Los Angeles River-Arroyo Seco Confluence Restoration Vision Plan. Professor Meredith McKenzie, JD Urban & Regional Planning Dept Cal Poly Pomona

Similar documents
Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment

Mendota Heights 2040 Comprehensive Plan Draft Vers

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

San Diego River Coalition 2012 Work Plan

City of Nogales General Plan

Urban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris.

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

Chapter 5: Natural Resources and Environment

FY Capital Improvement Program Arroyo Projects

SQUAMISH 2010 AND BEYOND COMMUNITY VISION

Executive Summary Purpose of the Plan Defining Open Space and Greenways

U.S. Army Corps of Engineers, Los Angeles District Prado Basin Project Updates

MCCOYS CREEK RESTORATION 30% DESIGN

This page intentionally blank.

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Parks, Open Space and Trails

Whitemarsh Township Greenway Plan

Northampton County, Pennsylvania

Upper Dean Landscape Character Area: A1 Landscape Character Type: River Valley

include playgrounds, sports fields, community gardens and picnic areas.

Town of Sahuarita Open Space Plan Element. University of Arizona Planning Program Projects Team

Greenways as an alternative to traditional infrastructure. Green Infrastructure

A Vision for Walnut Creek

1 st now. Design Elements. iii STREET TREES PATTERNED CROSSWALKS SPECIAL SIDEWALK PAVING. First Street ELEMENTS TRANSIT SHELTER / LANTERN

MARSH STREET PARK ELYSIAN VALLEY, LOS ANGELES, CA

Potential Green Infrastructure Strategies May 6, 2015 Workshop

8.0 Design and Form of Development 43/

5. Father Hennepin Blufs Park and Hennepin Island Father Hennepin Bluffs Park Supporting Initiatives (see Figure 36): 7-22

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 LOS ANGELES GREEN VISION PLAN. File No.: Project Manager: Marc Beyeler

CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES

NORTH DISTRICT. Description

A p r i l LOS ANGELES RIVER REVITALIZATION MASTER PL AN

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

FY Capital Improvement Program Arroyo Projects - Lower Arroyo Summary

Brampton. Secondary Plan. Review. Bram West. A New Direction in Planning & Public Consultation

Glenborough at Easton Land Use Master Plan

Master Plan Objectives and Policies

Farmers Investment Co. (FICO) Continental Farms

Edgeley Pond + Park Public Meeting

Rain Gardens. A Welcome Addition to Your Landscape

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

UNIVERSITY TOWN NEIGHBOURHOODS 5.2 ECO-CORRIDOR MELBOURNE CAMPUS MASTER PLAN 2014

STUDIO CITY SENIOR LIVING CENTER PROJECT ENV EIR APPENDIX H RIO CHECKLIST

UBC URBAN STUDIO, FALL 2002 PEDESTRIAN ORIENTED

Rouge River Gateway Master Plan Update: 2011

Pinellas County Greenways

Mariposa Lakes. Planned Community. Project Overview. Stockton, CA

4.1 AESTHETICS AND VISUAL QUALITY

Regional Context Statement

Town of Lyons Parks Flood Recovery Planning Process. Photograph courtesy of Ed Bruder

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347

G. RECREATION AND OPEN SPACE ELEMENT. The following summarizes the Recreation and Open Space Element:

Ecological Restoration at the Las Vegas Springs Preserve. Von K. Winkel, Ph.D.

6Natural. Environment Development Permit Guidelines

SECTION 5: REACH RECOMMENDATIONS/MAPS

Transportation. Strategies for Action

Redesigning Vogel Flat Angeles National Forest, California

Parks, Trails, and Open space Element

City of Surrey Ecosystem Management Study. Integration of ecological processes with land use

Surrey Ecosystem Management Study

Turkey Creek Streamway Corridor

PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting

Parks, Trails, and Open Space Element

PARKS AND RECREATION

SHEFFIELD PARK Paulding County, GA DRI #588

City of Iowa City Department of Neighborhood and Development Services Department of Parks and Recreation Department of Public Works City Manager s

Restoration in the Sky Islands:

Yadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run

UNIVERSITY OF ARKANSAS FOR MEDICAL SCIENCES

Southeast Michigan Council of Governments

EIR Scoping Meeting MULTI-BENEFIT/MULTI USE PROJECT

WILLAMETTE FALLS LEGACY PROJECT

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

Riparian Buffer on the Bushkill Creek. Policies

Lake and Stream Restoration Project

Las Colonias Park Master Plan

A: Downtown Diversion Pipe

RIPARIAN HABITAT RESTORATION. Helen Swagerty Senior Restoration Biologist/Project Manager

4.0 KEY ISSUES AND MANAGEMENT ZONES

Manchester. Vision for Manchester

RECOMMENDATIONS. Design Recommendations

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651)

Great Rivers Greenway CLEAN GREEN CONNEC TED T RAILS

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

Woodland Conservation and the Master Plan

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

Introduction 1. Contents. Draft:

City of Surrey Ecosystem Management Study. Integration of ecological processes with land use

Case studies. B1.1 Lloyds Crossing, Portland (USA)

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES

The West Vaughan Employment Area Secondary Plan Policies

Open Space Element. General Plan. County of Sacramento Community Planning and Development Department

4. What are the goals of the Kawarthas, Naturally Connected project? 7. What are watersheds and why are they being used as the project boundaries?

