TCDSB Containing Material June 3, 07 Page St. Josaphat Catholic School 50373 0/0A/0B/0/ 0A/0B/03/03 A/04/05/06/06B //4/5B/5 C/S0 Below Remnant Mastic - Below Tiles 00 (now 0A) Above Ceiling Pipe fitting 00 (now 0A) Above Ceiling 00A (now 0B) Above Ceiling 00A (now 0B) Above Ceiling 00B (now 0D) Above Ceiling 00B (now 0D) Above Ceiling 00C (now 0C) Above Ceiling 00C (now 0C) Above Ceiling 03A/6/C0 Ceiling 03 (now 3)/04(now 7)/05(now 8)/4(now 04) 03A (now 5)/ 06 (now 4A)/ 06B(now 4B) Inside radiator cabinet 08 (now ) Above Ceiling Corrugated paper 9"x9" - Grey with White and dark 60-800 m 0.67% >0 Fittings 5-30 m 5-0 Fittings 3-5 m 5-0 Fittings 5-30 m 0% 0% 0% 0% 65 m.5% 30-50 m 5-0 fittings 30% 0.5% NF No D Good F No D Good F No D Good Inaccessible - below floor tile. Room 0A is now labelled 03A, 0B is now 03B, 0 is now 07, 03A is now 5 and is now 06. NF No D Unknown Inaccessible - below radiator. F Yes D Unknown Inaccessible above drywall ceiling.
TCDSB Containing Material June 3, 07 Page St. Josaphat Catholic School 50373 08 (now ) Above Ceiling 09 (now 0) Above Ceiling 09 (now 0) Above Ceiling 09 (now 0) Above Ceiling 09 (now 0) Above Ceiling (now 06) (now 06) 3 (now 05) Below Ceiling 3 (now 05) 3 (now 05) Below Ceiling- at boiler door Below Ceiling- Inside boiler door Air cell on straight run pipe Parging cement on fittings 9"x9" - Black with beige 9"x9" - Beige with black 3-5 m 5-0 fittings 3-5 m 0 m 0 m 0-50 m 0-50 m <5 fittings Boiler <0 m² Boiler <0 m² 0% 0% 75% 50% 0.5% 0.5% 8.9%, % Amosite 8.4% F Yes D Unknown Inaccessible above drywall ceiling. 3 (now 05) Door Fire Door Assumed 3A (now 05A) 3A (now 05A) "x" - Orange "x" - White tiles 0-50 m 0-50 m 0.58% 0.58% the Fire Door, this material should be sampled to confirm
TCDSB Containing Material June 3, 07 Page 3 St. Josaphat Catholic School 50373 03 (now 3)/04(now 7) /05 (now8)/06 (now 4A) /06A (now4)/06b (now4b)/ (now06)/3a (now05a)/3b (now05b)/5a (now0)/5b (now0b)/5c (now0b) 03 (now 3)/04(now 7)/05 (now8)/06 (now 4A)/06A (now4)/06b (now4b)/ (now06)/3a (now05a)/3b (now05b)/5a (now0)/5b (now0b)/ 5C (now0b) Above Ceiling Above Ceiling 3B (now 05B) 5B (now 0B) 6 Below Ceiling 6 Ceiling "x" - White tiles 9'x9' Blue with white Unknown Unknown Unknown No D Unknown Inaccessible above drywall ceiling. Unknown Unknown Unknown No D Unknown 0-50 m 0-50 m² <5 Fittings <0 m² 0.56% 0.54%.5% Inaccessible above drywall ceiling. Prior to renovation/demolition activities which may disturb the pipe insulation, this material should be sampled to confirm
TCDSB Containing Material June 3, 07 Page 4 St. Josaphat Catholic School 50373 C0/S0 (now00) /S0 (now stairs B) C0 Ceiling 4 (now 04) Walls 00 (now 0A) 0B (now 03B)/0 (now 07)/ 0B(now 07B)/ 03(now 3)/04(now 7)/5 (now 0A) C0 C0/S0 (now Stair A)/S0 (now Stair B) 00 (now 3)/ 00A(now 3A)/ 0(now 03)/0(now 05)/03(now 07)/04(now 08)/05(now 06)/06(now 04) 0/03/04/05/0 6/07/ 0/03/04/05/0 6/07/ Walls Textured plaster 60-300 m² window canopies, and exterior door frame window canopies East and West Door Frames <3 m² 0 m² <0 m 90 m 50 m.6-3.%.5%.5%.8% 0.63% Walls Textured plaster 60-300 m.6-3.% Inside radiator cabinet Corrugated paper 9x9 - Grey with white 30% 0.54% - 40-00 m 0.5% Mastic 40-00 m 0.67% NF No D Unknown Inaccessible - below radiator. Room 00 now labelled 3, 00A is now 3A, 03 is 07, 04 is now 08, 05 is now06 and 06 is now 04.
TCDSB Containing Material June 3, 07 Page 5 St. Josaphat Catholic School 50373 04 (now 08)/05(now 06)/06 (now 04)/ (now 0) 04 (now 08)/05(now 06)/06(now 04) 09 (now )/ C0A (now )/ C0B (now 5) Ceiling (now 0) C0/C0A/C0B Ceiling 00 (now 3)/ 00A(now 3A)/0 (now 03)/0 (now 05)/ 03 (now 07) S0 (now Stair B)/C0/ S0(now Stair A) C0 window canopies 9x9 - Beige with white 9x9 -Tan with dark 9x9 - Teal with white 40-00 m 0.54% 30-50 m 0.54% 0-50 m.5% 0-50 m 0.54% <0 m.5% 75 m Walls Textured plaster 450 m 3.8% East and West Door Frames 4 m All _ Around Windows Window N/A All _ Around Doors Door N/A 0.63 % 0.67% F Yes A Good Roof _ Roof Top Roof N/A Assumed NF N/A N/A Unknown Roof _ Roof Top Roofing Material N/A Assumed NF N/A N/A Unknown *Please note the roof was not assessed at the time of this survey due to safety concerns. Reports reviewed prior to completion of 07 Re-Assessment: ) "Updated Survey of -Containing Materials, Ecole Elementaire Parkview, Etobicoke, Ontario ", prepared by Decommissioning Consulting Services, dated August 30, 0. ) 06 Containing Material Condition, St. Josaphat Catholic School. the caulking, this material should be sampled to confirm the roofing material, this material should be sampled to confirm