Washington Irving Elementary School

Similar documents
Agustin Lara Elementary Academy

Charles W Earle Elementary School

Josefa Ortiz De Dominguez Elementary School

Richard Henry Lee Elementary School

Oscar DePriest Elementary School

Joseph Brennemann Elementary School

Edward Jenner Elementary Academy of the Arts

Genevieve Melody Elementary School

Calmeca Academy of Fine Arts and Dual Language

Francis M McKay Elementary School

John Palmer Elementary School

Sidney Sawyer Elementary School

DeWitt Clinton Elementary School

George B Swift Elementary Specialty School

Alessandro Volta Elementary School

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

PLAN REVIEW SUBMITTAL GUIDE

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

NYC Department of Education

NYC Department of Education

1354 CHECKLIST for Project Closeout

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

Cook - Wissahickon Elementary School

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

NYC Department of Education

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

NYC Department of Education

NYC Department of Education

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

NYC Department of Education

NYC Department of Education

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

NYC Department of Education

NYC Department of Education

Briar Crest Elementary

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

Mechanical Inspection Plumbing

NYC Department of Education

RECAPP Facility Evaluation Report

NYC Department of Education

Master Facility Planning Update School Board Meeting May 26, 2016

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

Estimated Repair, Replacement, and Upgrade Costs

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

RECAPP Facility Evaluation Report

Ashland School District Facility & Capacity Assessment Report 2005

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

GARCIA GALUSKA DESOUSA Consulting Engineers

DOCUMENT TABLE OF CONTENTS

NYC Department of Education

$ Each additional variance per petition. $ All Other Zoning Districts: One variance per petition

NYC Department of Education

NYC Department of Education

GARCIA GALUSKA DESOUSA Consulting Engineers

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

NYC Department of Education

PLATTEVILLE MIDDLE SCHOOL

NYC Department of Education

NYC Department of Education

Florence High School / Middle School Page 1 of 3 Florence, WI

NYC Department of Education

FAIRA TRANSPARENCY REPORTS S 236th St, 10-5, Kent, WA 98032

Appendix B. Facilities Assessment Report

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

NYC Department of Education

NYC Department of Education

Building Self-Inspection Program

NYC Department of Education

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

NYC Department of Education

NYC Department of Education

NYC Department of Education Building Condition Assessment Survey :49AM :00PM

NYC Department of Education

2014 Bond Project Guide

New High School Concept

Mechanical System Description

NYC Department of Education

DRAFT. Widen Elementary School Site Summary 74,523 SF. Introduction

Axiom Property Inspections

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

RECAPP Facility Evaluation Report

NYC Department of Education

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. 5: The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. : The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Concrete/ Stucco Canopy CHIMNEY 5 6 GRE 6 922 7 922 SF $26,106 $26,106 Metal Flue 5 6 7 0 10 LF Assessment Date: 1/8/2013 Page 1 of 15

DOORS Exterior Steel Door Overhead Rolling / Garage Door Side Lite Store Front Door Transom Lite 5 6 7 GRE 6 5 16 GRE 7 4 GRE 7 8 2 2 $1,652 4 EA 8 EA 12 EA $1,652 ENTRANCE Entrance Controls - Audio and Video Power Door Operator and Controls 5 6 7 GRE 7 3 GRE 7 3 3 EA 3 EA FOUNDATION Concrete Foundation 5 6 7 GRE 7 925 925 LF LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted 5 6 7 GRE 7 2 7 2 EA 17 EA LINTELS Lintels - Concrete Lintels - Steel 5 6 7 BLU 5 25 6 GRE 7 699 31 LF $3,056 699 LF $3,056 Assessment Date: 1/8/2013 Page 2 of 15

