Electric Service Requirements

Similar documents
ELECTRIC SERVICE RELIABILITY IN PENNSYLVANIA 2008

ELECTRIC SERVICE RELIABILITY IN PENNSYLVANIA 2006

Westerville, OH Code of Ordinances. CHAPTER 969 Alarm Systems

New York s Electric Reliability Monitoring Utility Performance

Sec False alarms.

ARTICLE 4-13 ALARM SYSTEMS * Division 1. Generally

Standard PRC Protection System Misoperation Identification and Correction

THE STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION PREPARED TESTIMONY OF LEE LAJOIE AND BRIAN DICKIE

Standard PRC Protection System Misoperation Identification and Correction

May 27, Mayor Thomas M. Roach Members of the Common Council City of White Plains 255 Main Street White Plains, New York 10601

Article 3: Police Regulated Occupations and Businesses. Division 37: Burglary, Robbery and Emergency Alarm Systems

SECTION SECURITY TESTING AND COMMISSIONING

MANUAL OF PROCEDURE. Keys and Access Control (Standard and Electronic)

Standard PRC Protection System and Automatic Reclosing Maintenance. Standard Development Roadmap

Standard PRC 004 5(i) Protection System Misoperation Identification and Correction

Standard PRC Transmission Relay Loadability

June 2017 (Updated 18 January 2018) Fire Safety Policy. Peter Webb, Project Manager Compliance First Choice Homes Oldham Limited

ARKANSAS FIRE PROTECTION LICENSING BOARD ACT 743 OF 1977

May 27, Mayor Joanne D. Yepsen Saratoga Springs Commissioners City of Saratoga Springs 474 Broadway Saratoga Springs, New York 12866

The Machinery Directive 2006/42/EC

HESNI ANNUAL CONFERENCE May 3, 2012 Aramark Conference Center, Downers Grove

Standard PRC-005-3(i) Protection System and Automatic Reclosing Maintenance

DEPARTMENT OF PUBLIC SAFETY DIVISION OF FIRE PREVENTION AND CONTROL

Fire Inspection Frequently Asked Questions

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

FIRE AND ENVIRONMENTAL SAFETY INSPECTOR II

BIRCH RUN TOWNSHIP SAGINAW COUNTY, MICHIGAN ORDINANCE # ALARM SYSTEM ORDINANCE

Standard Development Roadmap


g) "Minor repair" means repairs dealing primarily with nonstructural portions of the fence, as well as appearance.

MONTGOMERY COUNTY RULES GOVERNING ALARMS SECTION 1. PURPOSE SECTION 2. DEFINITIONS

maintaining the health, safety and welfare of the citizens of the City and its visitors; and

Charter reference Conflicts between county and municipal ordinances, 2.01, 2.04.

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE PROTECTION SPRINKLER SYSTEM CONTRACTORS

PQS Independent type-testing protocol

Performance and Cost Data. fire services

Letter of Notification For East Lima Station Expansion Project

MUNICIPALITY OF EAST HANTS BYLAW F-500 FIRE AND BURGLAR ALARM BYLAW A BYLAW IN AMENDMENT TO BYLAW 5-1 BURGLAR ALARM BYLAW

1.0 Purpose. 2.0 Scope. 3.0 Reference. 4.0 Definitions. University Policy. Keys & Building Access Cards Policy

National Grid / DG Installation Process Guide per NY SIR / July 2011 ver. 1.0

dss PHILADELPHIA POLICE DEPARTMENT DIRECTIVE 4.11

DIVISION C ADMINISTRATIVE PROVISIONS

DRIVEWAY REGULATIONS

IC Chapter Severe Weather Warning Sirens

S T A T E O F F L O R I D A D E P A R T M E N T O F J U V E N I L E J U S T I C E BUREAU OF MONITORING AND QUALITY IMPROVEMENT PROGRAM REPORT FOR

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

City of Regina Alarm Bylaw

Centexbel. General certification regulations. Construction products

Electrical Safety Policy and Management System

CITY OF MEDINA OFFICE OF THE HEARING EXAMINER

BY-LAW NO THE CITY OF BRANDON Fire Prevention Division Phone: (204) Fax: (204)

