Blake C. Kronkosky, PE, Ph.D.

Similar documents
NAPA COUNTY PUBLIC WORKS Standards & Specifications

CHECKLIST FOR PHASE II DRAINAGE REPORT

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

Bexar County Public Works Department Flood Control Program

Drexel, Barrell & Co.

Drexel, Barrell & Co.

South Bismarck Watershed Model Update and Stormwater Improvement Project

Existing Conditions and Environmental Consequences Floodplains

Floodplain Technical Memorandum

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

September 7, Mr. Brant Gary Director of Public Works City of Bellaire 7008 S. Rice Avenue Bellaire, Texas 77401

Modeling Cumulative LID Features for Floodplain Impacts in an Urban Watershed in Houston, TX

City of Waco Stormwater Management Regulations

When planning stormwater management facilities, the following principles shall be applied where possible.

1. Project Description

TxDOT Experience with Long-Term Private Maintenance Agreements

Village of Forest Park. July 27, Sewer Separation Evaluation

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

Level 1 Downstream Analysis

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

MEMORANDUM. September 10, 2018

City of Norfolk Coastal Flood Mitigation Program. March 13, 2013

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014

Physical Map Revision Flood Insurance Study

Appendix I. Checklists

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

DRAFT. Draft Addendum 1 to Visual Impact Assessment Technical Report

PHASE III DRAINAGE REPORT

New Braunfels Growth & Development. Garry Ford, Jr., P.E., PTOE City Engineer City of New Braunfels

Figure 1 Cypress Street Study Area Location Map

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

Poisoned Park? How Exide s Lead Contamination Risks Frisco s Grand Park

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

Draft Rhode Island Stormwater Design and Installation Standards Manual

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

Overall Drainage Report

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

I. INTRODUCTION. identify long-term capital improvements and rehabilitation measures for the existing drainage system;

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue

Using AutoCAD Civil 3D and ESRI ArcGIS to meet LEED-ND (Neighborhood Development) Requirements NDIA O Brien & Gere. All Rights Reserved.

SEMSWA s Role in the Land Development Process

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

J. WILLIAM (BILL) BROWN Office Phone: (608) Cellular Phone: (817)

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

NAI Principles In Gwinnett County

North Street Reconstruction & Integrated Stormwater Management System

Impact of Storm Drains on Urbanized Alluvial Fan Flooding in Ventura County, California

Appendix E Preliminary Location Hydraulic Study

3. Are there any projects exempt from the definition of Regulated Projects?

Protocol for Sustainable Roadsides

City of Ingleside Avenue B Outfall Project

Commercial / Site Development Experience Subdivision / Master-Planned Community Experience

New Development Stormwater Guidelines

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting

Green Infrastructure Modeling in Cincinnati Ohio. Small Scale Green Infrastructure Design Using Computer Modeling

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

Pollutant Removal Benefits

Problem Understanding

Appendix K. Stormwater Management Plan

Northern Branch Corridor DEIS December 2011

LID IN REGION 6 HOUSTON AREA FOCUS. Steve Albert, P.E., CFM Senior Project Manager Sherwood Design Engineers

HOU: GRAND PARKWAY TERMS AND CONDITIONS

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan


Chapter 4 - Preparation of Stormwater Site Plans

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

Neighborhood Drainage Infrastructure Improvements Using Green Initiatives. Village of Hinsdale, IL

Getting the Locals to Go Along. Keys to Tulsa s Successful Floodplain Management

Pond Siting Report Update

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

The Trinity River Corridor Project Update

Huntington Stormwater Utility

Princess Anne Road. Phase VII (CIP 2-195) Citizens Information Meeting

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

Historic Bridge Adoption Information Packet

Fixer Upper. MS4 Post-Construction and Redevelopment. Anthony Betters, CSI City of Waco Environmental Storm Water Compliance

Regional Mobility & the US 380 Bypass Concept. Informational Meeting February 9, 2017

Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting. El Paso, TX April 11, 2018

What Can We Do to Reduce the Impact of Floods? Joe Barron, P.E. Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

Table of Contents G.1.a Water Resources - Surface Water - Drainage

DESIGN CRITERIA PACKAGE

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

WHAT CAN WE DO? - CORRIDORS

Project Overview. Get Involved. Public Information Meeting. Contact Information

Boeckman Road Extension

DESIGN PUBLIC HEARING. Phase II

Bioretention cell schematic key

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.