PARAPET Coping - Metal Parapet < 16" Height 5 6 7,409,409 1,409 LF 1,409 LF ROOF SYSTEM Interior Downspouts Modified Bitumen Roof Roof Structure: Concrete Roof Structure: Steel/Metal Deck/Concrete Topping 5 6 GRE 6 327 GRE 6 30,756 7 GRE 7 24,322 GRE 7 6,434 327 LF 30,756 SF $217,706 24,322 SF 6,434 SF $217,706 SUPERSTRUCTURE Metal Deck/Concrete Topping 5 6 7 WALLS Brick Concrete Block 5 6 7 GRE 7 23,013 GRE 6 400 2,288 23,013 SF 2,688 SF $7,722 $7,722 WINDOWS Windows - Sash Aluminum Double-pane EXTERIOR 5 6 GRE 6 3,852 7 3,852 SF $33,050 $33,050 $289,291 Assessment Date: 1/8/2013 Page 3 of 15

ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Emergency Battery Packs - Toilets Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - CCTV Security System - Intrusion detection 5 6 7,735 GRE 7 8,239 GRE 7 6,367,540 GRE 7 20 GRE 7 7 GRE 7 8 ORA 3 25 ORA 3 7 BLU 5 56,498 1,735 SF 8,239 SF 6,367 SF 1,540 SF 20 EA 7 EA 8 EA 25 EA $23,238 7 EA $6,507 $80,792 $110,536 MAIN SERVICE Main Electrical service 1600 A 277/480/3PH POWER DISTRIBUTION 5 6 GRE 6 1 7 $11,619 $11,619 Lighting and power panels Main distribution panels above 600 amp Main distribution panels less than 400 amp Transformers 277/480-120/208 5 6 7 GRE 6 1 5 7 GRE 6 2 GRE 6 2 13 EA $9,009 2 EA $4,290 2 EA $2,288 $15,587 Assessment Date: 1/8/2013 Page 4 of 15

ELECTRICAL $137,742 FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System FIRE PROTECTION 5 6 7 MECHANICAL AIR CONDITIONING Chillers - Air Cooled - Screw Type - Roof Mounted less than 50 tons AIR HANDLING SYSTEMS 5 6 GRE 6 2 7 2 EA $31,746 $31,746 Air Handling Package - Multi Zone - Hot Water less than 6,000 cfm Air Handling Package - Single Zone - Hot Water 4,000 to 8,000 cfm Air intake for all Air Handling s except built up AHU Return Fans - Indoor 5,000 to 10,000 CFM Variable Air Volume (VAV) Box With Hot Water Coil 5 6 GRE 6 1 GRE 6 3 7 GRE 7 4 GRE 6 1 GRE 6 8 $3,861 3 EA $15,015 4 EA $1,716 8 EA $2,631 $23,223 BOILER SYSTEMS Boiler Assembly - Non-Condensing Scotch Marine Hot Water Boiler 2,001MBH-3,000 MBH Boiler Auxiliary Non-Condensing Hot Water Boiler 2,001MBH-3,000 MBH Chemical Pot Feeder - Hot Water 5 BLU 5 2 6 7 GRE 7 2 GRE 6 1 2 EA $165,880 2 EA $300 Assessment Date: 1/8/2013 Page 5 of 15

Combustion Dampers HEATING DEVICES $166,180 Cabinet Heaters With Hot Water Coils Heater - Hot Water MECHANICAL PLUMBING Piping - Hydronic Supply and Return - Copper Pumps - Chilled Water less than 10 HP Pumps - Hot Water 5 to 10 HP Pumps - Hot Water less than 5 HP TEMPERATURE CONTROL 5 6 GRE 6 8 GRE 6 7 5 6 GRE 6 500 BLU 5 2 BLU 5 2 BLU 5 2 7 7 8 EA $4,004 7 EA $10,010 $14,014 500 LF $8,437 2 EA $17,160 2 EA $17,160 2 EA $10,725 $53,482 Pneumatic System Thermostats - Pneumatic 5 6 GRE 6 56,498 7 8 $20,198 18 EA $20,198 UNIT VENTILATION Ventilators - Hot Water and Chilled Water VENTILATION 5 6 GRE 6 30 7 30 EA $51,480 $51,480 Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm 5 6 GRE 6 7 7 GRE 7 5 GRE 7 2 7 EA $3,504 5 EA 2 EA Assessment Date: 1/8/2013 Page 6 of 15