Santa Cruz River Master Plan. Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Lake O the Pines Master Plan Revision Public Information Meeting April 25 & 27, 2017

SANDPOINT/LAURELHURST. <Study Area>

CHAPTER VIII Implementation

SITE INTRODUCTIONS AND OVERVIEW

10.0 Open Space and Public Realm

Transcription:

Los Angeles River-Arroyo Seco Confluence Restoration Vision Plan Professor Meredith McKenzie, JD Urban & Regional Planning Dept Cal Poly Pomona

The Los Angeles River Watershed

Arroyo Seco Watershed Map with Los Angeles River Confluence

The Confluence LEGEND Proposed Site s Boundaries Confluence Courtesy of: Google Maps

Courtesy of Metro, website: http://www.metro.net Metro Transit

Confluence at the Arroyo Seco and LA River in a relatively natural state in 1920 Historic Conditions Arroyo Seco has 4 spaces to allow flow under Avenue 19 bridge It is also lined by significant riparian habitat Courtesy of: Arroyo Seco Foundation. Website: www.arroyoseco.org Bridge in the foreground had a capacity to handle flood flows

Only one way for the the river to flow (under Avenue 19 bridge) Channel is now blocked by a retaining wall Current Conditions Confluence is significantly narrowed Contains no habitat in the stream Courtesy of: Arroyo Seco Foundation. Website: www.arroyoseco.org Still contains significant amount of trees along the rim of the Arroyo

Existing Land Uses LEGEND Courtesy of: www.planning.lacity.org

Goal Enhance the life, health, and safety of regional and local residents as well as ecological processes through social, educational, and environmental connections between the confluence, its communities and the watershed.

Objective: Social Attract local residences and disadvantaged communities to the river Attract visitors from Dodger Stadium/Elysian Park to confluence Improve quality of life, health, and safety of residences and visitors Create a pedestrian and bicyclist-friendly park Create a sense of identity for the confluence and local community Increase community stewardship Introduce active and passive activities for recreation and education

Objective: Educational Educate residents and visitors about: Los Angeles River and Arroyo Seco History of Native Americans Native vegetation and wildlife Wetland and riparian habitat Environmental and sustainable planning, design, and living Water collection, treatment, and conservation Urban agriculture and edible gardens

Objective: Environmental Collect, treat and recycle water Create wetland and riparian habitats Create wildlife patches and corridors Use native plant materials for water treatment and conservation Use permeable surfaces for water percolation and groundwater recharge Design and build a sustainable community center

Water Flow: The Challenge of River Water Levels New regulations have made the use of effluent water acceptable to be released into the river. The river flows at a higher rate more consistently throughout the year. Species become dependent on the increasing flow.

Riverine Restoration Soft bed areas Encourage new and existing biological communities. Native plantings Naturally help filter impurities. Help sustain biological communities. Create aquifer holding beds Channel water to allow communities to survive with lower flow.

Northwest Confluence Touchstones Taylor Yard Rio De Los Angeles State Park Parcel G1 LA River Glendale narrows Soft Bottom portion of river Elysian Valley Gateway Park Provides access to LA Greenway Trail

TAYLOR YARDS.Remediate Parcel G as a Wetland.Develop Parcel D into a recreational area - Global sustainability: Area is important link of Pacific Flyway - Proximity of park to the soft-bottom section of the LA River places it in key position to enhance the function of the area. Recommended Actions - Restore native grassland habitats that enhance the viability of area s ecosystem. -. - Create wetland habitats within the park that will become synergistic with the viability of riparian wetlands along the river

Check Dam Create a Check Dam to divert flow of water to and from Taylor Yards for manmade wetland water treatment and vegetative growth to restore animal habitat.

Northwest Confluence: Restoration Challenges Restore Native Habitats Remediate soil and groundwater at Taylor Yard Remove invasive species at Taylor Yard and LA River channel Create wetlands / grasslands on Taylor Yard Parcel G Provide Recreation Connect recreation trail to parkland Access to river via terraced channel wall Construct Northern Confluence Bridge Provide Mobility and Connectivity

Arroyo Seco Confluence Vision Phase 1 Remove Arroyo Seco Parkway and ramps Modify concrete channel Introduce water treatment wetlands, pedestrian and bicycle paths, community center, active and passive parks for recreation and education

Sections Section at Wetlands Section at Arroyo Seco

Community Center

Arroyo Seco Confluence Vision - Phase 2 Further remove and naturalize concrete channel Connect individual wetlands and ponds to create network of riparian habitats Remove secondary circulations to protect native vegetation and wildlife habitats

For More Information, Contact Meredith at arroyolover@gmail.com