Transcription:

Blake C. Kronkosky, PE, Ph.D. Blake.Kronkosky@statetecheng.com, CELL (512) 663-1954 Education Ph.D., Civil Engineering, Texas Tech University, May 2018: An Engineer's Guide for Estimating 1-Day, 100-Year Rainfall Depths in Texas M.S., Civil Engineering, Texas Tech University, May 2014 B.S., Civil Engineering, Oklahoma State University, May 2008 Registrations/Licenses Texas Professional Engineer #114368 Qualifications Mr. Kronkosky has over 10 (+) years of experience serving public and private-sector clients within the areas of water resources, general civil engineering, site development, and transportation engineering design. His technical focus has been in stormwater management and roadway drainage. He has been responsible for providing technical design support and leadership for drainage and general civil engineering projects. Computer Skills HEC-HMS, HEC-RAS, SWMM, TR-55, GEOPAK, GEOPAK DRAINAGE, WinStorm, HY-8, Culvert Master, Hydraflow, Pond Pack, StormCAD V8 and V8i, Sewer Gems V8 and V8i Other: MS Office, Microstation, AutoCAD, GIS, Visual Basic for Windows and Microstation, Geopak Criteria, 3-port Criteria, Advanced statistical analysis using L- Moments, Modflow, SQL, R Professional Experience: Texas Tech University Research Assistant Spring 2016 TxDOT Lubbock District Martha Sharp: The objective of this analysis was to quantify the AEP depths for recent storm events causing inundations to the Martha Sharp Freeway in Lubbock, TX. Mr. Kronkosky was retained by Texas Tech University to evaluate rainfall patterns near the project site using statistical methods outlined in USGS WRI Report 98-4044. StateTech Engineering, LLC, TX # F-15299 http://www.statetecheng.com/ May 2013-Present StateTech Engineering is a small; family owned and operated, Civil Engineering Firm based out of Lubbock Texas. Mr. Kronkosky acts as the President of StateTech Engineering, LLC, providing Civil Engineering services for roadway, drainage, and land development projects. Our project experience includes: TxDOT SH 71 Tollway: StateTech Engineering, LLC worked with Lockwood Andrews and Newnam, Inc. to prepare PS&E for 2(+) miles of urban/rural roadway storm sewer design, along SH71 from F.M. 973 to Onion Creek. This included designing/analyzing 16 culvert crossing, 50(+) storm sewer inlets, and 1.5 miles of open ditch along the project corridor. 1

Williamson County CR 110 North: StateTech Engineering, LLC worked as a sub-consulting firm on the Williamson County CR 110 N. bond program project. Our work included hydrology and hydraulic analysis of three culvert crossings (one TxDOT Bridge Class), flood plain study of Makins Branch, preparation of the PS&E for the culvert crossings and channel improvements. Lockwood Andrews & Newnam, Inc. (LAN) December 2012-Present Mr. Kronkosky currently acts as needed as a temporary employee for LAN, performing engineering services on roadway and drainage projects. 2008-October 2012 At Lockwood, Andrews, and Newnam, Inc. (LAN), Mr. Kronkosky developed a solid engineering background working on drainage, and storm water quality, transportation, and rail transit projects. His experience includes quantity takeoff calculations and cost estimates, storm drainage calculations, culvert design, bridge hydraulic analysis, floodplain mapping, dynamic storm sewer modeling, detention pond design, horizontal and vertical geometric roadway design, review of site development projects for FEMA permitting, project construction submittals, construction site observation, advanced rainfall analysis using L-Moment statistics, storm sewer and water quality master planning for local governments, and drainage CIP recommendations to government agencies. His experience as an Engineer has provided him with the knowledge to design and prepare construction plans, bid documents, perform value engineering to provide cost effective designs, and an understanding of the construction phase process. Major Projects Include: TxDOT Waco North Loop 363 - N. Troy: Mr. Kronkosky was responsible for preparing plans, specifications & estimates (PS&E) on approximately 6.4 miles of IH 35 in Bell County from north of LP 363 in Temple to north of the City of Troy. Mr. Kronkosky served as a Lead Drainage Designer for these multi-lane improvements. Designs include; storm sewer and culvert analysis, bridge and floodplain hydrology and hydraulic modeling, and roadway open channel drainage. Kuykendahl Regional Detention Basin (P545-01-000E005) - HCFCD, Houston, TX: Mr. Kronkosky provided preliminary engineering for Kuykendahl Regional Detention Basin P545 for Harris County Flood Control. The design consisted of 3D surface modeling of the 2,900 ac-ft regional facility and generating a proposed DTM for calculating storage. The proposed basin improvements were prepared using Geopak Site. Tomball Ditch M124; Tomball, Texas: Acting as the Lead Design Engineer, Mr. Kronkosky performed a feasibility and alternatives analysis, preliminary engineering, design and construction phase services for the expansion and improvement to an unnamed tributary of Willow Creek identified as Channel M124-00-00. The project involved the design of a four mile flood control channel with vertical and horizontal alignments, R.O.W acquisitions, and the design of a 400 ac-ft detention pond. 2

