wholesalesolar.com Table of Contents 1. Racking Layout Options (page 2-3) 2. IronRidge Roof Mounting System (page 4-12)

Similar documents
Roof Mounting System. Installation Manual. Standard (XRS) and Light (XRL) Rails with Integrated Grounding *ETL Listed Per UL Edition v1.

Roof Mounting System. Installation Manual. Light Rail (XRL) 2013 Edition v1.3. Solar Mounting Made Simple

Roof Mounting System. Installation Manual. Standard Rail (XRS) 2013 Edition v1.3. Solar Mounting Made Simple

FLUSH MOUNT INSTALLATION MANUAL

Installation Manual Universal Side-of-Pole Mount UNI-SP/01A

Installation Manual Universal Single-Arm Side-of-Pole Mount UNI-SA/21.5

Installation Manual Universal Side-of-Pole Mount UNI-SP/02A

Installation Manual Universal Top-of-Pole Mount UNI-TP/02

Installation Manual Universal Top-of-Pole Mount UNI-TP/08LL

Pole Mounting System Installation & Certification Manual

Pole Mounting System Installation & Certification Manual

Installation Manual. Top of Pole Mount Edition v1.01. For models:

Pole Mounting System Installation & Certification Manual

Pole Mounting System Installation & Certification Manual

Parts Catalog Edition v1.85. This catalog includes parts and accessories for IronRidge s Mounting Systems.

Parts Catalog. Version This catalog includes components for IronRidge s solar mounting systems.

Parts Catalog. Version This catalog includes components for IronRidge s solar mounting systems.

FES - Series Portable Electric Heaters. YES - Series Suspended Electric Heaters CONTENTS

52 CEILING FAN. Owner s Manual Models #50336, 50337

36 & 48 E-Z Cone Fan. Installation & Operator s Instruction Manual (Direct Drive)

TURBO Fiberglass Cone Fan and Grill Fan 48'' Belt Drive. Installation & Operator s Instruction Manual

OCH-SS series Direct Wired Units Indoor * and Outdoor Comfort Heaters

Here is what comes in your box:

Oahu Showerspa Model #1035 Owner's Manual

AMERICA AMERICA 52 CEILING FAN INSTALLATION AND OPERATION MANUAL

Torrena 42 Ceiling Fan

48 Vanguard Belt Drive Fans Installation and Operators Instruction Manual

Camarillo 52 Ceiling Fan

48 Vanguard Belt Drive Fans Installation and Operators Instruction Manual

HI Industrial Utility Heater HI Soleus Air International

INSTRUCTIONS PARTS LIST For President, Monark, Standard, and Fast-Flo Pumps, and Agitator

55-Gallon Dispenser Package

SOLARHOT. SuperVox. Description / Applications System Overview. Installation/ Owner s Manual

Installation Instructions

Fly / Rear Deltoid. Owners Manual

INTERMEDIATE GUIDE BRACKET

SUTTON 52 CEILING FAN

Florentine IV 56 in Ceiling Fan Owner s Manual Florentine IV Ventilador de Techo de 1,42 m Manual del Propietario

User s Manual and Operating Instructions

Refrigerator BRFB1920SS BRFB1900FBI BRFB1920FBI

Installation & Operation Manual

WATER CLAW SUB-SURFACE FLOOD EXTRACTION TOOL AC016 - AC018. Water Claw 4282 South 590 West Salt Lake City, UT FAX

The Extraordinaire OWNER S MANUAL. Orbital Ceiling Fan. Model No. OF110** READ AND SAVE THESE INSTRUCTIONS. Net Weight 14.5 lbs. or 6.59 kg.

C-IV 60 CEILING FAN READ AND SAVE THESE INSTRUCTIONS. FAN RATING AC 120V. 60Hz

TOUCHDOWN 48 CEILING FAN

Air Storm Fans. Air Storm 54 Fiberglass Fan Installation and Operation Manual

FFP S700 SERIES. Pull-Out Spray Faucet. Installation guide

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

Table of Contents. What to Expect with. Mounting Options. Tools Needed. Downrod. Blades. Maintenance & Cleaning.

