottle 2

After compressing, a couple of bottles are cut using a saw and some scissors. Both ways were good for cutting the bottles into smaller pieces. Both whole and cut bottles were tested. This led to a conclusion that shredding whole bottles works better. When the shredder grabs on to an object it easily pulls the whole object in the machine. When shredding cut pieces, the machine must grab on to more objects for the same volume of material. Figure 6: Cutting the bottles Shredding PET Below is the process of shredding the PET bottles in the SHR3D IT : 1. First, the SH3D IT Recycler must be cleaned. It is important that there is no old material left in the SH3D IT Recycler. If the machine isn t cleaned properly, the regrind will be contaminated with other materials. This will give bad results while extruding the shredded PET. 2. At this point, the bottles can be placed in the shredder. It is important that the opening of the bottle is pointed down while shredding. The opening of the bottle will give the shredder a good surface and edges to grab on to. 3. Sometimes the shaft won t grab on to the bottle. When this problem occurs, a solution is to push the bottle on the shaft with a stick. When the shaft experiences pressure from the bottle it will grab on to the bottle. Make sure to never use your hands to put pressure on the bottle and never put your hands in the hopper! Always use an object for pushing down the bottles. Never let the stick get close to the shaft, this can be very dangerous! 4. When the drawer is full, it is recommended to shred the whole drawer content. This will ensure a well shredded regrind (shown in figure 7). Figure 7: PET regrind and reshredded PET regrind Starting up PET is a very hydrophilic material. Therefore, the PET was dried for 4 hours at a temperature of 160 C. Meanwhile, looking at some past test with shredded PET, some previously used settings were 3

found. The temperature of these settings was raised with +- 10 C and used as a benchmark for carrying out the first set of tests. Cleaning the extruder PET and PET-G (and most other highly polar polymers) cannot stay inside the machine because both polymers are hygroscopic by nature, which means that they will absorb moisture (water) out of the atmosphere which will decrease filament quality in subsequent extrusion due to hydrolysis. Hydrolysis is a form of polymer degradation; small amounts of moisture will hydrolyse PET in the melting phase which will lead to a decrease in molecular weight. A decrease in molecular weight means a reduction in mechanical properties (i.e. more brittle materials). When hydrolysis happens covalent bonds in the polymer chains will break as can be seen in the picture below. Another reason why PET and PET-G cannot stay inside the machine is due to their molecular structure containing oxygen atoms. PET PET-G The picture above shows the molecular structure for PET and PET-G respectfully, in both cases we can see the oxygen atoms. When working at the high temperatures necessary for processing of PET and PET-G the oxygen atoms can start to attack the bonds inside the molecule which possibly leads to molecular degradation and a reduction of molecular weight and mechanical properties. 4

Before extrusion, the machine was cleaned using Devoclean standard. Then the NEXT Filament Extruder was heated up to the desired temperatures and the PET was inserted into the hopper up to the point that all the cleaning material had exited the barrel. After extrusion, the method above was used backward. Devoclean standard was ran until all the PET was out of the machine and only Devoclean was coming out of the nozzle. Devoclean standard can stay in the extruder after extrusion has finished. Extrusion results After the material is shredded and dried (shown in figure 8), its ready to be extruded. The Next filament extruder was used for the extrusion of shredded PET. Following are the test results. Here we show the settings used for every test, an observation of some samples of the filament and the conclusion of the test including advice for the settings for the next test. Figure 8: Dried PET regrind 1. Result 1 After drying the PET was prepared for extrusion. The settings used for this extrusion are visible in table 2. These settings were based on past test done with PET and the thermal properties from table 1. Test 1 (2.85 mm) Heater 1 Heater 2 Heater 3 Heater 4 Set temperature heaters [ C] 260 260 260 260 Extruder rpm 5 Filament fan speed 50% 5

Table 2: Settings test 1 results & observations Shown in figure 9 is a photo of the extrusion of PET. The extruded PET was swirling a lot. This is caused by the high temperatures used for this extrusion. To hot material is liquid and will drop past the already solid material at the fans. When it reaches the fans, it will become solid as well. This will cause the material to swirl. Most of the time, the material twitched when it reached the pullers. This made the filament jam in at the puller. The small amount of filament that was received is visible in figure 9. In figure 10 is also visible that the filament contains some bubbles. This problem is also due to the high temperatures. Conclusion The material was swirling, which is never good for a filament extrusion. The swirling and the bubbles in the filament are due to the material being too warm. Therefore, we will decrease the temperatures of heater two and one for the next test. Figure 9: PET extrusion test 1 Figure 10: Samples test 1 6

