CPC-180-ABNAB. 180 litres, 535mm x 1550mm high

Similar documents
CPC-150-ANA. 150 litres, 535mm x 1300mm high. Pandora Heat Bank. 100kW Plate Heat Exchanger with 22mm Thermostatic Mixing Valve.

CPC-150-ABIAB. Important Installation Notes.

PANDORA HEAT BANKS OXFORD BROOKES, HARCOURT HILL. Operation and Maintenance. THERMAL INTEGRATION LTD. Tel: Internet:

A comparison of Pandora Heat Bank Thermal Stores to Unvented Hot Water Cylinders HIGHER PRESSURES AND FLOW RATES

INSTALLATION & TECHNICAL MANUAL

MEGAFLO HE Iss 1

XCEL HEAT BANKS Installation Instructions. Thermal Integration Ltd., 1-3 Wealdstone Road, Sutton, Surrey SM3 9QN.

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

ADVANCE ELECTRIC THERMAL STORE

ADVANCE ECB ELECTRIC COMBINATION BOILER

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

unistor Instructions for Installation and Use Unvented hot water storage cylinder

ELECTRIC COMBINATION BOILER. (European Patent No: Design Right Protected.) TH12-450U MRK 2

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

INSTALLATION & TECHNICAL MANUAL

HEATRAE SADIA. Installation and User Instructions for the UTC Undersink Vented Water Heater

DOMESTIC HEATING CONTROLS ARE EASY PART 1 - THE BASICS

Thermostatic bar mixer valve with adjustable head Installation guide

Plus. USER and INSTALLATION INSTRUCTIONS. 30,000-9kW for Heating and Hot Water

Solar System Demonstrations

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

Instructions for Use Installation and Servicing

Aquamixa. Thermo. Thermostatic shower valve with manual bath fill

INSTANTANEOUS ELECTRIC SHOWER

Quartz. Thermo. Concealed shower valve with adjustable head. Quartz Thermo installation guide page 1

Quartz. Digital. Bath with bath waste filler. Quartz Digital Bath with bath waste filler installation instuctions page 1

CalMag Filter Installation Instructions

Installation & User Instructions

Bosch Group. 15SBi / 24SBi. WALL MOUNTED BOILERS FOR CENTRAL HEATING and Indirect supply of domestic hot water

Understand and apply domestic central heating system installation and maintenance techniques

Dream DCV. Thermostatic Dual control mixer valve range. Installation guide

SEALED THERMAL STORE

Technical and Installation manual All Models

INSTALLATION INSTRUCTIONS ONE LARGE ZONE

Quantum. Installation, User and Service Manual. Hot Spring

Rise. Digital. Bath with overflow filler. Rise Digital Bath installation instuctions page 1

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

Bosch Group. 24CDi OF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

CROWN WATER HEATERS CPU10 - CPU15 CPOS10 - CPOS15

OWNER S GUIDE SEQUENTIAL THERMOSTATIC SHOWER VALVE. 150mm Inlet Pipe Centres. Shower Control. Handles and. may differ depending.

Dove Eco thermostatic bar mixer shower

Installation & User Instructions

Contents. Commissioning 6 Operation 6 Routine Preventative Maintenance 6 Fault Finding 7 Spares Parts 8 Technical Support 9

SINGLE LEVER CERAMIC DISC MANUAL SHOWER VALVE

Alpha FlowSmart 25 and 50

POWERFLOW Series. Unvented Electric Storage Water Heaters. Installation & Operating Instructions Manual

Manual Heatstream Installation & Maintenance

INSTALLATION INSTRUCTIONS

Space Saver. New Easy Guide. Connecting your Space Saver to a central heating system BEFORE AFTER

Thermostatic exposed shower valve and bath/shower mixer systems Installation guide

Alpha CD13R,18R and 24R

Megaflo Eco Slimline Unvented Direct & Indirect Hot Water Cylinders 100L - 200L

Extreme Domestic Hot Water Loading System TECHNICAL DOCUMENTATION. Issue 11/09

Bar valve with fixed and adjustable shower heads. Installation guide. Midas Plus installation instructions Page 1