Ozone + UV Sanitation

ELSTON 52 CEILING FAN

MaxLite LED High Bay Fixtures

Installation Instructions PP-AS20 Anti-Scale System

ICS Float and Thermostatic Steam Trap Installation and Operation Manual

FLCH4R Garage and Utility Electric Heater

Installation Instructions Built-In Dishwasher

Installation & Operation Manual

DUVAL 52 CEILING FAN MODELS #50201, Español p. 19 LISTED FOR DAMP LOCATION

W Model 1RKU2 w/optional Wall mount. Unit Model Weight (Lbs) Kilowatts Volts- Phase Amps Fan Output Heat Output

Built-In Dishwasher. Installation Instructions. BEFORE YOU BEGIN Read these instructions completely and carefully. IMPORTANT The dishwasher MUST be

Turin LED Ceiling Fan

MODENA ZUHNE

Air Storm Fans. Air Storm 18 Fiberglass Fan Installation and Operation Manual

ST. KITTS CEILING FAN

Installation Instructions

McDONALD S 30 ROOF ELEMENT

installation, operation & Maintenance manual Floor-mounted Induction units acb 30/35

Lynwood 52 in Ceiling Fan Owner s Manual. Lynwood Ventilador de Techo de 1,32 m Manual del Propietario

NIAGARA. Niagara ShowerSpa Model #1048B-BN Owner s Manual

Wheelbarrow Mixer Operations Manual

52 BARSTOW CEILING FAN

COMPRESSED AIR DRYER. SAFETY... Page 2 MAINTENANCE... Page 5. INSTALLATION... Page 3 PARTS AND KITS... Page 6

INSTALLATION INSTRUCTIONS

Design Criteria. Installation

24 & 30 Quiet Design Oscillating Wall Mount Fan

Gas Connector Installation Instructions

Installation Manual WARNING. Add-on Controller Installation Kit NPE-180A/210A/240A

Arctica Solar 1500 Series Heater Installation Manual

Installation and Maintenance "L" and "LS" Series

INSTALLATION INSTRUCTIONS TOOLS YOU WILL NEED GETTING STARTED

52 SAN LUCAS CEILING FAN

MTC-Series Manual Trash Compactors Instruction Manual

Installation Instructions

Installation Instructions

Bentley II 13 in Ceiling Fan Owner s Manual. Bentley II Ventilador de Techo de 33 cm Manual del Propietario

55-Gallon Dispenser Package

Installation Instructions 30 French Door Built-in Wall Ovens

OPERATION MANUAL Dated: 04/09/2018 Document Name: SHV _OM Page 1 of 8. Ion Technologies SHV40, 75 & 100 Sewage Ejector Pump SAFETY WARNINGS

WAIMEA. Waimea Showerspa Model #1034 Owner's Manual

GLOBAL LIFT CORP. Owner s Manual. Home Series

5COM52XXD Series Fan. Owner s Guide and Installation Manual. UL Model NO. : 5COM52XXD

Installation Instructions for. OmniFount

MAYFIELD CEILING FAN LISTED E ITEM # MODEL #BTH44ABZC5C BTH44BNK5C Español p. 20 ATTACH YOUR RECEIPT HERE.

HD-26, HD-36, HD-48 Heated Displays

User s Manual and Operating Instructions

RIO. Rio ShowerSpa Model #1049B-BN Owner s Manual

52 CEILING FAN READ AND SAVE THESE INSTRUCTIONS FAN RATING AC 120V.

INSTALLATION AND MAINTENANCE INSTRUCTIONS. 1700ºF Air-Cooled and Insulated ECO-STEEL Chimney Size 13

User s Manual and Operating Instructions

Installation Manual NPE-180A/240A WARNING. Add-on Controller Installation Kit

Transcription:

wholesalesolar.com Table of Contents 1. Racking Layout Options (page 2-3) 2. IronRidge Roof Mounting System (page 4-12) 3. WEEB Installation Instructions (page 13-24) Page 1

