Casey Craft

Similar documents
AccuBrine automated brine maker Technical Specifications

GIRTON CABINET WASHER MODEL 794A

Models. Options. Standard Features. LoH 2 O

SECTION AUTOMATIC DRIVE THRU VEHICLE WASH SYSTEM

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS

Direct Fired Heater Model AD Specification

POULTRY MARKET CATALOG

YOUR PROCESS DEMANDS THE MOST DEPENDABLE TEMPERATURE CONTROL UNIT AVAILABLE.

SENTRA Series Water Unit

FLANGE-MOUNT CENTRIFUGAL PUMPS

COMPETITIVE INITIATIVE POWDER COATING SPRAY SYSTEM MINES TECHNICAL SPECIFICATION

Internal ridged board 1" x 1.5 foil face installation shall be installed on roof, walls and base of casing.

Intelligent Variable Speed Pump

JFT Flight Machine. JFT Flight Machine. Models. Options. Standard Features. JFT Flight Machine

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

AUTOTROL 363TC AUTOMATIC FILTER VALVE SERVICE MANUAL

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

J SERIES. Technical Specifications. Centrifugal Pumps for J Series Condensate & Boiler Feed Pumps. Features

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

SECTION STEAM CONDENSATE PUMPS

Paragon. Induced Draft, Counter Flow Optional Accessories

STERO SCT-94SC/108SC/120SC CONVEYOR SERIES

Standard Features. Performance/Capacities

SECTION WASTEWATER PUMPING STATION DESCRIPTION

30 F to 300 F Process Temperatures* 1/2 to 7.5 HP Centrifugal Pumps ( GPM) 3/8-1 Solenoid Cooling Valves (VE & 300 F models)

SECTION ROTARY-SCREW WATER CHILLERS

AM-14/AM-14C DISHWASHERS

TM Series. Induced Draft, Counter Flow Optional Accessories

SECTION PLUMBING EQUIPMENT Piping (Plumbing). 2. Division 16 - Electrical Wiring and Connections.

60 TON AIR-COOLED CHILLER. Call us today! (800) PA-ACCTR-60 GENERAL DIMENSIONS ELECTRICAL DATA 60 TON AIR-COOLED CHILLER FEATURES

4VH and 4VHX. 4" Non-Clog Wastewater Pumps Standard (4VH) and Explosion-Proof (4VHX) Construction

Hydroflo Prepackaged Pumping Systems

VENTLESS DOOR-TYPE DISHWASHER

Condensate Boiler Feed Water Make-Up

Maytag Commercial Laundry Industrial Washers. Dependable engineering to tackle even the most demanding applications.

High Plume Blowers Suggested Specification Section (Master Format 1996) Suggested Specification Section (Master Format 2004)

Our Purifier systems

1 ESMA, Inc. P. O. BOX 734 * SOUTH HOLLAND, IL * (800) * FAX (708)

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

MARLOW PUMPS RECIRCULATION

5. CONDENSATE PUMPS/UNITS

Deaerator. Specifications

SECTION HEATING BOILERS

Electric Pumps. Introduction. W4100, W4200 & W4300 Condensate Pumps. Typical Condensate Pump Features

AM SELECT DISHWASHER STANDARD FEATURES MODEL OPTIONS AT EXTRA COST ACCESSORIES VOLTAGE. Item # Quantity C.S.I. Section AM15

Schust Engineering, Inc. 701 North Street P.O. Box 128 Auburn, IN (260) Fax: (260)

FUEL OIL DAY TANKS. SST Level Controller: UL 508 LISTED

BASIL 6000 TUNNEL CAGE WASHER

BASIL 6700 TUNNEL CAGE WASHER

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

Stancor Duplex Oil-Minder System Submittal SE Volt Single Phase Duplex SE-100 Pumps with Floats and Oil-Minder Probe

100 TON AIR-COOLED SCROLL PACKAGED. Call us today! (800) SPECIFICATIONS GENERAL DIMENSIONS ELECTRICAL DATA ADDITIONAL INFORMATION

GIRTON TREE, TUB, AND CART WASHER MODEL 80-O

FT900SDBD DUAL RINSE FLIGHT-TYPE DISHWASHER

Medical Equipment Washer Information & Setup

Technical Installation, Start-up, Operation & Maintenance Manual For ENERGENICS KARTWASH PREMIER WITH TOUCHPAD DISPLAY

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

SECTION FIRE PUMP AND CONTROLS

DIVISION 8 OPENINGS SECTION OVERHEAD COILING FIRE DOORS. A. Section Metal Fabrications: Support framing and framed opening.

