COMBUSTION AIR SYSTEM

Similar documents
BIG BOOT COMBUSTION AIR KIT Model: CAS-2BB, CAS-2CB, CAS-2B375

COMBUSTION AIR SYSTEM Model: CAS-3

READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY BEFORE PROCEEDING WITH THE INSTALLATION.

120 VAC SYSTEM CONTROL KIT

SYSTEM CONTROL KIT READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY BEFORE PROCEEDING WITH THE INSTALLATION.

SYSTEM CONTROL KIT Model: CK-41P

120 VAC SYSTEM CONTROL KIT Model: CK-63

24 VAC SYSTEM CONTROL KIT Model: CK-91F and CK-91FG

POWER VENTER SYSTEM MODEL: PVO-300, PVO-600

POWER VENTER SYSTEM. Model: PVG-100, PVG-300, PVG-600

SIDEWALL POWER VENTING KIT

SIDEWALL POWER VENTER KIT

Instruction manual. Carlin Combustion Technology, Inc. 70 Maple Street East Longmeadow, MA Ph Fx

COMBUSTION AIR SYSTEM

EUTECTIC EC-10DV Series

MODEL HS115-3, HS115-4 & HS115-5 WIRING DIAGRAM ADDENDUM

POWER VENTER SYSTEM. Model: PVO-300, PVO-600

24 VAC SYSTEM CONTROL KIT

SIDEWALL POWER VENTER KIT

Sound Cover [ , , , ]

POWER VENTER. Model: PVE Series

Please Read and Save These Instructions.

120 VAC SYSTEM CONTROL KIT

e Heater/Exhaust Fan/Light User s Guide

Z-VENT MODEL SVE SERIES III INSTALLATION AND MAINTENANCE INSTRUCTIONS

ELECTRONIC FIREPLACE DAMPER

INSTRUCTION MANUAL HS-229G

MODEL CDB8 INSTALLATION INSTRUCTIONS

e Bath Fan with Light User s Guide

Do not use this vent pipe or fittings for venting incinerators of any kind.

ELECTRONIC FIREPLACE DAMPER

DUST FREE CARBON Whole House Air Purifier

e Bath Fan with Light User s Guide

e Bath Fan with Light User s Guide

DBF 4XL Dryer Booster Fans

Patent Pending invent for New Construction

NATURAL GAS MODELS: SGC-36N/SGC-48N/SGC-60N/SGC-72N SGR-24N/SGR-36N BARBECUE - CARE AND USE

Venting Supplement. Direct Vent Through-Roof or Through-Unused-Chimney. Water Boiler Series 3 & 4

INSTALLATION, OPERATION AND MAINTENANCE

Installation & Maintenance Instructions

CVS Model Inline Multi-Port Ventilators

TECHNICAL ASSISTANCE TOLL FREE TELEPHONE NUMBER TECHNICAL ASSISTANCE FAX:

RL Series Commercial/Residential Ventilation Fan Installation Instructions Please Read And Save These Instructions.

Oil Fired Unit Heaters September, 2008

Fire Bowls and Fire Bowl Inserts (Automated Operation) Operating and Maintenance Instructions

Instruction Leaflet. Read instructions before operating. Retain for future reference.

DEDPV-705, DEDPV-705 Hi Alt Dryer Exhaust Duct Power Ventilator (DEDPV)

BUNN A10 & A10-A BUNN-O-MATIC CORPORATION POST OFFICE BOX 3227 SPRINGFIELD, ILLINOIS PHONE: (217) FAX: (217)

Installation Instructions

Installation and Maintenance "L" and "LS" Series

DISCARD DECANTER IF: FAILURE TO COMPLY RISKS INJURY FUNNEL CONTENTS ARE HOT ILLUSTRATED PARTS CATALOG

SUNCOURT INSTALLATION INSTRUCTIONS RADON FAN MODEL: RDKO4, RDK04-3, RDN04 & RDN04-3

Instruction Leaflet. Read instructions before operating. Retain for future reference.

SSF1610B-CN TRUSTED FOR OVER 100 YEARS. 16 inch (40cm) Oscillating. Stand Fan. Instruction Leaflet PLEASE READ AND SAVE THESE IMPORTANT INSTRUCTIONS

IMPORTANT INFORMATION - PLEASE READ CAREFULLY

Installation Manual. THM-0100 Setpoint Thermostat Version THM HBX Control Systems Inc.

Instruction Manual. Astro Staging Cabinet

B.I.C.A Built-In Coffee Appliance

IMPORTANT INFORMATION - PLEASE READ CAREFULLY

TJERNLUND PRODUCTS, INC.