RACKING LAYOUT OPTIONS MID CLAMP END CLAMP RAIL D PANELS VERTICAL RAILS HORIZONTAL UNLESS OTHERWISE NOTED ON YOUR QUOTE, THIS IS THE CONFIGURATION THAT YOUR RACKING HAS BEEN DESIGNED FOR. C PANELS HORIZONTAL RAILS VERTICAL B PANELS HORIZONTAL RAILS HORIZONTAL RAIL RUNS THAT ARE PARALLEL TO PV MODULES (OPTIONS A & B) MAY VOID PV MODULE WARRANTY. CALL WHOLESALE SOLAR FOR DETAILS. A PANELS VERTICAL RAILS VERTICAL MODULE MOUNTING RAILS SHOULD CROSS THE LONG SIDE OF THE MODULES WITHIN 2" EITHER SIDE OF THE MANUFACTURER'S PRE-DRILLED MOUNTING HOLES. WITH RAILS, THE MOUNTING HOLES ARE NOT USED BUT DO GIVE THE PROPER LOCATION RECOMMENDED BY THE MANUFACTURERS TO SUPPORT SNOW AND WIND LOADING. THESE HOLES CAN BE SEEN ON THE BACK LONG SIDES OF THE MODULE BETWEEN 7 TO 11 INCHES FROM THE ENDS OF THE MODULE DEPENDING ON THE MODEL. OPTIONS D & C 2" OC 4" CLAMPS ATTACH MODULES TO RAILS WITHOUT USING MODULE MOUNTING HOLES END CLAMPS MID CLAMPS IRONRIDGE IRONRIDGE 2" OC 4" WHOLESALE SOLAR www.wholesalesolar.com 1-800-472-1142 Page 2

MODULE GROUNDING ROOF ATTACHMENT MODULE FRAMES MUST BE GROUNDED (EGC) VIA UL APPROVED WEEB CLIPS OR UL APPROVED LAY-IN LUGS. WEEB CLIPS - "LEGS" IN RAIL GROOVES, ONE PER MODULE FOR MODULE OR MICRO INVERTER GROUNDING (EGC) GR QUICK MOUNT QMSE - 6963152 DMC (IRONRIDGE) 6400014 4-LEG 9.5 6949504 NO-LEG 9.5NL 2 PER MODULE FOR GROUND OR POLE MOUNTS 6949504 QUICK MOUNT COMPOSITION FLASHING KIT - 6963150 LAY-IN LUGS - ONE ONLY AT ONE END OF RAIL LENGTH OR ONE PER MODULE FOR ELECTRICAL GROUNDING (GEC) [N\A FOR ENPHASE] IRONRIDGE LUG W/WEEB CLIP 6910554 6400024 MODULE LUG 9934145 QUICK MOUNT UNIVERSAL TILE FLASHING KIT - 6963287 WIRE MANAGEMENT CLIPS (2-3 CLIPS PER MODULE) RACKING INSTALLATIONS WITHOUT WIRE MANAGEMENT CLIPS MAY LEAVE PV WIRE LOOSE AND IN CONTACT WITH ROOF OR OTHER SURFACES. OVER TIME THE EXTERIOR WIRE INSULATION MAY BE WORN AWAY FROM RUBBING AGAINST SURFACES, EXPOSING LIVE WIRE, THUS BECOMING AN ELECTROCUTION OR FIRE RISK. RAIL CLIPS MODULE CLIP RAIL L-FEET RAIL GROUND BONDING JUMPER ENPHASE 7500011.005 -.125 INCH MODULE EDGE 7500013 IRONRIDGE 6410004 IRONRIDGE 6400343 RAIL CLIPS FOR IRONRIDGE XRS/XRL RAIL INTERNAL SPLICE CONNECTORS ENPHASE 2977175 IRONRIDGE 6400077 IRONRIDGE XRS 6400104 WHOLESALE SOLAR www.wholesalesolar.com 1-800-472-1142 IRONRIDGE XRL 6500002 *IronRidge FlashFoot and Quick Mount PV flashings sold separately from XR rail system hardware Page 3

