Calmeca Academy of Fine Arts and Dual Language

Similar documents
Agustin Lara Elementary Academy

Charles W Earle Elementary School

Richard Henry Lee Elementary School

Oscar DePriest Elementary School

Josefa Ortiz De Dominguez Elementary School

Edward Jenner Elementary Academy of the Arts

Washington Irving Elementary School

Joseph Brennemann Elementary School

Genevieve Melody Elementary School

Sidney Sawyer Elementary School

DeWitt Clinton Elementary School

John Palmer Elementary School

Francis M McKay Elementary School

George B Swift Elementary Specialty School

Alessandro Volta Elementary School

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

2014 Bond Project Guide

NYC Department of Education

Mechanical Inspection Plumbing

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

NYC Department of Education

NYC Department of Education

RECAPP Facility Evaluation Report

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

NYC Department of Education

NYC Department of Education

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

PLAN REVIEW SUBMITTAL GUIDE

NYC Department of Education

NYC Department of Education

Master Facility Planning Update School Board Meeting May 26, 2016

NYC Department of Education

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

NYC Department of Education

Briar Crest Elementary

Florence High School / Middle School Page 1 of 3 Florence, WI

NYC Department of Education

DOCUMENT TABLE OF CONTENTS

New High School Concept

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

RECAPP Facility Evaluation Report

Cook - Wissahickon Elementary School

NYC Department of Education Building Condition Assessment Survey :49AM :00PM

Estimated Repair, Replacement, and Upgrade Costs

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

NYC Department of Education

NYC Department of Education

1354 CHECKLIST for Project Closeout

NYC Department of Education

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

NYC Department of Education

NYC Department of Education

PLATTEVILLE MIDDLE SCHOOL

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

NYC Department of Education

NYC Department of Education

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

NYC Department of Education

RECAPP Facility Evaluation Report

NYC Department of Education

NYC Department of Education

NYC Department of Education

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

Mechanical System Description

NYC Department of Education

RESERVE DATA ANALYSIS est.1983

NYC Department of Education

NYC Department of Education

Ashland School District Facility & Capacity Assessment Report 2005

NYC Department of Education

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

$ Each additional variance per petition. $ All Other Zoning Districts: One variance per petition

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

RECAPP Facility Evaluation Report

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. : The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. : The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Metal Canopy CHIMNEY 6 GRE 6 1,112 7 1,112 SF $26,762 $26,762 Metal Flue 6 7 6 16 LF Assessment Date: 4/3/2013 Page 1 of 16

DOORS Exterior Steel Door Overhead Rolling / Garage Door Store Front Door 6 GRE 6 9 7 5 9 EA $2,973 15 EA $2,973 ENTRANCE Entrance Controls - Audio and Video Power Door Operator and Controls 6 7 GRE 7 3 GRE 7 6 3 EA 6 EA FOUNDATION Concrete Foundation 6 7,298 1,298 LF LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted 6 GRE 6 1 5 7 GRE 6 24 7 6 EA $6,221 3 $5,148 $11,369 LINTELS Lintels - Steel 6 7,134 1,134 LF PARAPET Coping - Metal 6 7,390 1,390 LF Assessment Date: 4/3/2013 Page 2 of 16

Coping - Stone Parapet < 16" Height Parapet > 30" Height Parapet 16" to 30" Height ROOF SYSTEM 60 65 60,085 160 LF 165 LF 160 LF 1,085 LF PVC Membrane Roof Roof Structure: Steel/Metal Deck/Concrete Topping 6 7 GRE 7 40,609 GRE 7 40,609 40,609 SF 40,609 SF SUPERSTRUCTURE Steel 6 7 WALLS Brick Prefabricated Metal Panel Wall Stone - Cast 6 7 GRE 7 44,654 GRE 6 1,330 6,979,449 44,654 SF 8,309 SF $11,297 1,449 SF $11,297 WINDOWS Curtain wall - Glazed Double Pane Window - Guards perforated Window - Guards wire guard Windows - Casement Aluminum Double-pane EXTERIOR 6 7 GRE 7 6,105 GRE 6 2,408 33 GRE 7 7,827 6,105 SF 2,408 SF 233 SF 7,827 SF $52,401 Assessment Date: 4/3/2013 Page 3 of 16

ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency generator 150 KW -200 KW natural gas - Indoor Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Public Announcement System Security System - CCTV Security System - Intrusion detection 6 7 GRE 7 3 7,152 GRE 7 8,605,621 GRE 6 1 GRE 6 47 GRE 6 7 5 BLU 5 108,624 3 EA 17,152 SF 8,605 SF 2,621 SF $14,372 47 EA $10,955 1 $1,632 $310,665 $337,623 MAIN SERVICE Main Electrical service - Live Front - 2000 to 3000 A 277/480/3PH POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp Main distribution panels less than 400 amp Transformers 277/480-120/208 ELECTRICAL 6 GRE 6 1 6 GRE 6 27 GRE 6 3 GRE 6 11 GRE 6 1 GRE 6 4 7 7 $30,388 $30,388 27 EA $19,305 3 EA $4,290 1 $23,595 $1,216 4 EA $4,576 $52,982 $420,992 Assessment Date: 4/3/2013 Page 4 of 16

FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System Fire Pump Controller 6 7 PUMP ROOM ASSEMBLY Fire Pump 50-75hp Jockey Pump 6 7 SPRINKLER SYSTEM Combination Wet and Dry Sprinkler System Sprinkler Heads FIRE PROTECTION 6 7 MECHANICAL AIR CONDITIONING Chillers - Air Cooled - Rotary/Screw type - Roof Mounted 100 to 200 tons Condensing - Roof Mounted less than 5 tons 6 7 AIR HANDLING SYSTEMS Air Handling Package - Single Zone - Hot Water 12,001 to 20,000 cfm 6 GRE 6 1 7 $7,579 Assessment Date: 4/3/2013 Page 5 of 16

Air Handling Package - Single Zone - Hot Water 8,001 to 12,000 cfm Air Handling Package - Single Zone - Hot Water above 30,000 cfm Air intake for all Air Handling s except built up AHU Return Duct Work - Sheet Metal - Exterior Vertical Shaft and Ducts Return Fans - Indoor 10,001 to 20,000 CFM Return Fans - Indoor greater than 20,000 CFM Variable Air Volume (VAV) Box With Hot Water Coil BOILER SYSTEMS GRE 6 2 GRE 6 1 GRE 7 400 GRE 7 61 $12,584 $21,450 400 LF 6 $41,613 Boiler Assembly - Condensing Hot Water Boiler 1,001MBH-2,000 MBH Boiler Auxiliary - Condensing Hot Water Boiler 1,001MBH-2,000 MBH Chemical Pot Feeder - Hot Water Glycol Feed System 6 7 HEATING DEVICES Cabinet Heaters With Hot Water Coils Radiators - Hot Water Heater - Electric Heater - Hot Water 6 7 GRE 7 8 GRE 7 6 GRE 7 7 8 EA 6 EA 7 EA MECHANICAL PLUMBING Piping - Hydronic Supply and Return - Steel or Galvanized Pumps - Chilled Water 10 to 20 HP Pumps - Hot Water 5 to 10 HP Pumps - Hot Water less than 5 HP 6 7,000 GRE 7 4 1,000 LF 4 EA Assessment Date: 4/3/2013 Page 6 of 16

TEMPERATURE CONTROL Direct Digital Control (DDC) System Thermostats - Direct Digital Control (DDC) 6 GRE 6 108,624 7 GRE 7 75 $108,733 75 EA $108,733 VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof mounted less than 500 CFM Type II Exhaust Hood - Warming Kitchen MECHANICAL 6 7 GRE 7 7 GRE 7 3 7 EA 3 EA $150,346 PLUMBING HOT WATER Hot Water Heater - Gas more than 300,000 BTU/HR 6 7 PIPING Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines 6 7 Assessment Date: 4/3/2013 Page 7 of 16