Supplier Handbook. InSinkErator st Street Racine, WI

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

FORT MYERS BEACH FIRE DEPARTMENT JOB DESCRIPTION

OPUCN CUSTOM INCENTIVE RATE PLAN PERFORMANCE REPORT

PENALTIES. All imported products are required to meet the same standards as domestic goods. National Safety Requirements. Customs Requirements

CHAPTER 91: ALARM SYSTEMS

CITY OF MORRO BAY PUBLIC SERVICES DEPARTMENT 955 SHASTA AVENUE. MORRO BAY, CA

BRL-K21030/02 5 August Certification of Alarm Communication. Certification Alarm Transmission Systems (ATS) Alarm Transmission Systems

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

C-I-10. The effect of establishing a comprehensive site review as follows will: B. Reduce the cluttered aspects of current development by:

Authorized individuals to be notified. Include two (2) persons with access to the premises to allow emergency access.

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Neo-Traditional Overlay Application

FINAL REPORT ON THE 4 TH JOINT CROSS-BORDER EMC MARKET SURVEILLANCE CAMPAIGN (2011) LED LIGHTING PRODUCTS

Can You Hear Me Now?

S T A T E O F F L O R I D A D E P A R T M E N T O F J U V E N I L E J U S T I C E BUREAU OF MONITORING AND QUALITY IMPROVEMENT PROGRAM REPORT FOR

OHIO UNIVERSITY RADIATION SAFETY REVIEW

June 4, 2014 VIA ELECTRONIC FILING. Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C.

ite the correct module for the programme for which they have registered. 1 April in first semester and 1 September in second semester

LEE COUNTY ORDINANCE NO

City of Fort Lupton Site Plan Process

Standard PRC-005-3(X) Protection System and Automatic Reclosing Maintenance

Medical Gas and Vacuum Systems

36 months or more 12 months

Standard PRC-005-X Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

CTC Meeting #27 JUNE 17 18, 2013 NIST report on the Charleston sofa store fire

Glenborough at Easton Land Use Master Plan

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan

Computer Room Guard Model VM Manual and Installation Instructions

Project phasing plan (if applicable) 12 copies of site plan

4. Applicability: 4.1. Functional Entities: 4.2. Facilities:

(1135/2016) Translation from Finnish Legally binding only in Finnish and Swedish Ministry of Economic Affairs and Employment, Finland

Tennessee Code/TITLE 62 PROFESSIONS, BUSINESSES AND TRADES/CHAPTER 32 FIRE PROTECTION/PART 1 FIRE PROTECTION SPRINKLER SYSTEMS

National Industrial Security Monitoring Station Evaluation

Stormwater Program Coordinator: Title: Office Phone #: Emergency Phone #: Public Notice Coordinator: Title: Office Phone #: Emergency Phone #:

This chapter shall be known as the "City of Bayfield Alarm Systems Ordinance."

Standard PRC-005-4(X) Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

PART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision...

6/23/ National Electrical Contractors Association and Intec, Inc.

ITS Concept Development Activity Descriptions

Electrical Safety Program.

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan

FIRE DEPARTMENT PERMIT GUIDELINES

THE REGIONAL MUNICIPALITY OF HALTON POLICE SERVICES BOARD BY-LAW

BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION DOCKET NO EI

Can You Hear Me Now?

Chief Operating Officer Giampiero Belcredi

Conditions for the provision of services Valid from 1 November only for the Jablotron Alarms series of alarms

Transcription:

Electric Service Requirements Peter Baker Section Chief in the Reliability and Service Analysis Division Service Monitoring & Enforcement Department Rob Fadley Chief, Facility and Operations Field Division Service Monitoring & Enforcement Department

General Outline of Presentation Peter Baker Electric Service Availability Power Quality Service Reliability Rob Fadley Maintenance Programs Field Inspection Process

Electric Service Availability Obligation to Serve Each electric utility has been assigned a given territory with designated boundaries. The utility is obligated to provide electric service to all qualifying customers within its territory. A utility can change its boundaries upon approval from the Public Utilities Commission of Ohio (PUCO).