ROOF MOUNT INSTALLATION MANUAL

Contents DISCLAIMER 1 CHECKLIST 2 1. ATTACH BASe 3 2. PLACE RAILS 3 3. SECURE LUGS 4 4. CLAMP MODULES 4 ELECTRICAL DIAGRAM 5 EXPANSION JOINTS 5 ALTERNATIVE LUGS 6 END CAPS (OPTIONAL) 6 WIRE CLIPS (OPTIONAL) 6 GROUNDING STRAPS (OPTIONAL) 6 STANDOFFS (OPTIONAL) 7 TILT LEGS (OPTIONAL) 7 WARRANTY 8 DISCLAIMER This manual describes the proper installation procedures and provides minimum standards required for product reliability and warranty. Thoroughly understanding this manual is imperative to proper installation; failure to follow the guidelines set forth can result in property damage, bodily injury, or even death. IT IS THE INSTALLER S RESPONSIBILITY TO: Comply with all applicable local or national building codes, including any that may supersede this manual. Ensure all products are appropriate for the installation, environment, and array under the site s loading conditions. Comply with all of roofing manufacturer s warranty terms, ensuring that any loose debris potentially obstructing installation procedures is removed from the installation area. Use only IronRidge parts or parts recommended by IronRidge; substituting parts may void any applicable warranty. Ensure safe installation of all electrical aspects of the array. All electrical installation and procedures should be conducted by a licensed and bonded electrician or solar contractor. All work must comply with national, state and local installation procedures, product and safety standards. Comply with roofing manufacturer s warranty terms including: using protective barriers between mounting and roofing and roof penetrations and removing all loose debris or gravel prior to installation. Ensure that the installation is completed by a licensed solar professional. Review the Engineering Design Guide and Certification Letters to confirm any engineering specifications. Comply with all applicable fire codes including, but not limited to, keeping walkways clear and avoiding obstacles. Ensure provided information is accurate. Issues resulting from inaccurate information are the installers responsibility. Confirm with the selected module manufacturer that the mounting is compatible with the selected module. Please consult module manufacturer s installation guidelines in order to verify mounting compatibility. 2014 IRONRIDGE, INC. VERSION 2.03 ROOF MOUNT INSTALLATION MANUAL - 1

CHECKLIST PRE-INSTALLATION PRIMARY COMPONENTS Plan project with a Professional Engineer, reviewing the Engineering Design Guide and Design Assistant. 236 in-lbs Schedule any necessary inspections and acquire any needed approval from the roofing manufacturer. Verify module compatibility with Roof Mount. For Integrated Grounding, ensure module is UL-listed. Verify that needed components have been obtained. Contact your local distributor for any additional parts. Not UL 2703 Evaluated FlashFoot Aluminum 236 in-lbs IronRidge Rail Aluminum 84 in-lbs TOOLS REQUIRED Cordless Drill (non-impact) Torque Wrench (0-240 in-lbs) 5/16 Socket (deep) L-Foot Aluminum Internal Splice Aluminum 7/16 Socket (deep) 9/16 Socket (deep) 1/8" Allen Wrench 3/8 Socket (for Tilt Legs) 65 in-lbs 120 in-lbs 236 & 15 in-lbs TORQUE VALUES Reduce torque values by 15% when lubricated. FlashFoot Lag Bolts (5/16"-9): Fully seat End Clamp Aluminum Mid Clamp Stainless Steel SECONDARY COMPONENTS Grounding Lug Tinned Cu & SS L-Feet Nuts (3/8"-16): 236 in-lbs (dry) Internal Splice Screws (1/4"-14): 84 in-lbs (dry) Grounding Lug Nuts (1/4"-20): 84 in-lbs (dry) Grounding Lug Set Screws (1/4"-28): 15 in-lbs (dry) End Clamp Nuts (1/4"-20): 65 in-lbs (dry) Mid Clamp Nuts (1/4"-20): 84 in-lbs (dry) End Cap Polycarbonate 180 in-lbs Wire Clip Polycarbonate 139 in-lbs Grounding Strap Tinned Copper 84 in-lbs Expansion Joint Nuts (1/4"-20): 84 in-lbs (dry) Tilt Leg Nuts (3/8"-16): 180 in-lbs (dry) Not UL 2703 Evaluated Not UL 2703 Evaluated Flush Standoff (5/16"-18): 139 in-lbs (dry) Tilt Leg Aluminum Standoff Aluminum & SS Expansion Joint Tinned Cu & SS 2014 IRONRIDGE, INC. VERSION 2.03 ROOF MOUNT INSTALLATION MANUAL - 2