Exhaust Fans - Roof mounted less than 500 CFM Type I Exhaust Hood - Kitchen or Culinary Arts MECHANICAL PLUMBING HOT WATER GRE 7 3 3 EA $3,504 $363,827 Hot Water Heater - Gas 150,000-300,000 BTU/HR 5 6 7 GRE 7 2 2 EA PIPING Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping PLUMBING 5 6 7 GRE 6 56,498 GRE 6 56,498 GRE 6 56,498 GRE 6 56,498 GRE 6 56,498 GRE 6 56,498 $8,887 $8,887 $8,887 $12,927 $11,311 $8,887 $59,786 $59,786 INTERIOR ADMINISTRATIVE SUITES Ceiling - Exposed 5 6 7 GRE 7 280 280 SF Assessment Date: 1/8/2013 Page 7 of 15

Ceiling - Lay-In Flooring - Carpet Flooring - Tile/Sheet Lighting - Lay-In Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall AUDITORIUM - DEDICATED GRE 6 243 2,281 68 GRE 6 143 2,493 GRE 7 33 GRE 7 22 GRE 7 3,865 GRE 7 2,910 2,524 SF $521 168 SF 2,636 SF $204 33 SF 22 SF 3,865 SF 2,910 SF $726 Sound System Stage Curtains Stage Lighting System 5 6 GRE 6 1 7 $35,750 $35,750 CORRIDOR Stairs - Asphalt 5 6 7 3 13 LF DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Store Front Door 5 6 7 GRE 6 5 41 GRE 6 1 15 43 GRE 7 267 GRE 6 1 5 46 EA $1,416 59 EA $4,719 267 SF 6 EA $236 $6,371 GYMNASIUM / AUDITORIUM Ceiling - Exposed Flooring - Tile/Sheet 5 6 7 GRE 7 4,045 GRE 6 4,045 4,045 SF 4,045 SF $5,784 Assessment Date: 1/8/2013 Page 8 of 15

Lighting - Metal Halide/Sodium Vapor Walls - Concrete Block KITCHEN GRE 6 28 GRE 6 6,710 28 EA $5,005 6,710 SF $57,572 $68,361 Ceiling - Plaster/Drywall Flooring - Tile Quarry Lighting - Lay-In Wall - Structural Glazed Tile 5 6 7,021,021 2,386 1,021 SF 1,021 SF 12 SF 1,386 SF LOCKER/SHOWER ROOM Showers LUNCHROOM 5 6 GRE 6 2 7 2 EA $486 $486 Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Lay-In Serving Line Wall - Concrete Block Wall - Plaster/Drywall 5 6 7,728 GRE 7 594 GRE 7 2,322 GRE 6 15 32 GRE 7 20,746 GRE 7 328 1,728 SF 594 SF 2,322 SF 47 SF $70 20 LF 1,746 SF 328 SF $70 MDF/IDF Finishes Ventilation and Cooling 5 6 7 GRE 7 200 200 SF Assessment Date: 1/8/2013 Page 9 of 15

MECHANICAL/SERVICE ROOMS Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room Vaults 5 6 7 GRE 7 486 GRE 7 3 GRE 6 200 3,560 GRE 6 300 835 GRE 7 90 486 SF 3 SF 3,760 SF $944 1,135 SF $1,416 90 SF $2,360 STAFF RESTROOM Accessories Ceiling - Lay-In Ceiling - Plaster/Drywall Floor Drain Flooring - Tile Ceramic/Porcelain Lavatory Lighting - Pendant/ Surface Lighting - Wall Mounted Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Water Closet 5 6 7 GRE 6 1,288 420 GRE 6 108 130 GRE 6 310 1,170 GRE 6 2 13 GRE 6 160 1,558 GRE 7 28 GRE 6 3 28 GRE 7 3 GRE 6 3 20 GRE 7 6 GRE 7 6,032 GRE 7 432 GRE 6 2 23 1,708 SF $9,946 238 SF $232 1,480 SF $878 15 EA $601 1,718 SF $407 28 EA 31 SF $13 3 EA 23 EA $538 6 EA 6,032 SF 432 SF 25 EA $3,718 $16,332 THEATER Ceiling - Lay-In Flooring - Tile/Sheet Lighting - Lay-In Wall - Concrete Block 5 6 GRE 6 1,735 GRE 6 1,735 7 GRE 7 24,200 1,735 SF $13,646 1,735 SF $2,481 24 SF 1,200 SF Assessment Date: 1/8/2013 Page 10 of 15