New Service Availability (Continued) Line Extensions The utility may need to extend its lines to serve a new customer. The new customer may need to pay part of the line extensions cost. Line extension requirements are specified in the utility s line extension tariff, which is governed by a PUCO rule. Below is a link to that rule. http://codes.ohio.gov/oac/4901:1-9-07

New Service Availability (Continued) The PUCO has adopted standards for new-service installation time. 99 percent of new service requests requiring no construction shall be completed within three business days (after the customer notifies the utility that the location is ready for service). 90 percent of new service requests requiring construction shall be completed within ten business days (after the customer notifies the utility that the location is ready for service). Primary line extensions are excluded from these requirements. Primary line extensions are those requiring construction on the utility s side of the customer transformer. Here is a link to the applicable rule: http://codes.ohio.gov/oac/4901:1-10-09

Power Quality The PUCO has adopted rules requiring each electric utilities to: Adopt nominal voltages established by the American National Standards Institute in its Standard C 84.1 File with the Commission (as part of its tariffs) the nominal service voltages available to customers Use proper equipment and procedures to maintain voltage levels within specified limits. Investigate voltage fluctuations, take corrective action to restore voltage levels if the fluctuations are under the utility s control, and document those actions. Here is a link to the applicable rule: http://codes.ohio.gov/oac/4901:1-10-04

Service Reliability Service Reliability Topics to be Discussed Reliability Measures Reliability Standards Worst-Performing Circuits

Reliability Measures The PUCO measures reliability using SAIFI and CAIDI SAIFI represents the average number of interruptions per customer. CAIDI represents the average time to restore service to interrupted customers. SAIFI and CAIDI calculations are based on sustained interruptions, which involve a complete loss of power for over five minutes. SAIFI and CAIDI calculations exclude data for major events and transmission outages, which are reported separately. Here is a link to the applicable rule: http://codes.ohio.gov/oac/4901:1-10-10

Reliability Measures (Continued) Excluding Major Events Previously, utilities were required to exclude major storms from performance data, and each utility was allowed to develop its own major storm definition. As a result, there were variations among utilities on how their major storm exclusions affected their performance. To address this problem, the Institute of Electrical and Electronics Engineers (IEEE) developed the 2.5 Beta methodology for establishing a standardized major event threshold. The 2.5 Beta method is a statistical methodology which excludes any day when the average duration of interruptions across a utility s system is more than 2-1/2 standard deviations above the mean for the past five years. The current PUCO rules adopt the IEEE methodology

Reliability Standards The PUCO has established reliability standards for each electric utility. These standards apply to performance across the utility s entire Ohio distribution system. The standards were initially established in 2010 and remain in effect until the utility applies for new standards. Previously, PUCO rules provided for reliability targets, but missing a target was not considered a violation. Under the current rules, however, missing a reliability standard in two consecutive years constitutes a rule violation.

Reliability Standards (Continued) The standards are based on the following factors: Historical system performance (primary factor); System design; Technological advancements; Service area geography; and Customer perception surveys.

Reliability Standards (Continued) Reliability Surveys Each electric utility is required to conduct a periodic survey to measure customers reliability perceptions and expectations. The survey is paid for by the utility, and is developed and conducted under Staff supervision. The survey results are considered in the establishment of performance standards.

Reliability Standards (Continued) Establishing Reliability Standards Each electric utility must file a reliability standards application that includes: A methodology for establishing reliability standards; The proposed standards resulting from that methodology; and A justification for the proposed standard.

Reliability Standards (Continued) The legal process to establish the standards includes the following steps: 1. A technical conference is convened to explain the utility s application 2. Twenty days after the conference, interested parties file comments on the application 3. Thirty days after the conference, the PUCO Staff files comments on the application 4. Fifty days after the conference, the utility and interested parties file reply comments 5. After comments are filed, the commission may order a hearing, where interested parties may participate once they are granted permission. 6. The new standards are adopted when the Commission issues an order approving them.

Reliability Standards (Continued) Compliance Requirements Each electric utility is required to file an annual report of its reliability performance compared to reliability standards. If the utility misses one of its reliability standards, it must submit an action plan to improve performance. If the utility misses the same performance standard two years in a row, it is considered out of compliance with the rule.