1. Attach Base For composition shingle roofs, use FlashFoot. For other roofs, mount L-Feet on suitable third-party attachments. Not UL 2703 Evaluated FLASHFOOT Locate and mark locations on roof. Drill 1/4 pilot holes and backfill with approved sealant. Slide flashing between 1st and 2nd course of shingles. Line up pilot hole and fully seat lag bolt through washer, L-Foot, and flashing. Spacing varies with load conditions. Consult engineering specs. Refer to Page 7 for installing Standoffs or Tilt Legs. If using FlashFoot with Tilt Legs, replace L-Foot with U-Foot and add EcoFasten CP-SQ-Slotted Bracket with extra flat washer. 2. PLACE RAILS A. PREPARE HARDWARE A On the ground, slide 3/8-16 hardware into side-facing rail slot. Space out bolts to match L-Feet spacing. Tape ends of rail, to keep bolts from sliding out while moving. If using Mid Clamps with hex bolts, slide provided 1/4-20 bolts into top slot of rails at this time. Space bolts for panel spacing. Load and Space Bolts B. SPLICE CONNECTIONS B 6" Inside Rail Insert Internal Splice into first rail and secure with provided screw. Slide second rail over Internal Splice and secure with provided screw. Torque screws to 84 in-lbs (dry). Repeat splices for all rail connections. Tighten Snug (About 84 in-lbs) Grounding Straps should be installed at this time. For rows exceeding 100 feet of rail, an Expansion Joint is needed for thermal expansion. See Pages 5-6 for more info. 3" Inside Rail C. FASTEN L-FEET C Attach rails to L-Feet using preloaded hardware. Position rails at desired height and level. Torque to 236 in-lbs (dry). To level rails, adjust L-Foot attachments to same height from roof. L-Foot Hardware (236 in-lbs) 2014 IRONRIDGE, INC. VERSION 2.03 ROOF MOUNT INSTALLATION MANUAL - 3

3. Secure Lugs IRONRIDGE LUGS Using a 13/64 or #7 drill bit, drill a hole through side of rail at least 1/2" from the end and centered. Attach lug and secure 10AWG (minimum) copper grounding wire. Torque hex bolt to 32 in-lbs (dry). Torque set screw to 20 in-lbs for 10AWG, 25 in-lbs for 8AWG, or 35 in-lbs for 4-6AWG (dry). For WEEB Lugs, review Wiley WEEB Installation Instructions. Grounding hardware is only needed on one rail per row of modules. Grounding Lugs and Straps should be on same rail. 4. CLAMP MODULES A. END CLAMPS A Place first module in position on rails, a minimum of 1.5 from rail ends. Secure End Clamp on rail, ensuring it is hooked over top of module. Torque to 65 in-lbs (dry). Repeat with End Clamp on other rail. Torque to 65 in-lbs B. GROUNDING MID CLAMPS B Assemble Grounding Mid Clamp and position next to first module. Slide second module into position under clamp and secure. Ensure the clamp teeth are in contact with both of the module frames and the bolt is properly aligned in slot. Torque to 84 in-lbs (dry). Repeat the procedure to secure each following module. Torque to 84 in-lbs If needed, present Integrated Grounding Certification Letter to inspector. If using Standard Mid Clamps with ETL-listed WEEB Clips, refer to Wiley WEEB Installation Instructions. Torque to 120 in-lbs (dry). T-Bolt Indent Perpendicular to Rail C. END CLAMPS C Place last module in position on rails, a minimum of 1.5 from rail ends. Secure End Clamp on rail, ensuring it is hooked over top of module. Torque to 65 in-lbs (dry). Repeat with End Clamp on other rail. D. REPEAT STEPS Install remaining module rows. 2014 IRONRIDGE, INC. VERSION 2.03 ROOF MOUNT INSTALLATION MANUAL - 4