METRO SE Corridor - PH 1B Design Services; Houston, Texas: Mr. Kronkosky assisted with the storm sewer design that included dynamic modeling and simulation for surcharge conditions and deficiencies, storm sewer layouts, and P&P sheets. Roadway design consisted of intersection layouts, vertical profile improvements, hike and bike profile and alignments, P&P sheets, and cross- sections. DCTA Support Services for A-Train Commuter Rail Implementation; Denton, Texas: Mr. Kronkosky performed value engineering on third party drainage designs for DCTA s light rail project that contributed to a $50 million construction cost reduction. Services included adjustments and modifications to; roadway and hike and bike vertical and horizontal roadway alignments, roadway open channel drainage, culvert hydraulics and quantity take-offs. SH130 Segments 5&6 Mr. Kronkosky assisted in designing 15 miles of roadway open channel drainage design, FEMA floodplain mapping, culvert hydraulics, channel erosion protection, SW3P, and answered and executed RFI s during construction phase of this project. Elysian Viaduct Acting as a Roadway Design Engineer, Mr. Kronkosky assisted in developing roadway P&P sheets and proposed cross sections for a 4.500 foot bridge replacement over IH-10 and Buffalo Bayou. Boom Branch Road Bridge Replacement, Denton County Texas Mr. Kronkosky performed a detailed H&H analysis of the Boom Branch Reach between FM 455 and Bernard Rd. This involved SCS hydrograph modeling and open channel flow analysis using HEC-HMS and HEC-RAS. City of New Braunfels Stormwater Master Plan As a Project Engineer, Mr. Kronkosky was responsible for reviewing the City s drainage and erosion control criteria manual and was tasked with providing recommendations for technical improvements. Additionally, he performed a detailed rainfall frequency analysis using advanced L-Moment statistics. The results of this analysis were presented at the Texas Floodplain Management Association (TFMA) in 2011 and at the American Society of Floodplain Managers (ASFPM) in 2012. Wheatland Road, Dallas Texas As a Project Engineer, Mr. Kronkosky was responsible for designing and analyzing the storm sewer system for a two mile roadway and performing the H&H analysis of two major culvert crossings. TxDOT Paris District Off-System Bridge Replacements As a Project Engineer, Mr. Kronkosky was responsible for developing the scope and fee for drainage related services for eight off-system bridge replacements within Denton, Fannin, and Rains County Texas. His design responsibility consisted of preparing the H&H analysis, developing PS&E, and preparation of final hydraulic reports. Beamer Road, TxDOT Houston District and Harris County As a Drainage Project Engineer, Mr. Kronkosky was responsible for bridge modeling and impact analysis, preparing PS&E for two miles of storm sewer designs, and the design and analysis of five detention ponds for peak flow mitigation. 3

Travis County, Eastside Service Center As a Drainage Project Engineer Mr. Kronkosky was responsible for providing solutions to adverse impacts to Elm Creek related to a recently constructed roadway. This included adjusting roadway profiles and culvert crossings to provide a zero impact to the 100-yr floodplain. Bulverde Road, Bexar County Texas As a Drainage Engineer, Mr. Kronkosky was responsible for providing preliminary design of the storm sewer system and water quality BMP s for the roadway improvements. In addition, a hydraulic analysis of a FEMA regulated waterway- Bulverde Creek, was prepared for the project. RM 1431, TxDOT Austin District Mr. Kronkosky was responsible for developing the scope and fee for the drainage portion of the roadway 3R project along RM 1431. As the Design Engineer, Mr. Kronkosky developed the PS&E for the storm sewer systems and culvert crossings. SPUR 536, TxDOT San Antonio District As the Drainage Project Engineer, Mr. Kronkosky was responsible for designing the storm sewer system and developing the PS&E for one mile of SPUR 536 in San Antonio Texas. US 290, TXDOT Austin District As Head Drainage Engineer, Mr. Kronkosky was responsible for development of the PS&E for storm sewer systems along US 290 and adjacent local roads. US 75, SH 121 South to US 380 Mr. Kronkosky acted as the Lead Drainage Engineer responsible for development of the PS&E for two miles of storm sewer systems for main-lanes and frontage roads along US 75. During the construction phase Mr. Kronkosky provided answers and executed RFI s during the construction phase of this project. 4

Publications/Presentations Texas Floodplain Managers Association (TFMA), Fall 2011, Rainfall Frequency Analysis for New Braunfels, TX The Association of State Floodplain Managers (ASFPM), Spring 2012, Rainfall Frequency Analysis for New Braunfels, TX Texas Floodplain Managers Association (TFMA), Fall 2016, Rainfall Statistics: Where We Were, Where We Are, Where Are We Going? Evaluation of the 1-Day, 1%AEP Rainfall Depths in Oklahoma, Fall 2016, Southern Plains Transportation Center--Climate Summit 5