Reliability Standards (Continued) The annual reliability report must contain the following information: The utility s performance compared to standards; Additional data that supports reliability performance data; A listing of outages that were excluded from the calculation; and An analysis of outages by cause; The utility submits its report using an electronic form prescribed by the PUCO Staff

Reliability Standards (Continued) Staff monitors each utility s performance against its reliability standards If the utility meets its standards, Staff would still look for any adverse performance trends. If performance misses the standard, Staff would assess the sufficiency of the utility s action plan for improving performance. If the utility misses a standard two years in a row, Staff would investigate the circumstances and recommend any needed enforcement action, which could include: Corrective action to return to compliance Restitution to customers Fines up to $10,000 per day

Reliability Standards (Continued) To ensure the Validity and Authenticity of the reported reliability performance: The annual reliability report must also include the components used in the formula to calculate that performance; The report must also include an analysis of outages by cause and a listing of excluded outages, which must be consistent with the data used to calculate reliability performance Finally, Staff has audited the utilities exclusion of major events to verify accuracy

Reliability Standards (Continued) Sample Report

Reliability Standards (Continued) Sample Report (Continued)

Reliability Standards (Continued) Sample Report (Continued)

Reliability Standards (Continued) Example of Staff Analysis

Worst Performing Circuits A distribution circuit includes the wires that extend from the distribution substation to each of the customers served by that circuit. Each electric utility is required to submit (for Staff s review and acceptance) a method for measuring the performance of its distribution circuits. That method must include SAIFI and CAIDI, but may also include other factors as well. Once the method is accepted, the utility must use it to rank its circuits in terms of their performance. The utility must include its eight-percent worst-performing circuits in an annual report to Staff. Here is a link to the applicable rule: http://codes.ohio.gov/oac/4901:1-10-11

Worst Performing Circuits (Continued) The annual report must include the following: The circuit ID number, location, and number of customers; The circuit ranking value; The circuit s SAIFI, SAIDI, and CAIDI performance; The number of safety and reliability complaints; The number of critical customers on the circuit; A listing of circuit lock-outs with associated cause and duration; A listing of outages by cause with associated frequency and customer minutes interrupted; Identification of major factors causing the circuit to be reported; and An action plan to remove the circuit from the report within the next two reporting periods.

Worst Performing Circuits (Continued) Staff Compliance Activities Staff identifies those circuits that appear on the report in consecutive years; For those circuits, Staff analyzes outage causes and the utility s remedial action plans to see if they are sufficient to remove the circuit; If a circuit remains on the report for three consecutive years, it is presumed out of compliance (unless the utility can rebut that presumption). For those circuits, Staff would investigate the circumstances and recommend any enforcement action

This concludes my portion of this presentation. Are there any more Questions on Service Availability, Power Quality, and Service Reliability? Next, Rob Fadley will discuss required Maintenance Programs and Staff s Inspection Activity.

Facilities and Operations Field Division (FOFD) Field inspections for all four major utility functions: Electric Natural Gas Pipeline Telephone Water/Wastewater Outage Reporting

Electric Utilities Three types of field inspections/audits: Rule 11 (OAC 1-10-11) Rule 6 (OAC 1-10-6) Rule 27 (OAC 1-10-27)

Rule 11 Worst Performing Circuits Annual Report Action Plan to remove circuit from the list Examples Include: Lightening Mitigation Vegetation Clearance Etc. Inspect/Audit Verify Actions Taken

Rule 6 National Electric Safety Code (NESC) Institute of Electrical and Electronic Engineers (IEEE) NESC sets the ground rules for practical safeguarding of persons during the installation, operation, or maintenance of electric supply & communication lines & associated equipment. It contains the basic provisions that are considered necessary for the safety of employees & the public under the specified conditions. http://standards.ieee.org/about/nesc/

Rule 6 National Electric Safety Code (NESC) Clearances Relations

Rule 27 Maintenance Plans Inspections, Maintenance, Repair, and Replacement Submitted to Commission 45 Day approval Updated as needed These programs shall establish preventative requirements for the electric utility to maintain safe and reliable service.

Rule 27 Maintenance Plans Seven (7) types of facilities: Poles and Towers Circuit and Line Inspections Primary & Secondary Enclosures Line Reclosers Line Capacitors Vegetation Control Substations

Rule 27 Maintenance Plans AUDITS Desk Audits Review Plan Compliance Documentation Interview Employees Field Audits Verifications Post-Inspection Audit

Outage Reporting Email: OutageReport@puc.state.oh.us Reporting Thresholds: 2,500+ Customers, 4+ Hours 100+ Customers, 24+ Hours Other utility facility, 4+ Hours or affects public safety Interruption to police/fire/hospital/9-1-1 System, 4+ Hours