ELECTRICAL DIAGRAM End Clamp Mid Clamp Grounding Lug Grounding Strap Internal Splice (Rail Connection) Minimum 10 AWG Copper Wire EXPANSION JOINTS For rows exceeding 100 feet of rail, a Grounding Strap Expansion Joint is required for thermal expansion. 3/8" From End Hex Nut (84 in-lbs) Tighten Until Snug (About 84 in-lbs) Insert Internal Splice into first rail and secure with screw. Assemble and secure Expansion Joint an inch from rail end. Slide second rail over splice and attach other end of Expansion Joint with hardware, leaving splice secured only on one side. Torque screws and nuts to 84 in-lbs (dry). Do not splice middle 1/3 of spans nor end spans of rows. Modules should not span over Expansion Joints and should have End Clamps on each side of joint. 1" Gap 5-1/2" Inside Rail 2014 IRONRIDGE, INC. VERSION 2.03 ROOF MOUNT INSTALLATION MANUAL - 5

GROUNDING STRAPS Insert Internal Splice into first rail and secure with strap, star washer, and screw. Slide second rail over Internal Splice and secure with strap, star washer, and screw. Torque screws to 84 in-lbs (dry). Repeat for all splices. Grounding hardware is only needed on same rail as lug. 6" Inside Rail Tighten Snug (About 84 in-lbs) END CAPS (OPTIONAL) End Caps add a completed look and keep debris and pests from collecting inside rails. Firmly press End Cap onto rail end. WIRE CLIPS (OPTIONAL) Wire Clips offer a simple wire management solution. Firmly press Wire Clip into top rail slot. Open clip and insert electrical wire accordingly. Close clip once complete. 2014 IRONRIDGE, INC. VERSION 2.03 ROOF MOUNT INSTALLATION MANUAL - 6

STANDOFFS (OPTIONAL) FLUSH STANDOFFS Attach Standoffs to roof locations with lag bolts (not included). Place flashing over Standoff. Attach L-Foot above washer with hardware. Torque to 139 in-lbs (dry). Not UL 2703 Evaluated Torque to 139 in-lbs Only attach to Tilt Legs if assembly is tilted 10 degrees or less. TILT STANDOFFS Refer to QuickMount PV QBase Low Slope Mount Manual. TILT LEGS (OPTIONAL) A. MOUNT U-FEET Mount all U-Feet on top of roof attachments and torque to required specifications. A Not UL 2703 Evaluated B Not UL 2703 Evaluated Determine the maximum distance between U-Feet, according to engineering specifications. B. PLACE TILT LEGS Place Tilt Legs into U-Feet, aligning slots of legs with U-Feet holes. Insert 3/8"-16 bolt with washer into hole and attach nut. Finger tighten, to allow pivoting. Join Inner and Outer Legs For Adjustable Tilt Legs (Not UL 2703 Evaluated) For Adjustable Tilt Legs, join inner and outer legs with hardware. C. ATTACH RAILS C Slide bolts into 3/8" rail slot. Lay rail in place, next to legs, and line up bolts with rail to attach. Place nut and finger tighten, to allow alignment. For Adjustable Tilt Legs, attach pivot bracket to north rail in each position where legs will connect. Adjust leg to desired length. Adjustable Tilt Leg Pivot Bracket D. TILT ASSEMBLY D Make sure assembly is aligned and square. Tilt assembly to desired angle. Tighten all bolts to 180 in-lbs (dry). Check with module manufacturer for rail placement specifics. Place rails from module's edge, up to 20% of the module's length. Torque to 180 in-lbs at Desired Angle 20% 20% 2014 IRONRIDGE, INC. VERSION 2.03 ROOF MOUNT INSTALLATION MANUAL - 7