Alpha CombiMax 350 and 600

IntaKlean Installation & Servicing Instructions IKMF22 and IKMF28

Pivot Stove Hydronic Installation Guide

Highflow 400 ELECTRONIC BF FLOOR STANDING COMBINATION APPLIANCE FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER

Electronic Dual Cylinder Thermostat Installation Instructions

Installation and Servicing Instructions. Alpha FlowSmart

AQ150:Midas 10/9/15 14:50 Page 1 AQ150. Thermostatic bar mixer valve with adjustable head. Installation guide

warm water underfloor heating installation manual v4b-aug 08 Nu-Heat design innovation expertise service

Mains Pressure Hot Water from an existing vented copper cylinder... Allows the cold water tank to be removed, freeing loft space.

Installation and Servicing Instructions

Installation, Operating and Maintenance Guide

MEGAFLO Eco Plus Solar Unvented Hot Water Cylinders 400L -570L

Bosch Group. 24CDi RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

Installation, operating and servicing instructions

ADVANCE UNIVERSAL MULTI-FUEL THERMAL STORE

Sanitary Water Tank INSTALLATION & SVC MANUAL

Unvented Hot Water Storage Cylinders Installation and Maintenance Instruction Manual

HI-MAX STORE Installation, operation and maintenance manual

Prism Thermostatic Recessed Shower with Integral 2 Outlet Diverter

AquaFlo II. Issue 3 December Please read these instructions carefully before commencing installation of the AquaFlo unvented water heater

Risk Assessment and Control Measures for Household Hot Water Systems

Aqua & Instantaneous Electric Shower Installation Instructions SERVICE POLICY

NENE. Installation and Operating Instructions. Thermostatic bar mixer shower PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

Bosch Group. 24i RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

MIDAS. Installation instructions 110/220

DEFENDER DEFENDER. Models: MD22A OPERATION MANUAL. Full Flow Magnetic Filter

Cylinder Manual. Open Vented Cylinders Stainless Steel Water Heaters. Twin Coil TW180V TW210V TW250V TW300V Triple Coil TR250V TR300V

Leona thermostatic bar mixer shower pole Installation and operating instructions

Assessment Schedule - TS.6

Megaflo HE issue 6

Please take time to carefully read through these guidelines before using your Kamco pump.

INSTALLATION AND SERVICING INSTRUCTIONS

Installation and Servicing Instructions. Alpha CD24C/32C

GB24 & GB30. User Manual

Furrows Business Park, Haybridge Road Wellington, Telford, Shropshire TF1 2FE

BOILERMATE 2000 DESIGN, INSTALLATION AND SERVICING INSTRUCTIONS

SYSTEMATE 2000 DESIGN, INSTALLATION AND SERVICING INSTRUCTIONS

Oltis thermostatic bar mixer

For more information on Pegler Yorkshire visit Heating Controls. Radiator valves with new integral push-fit inlet

Ambassador. Installation guide & user instructions. Please ensure that this document is handed to the user after installation is completed

INSTALLATION INSTRUCTIONS SINGLE CIRCUIT

Traditional Rigid Riser With Eight Inch Rose

Delphi dual control thermostatic mixer shower Installation and operating instructions

STREAMLINE OVERSINK. Fitting Instructions and User Guide _iss_05.indd 1 15/09/ :46:30

Bosch Group. 15SBi / 24SBi. WALL MOUNTED BOILERS FOR CENTRAL HEATING and Indirect supply of domestic hot water

THERMAL STORE MAINS PRESSURE SYSTEM

Transcription:

6 8 9 10 1 3 7 2 4 11 13 17 5 28 21 20 19 18 30 Wiring Pandora Heat Bank. 100kW Plate Heat Exchanger with 22mm Thermostatic Mixing Valve. Indirectly Heated. Cylinder Thermostat. Manually Filled store - NO discharge pipe or overflow. 100kW Plate Heat Exchanger can heat 30 ltr/min of mains hot water, up to 6 bar pressure. 180 litres, 535mm x 1550mm high 16A, 3kW HX14