MOJAVE. Mojave ShowerSpa Model #1016 Owner's Manual

THARRINGTON OIL FIRED ROOM HEATERS MODELS 5135, 5160, R35, 10R60, 13R75 FEATURES SAFETY NOTICE

Leisure Line Power Vent Operations & Maintenance Manual And Safety Instructions

Instruction Manual. Portion Cup Cheese Warmer

24 VAC SYSTEM CONTROL KIT

Discontinued Old-Style Switch

Vent Supplement Ultra-80, -105, -155, -230 & -310

DISCARD DECANTER IF: FUNNEL CONTENTS ARE HOT FAILURE TO COMPLY RISKS INJURY

Installation Manual NPE-180A/240A WARNING. Add-on Controller Installation Kit

Installation Instructions PP-AS20 Anti-Scale System

Wrap-Around TOTE Tank / IBC Heaters (TOTE and TOT Series)

Owner s Manual Hydro-X Vacuum Pac

BUNN CWT-CS CWTF-CS BUNN-O-MATIC CORPORATION POST OFFICE BOX 3227 SPRINGFIELD, ILLINOIS PHONE: (217) FAX: (217)

INSTALLATION AND MAINTENANCE INSTRUCTIONS. 1700ºF Air-Cooled and Insulated ECO-STEEL Chimney Size 13

(The chances are you re never going to read me) Owner s Manual. Model S10E.

Hot Dog Roller Grills

OPERATING MANUAL/ INSTALLATION

FLASH XTRACTOR II NEXT GENERATION SUB-SURFACE FLOOD EXTRACTION TOOL AC002

Humidistat-Thermostat

Instruction Manual. Nacho Cheese Dispenser and Warmer

INSTALLATION MANUAL VISUAL PERFORMANCE RECTANGLE SPEAKERS. Introduction. Box Contents. Speaker Placement. Surround Speakers (5.

Corn Flame Energy Corn Stove Model 3000

SONANCE ORIGINAL SERIES MEDIUM IN-WALL SPEAKERS

TURBO Fiberglass Cone Fan and Grill Fan 48'' Belt Drive. Installation & Operator s Instruction Manual

Leisure Line Power Vent Operations & Maintenance Manual And Safety Instructions

FOR EASY, FAST INSTALLATION AND FOR RESULTS

TRU-TEMP VALVE. Tru-Temp Pressure Balance 1/2" Rough-In Valve Owner's Manual 3001-RIV-PB-ORB 3001-RIV-PB-BN 3001-RIV-PB-CH 3003-RIV-PB-ORB

INSTALLATION, OPERATION & MAINTENANCE AVANTCO SERIES 177AG OWNER S MANUAL

READ AND SAVE THESE INSTRUCTIONS

Honeywell Garrett Drop-in Intercooler for 2.3L Mustang EcoBoost IMPORTANT INFORMATION - PLEASE READ CAREFULLY

XT Series Thermostats

GRAND EFFECTS Fire-Water Bowls Model 100

Heater Installation Kit

SPA BLOWER OWNER'S MANUAL XXXX, XXXX, XXXX, XXXX, XXXX, XXXX fax

MCD. Corona Discharge Ozone Generators MANUFACTURED BY Bullock Lane San Luis Obispo, CA

OPERATION, SERVICE & PARTS MANUAL

SEABREEZE. SeaBreeze Rain Shower System Model #1086-CH Owner's Manual

4000IS PROFESSIONAL IRONING SYSTEM INSTRUCTION MANUAL

Fire-Water Bowls Model 100

Installation Manual WARNING. Add-on Controller Installation Kit NPE-180A/210A/240A

Transcription:

COMBUSTION AIR SYSTEM MODEL: CAS-2WM WEIL-MCLAIN OUTSIDE AIR KIT FOR USE WITH OIL BURNER MODELS QB-180 & QB-300 4" VRV 4" IAH HOOD AIR BOOT TM The Air Boot model CAS-2WM is for use only on the designated burner(s) as described in these instructions only when the specific burner includes this Air Boot when shipped from the burner manufacturer or where the burner instructions specifically reference the model CAS-2WM Air Boot as an optional air intake system. ITEMS INCLUDED IN KIT: 1 - Air Boot 1-4" VRV (Vacuum Relief Valve) 1-4" IAH Hood 1 - Set of Gaskets 1 - Burner Coupling Set 2 - Mounting Bolts INSTALLER SUPPLIED ITEMS: Air Duct Pipe and Elbows as needed - use 4" Dryer Venter, Aluminum or Galvanized Steel 1 4" NPT 90 street ell for oil line, if needed Exterior rated caulk, silicone sealant, or equivalent READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY BEFORE PROCEEDING WITH THE INSTALLATION. This device MUST be installed by a qualified agency in accordance with the manufacturer's installation instructions. The definition of a qualified agency is: any individual, firm, corporation or company which either in person or through a representative is engaged in, and is responsible for, the installation and operation of HVAC appliances, who is experienced in such work, familiar with all the precautions required, and has complied with all the requirements of the authority having jurisdiction. Please retain these instructions after installation. Installed By: Phone: Installation Date: www.fieldcontrols.com