2. Result 2 To stop the filament from swirling, the temperatures of heater one and two were decreased. The settings used for this test are shown in table 3. Test 2 (2.85 mm) Heater 1 Heater 2 Heater 3 Heater 4 Set temperature heaters [ C] 240 240 260 260 Extruder rpm 5 Filament fan speed 80% Table 3: Settings test 2 results & observations The extrusion with these settings went not so great. The material came out too cold. This made the filament solidify around the nozzle, making it clog in the nozzle (shown in figure 11 and 12). After turning up the heaters a bit, the filament came out of the nozzle with a new problem. The material solidified at the edges of the nozzle, but it stayed liquid in the middle. The solid parts in the nozzle started to work as an insulator. This kept the material in the middle warm enough to keep its liquid state. The solid material at the edges of the nozzle decreased the diameter of the nozzle, giving bad test results. This problem is clearly visible in figure 13. We also found the filament still contained some bubbles now end then. This meant the material still got too hot in the barrel. Figure 11: Extrusion test 2 (1) Figure 12: Extrusion test 2 (2) Figure 13: Solidified PET in the nozzle 7

Conclusion The biggest problem we found during this test, was the nozzle being too cold for a good extrusion. The cold nozzle made the filament solidify, making the material either a sort of insulator or completely clog up the nozzle. To keep the nozzle warm enough for extrusion, we surrounded the whole nozzle with the glass wool as visible in figure 14. Another problem was the material still being too warm in the barrel. This resulted in bubbles in the filament. To stop this from happening, heater four and three were lowered. Heater one and two were increased a bit to stop the filament from becoming solid around the nozzle. We found that the filament was still swirling. PET bottles are made using injection moulding. Most materials used for injection moulding have a very low melt viscosity and have a very narrow transitioning window of being a liquid or a solid. This makes it hard to extrude these materials because in a molten state the material is very liquid and a few degrees lower will give the material a very solid state. This makes it very hard to Figure 14: Insulating the nozzle form filament without it collapsing under its own weight, as seen in the previous tests. In the following test, we will extrude filament on a diameter of 1.75 mm instead of the 2.85 mm. This will hopefully stop the filament from collapsing under its own weight. 8

3. Result 3 A couple of things changed due to the results of the previous test. The heaters were all set at 240 C, the diameter was changed from 2.85 mm to 1.75 mm and the nozzle was more insulated by the glass wool. The settings used for this test are shown in table 4 underneath. Test 3 (1.75 mm) Heater 1 Heater 2 Heater 3 Heater 4 Set temperature heaters [ C] 240 240 245 240 Extruder rpm 5 Filament fan speed 80% Table 4: Settings test 3 results & observations The filament extruded using these settings was a lot better than with the previous tests. All the bubbles were gone, the material stopped clogging in the nozzle and the filament stopped swirling. The average diameter of the filament was well around 1.75 mm. The only small problem was the filament being just a bit too cold around the nozzle. This caused some hard pieces in the filament right before the cooling was done by the fans (shown in figure 15). Figure 15: Samples test 3 Conclusion The filament had gotten a lot better with the new settings and the insulated nozzle. The only small problem was the filament having some hard pieces. To make even filament with no hard pieces, the temperature of heater four was increased in the next test. 9

4. Result 4 In the last test, good filament was extruded, with the only issue being the forming hard pieces now and then. Therefore, heater one was set on a slightly higher temperature The final settings used are shown in table 5 underneath. Test 4 (1.75 mm) Heater 1 Heater 2 Heater 3 Heater 4 Set temperature heaters [ C] 245 240 245 240 Extruder rpm 5 Filament fan speed 80% Table 5: Settings test 4 results & observations It was found that for a good extrusion, heater one is necessary to be increased by 5 C. When the temperature of heater one got above 245 C, then the filament came out too liquid and started swirling again. The filament received with these settings was good. As shown in figure 16 and 17, was the filament perfectly round and had a smooth surface. Shown in graph 1 is the filament thickness of this extrusion. Here is visible that the diameter of the filament was consistent with these settings. Figure 16: Surface view test 4 Figure 17: Section view test 4 Graph 1: Filament thickness test 4 10

Conclusion Important mentioning while extruding shredded PET is to keep the nozzle warm. This is done by insulating the nozzle with glass wool (shown in figure 18). It s also important to set heater one at least 245 C. When these precautions are not taken, some filament will most likely solidify in the nozzle and completely jam it. Making filament from shredded PET will work best if it s made with a diameter of 1.75mm. When a thicker diameter is used, the filament will probably collapse under its own weight, causing the filament to swirl and jam in the filament sensor. The filament formed using the settings is shown in figure 19 and 20 underneath. The final settings for a good extrusion of shredded PET are shown in table 6 underneath. Figure 18: Insulated nozzle Final settings (1.75 mm) Heater 1 Heater 2 Heater 3 Heater 4 Set temperature heaters [ C] 245 240 245 240 Extruder rpm 5 Filament fan speed 80% Table 6: Final settings PET extrusion Figure 19: Final filament (1) Figure 20: Final filament (2) 11