VSA SEWAGE PUMP. Capacities to 1600 gpm, Heads to 120, Horsepower range 3/4 thru 40, 3 thru 6 discharge, 1750 and 1150 operation.

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps

SECTION AIR COMPRESSORS AND ACCESSORIES

hinged tops or hinged doors.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

A. Operation and Maintenance Data: For pumps to include in emergency, operation, and maintenance manuals.

P.C. Simonton & Associates, Inc. Consulting Engineers. Paul C. Simonton

FT900BD FLIGHT-TYPE DISHWASHER

AUTOTROL 363 DEMAND AUTOMATIC FILTER VALVE Service Manual

CL64T INDUSTRIAL TOTE WASHER

SECTION DOMESTIC WATER PUMPS

BOHEC R CRS86A DISHWASHER STANDARD FEATURES MODEL ACCESSORIES DIRECTION OF OPERATION VOLTAGE OPTIONS AT EXTRA COST

End To End Optical Beam Smoke Detector. Additional Information

SNA-SKID Series - Preassembled Safety Shower Heater Skid Tankless Water Heating Solutions

LC Series - Light Commercial Pump Station Installation and Operation Manual

Tankless Electric Water Heater Available up to 54 KW in Single or Three Phase Voltages

SETION EMERGENCY LIGHTING NATIONAL FIRE PROTECTION ASSOCIATION (NEPA) (2006) Life Safety Code, 2006 Edition

PRESSURE WASHING SYSTEM

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

FT1000 ENERGY RECOVERY WITH BLOWER DRYER FLIGHT-TYPE DISHWASHER

Vent-Rite. Cast Iron And Steel Receivers. Simplex, Duplex, Triplex And Quadruplex Units. Pump Capacities To 150 GPM. Discharge Pressure To 75 PSI

CL64e DISHWASHER DISHWASHER STANDARD FEATURES MODEL OPTIONS AT EXTRA COST ACCESSORIES DIRECTION OF OPERATION VOLTAGE

Liebert CSU3000 Chiller

Packaged Instantaneous Circulation Heater Full KW Selection In All Voltages, Single or Three Phase

Parts Washers, Water Pumps, special applications

TGIF-1. Indirect Fired Heating Systems. Technical Guide for: IF Indoor Installations. IFW Outdoor Installations. Applied Air. Keeps You.

C44A/C44AW DISHWASHER

Technical Installation, Start-up, Operation & Maintenance Manual For ENERGENICS KARTWASH PREMIER WITH TOUCHPAD DISPLAY

SECTION AIR DOORS

Electric Submersible Pumps

Shipboard Electric Water Heater

568X, 587X, 588X Series

Centro-Matic Automated Lubrication Systems System Controls

BESB Box Ventilator USA CAN. Product Information. Mechanical Installation. ... Chapter 3. Electrical Installation. ... Chapter 4

24V PCU CORE FIRE PROTECTION INSTALLATION SUMMARY

INDUSTRIAL CLEANING AND FINISHING SYSTEMS

SECTION AIR COOLED WATER CHILLERS

Type VSA Suspended Wet Pit Sewage Pumps BULLETIN 228E-1 September 2014

Transcription:

SmartWash Locomotive Wash Whiting Systems, Inc. 9000 Highway 5 North Alexander, Arkansas 72002 800-542-9031 501-847-0074 fax Casey Craft cc@rmsi.net 1

Whiting Systems, Inc. 9000 Highway 5 North Alexander, AR 72002 501-847-9031 SmartWash Sprite Locomotive Wash Drive-Thru Wash Specifications Bid Table of Contents Section 1: 1:01 Capability 1:02...Operation 1:03..Frame Construction & Features A. Motors & Bearings B. Blaster System C. Detergent Coverage D. Piping & Nozzles E. Compressed Air System F. Controls G. P.L.C H. Final Rinse Arch I. Water Supply System 1. Pump skid 2. Detergent distribution system J. Electrical System Section 2: 2:01..Warranty Section 3: 3:01...Installation Section 4: 4:01......Included Components Section 5 5:01......Customer to Supply Whiting Systems, Inc. Contact Information: Casey Craft 800-542-9031 cc@rmsi.net 2