THE PURPOSE OF THE VACUUM RELIEF VALVE (VRV) The vacuum relief valve provides combustion air to the burner if the outside air supply is interrupted for any reason. Typical situations would be blockage of the air intake or duct, or wind effect which cause a negative pressure at the air intake hood. VRV OPERATION With normal air flow through the air intake hood and duct, the VRV stays closed. All combustion air comes in through the air duct. If the pressure in the Air Boot drops, the valve door opens. Room air flows in through the VRV to provide the air needed for combustion. When the Air Boot pressure returns to normal, the VRV closes. Rotate Oil Solenoid valve and realign 90º fitting as shown below. Do not reconnect the oil line as in E and F until you have installed the Air Boot WARNING: Failure to perform the following can cause severe personal injury, death, or substantial property damage: Read all instructions before starting. Follow all instructions in proper order. Turn off service switch on boiler and any other electrical disconnect switches. Turn off the fuel supply valve(s) and disconnect fuel lines from the burner. INSTALLATION 1. Rotate the burner oil solenoid valve as shown in Figure 1, steps A-D. Do not reconnect the oil line (per E-F). The solenoid valve must be aligned as shown to prevent interference with the Air Boot. Figure 1 2. Remove the two 1 4" bolts holding the oil pump to the burner housing. Remove the oil pump. 3. Remove the screw which holds the air band to the housing. Remove the air band. Figure 2 4. Install the sealing gaskets onto the burner housing. (See Figure 2) 5. Install mounting spacer onto Air Boot. (See Figure 3) 6. Place the Air Boot on the housing, through the large opening in the back side of the Air Boot (See Figure 3). Press the AirBoot into position and align roughly plumb with the burner. Align the Air Boot mounting holes with the burner oil pump mounting holes. Figure 3 NOTE: Replace pump coupling with the coupling supplied with kit. page 2

7. Now put the oil pump and the AirBoot kit coupling back into place. Replace the two 1 4" oil pump mounting screws. Tighten the screws. 8. Reconnect the burner oil line to the ell fitting on the oil pump per Figure 1, drawings E and F. Figure 4 9. Mount the VRV tee assembly or 90 elbow onto the Air Boot intake. Fasten using three (3) sheet metal screws on all joints. (See Figure 5) Figure 5 page 3

10. Assemble the VRV balance weight onto the gate. Screw the weight all the way in. Then attach lock nut and knurl nut. (See Figure 6) Figure 6 11. Mount the VRV assembly onto the tee and fasten with the supplied screw and nut in collar tabs. To ensure proper operation, check the gate for being level across the pivot points and plumb. (See Figure 7) Figure 7 page 4

12. Refer to Figure 8 for general installation layout. AIR DUCT AND AIR INTAKE HOOD (See Figure 8) 1. Mount the air intake hood through an outside wall. It must be at least 12" ABOVE grade or snow line. 2. Locate the air intake hood at least 3' BELOW or 6' horizontally from any appliance VENT termination. 3. When the appliance is sidewall vented, locate the air intake hood on the same side of the building as the appliance vent outlet. 4. Always mount the air hood with the intake pointed down. 5. To install the air intake hood, cut a 4 1 4" hole through the side of the building. Slide the hood through the wall and fasten with appropriate screws. 6. Seal around the exterior plate with an exterior rated caulk, silicone sealant, or equivalent. Figure 8 page 5

7. Locate the air hood so the air piping length doesn't exceed the limits below: NUMBER OF ELBOWS MAXIMUM LENGTH OF AIR PIPE 2 to 4 35' 5 28' 6 21' 7 14' 8. Construct the air duct piping with 4" diameter dryer vent or aluminum or galvanized steel pipe, using as few elbows as possible. 9. Fasten and support the air duct piping to prevent damage and separation of joints. page 6

