IUCN/MEDIA WORKSHOP LOME TOGO

Similar documents
Vietnam Scaling up Urban Upgrading Project (SUUP)

Taking forward the All London Green Grid

SOUTH AFRICA S PREPARATIONS FOR HABITAT III COMMON AFRICAN POSITION FOR HABITAT III. Habitat III Urban Breakfast 5 October 2016

Regional Training Workshop on Human Settlement indicators

E x E C U T I v E S U M M A R y / P L A N N I N G C O N T E x T 14 //

Consolidated Workshop Proceedings Report

The Hadean-Creation studio.

Sustainable urban mobility plans Overview of the concept. EPA Polis workshop 17 May Stuttgart

Consolidated Workshop Proceedings Report

Jury Report 2019 June 2018

Living with World Heritage in Africa

Expert Group Meeting. NUP Framework for A Rapid Diagnostic. Mainstreaming Climate Change into National Urban Policies. Themba R.

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

TOWN OF BRUDERHEIM Report to the capital region board

CITY COUNCIL AGENDA REPORT

Laberge Group. Town of Coeymans. Draft Comprehensive Plan. Overview of Planning Process

Social Screening and Impact Assessment for Sub Projects

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

From Concept to Creation: Building Amaravati, the People s capital of Andhra Pradesh

INDIA Biodiversity Conservation and Rural Livelihood Improvement Project

Alpine Green Infrastructure Joining forces for nature, people and the economy

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

Early Warning Systems for. Natural Disasters in Korea

Former North Works, Lickey Road, Longbridge, Birmingham

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Why the workshop, why the cases?

Green Infrastructure. IENE 2012 International Conference

Retrofitting SuDS. Virginia Stovin. Department of Civil and Structural Engineering Pennine Water Group University of Sheffield.

Witteveen+Bos. Strategy // Planning // Design for resilient urban places. Rachael Cox April 2017

Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development

Outline of Presentation

Uttarakhand Rural Water Supply & Sanitation Project ( )

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

BRE Strategic Ecological Framework LI Technical Information Note 03/2016

Implementing sustainable water strategy through development industry engagement

Building Blocks for Sustainable Communities Technical Assistance Flood Resilience for Riverine and Coastal Communities

WATERFORD Plan of Preservation, Conservation and Development Supplement Part 1 - Policy Element

Resolution XII NOTING also that with the increasingly rapid urbanization, wetlands are being threatened in two principle ways:

Adaptation and Resilience at the City of Fort Lauderdale

The Africa We Want. Agenda ( Progress Report on Agenda 2063 as of 10 Feb 15) Presented By : Kassim Khamis Agenda 2063 Technical Team - AUC

Lake Arlington Master Plan. Presented by Randle Harwood, Planning and Development Director October 27, 2015

Town of Vershire Road Erosion Inventory Report

Public Participation in Urban Planning Case of Lilongwe, Malawi

Draft Resolution XII.10

South King County High Capacity Transit Corridor Report. Figure Other Infrastructure

Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

UNECE Committee on Housing and Land Management activities on urban development

Habitat III National Reports for the Asia-Pacific Region. Bangkok, January 2016

Portland International Airport Storm Water Master Plan June 5, Susan Aha Water Quality Manager

Results and Expectations of the Megacity Project LiWa

Contents. The Wixams > Village One Implementation

implementation r expression in landscape

ENGINEERING CONSULTANT OFFICE FOR UTILITIES

Urban and Landscape Design Frameworks Highways and Network Operations Guideline

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

INTERNATIONAL PROJECTS DAVID LOCK ASSOCIATES

Kinzie Industrial Corridor

JOINT DECLARATION BETWEEN THE EUROPEAN UNION AND THE REPUBLIC OF INDIA ON A PARTNERSHIP FOR SMART & SUSTAINABLE URBANISATION. New Delhi, 6 Oct 2017

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

Remi Mendoza City Planning Academy March 13, 2017

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose

Development of green infrastructure in EU regions Nature-based solutions delivering multiple benefits

KEY TO SUSTAINABILITY

Świętokrzyskie region (PL): Modern water supply and sewerage disposal for more effective utilisation of local assets.

Update from the United Nations Inter-Agency Coordination Group - Mine Action

Nominee Statement for Mr. Wang Aiguo

Bay County RESTORE Act Direct Component Proposals The project will encompass all of Unincorporated Bay County as a whole.

Streets for People, Place-Making and Prosperity. #TOcompletestreets

Infrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation

IND: MFF - North Karnataka Urban Sector Investment Program - Tranche 2

Inspiring Technovation

Goals and Objectives

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

D-O LRT Zoning Discussion. Chapel Hill Boards & Commissions October 16, 2017

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Report Date: June 25, 2013 Contact: Nick Kassam Contact No.: RTS No.: VanRIMS No.: Meeting Date: July 10, 2013

Watershed Planning Workshop

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

Rio de Janeiro - Brazil. Urban Regeneration & Climate Change

Cookham Parish Council s Response to The Draft Local Borough Plan

UNEP s Role in Promoting Environmentally Sound Management of E-Waste

PUBLIC REALM STRATEGY

Neighbourhood Planning Local Green Spaces

SCORP THE 2019 STATEWIDE COMPREHENSIVE OUTDOOR RECREATION PLAN EXECUTIVE SUMMARY

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

City of Norfolk Coastal Flood Mitigation Program. March 13, 2013

Employment and Commercial Review Analysis of Policy Directions

MAGALIESBURG DEVELOPMENT INITIATIVE (MDI)

Policy and Resources Committee 10 th October Green Infrastructure Supplementary Planning Document (SPD) Summary. Title

Elfrida Growth Area Study

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

SHORELINE, FLOOD AND COASTAL DEFENCE MANAGEMENT PLANS

Site Assessment Technical Document Appendix A: Glossary

Part I: Setting the Scene

Transcription:

IUCN/MEDIA WORKSHOP LOME TOGO 1

Project Development Objective (PDO): NEWMAP project PDO is to reduce vulnerability to soil erosion in targeted sub-watersheds. Other goals include Tackling vulnerability to soil erosion in targeted sub-watersheds Address climate change and air quality Maintain water quality and effective drainage system Job creation and Implement strategies for resolving Nigeria s longstanding infrastructure problems.