Warranty Effective for IronRidge, Inc. ( IronRidge ) mounting structure components ( Products ) manufactured after April 1st, 2012, IronRidge provides the following warranties, for Products installed properly and used for the purpose for which the Products are designed: finishes shall be free of visible defects, peeling, or cracking, under normal atmospheric conditions, for a period of three (3) years from the earlier of (i) the date of complete installation of the Product or (ii) thirty days after the original purchaser s date of purchase of the Product ( Finish Warranty ); components shall be free of structurally-related defects in materials for a period of ten (10) years from the earlier of (i) the date of complete installation of the Product or (ii) thirty days after the original purchaser s date of purchase of the Product; components shall be free of functionally-related manufacturing defects for a period of twenty (20) years from date of manufacture. The Finish Warranty does not apply to: (a) surface oxidation of the galvanized steel components or any foreign residue deposited on Product finish; and (b) Products installed in corrosive atmospheric conditions, as defined solely by IronRidge; corrosive atmospheric conditions include, but are not limited to, conditions where Product is exposed to corrosive chemicals, fumes, cement dust, salt water marine environments or to continual spraying of either salt or fresh water. The Finish Warranty is VOID if (c) the practices specified by AAMA 609 & 610-02 Cleaning and Maintenance for Architecturally Finished Aluminum (www.aamanet.org) are not followed by Purchaser for IronRidge s aluminum based components; and (d) if the practices specified by ASTM A780 / A780M - 09 Standard Practice for Repair of Damaged and Uncoated Areas of HotDip Galvanized Coatings are not followed by Purchaser for IronRidge s galvanized steelbased components. The warranties above do not cover any parts or materials not manufactured by IronRidge, and exclude nonfunctionallyrelated defects, as defined solely by IronRidge. The warranties do not cover any defect that has not been reported to IronRidge in writing within twenty (20) days after discovery of such defect. In the event of breach of or non-compliance with the warranties set forth above, IronRidge s sole obligation and liability, and the sole and exclusive remedy for such breach or non-compliance, shall be correction of defects by repair, replacement, or credit, at IronRidge s sole discretion. Such repair, replacement or credit shall completely satisfy and discharge all of IronRidge s liability with respect to these warranties. Refurbished Product may be used to repair or replace the defective components. Transportation, installation, labor, or any other costs associated with Product replacement are not covered by these warranties and are not reimbursable. These warranties additionally do not cover (a) normal wear, or damage resulting from misuse, overloading, abuse, improper installation (including failure to follow professional instruction and certification), negligence, or accident, or from force major acts including any natural disasters, war or criminal acts; and (b) Products that have been altered, modified or repaired without written authorization from IronRidge or its authorized representative; and (c) Products used in a manner or for a purpose other than that specified by IronRidge. A formal document proving the purchase and the purchase date of the Product is required with any warranty claim. Except as set forth above, IronRidge sells the Products on an AS IS basis, which may not be free of errors or defects, and ALL EXPRESS OR IMPLIED REPRESENTATIONS AND WARRANTIES, INCLUDING ANY WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, QUALITY, WORKMANLIKE EFFORT, CORRESPONDENCE TO DESCRIPTION, DESIGN, TITLE OR NON-INFRINGEMENT, OR ARISING FROM COURSE OF DEALING, COURSE OF PERFORMANCE OR TRADE PRACTICE, ARE HEREBY DISCLAIMED. 2014 IRONRIDGE, INC. VERSION 2.03 ROOF MOUNT INSTALLATION MANUAL - 8

Wiley Electronics LLC Washer, Electrical Equipment Bond WEEB Patent Pending INSTALLATION INSTRUCTIONS For IronRidge Please read carefully before installing. WEEB-DMC WEEBL-6.7 WEEB Bonding Jumper-6.7 Products are tested to UL 467 3098177 UL standard for safety grounding and bonding equipment Document Number 104-0404-000039-000 Wiley Electronics LLC. 2006-2010 All Rights Reserved

The WEEB family of products can be used to bond anodized aluminum, galvanized steel, steel and other electrically conductive metal structures. Standard Top Down Clamps WEEB COMPATIBILITY The WEEBs used for bonding the PV modules to the mounting rails are compatible with various cross-sections of module frames. The following are examples of module frames that are compatible. Notice that the WEEB teeth are positioned completely under the edge of the module frame. OK OK OK The following is an example of a module frame that is incompatible with the WEEB. The WEEB teeth are positioned only partially under the edge of the module due to the lip on the top edge of the module frame. X Wiley Electronics LLC. 2006-2010 All Rights Reserved

Top Down Clamps for Lipped Modules The following are a few variations of lipped solar modules mounted with inverted U-shaped clamps. Notice that the force which the inverted U- shaped clamp exerts is in line with the WEEB teeth. OK Low-Lipped Module WEEB-DMC is not compatible with high lipped modules. The WEEB teeth do not intersect with the solar module frame. X High-Lipped Module Wiley Electronics LLC. 2006-2010 All Rights Reserved