ADJUSTMENTS AIR INTAKE BOOT AIR SETTING 1. Follow the instructions in the Boiler and Burner Installation Manuals for adjusting and setting the burner. WARNING: Failure to properly adjust the burner after installing this kit can result in severe personal injury, death or substantial property damage. 2. Loosen the air band screw on the Air Boot. Position the screw at the initial setting on the following chart. Use this setting only as a starting point. Do not leave the burner with this setting unless your testing proves it to be acceptable. INITIAL AIR BOOT TM AIR CONTROL SETTINGS Input Range (GPH) Air Band Setting 0.55-0.70 25º F 0.75-1.00 60º F 1.10-1.75 80º F 2.00-2.55 180º F 3. Start the burner and adjust the air control as needed to achieve the required CO and smoke levels. Set 2 over fire draft to appliance manufacturer's specifications (typically -.02" of water). Secure air control knob with indicator bracket. If draft levels are not obtainable or controllable, use standard industry methods to control the draft or call the Field Controls Tech Line at 1-800-742-8368 for more information. 4. Adjust the counterweight on the vacuum relief valve so the gate remains closed during the burner setup and testing. VACUUM RELIEF VALVE COUNTERWEIGHT 1. After you have completed adjusting the burner, adjust the VRV counterweight. 2. With the burner running normally, rotate the counterweight screw counterclockwise until the gate just begins to open. 3. Check the combustion again to verify no changes have occurred. If OK, hold the counterweight screw in position and tighten the hex nut against the gate to lock the screw permanently in position. page 7

LIMITED WARRANTY Field Controls, LLC ( Company ) warrants that its products shall be free from defects in material and workmanship under normal use for the limited period indicated, from the date of manufacture, subject to the provisions 1-8 below. Eighteen (18) months All Field Controls Products (except for those listed below as 5 years or 90 days). Five (5) years Field Controls Direct Vent Systems (FDVS), Field Oil Vent Kits (FOVP), and ComboVents (CV). Field Controls warrants that the products listed below shall be free from defects in material and workmanship under normal use for the limited period indicated, from the date of purchase by the consumer, subject to the provisions 1-8 below. Ninety (90) days UV lamps/bulbs Provisions: 1. During the limited warranty period, Company, or its authorized service representative, will repair or replace, at Company s option, without charge, a defective Product. Product that is repaired may be repaired with new or refurbished replacement parts. Product that is replaced may be replaced with a new or refurbished product of the same or similar design. Company will return repaired or replacement Product to customer in working condition. Labor charges are not covered as part of the limited warranty. 2. With regard to UV lamps/bulbs, customer shall be required to include a "valid proof of purchase" (sales receipt) identifying the Product purchased (Product model or accurate date code information) and the date the Product(s) was purchased. 3. Product whose warranty/quality stickers, Product serial number plates or electronic serial numbers have been removed, altered or rendered illegible shall not be covered under the limited warranty. 4. Defective Product must be returned to Company, postage prepaid. 5. IN NO EVENT SHALL COMPANY BE LIABLE FOR ANY INDIRECT, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR SIMILAR DAMAGES (INCLUDING, BUT NOT LIMITED TO, LOST PROFITS OR REVENUE, INABILITY TO USE PRODUCT, OR OTHER ASSOCIATED EQUIPMENT, THE COST OF SUBSTITUTE EQUIPMENT, AND CLAIMS BY THIRD PARTIES) RESULTING FROM THE USE OF PRODUCT. Some states do not allow the exclusion or limitation of incidental or consequential damages, so the above limitation or exclusion may not apply to you. 6. THIS WARRANTY AND REMEDIES ARE EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES, REMEDIES AND CONDITIONS, WHETHER ORAL, WRITTEN, EXPRESS, STATUTORY OR IMPLIED. TO THE EXTENT PERMITTED BY LAW, COMPANY DISCLAIMS ALL IMPLIED AND STATUTORY WARRANTIES, INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. 7. Company makes no warranty of any kind in regard to other manufacturer s products distributed by Company. Company will pass on all warranties made by the manufacturer and where possible, will expedite the claim on behalf of the customer, but ultimately, responsibility for disposition of the warranty claim lies with the manufacturer. 8. Product that has been subjected to misuse, accident, shipping or other physical damage, improper installation or application, abnormal operation or handling, neglect, fire, water or other liquid intrusion are not covered by the warranty. Phone: 252.522.3031 Fax: 252.522.0214 www.fieldcontrols.com Field Controls, LLC P/N 46330800 Rev E 11/09