Equipment Specifications SECTION 1: 1:01CAPABILITY: Fleet maintenance automatic washer, capable of cleaning front, sides, and rear of large locomotives. Designed to fit individual customers requirements. This system shall be fully automatic by means of infrared fiber optic beams, starters, and overloads. If needed, washer controls may by overridden at any time by manual controls as desired for concentrated drive-thru, washing action. 1:02 OPERATION: Locomotive enters the wash bay at 2 MPH or less, breaking first set of sonic beams which then activates the soap arch thoroughly cleaning front, sides and rear of the locomotive. After traveling down the track, allowing the chemical to dwell for maximum cleaning, the locomotive then breaks beams for the high-volume blaster arch. In entry of arch, one set of blaster nozzles spray towards the front of the locomotive and as the rear of the locomotive nears the exit of the arch, the second set of blasters spray back towards the rear. The locomotive then breaks the beams at the rinse arch for the final phase before exiting the bay. Once the beams are broken at each arch, the arches will continue to operate until the locomotive exits the arch allowing the spray action to be timed out. A speed readout package will be provided to assist in maintaining a constant travel speed through the wash bay. This will consist of a Digital MPH readout with amber color strobe lights. These will be located on left side of tracks every 100 feet of the wash bay. 1:03 FRAME CONSTRUCTION AND FEATURES: The frame shall be constructed of welded stainless steel tube and stainless steel angle iron. Stainless steel construction stress points should be reinforced and double welded. All bolts, rivets, and fasteners shall be constructed of stainless steel. Operating components shall be easily accessible within the frame for maintenance. A. Motors and Bearings: All pump motors shall be totally enclosed, squirrel cage type, continuous duty wash-down motors. Each motor shall be individually protected by manual reset adjustable range thermal overload relays with bimetallic, ambient compensated operation. Motor starter and control relays shall be heavy-duty industrial type, rated for 600 volts. All bearings must be non-lubricating and completely sealed. B. Blaster System: The blaster arch shall have sixty blaster nozzles to ensure uniform coverage on each locomotive. Nozzle arrangement will be twenty on both sides and twenty on top with a 25-degree fan spray for each nozzle. By allowing two blaster bars in this arch, 45* angles in each direction will be used to target front & rear of the locomotives. With the overlay of each nozzle, this will also be effective in cleaning the sides without harm to decals & logos. C. Detergent Coverage: Complete detergent coverage on the front and rear of the locomotives shall be achieved by 60 angled soap nozzles, 30 on each spray bar, dividing the spray patterns to target the front and rear of the locomotives. This will achieve complete and consistent chemical coverage. D. Piping and Nozzles: Piping shall include 1 schedule 80 pipe for each chemical arch. The blaster arch shall utilize 2 galvanized schedule 40 piping. All water nozzles and pipes shall be separately removable for cleaning purposes. 3