SYSTEM OVERVIEW Use WEEB-DMC to bond solar modules to module mounting rail. Use WEEB Bonding Jumper to electrically connect mechanically spliced rails. Use one WEEBL-6.7 assembly per rail to connect system to equipment ground conductor Important notes: 1. 2. Use general purpose anti-seize compound on fastener threads when installing WEEBs. WEEBs are intended for SINGLE USE ONLY. Functionality will not be guaranteed if reused. Wiley Electronics LLC. 2006-2010 All Rights Reserved

WEEB-DMC ASSEMBLY 1 Inverted U- shaped mid-clamp Mid clamp WEEB-DMC WEEB-DMC Pre-assemble WEEB-DMC to mid clamp assembly as shown. Pre-assembling WEEB-DMC to mid clamp assembly will contain the small individual parts, reducing the possibility of losing parts during installation. 2 Assemble end clamp to manufacturer's specification. Wiley Electronics LLC. 2006-2010 All Rights Reserved

3 Slide pre-assembled WEEB-DMC and mid clamp assembly into position. Slightly lift solar module and slide WEEB-DMC and mid clamp assembly into position. WEEB teeth will automatically be aligned under the edge of the module when mid clamp assembly is correctly installed. Important note: To correctly install mid clamp assembly, ensure that the bolt is perpendicular to the mounting rail and both sides of the solar modules are completely positioned against the mid clamp. Refer to WEEB compatibility page for illustrations. Wiley Electronics LLC. 2006-2010 All Rights Reserved

4 Important note: WEEBs are for SINGLE USE ONLY! Do not torque fasteners down if position of solar modules is not finalized. Only slighty tighten fasteners to keep modules in place. When position of solar modules is finalized, tighten fasteners to 10 ft-lb / 13.5 N-m using general purpose anti-seize compound on threads. Assemble end clamp to manufacturer's specification. Wiley Electronics LLC. 2006-2010 All Rights Reserved

WEEB-DMC LAYOUT EVEN NUMBER OF MODULES IN ROW x x x x X DENOTES PLACES TO INSTALL WEEB-DMC C X R = 4 X 1 WEEB-DMC NEEDED = C X R = 4 X 1 = 4 ODD NUMBER OF MODULES IN ROW x x x x x x X DENOTES PLACES TO INSTALL WEEB-DMC C X R = 5 X 1 WEEB-DMC NEEDED = [C+1] X R = [5+1] X 1 = 6 Note: When replacing a single faulty module, also remove the adjacent module which contacts the same WEEBs as the faulty module. This will ensure that there are never ungrounded modules in the array. Wiley Electronics LLC. 2006-2010 All Rights Reserved

5 WEEBLUG ASSEMBLY WEEB teeth towards rail Slide bolt to desired position and slip bolt through WEEB-6.7 WEEB-6.7 Install WEEBL-6.7 assembly and torque fasteners to 10 ft-lb / 13.5 N-m using general purpose anti-seize compound on threads Important note: WEEB-6.7 that sits under the WEEBLug is for single use only. Ensure position is correct before tightening down. Wiley Electronics LLC. 2006-2010 All Rights Reserved

6 Equipment Ground Conductor Lay in equipment ground conductor and tighten bolt to 7 ft-lb / 10 N-m. Wiley Electronics LLC. 2006-2010 All Rights Reserved

IRONRIDGE SPLICE KIT ASSEMBLY 7 The flexible WEEB Bonding Jumper can be mounted in different ways shown below. WEEB Bonding Jumper Torque to 10 ft-lb / 13.5 N-m using general purpose anti-seize compound on threads. WEEB Bonding Jumper Torque to 10 ft-lb / 13.5 N-m using general purpose anti-seize compound on threads. Route WEEB Bonding Jumper as shown above if edge of solar module lands between two splice rails. Wiley Electronics LLC. 2006-2010 All Rights Reserved

LOW-LIPPED MODULE INSTALLATION Tighten to 10 ft-lb / 13.5 N-m using general purpose anti-seize compound on threads. Inverted U-shaped mid clamp Wiley Electronics LLC. 2006-2010 All Rights Reserved