Sanitary Piping Storm Piping Vent Piping PUMPS Domestic Booster Pump duplex Sump Pump PLUMBING 6 7 GRE 6 1 $1,359 $1,359 $1,359 INTERIOR ADMINISTRATIVE SUITES Ceiling - Lay-In Flooring - Carpet Flooring - Terrazzo Flooring - Tile/Sheet Lighting - Lay-In Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall 6 7 GRE 7 4,321,001 GRE 7 345,975 GRE 7 54 2 GRE 6 5,977 1,390,975 4,321 SF 2,001 SF 345 SF 1,975 SF 54 SF 12 SF 7,367 SF $17,094 1,975 SF $17,094 AUDITORIUM - DEDICATED Stage Platform 6 GRE 6 993 7 993 SF $4,217 $4,217 Assessment Date: 4/3/2013 Page 8 of 16

DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Store Front Door 6 7 GRE 7 97 GRE 7 77 GRE 7 350 GRE 7 9 97 EA 77 EA 350 SF 9 EA DRINKING FOUNTAINS Triple Fountain 6 7 GRE 7 6 6 EA GYMNASIUM / AUDITORIUM Bleacher Seating Ceiling - Exposed Ceiling - Lay-In Flooring - Wood Lighting - Metal Halide/Sodium Vapor Scoreboards Stage Curtain Walls - Concrete Block 6 7 GRE 7 75 GRE 7 4,120 77 GRE 7 4,397 GRE 6 20 0 GRE 7 8,356 75 EA 4,120 SF 277 SF 4,397 SF 20 EA $3,575 10 EA 8,356 SF $3,575 KITCHEN Ceiling - Lay-In Flooring - Concrete Lighting - Lay-In Wall - Concrete Block 6 GRE 6 1,030 GRE 6 1,030 7 2 GRE 6 1,204 1,030 SF $2,946 1,030 SF $4,861 12 SF 1,204 SF $3,443 $11,250 Assessment Date: 4/3/2013 Page 9 of 16

LIBRARY Casework Flooring Carpet Lighting - Lay-In Lighting - Pendant/ Surface 6 7 00 GRE 7 3,760 GRE 7 4 GRE 7 48 200 LF 3,760 SF 4 SF 48 SF LOCKER/SHOWER ROOM Showers 6 7 LUNCHROOM Ceiling - Lay-In Flooring - Tile/Sheet Lighting - Lay-In Lighting - Pendant/Surface Serving Line Wall - Concrete Block Wall - Structural Glazed Tile 6 7 GRE 7 4,208 GRE 7 4,208 GRE 7 56 8 GRE 7 30,786,283 4,208 SF 4,208 SF 56 SF 18 SF 30 LF 1,786 SF 1,283 SF MDF/IDF Finishes Ventilation and Cooling 6 7 GRE 7 330 330 SF Assessment Date: 4/3/2013 Page 10 of 16

MECHANICAL/SERVICE ROOMS Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room 6 7 GRE 7 3,000 GRE 7 7 GRE 6 58 5,015 GRE 6 132 2,124 3,000 SF 7 SF 5,073 SF $274 2,256 SF $623 $897 MUSIC ROOM Sound Panels 6 7 GRE 7 560 560 SF STAFF RESTROOM Accessories Ceiling - Lay-In Ceiling - Plaster/Drywall Floor Drain Flooring - Tile Ceramic/Porcelain Hand Dryer Lavatory Lighting - Lay-In Partitions Urinals Wall - Concrete Block Wall - Tile Ceramic/ Porcelain Water Closet 6 7 GRE 7 4,066 GRE 7 3,976 GRE 7 90 GRE 7 41 GRE 7 4,066 GRE 7 36 GRE 7 64 60 GRE 7 36 GRE 6 4 8 GRE 6 1,392 9,910 02 GRE 7 52 4,066 SF 3,976 SF 90 SF 4 4,066 SF 36 EA 64 EA 160 SF 36 EA 1 $1,487 11,302 SF $3,981 102 SF 5 $5,468 Assessment Date: 4/3/2013 Page 11 of 16