Implementation effectiveness The Project became effective in September, 2013. Intervention activities commenced initially with seven states (now referred to as first mover states) of Abia, Anambra, Cross River, Ebonyi, Edo, Enugu and Imo. Based on the progress recorded by the initial seven states, in September 2015 additional 7 states; Delta, Gombe, Kogi, Kano, Plateau, Oyo and Sokoto joined the project having met the necessary selection criteria. Presently, the third phase of states that recently joined the project includes; Akwa Ibom, Borno, Katisina, Nasarawa, and Niger, States; thus making a total number of 19 states in the project.

Project beneficiary The total number of primary beneficiaries envisaged at the onset of the project was about 2.2 million people. This to gradually increase in 2020 to about 2.6 million gradually as the project scale out, and to about 4.2 million in 2042 (30 years after project effectiveness).

Highlights of the Best Practices (on the part of the Project) Environmental Safeguards and Management Plan (ESMP) in all the project sites to ensure proper disaster risk management. The project also implemented resettlement Action Plan (RAP), where necessary, to compensate all project affected persons before commencement of civil works. Site designs with combination of flexible structures and bioremediation livelihood components. procurements are done in accordance with procurement guidelines and of best practices.

Best Practices on the part of the Communication Plan Design of a Communication Plan Raise awareness and ensure communities and other stakeholders clearly understand the current challenges and objectives of the project. Encourage Community Ownership of the project via town hall meetings Promote Sustainability, and behavioural Change Monitoring and Evaluation

What are the factors contributing to the project success? Action Planning: The creation of an action WORKPLAN /PROCUREMENT PLANS is an operational Key to Success for Watershed Management Organizations. An action plan is important because it clearly outlines a Project vision and goals Community participation and mobilization Community consultation, public education and information on erosion management and awareness techniques. This strengthens community outreach, as well as softens community entry for the necessary civil works and other interventions. Quality Civil and Environmental Engineering Designs High level design overview support and contracts-management guidance. Robust supervision of site designs to meet the highest possible international quality by working with all State PMUs and relevant MDAs and local actors, through adoptions of NEWMAP standards and world best practices. Effective supervision and Project Management: In ensuring efficient and timely delivery of project resources in accordance with the project s objectives, the management team has maintained comprehensive supervision and has efficiently managed fiduciary matters, taking into considerations: i) Procurement and financial management, ii) Social and environmental safeguards management and oversight, iii) Strategic project communication and documentation and iv) Project M&E, including two Mid-Term Reviews towards ascertaining the necessary impact evaluation.

Atakpa Erosion site CrossRiver State Atakpa before Atakpa now

Queen Ede Gully Edo State Queen Ede before Queen Ede Now

Brief on Queen Ede Queen Ede gully site,is at Ikpoba Okha Local Government Area of Benin City, Edo State The intervention site has estimated gully length of 960 m, maximum depth of about 25 m, average top and base width of about 56 m and 40 m, respectively The gully started as a result of abrupt termination of the outlet drain from the Benin-Agbor highway Queen Ede site had consumed a couple of houses and destroyed two public schools. NEWMAP intervention considered as a Miracle by many including Governor Oshiomole of Edo State. Intervention solved the severe impacts of flood water along Benin-Agbor highway, Pogah, Edebor, Agbonlahor and Igunbor streets across the road as well as runoff from Aroko estate and Ogbeson village. Hundreds of property saved, while interlink roads between the 8 communities restored.

Part of Queen Ede erosion site Before After

Auchi Gully Erosion Site Before in 2013 Recently in 2015

Brief on Auchi gully site Auchi is a town located in Etsako West Local Government Area of Edo North, Edo State, Nigeria. Its distance is about 130 km from Benin City, the capital of Edo State, and has an area of 946 km² and a population of about 197,609 (2006 census). The gully site is located in an urban area and has damaged several houses. The affected areas includes: Obe Streets, Union Bank road, Hospital roads, Inu Umoru road, Egbe Adokhai, Momoh streets, farm lands, residential buildings, schools, etc. At its deepest, the gully is about 20-25 m. Auchi gully accelerated in the 1980s when the government engaged in several gully control construction activities within the area in their quest to prevent the action of the gully. In the intervention, most of the drainage systems have insufficient capacity, wrongly placed and in most cases abruptly terminated. All these anthropogenic factors together with the natural factor of convergent topography of Auchi town brought about further destruction and environmental degradation of the gully area. The topography of this area generates floods from the uplands: Hospital roads, Egbe Adokhai, Inu-Umoru road, Obe streets, Momoh streets, Warrake road, Union Bank road, Oluedide main waterway, etc. These floods are transmitted through the poorly provided drainage systems into the natural water course. NEWMAP s Intervention saved over 100 houses that could have been consumed before the check. As at April 2015, PAP beneficiaries numbered about 121persons.

Auchi Gully Erosion Site Before After

NEWMAP APPROACH FLEXIBLE STRUCTURES Atakpa in Cross River state Iyiuzo Ihuoma in Imo State

THANK YOU