Wiring 6 1 Plate heat exchanger, L18-14 (100kw) 2 Flow switch 3 Heat exchanger pump 4 Thermostatic mixing valve, RWC Heatguard 22mm 5 Drain off cock 6 Removable lid 7 White plastic coated steel casing 8 Anti-vacuum valve 9 Vent, with evaporation protection 10 Filling Point, with hose 11 Wiring Centre 13 Boost Immersion Heater 17 Cylinder Thermostat, Immersed [70 C] 18 Lockshield Balancing Valve, 22mm 19 Automatic Air Vent with Manual Vent 20 Hot Water Zone Valve, 22mm 21 Heating Motorised Valve, 28mm 28 Danfoss FP715 Two Channel Programmer 30 Danfoss RMT230 Room Thermostat 8 9 7 10 11 13 28 20 19 18 16A, 3kW 30 HX14 1 4 17 21 3 2 5 Connections onto the unit are compression or Tectite push-fit. When connecting into a push-fit fitting, ensure that a wheel-type pipe citter is used and that there are no burs that may damage the o-rings. A dicsonnecting tool is supplied to enable release of pipes from push-fit connections. The outlet from the thermostatic mixing valve is made using the supplied solder union and washer (cable tied to the pipework).please ensure that the lowest point on the cold mains supply (after isolating valve) is fitted with a drain cock to both assist in servicing.

The Heat Bank, and all connected equipment, must be installed by a competent person. Correct function and operation must be checked. It is important that the incoming mains power supply has sufficient current and voltage, taking into account the supply requirements of the rest of the property. All power supplies must be fitted with double pole isolation within the cylinder cupboard, as well as suitably rated MCB protection at distribution box. It is important that power supplies to a seperate gas/oil boiler are taken from the unit wiring centre. It is unacceptable to have two independant power supplies/spurs connecting to the same circuit. Take a 5 core wire from store to boiler for safety. Ensure earth continuity throughout. In wiring diagrams, earth and neutral wires may be abbreviated for clarity. Wiring Diagram:

Connections onto the unit are compression or Tectite push-fit. When connecting into a push-fit fitting, ensure that a wheel-type pipe cutter is used and that there are no burs that may damage the o-rings. A dicsonnecting tool is supplied to enable release of pipes from push-fit connections. Filling the Pandora: The unit is filled by the use of a hose pipe connected to the mains water supply, and will only need to be filled up once in this way. Note that inhibitor is factory added to the store already, and so is only required if the unit is drained after initial filling. 1. Remove the filling cap [No.10, page 2] to reveal the filling hole. 2. Feed hose pipe into store through the filling hole, and start to fill. It may help to tie the hose to pipework to stop it slipping out. 3. Fill the unit until up to the water level marker (within 1cm of hole), then stop. 4. Remove the hose, and replace the filling cap securely. Filling the Primary System: The primary (boiler) system is filled seperately to the Heat Bank. The primary system must be properly cold/hot flushed prior to final filling. Always use the correct dose of a reputable corrosion inhibitor to protect the system. Please ensure that all air is properly vented from primary pipework and radiators prior to turning on the boiler. Testing of Primary System: The Wiring aim Diagram: of testing is to ensure correct operation of boiler and controls, as well as TRVs and general operation of the heating. It also allows hot water to be tested. 1. Check balancing valve(s) on the primary flow the the coil is open, and all radiator valves are open or set to MAXIMUM. 2. Turn system power on, turn the Boiler to FULL ON, and the system controls to HOT WATER ON. 3. The boiler pump should start circulating water and the boiler should start firing. 4. The boiler flow and the flow to the store heating coil should start to heat up. 5. Turn the system controls to HEATING ON and any room thermostats to MAXIMUM. 6. The flow to the central heating should now start to get hot, and in turn radiators. 7. Check all radiators for heat, and bleed air as required. Adjust By-Pass if required. 8. Turn the system controls to HEATING OFF and allow the system to continue heating the Pandora. 9. Check that the Pandora fully heats up (70 C on stat) and that the boiler switches off and the primary pump stops. Also, turn on power to the immersion heater (if fitted) and check that it is operating. If not then check heater control thermostat is set to around 77 C, the overheat thermostat is set to 90 C, and that the overheat does not need re-setting (see below). Immersion Heater Overheat and Dry-Fire protection is provided within each heater by the use of an additional reset thermostat. If the heater power supplies are turned on before the unit is filled then there is a very good chance that the thermostat will need re-setting. Simply remove the immersion heater cap and push in the small black button on the thermostat - if it clicks it has reset. Testing of Hot Water Services: Once the store has fully heated up, it is important to check that hot water is available at all hot water outlets, and with the required flow rates and temperatures. The hot water supply temperature should be checked, and if required adjusted using the fitted thermostatic blending valve. Once set, the blending valve can be locked in position (see valve instruction sheet). If not locked in position, set the thermostatic mixing valve to maximum.