Wall - Plaster/Drywall VERTICAL CONVEYANCE GRE 7 760 760 SF $16,127 Elevator - Roped Holeless Hydraulic 5 6 7 VOCATIONAL SHOP Work Sink INTERIOR 5 6 7 GRE 6 1 2 3 EA $386 $386 $146,968 ROOM CASEWORK Casework 5 6 7 GRE 6 160 145 305 LF $5,720 $5,720 CEILING Exposed Ceiling Lay-In/Drop Plaster/Drywall 5 6 7 GRE 7 759 GRE 6 13,225 8,031 GRE 7 58 759 SF 21,256 SF $28,368 58 SF $28,368 CHALK BOARD 5 6 7 Chalk Board YEL 4 404 404 LF $49,106 $49,106 Assessment Date: 1/8/2013 Page 11 of 15

CORRIDORS Concrete Block Drinking Fountains Drop/Lay-In Floors Lay-In Pendant/Surface Single Water Cooler Stair Handrails Stairs Tile/Sheet Flooring Walls 5 6 7 GRE 6 5,180 13,147 GRE 7 2 GRE 6 2,586 3,941 GRE 7 3,833 GRE 6 322 6,187,730 GRE 7 6 GRE 6 200 GRE 6 44 44 GRE 6 1,288 2,676 GRE 7 433 18,327 SF $14,815 2 EA 6,527 SF $5,547 3,833 SF 6,509 EA $1,957 1,730 EA 6 EA 200 LF 88 EA $2,517 3,964 SF $1,842 433 SF $26,677 CORRIDORS CEILING Plaster/Drywall 5 6 7 GRE 6 1,390 322 1,712 SF $3,936 $3,936 FLOOR Carpet Tile/Sheet 5 6 GRE 6 841 7 GRE 6 5,808 15,424 841 SF $1,203 21,232 SF $8,305 $9,508 LIGHTING Lay-In Pendant/Surface 5 6 7 GRE 7 307 2 307 EA 12 EA Assessment Date: 1/8/2013 Page 12 of 15

MARKER BOARD Marker Board 5 6 7 GRE 7 8 8 LF WALL Concrete Block Plaster/Drywall ROOM 5 6 7 GRE 6 9,672 13,940 GRE 7 696 23,612 SF $27,662 696 SF $27,662 $150,977 SITE CIVIL/DRAINAGE Catch Basin Site Manhole 5 6 7 GRE 7 3 GRE 7 5 3 EA 5 EA FENCING Chain Link Ornamental Iron 5 6 7 GRE 6 5 300 GRE 6 10 1,866 305 LF $179 1,876 LF $189 $368 LANDSCAPE Asphalt Play Area/Hardscape Grass Hardscape - Concrete Parkway trees 5 6 7 GRE 7 3,600 GRE 7 61,477 GRE 7 6,000 GRE 7 35 3,600 SF 61,477 SF 6,000 SF 35 EA Assessment Date: 1/8/2013 Page 13 of 15

Planting Beds/ Areas PARKING LOT,856 1,856 SF Asphalt Concrete Curbs Parking lot interior plantings Trash Enclosure 5 6 GRE 6 21,025 7 GRE 6 5 35 GRE 7 2 GRE 7 836 21,025 SF $18,039 40 LF $30 2 LF 836 SF $18,070 PLAYGROUND Playground Equipment - School Age 5-12 Playground Surfacing - Wood Chips SIDEWALKS 5 6 GRE 6 1 YEL 4 1,976 7 1,976 SF $12,716 $12,716 Internal Walks Perimeter Sidewalks 5 6 7 36 0,438 136 LF 10,438 SF SIGNAGE Flag Pole Marquee - Building Mounted Back Lighted Monument Sign SITE 5 6 7 $31,153 Assessment Date: 1/8/2013 Page 14 of 15

Campus Need ² ³ $1,179,744 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 1/8/2013 Page 15 of 15