E. Compressed Air System: The washer shall be capable of operating with 80 to 120 PSI, 3 CFM, air pressure through 3/8 air line. All air hoses/air components shall require no lubrication and shall be NFPA designed for continuous duty. Air control components shall be located behind an access panel and the main air hose shall have an automatic water filtration system. F. Controls: The control panel shall have numbered terminal strips for external wiring. Push buttons and selector switches shall be rated NEMA 4X. Internal wiring shall utilize conduits. Limit switches are not acceptable. Thermal overloads and motor starters shall be equipped with auxiliary contacts to switch off control circuit in event of any motor failure. The electrical control system shall be hardwired with a master control relay circuit for positive electrical disengagement, so all circuits will de-energize when the stop button is pressed for maximum safety. A separate power push button shall re-engage the master control relay for operation. G. PLC: The PLC shall include input and output modules and be ready for modem interface to permit the ladder program to be accessed directly from the factory in case of a breakdown via designated phone line. Modem shall be included and installed from factory. Batteries located in the local control panel shall automatically provide power to the main PLC in case of power failure and shall be capable of maintaining all software in memory for duration of four hours. During the duration of the power failure, the software program and associated processes residing within the PLC shall not be lost and after power is restored, the backup battery shall be automatically capable of being charged to its maximum level. H. Final Rinse Arch: Frame mounted, self-standing, automatic fresh water rinse arch shall be provided at wash bay exit. The rinse arch shall have a minimum of 30 stainless steel spray nozzles threaded into 2 galvanized schedule 40 pipe arranged to provide full rinsing coverage with fresh water over entire locomotive and capable of delivering 100 gallons per minute or greater at 200 PSI. Piping shall be supported by a frame constructed of 2 x 2 x 1/8 stainless steel structural tubing welded to four stainless steel base plates. I. Water Supply System: Includes wash pumps, electrical panels, detergent distribution system, and miscellaneous equipment to fully support washer operation. An automatic freeze protection system for the spray arches will be activated when outside temperatures drop to freezing. Customer to provide adequate supply of city feed water source with RPZ valve per city codes. Reclaim System, Water Softener, and Hot Water Heaters are optional. 1. Pump skid: The main electrical panel shall be factory plumbed and wired and located on the pump skid along with the following pumps: a. 4 - High-Volume Blasters: 40 HP, 150 GPM at 390 PSI for a total of 600 GPM. Multi-stage centrifugal, motor-stacked, chamber and impeller design, 80% efficient pump with water-resistant bearings and cartridge shaft seals. b. 1 - Wash Water: 10 HP, 50 GPM at 200 PSI Multi-stage centrifugal, motorstacked, chamber and impeller design, 80% efficient pump with waterresistant bearings and bellow shaft seals. 4

c. 1 Precise chemical metering injection pump mixed with the wash water pump, together make-up the desired chemical solution to the gantry. d. 1 Final Rinse: 25 HP, 100 GPM at 200 PSI. Multi-stage centrifugal, motor stacked, chamber & impeller design. 80% efficient pump with water-resistant bearings and bellow shaft seals. 2. Detergent distribution system: Washer detergent distribution system, consisting of chemical metering pumps and hot water heaters (optional), shall be capable of injecting chemicals to pressure side of wash water pump. Chemical volumes will be applied to achieve maximum cleaning of locomotive & to customer requirements. J. Electrical System: The entire wash system and pump skid shall be pre-wired and factory tested, except for field wiring to accommodate shipping. Electrical components shall be U.L. approved. Factory construction and installation shall meet Division 16 specification requirements. Provide wire markings and labeling per Section 16195. Installation will include final connections to customer provided service panels & hookups. Electrical requirements for locomotive wash equipment will be 480V 3 Phase with a 400 amp service. SECTION 2: 2:01 WARRANTY: The wash equipment comes with a 1-year parts warranty from the date of completed installation. SECTION 3: 3:01 INSTALLATION: Installation will be performed by Whiting Systems, Inc. Customer to provide all building plumbing, electrical, gas & chase lines. Whiting Systems will provide to contractor, all necessary building layouts and specifications prior to start of construction. The wash equipment will be installed to the customer s satisfaction and to the customer-supplied utilities such as water, natural gas, and electricity supply. Any unscheduled or additional work or permits needed, will be time plus material. All plumbing and electrical must conform to city and state codes. SECTION 4: 4:01 INCLUDED COMPONENTS: SmartWash Sprite Drive-Thru Locomotive Wash and necessary components listed above. Speed read-out package. Final plumbing and electrical connections to customer supplied utilities, building plumbing, and electrical. Installation. SECTION 5: 5.01 SUPPLIED BY CUSTOMER: Building to Whiting Systems, Inc. specifications. In-coming utilities stubbed inside equipment room to WSI specified locations. Building plumbing, chase lines, & electrical runs to WSI designated points. Proper electrical supply with 230v or 480v 3 phase (400 to 600 amp). Gas plumbed to equipment room. A minimum water supply of 600 gpm with RPZ. Forklift with 20 lift and 5000 lbs. capacity to off-load equipment. Crane or lift to set wash arches. Designated phone line for off-site diagnostics ran inside equipment room. Drains and pits. 5