VERTICAL CONVEYANCE Elevator - Roped Holeless Hydraulic Stage Lift 6 7 VOCATIONAL SHOP Work Sink INTERIOR 6 7 0 10 EA $42,501 ROOM CASEWORK Casework 6 7,506 1,506 LF CEILING Lay-In/Drop 6 7 GRE 7 35,259 35,259 SF CLASSROOM Eye Wash Station Laptop Charging Station Science Lab Elements 6 7 GRE 7 5,360 5 EA 1,360 SF Assessment Date: 4/3/2013 Page 12 of 16

CORRIDORS Concrete Block Drop/Lay-In Exposed Lay-In Pendant/Surface Stair Handrails Student Lockers Terrazzo Tile/Sheet Flooring Wall Mounted 6 7 GRE 7 32,076 0,916,326 6,556,326 48 GRE 7 751 6,556,326 GRE 7 418 32,076 SF 10,916 SF 1,326 SF 16,556 EA 1,326 EA 148 LF 75 16,556 SF 1,326 SF 418 EA CORRIDORS CEILING Plaster/Drywall 6 7 10 210 SF FLOOR Tile/Sheet 6 7 GRE 7 35,259 35,259 SF LIBRARY_CEILING Drop/Lay-In 6 7 GRE 7 3,760 3,760 SF LIBRARY_WALL Concrete Block 6 7 50 250 SF Assessment Date: 4/3/2013 Page 13 of 16

Plaster/Drywall,900 2,900 LIGHTING Lay-In Pendant/Surface 6 7 1 GRE 7 712 1 71 MARKER BOARD Marker Board 6 7 GRE 7 656 656 LF STAIRS Terrazzo 6 7 GRE 7 96 96 SF WALL Concrete Block Metal/Folding Panel Plaster/Drywall ROOM 6 7 GRE 6 4,628 11,315 GRE 7 530 GRE 6 3,118 16,870 15,943 SF $13,236 530 SF 19,988 SF $7,357 $20,593 $20,593 SITE CIVIL/DRAINAGE Catch Basin 6 GRE 6 9 7 9 EA $4,891 $4,891 Assessment Date: 4/3/2013 Page 14 of 16

FENCING Ornamental Iron 6 7,821 1,821 LF LANDSCAPE Benches Grass Hardscape - Concrete Hardscape - Pavers Parkway trees Planting Beds/ Areas Trash Receptacles 6 7 3 GRE 6 80,809,357 GRE 7 4,663 GRE 6 11 GRE 6 8,641 22,159 GRE 6 8 13 EA 80,809 SF $32,356 1,357 SF 4,663 SF 1 $3,146 30,800 SF 8 EA $1,661 $37,163 PARKING LOT Concrete Concrete Curbs Lights, Pole Mounted Pavers Trash Compactor PLAYGROUND 6 GRE 6 3,731 GRE 6 469 GRE 6 41 GRE 6 8,526 GRE 6 1 7 3,731 SF 469 LF $2,830 4 $46,904 8,526 SF $3,575 $53,309 Playground Equipment - School Age 5-12 Playground Surfacing - Poured Surface 6 7,941 2,941 SF Assessment Date: 4/3/2013 Page 15 of 16

SIDEWALKS Internal Walks Perimeter Sidewalks 6 7,405 GRE 6 7,654 2,405 LF 7,654 SF $14,448 $14,448 SIGNAGE Flag Pole SITE Campus Need ² ³ 6 7 $109,811 $798,002 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 4/3/2013 Page 16 of 16