Store hot, but no hot water (or hot water for up to 30 seconds only). 'Store Hot' means the store is heated to the required 70 C. To check, carefully touch a brass elbow connecting into the store near the top - it should be too hot to keep in contact long. If the store is cold then refer to section 'Store not heating up'. If the problem is the store is not quite hot enough, then you should obtain hotter water at a low flow rate. Check controls/programmer is set to provide hot water for at least 1 hour. You can heat up the store by using the backup immersion heater. If hot water is then available, it is a sure sign that the boiler is not heating up the store properly. Check the cylinder thermostat(s) set to 70 C. Check the boiler is turned up full. Check the mixing valve is set high enough. If increasing setting on valve does not improve hot water tempratures then check that the hot inlet to the mixing valve (with red cable tie) is hotter than the outlet. If it is hotter then the valve needs servicing or replacing. If the hot inlet is cold or luke warm then look elsewhere for a fault. Check power is turned on to controls. Set heat exchanger pump temporarily to speed III and check that the pump turns on and off as a hot tap is opened. If not, then try to 'kick' start the pump manually, by removing the bleed cap on the pump and using a screw driver to turn the spindle. If the pump spindle moves freely, then check that the flow switch has a live supply, and it is passing a live to the pump when a hot tap is opened. If it doesn't pass the live when a hot tap is opened it requires replacement (very rare - more common for hot and cold pipes to be cross-connected). Check that the unit is full. This MUST only be done once the filling point is cool to the touch. If not then top up with hose pipe (provided). ALWAYS re-cap filling connection to hose after use, and tighten filling cap properly. Store not heating up - completely cold to touch. Wiring Diagram: To get hot water temporarily, you can heat up the store by using the backup immersion heater. Check power is on (lights work on programmer) and controls/programmer is set to provide hot water for at least 1 hour. Does the central heating work? If not then the fault probably lies with the programmer or the boiler. Check the boiler is turned up full. Check the cylinder thermostat(s) set to 70 C. Check the coil balancing valve is open. Check the motorised valve for hot water has opened - if it has the lever will swing easily without returning. If not, then problem is with either the programmer, cylinder stat or motorised valve actuator. The valve can be manually locked open to temporarily obtain hot water. The programmer is faulty if terminal 4 (HW On) is not live with the programmer set HW On. The cylinder stat is faulty if terminal 4 is live but 8 is not, with the cylinder stat set to 70 C. The motorised valve is faulty if terminal 8 is live (brown wire to valve) but the valve is not opening. The fault will be with either actuator or the valve body - remove actuator and check free movement of valve spindle, and operation of actuator.

Manually Filled store - NO discharge pipe or overflow. 100kW Plate Heat Exchanger can heat 30 ltr/min of mains hot 6 7 water, up to 6 bar pressure. 8 30 9 10 28 1 Plate heat exchanger, L18-14 (100kw) 2 Flow switch 3 Heat exchanger pump 11 19 4 Thermostatic mixing valve, RWC Heatguard 22mm 5 Drain off cock 6 Removable lid 7 White plastic coated steel casing 8 Anti-vacuum valve 13 20 18 16A, 3kW 9 Vent, with evaporation protection 10 Filling Point, with hose HX14 11 Wiring Centre 13 Boost Immersion Heater 17 Cylinder Thermostat, Immersed [70 C] 18 Lockshield Balancing Valve, 22mm 19 Automatic Air Vent with Manual Vent 1 4 17 21 20 Hot Water Zone Valve, 22mm 21 Heating Motorised Valve, 28mm 28 Danfoss FP715 Two Channel Programmer 30 Danfoss RMT230 Room Thermostat 3 2 5 Wiring Diagram: