The school s metal push-out windows were assessed and nothing of concern was noted.

Similar documents
PBS observed paint chips in the garden, which is located approximately six to 10 feet from painted surfaces that were in intact condition.

For the sake of this investigation, it is assumed that all paint and varnish at the school contains some concentration of lead.

PBS did not observe any paint chips on soil at the school, and no areas of major concern were observed.

November 29, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227


POSTING (DATE/TIME): FROM: / 5:00PM UNTIL: / 5:00PM Pgs. 1 of 12

SERVICE MANUAL. Room Air Conditioner

NYC Department of Education

Pedestrian Annual Count Report

NYC Department of Education

NYC Department of Education

Explain in writing if the address of the building is different than the address on this form:

MULTI FAMILY INPUT FORM GREAT PLAINS REGIONAL MLS. Property Address: City State Zip Code

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

DLA Land and Maritime - VQ Supplemental Information Sheet for Electronic QPL-55302

If the address on this form is different than the address of the building, submit a written explanation.

Lead-Based Paint XRF Test Cover Sheet

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Explain in writing if the address of the building is different than the address on this form:

If there are emergency situations they should be reported to Maintenance Department immediately.

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

ALLEGHANY COUNTY PUBLIC SCHOOLS Maintenance Work Request Completion Analysis

Explain in writing if the address of the building is different than the address on this form:

Palmyra High School 07/16 Addition and Renovation Palmyra, Nebraska

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Fall 2017 Construction Update

School District of Milton 5- Year Capital Maintenance and Improvement Plan

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

APPENDIX J. Noise Assessment

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

Forest Hills Facilities Plan

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

IEQ SCHOOL DATA BASE. School Name: Reservoir High School Principal: Patrick Saunderson DATE: 1/23/2017. WORK ORDER NUMBER of POTENTIAL IEQ

If the address on this form is different than the address of the building, submit a written explanation.

Sink faucet Kohler 2007 X 5:

Explain in writing if the address of the building is different than the address on this form:

Tillamook High School Bond Projects

Existing Facilities Assessment

USHA SHRIRAM (INDIA)

Explain in writing if the address of the building is different than the address on this form:

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Custodial Guide

TS Series. Technical Instructions. Document No. TS-4000 June 25, TS-CE Combustion Enclosures with LMV5. Description

SCC Inc. TS Series. Technical Instructions. Document No. TS 5000 February 12, TS CE Combustion Enclosures with LMV3.

Food needs to be in sealed containers 03. FOOD: Unsealed, left in

Explain in writing if the address of the building is different than the address on this form:

Number of persons with a disability that live with a disability in your community?

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Briar Crest Elementary

NYC Department of Education

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Sprinkler System Installer Consultation Discussion Guide

MSL A B A BK3 OS P AB

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

Nor-Ray-Vac Modulating

Explain in writing if the address of the building is different than the address on this form:

Edward Jenner Elementary Academy of the Arts

TRIO Compact Gas Barbecue

Youth Connection - J. Addams Alter HS

GRAND PRIZE SHOWHOME SOURCE GUIDE 2019 SPRING HOSPITAL HOME LOTTERY BUILT BY ROCY DEVELOPMENTS CORP

DULANEY HIGH SCHOOL FEASIBILITY STUDY

BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM

Building Self-Inspection Program

NEW ELEMENTARY SCHOOL AT THOMAS JEFFERSON MIDDLE SCHOOL

TCDSB Asbestos Containing Material Re-Assessment Form. Friability (F/NF) Asbestos Content

Inside Out Home Inspections

Building and Grounds Self-Inspection Program

Richard Henry Lee Elementary School

Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016

Master Facility Planning Update School Board Meeting May 26, 2016


03. FOOD: Unsealed, left in room, dirty lunch. 03. FOOD: Unsealed, left in room, dirty lunch. 03. FOOD: Unsealed, left in room, dirty lunch

2014 Bond Project Guide

IEQ SCHOOL DATA BASE

ALABAMA. Downloaded

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

RECAPP Facility Evaluation Report

631 Logan Avenue - Features & Finishes

INVENTORY REPORT REPORT SUMMARY OPTIONAL ITEMS. 1 P a g e ASSOCIATION: SUNNYSIDE COURTS CONDO ASSOCIATION ADDRESS: 3047 N LINCOLN AVE

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

All Around Home Inspections Ltd 1346 Hurford Ave Courtenay, BC. 123 Sample 6 Plex

Tyco International Ltd. Securities Litigation Settlement c/o The Garden City Group, Inc. Claims Administrator P.O. Box 9156.

TopPage SJ-F74PS/F73PE/F72PC SJ-F79PS/F78PE/F77PC

Genevieve Melody Elementary School

ASBESTOS AND LEAD-BASED PAINT SURVEY 696/698 Hawthorne Avenue St. Paul, Minnesota. Prepared for:

HISTORIC RESOURCES INVENTORY - BUILDING AND STRUCTURES. Please send completed form to: National Register and State Register Coordinator,

New High School Concept

REV: 000. Mercury Compact Series

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MOSS CONTROL MOSS CONTROL. COVERS 5,000 sq. ft COVERS 5,000 sq. ft APPLY ANYTIME

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

NYC Department of Education

HELENA PUBLIC SCHOOLS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT. May 2013

FMS. Semiflush-Mounted Test Switches

Explain in writing if the address of the building is different than the address on this form:

Cleaning Service Levels

El 0. El 0. El El. El El. El 0 TWO FAMILY HOUSING INSPECTINO CHECKLIST

Oscar DePriest Elementary School

Explain in writing if the address of the building is different than the address on this form:

Transcription:

February 15, 2017 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Faubion at Tubman 2231 N Flint Avenue Portland, Oregon 97227 PBS Project: 6500.721 Phase 0020 Dear Mr. Wilton: On January 19, 2017, PBS Engineering and Environmental Inc. (PBS) conducted a visual inspection and assessment of painted and varnished surfaces on the interior and exterior of Faubion at Tubman located at 2231 N Flint Avenue in Portland, Oregon. PBS assessed painted and varnished interior and exterior hard surfaces as well as concrete, asphalt, soil, playground equipment, and windowsills adjacent or in close proximity to deteriorated painted or varnished surfaces. Paint and varnish conditions were assessed using US Department of Housing and Urban Development (HUD) guidelines for the Evaluation and Control of Lead Based Paint Hazards in Housing (2012 Addition) Chapter 5: Risk Assessment and Reevaluation. It is assumed that all paint and varnish at the school contain some concentration of lead. The purpose of this investigation is to identify those finishes in deteriorated condition. FINDINGS Overall, the building s painted and varnished surfaces were found to be in intact condition with areas of fair and deteriorated conditions. A table listing the locations and quantity of surfaces in deteriorated condition is attached to this report. The school s metal push-out windows were assessed and nothing of concern was noted. Painted playground and parking lot striping and curbing often contain lead and are generally in deteriorated condition due to weatherization and traffic. PBS did not assess this paint, but recommends restriping, as needed, to maintain in intact condition. RECOMMENDATIONS PBS recommends that all painted or varnished surfaces in deteriorated condition noted on the attached table be stabilized. 4412 SW Corbett Avenue, Portland, OR 97239 503.248.1939 Main 866.727.0140 Fax 888.248.1939 Toll-Free www.pbsenv.com Bend Boise Coos Bay Eugene I Issaquah Portland Seattle Tri-Cities Vancouver Walla Walla

Lead Paint Condition Assessment Portland Public Schools, Faubion at Tubman February 15, 2017 Page 2 of 2 Please feel free to contact me at 503 417 7691 or clark@pbsenv.com with any questions or comments. Sincerely, PBS Engineering and Environmental Inc. Clark Nelson, CIH Senior Project Manager Attachments: Condition Assessment of Deteriorated Paint/Varnish Table Field Drawing of Deteriorated Paint and Varnish Locations Lead-based Paint Risk Assessor Certification (Clark Nelson) Lead-based Paint Activities Firm Certification (PBS Engineering and Environmental) CN:DM:bmp Project: 6500.721 Phase 0020

Faubian at Tubman Assessment of Paint/Varnish in Deteriorated Condition ID A B Interior / Exterior Interior Interior Location Boy's restroom outside classroom 229 Girl's restroom outside classroom 228 C Interior Classroom 228 Structure Door Door Built-in cabinets and trim under sink D Interior Classroom 226 Door E Interior Classroom 224 Door F Interior Classroom 217 Door G Interior Classroom 222 Door H Interior Classroom 218 Door I Interior Classroom 215 Door J Interior Custodian 206B Door K Interior Classroom 211 Door L Interior Classroom 211 Built-in cabinet at sink M Interior Classroom 209 Built-in cabinet at sink N Interior Classroom 209 Door O Interior Classroom 206 Door P Interior Classroom 206 Built-in cabinets and trim under sink Q Interior Classroom 204 Door R Interior Classroom 204 Built-in cabinet at sink S Interior Classroom 207 Door T Interior Classroom 207 Built-in cabinet at sink U Interior Classroom 205 Built-in cabinet at sink V Interior Classroom 202 Door W Interior Classroom 202 Built-in cabinets and trim under sink Above / Below five feet K-2nd Grade Substrate Square Feet Below No Wood 25 Yes Wood 60 Below No Wood 30 Below No Wood 30

ID Interior / Exterior Location Structure X Interior Classroom 200 Built-in cabinet at sink Y Interior Classroom 203 Door Z Interior Classroom 203 Built-in cabinet at sink AA Interior Classroom 201 Door AB Interior Classroom 201 Built-in cabinets and trim under sink AC Interior Custodian 200B Wall Above / Below five feet K-2nd Grade Substrate Square Feet Below No Wood 40 No Plaster 60 AD Interior Custodian 200B Ceiling Above No Plaster 20 AE Interior Hallway outside classroom 201 Windowsill Below No Metal 12 AF Interior Classroom 119 Doorframe AG Interior Classroom 117 Doorframe AH Interior Classroom 117 AI Interior Classroom 115 AJ Interior Classroom 113 AK Interior Classroom 114 Chalkboard rail on north wall Chalkboard rail on south wall Chalkboard rail on north wall Chalkboard rail on south wall AL Interior Classroom 118 Doorframe AM Interior Classroom 118 Doorframe to west closet AN Interior Classroom 118 Doorframe to east closet Yes Metal 15 Yes Metal 15 Below Yes Wood 25 Below Yes Wood 25 Below Yes Wood 25 Below Yes Wood 25 Yes Wood 15 Yes Metal 15 Yes Metal 15 AO Interior South stairwell Handrails Below No Metal 60 AP Interior Art 156 Built-in cabinet and trim AQ Interior Hallway outside of art 156 Wall by sink No Wood 120 No Drywall 10 AR Interior Faculty dining Windowsill Below No Plaster 10 AS Interior Faculty dining Door to exterior AT Interior Faculty dining Door to commons AU Interior Kitchen Door and frames No Metal 45

ID Interior / Exterior Location Structure AV Interior Kitchen Door frame to dry storage AW Interior Custodial 125 Door Above / Below five feet K-2nd Grade Substrate Square Feet No Metal 15 AX Interior Custodial 125 Floor Below No Concrete 40 AY Interior Cafeteria 162 Floor Below No Wood 1000 AZ Interior Classroom 165 West door BA Interior Ramp down to commons Handrails Below No Metal 40 BB Interior ERC 125 Handrails Below No Metal 20 BC Interior Room next to 125 Door frame to stairs BD Interior Gym Southwest double doors No Metal 15 No Metal 90 BE Interior Gym Baseboards, all Below No Wood 300 BF Interior Gym Built-in bleachers Below No Wood 400 BG Interior Gym Northwest double doors BH Interior Gym storage West wall No Metal 90 No Plaster 100 BI Interior Boy's locker room Ceiling over lockers Above No Plaster 20 BJ Interior Gym Northeast door frames No Metal 30 BK Interior North building entrance Wall Below No Plaster 6 BL Interior Custodian 159C Door frames to 32 BM Interior Library Doors to hallway BN Interior Library Ceiling No Metal 15 No Metal 15 No Wood 90 BO Interior Electrical room West wall Above No Plaster 60 BP Interior Electrical room Beam on ceiling Below No Plaster 20 BQ Interior Electrical room East wall by entrance Above No Wood 40 BR Interior Electrical room North wall Below No Plaster 10 BS Interior Room next to nurse Door frame No Plaster 150

ID Interior / Exterior Location Structure BT Interior Nurse Floor Above / Below five feet K-2nd Grade Substrate Square Feet No Metal 15 BU Interior Boiler room Floor Below No Concrete 1000 BV Interior boiler room offices Floor Below No Concrete 200 BW Interior Custodian boiler Metal beams on breezeway Below No Concrete 200 BX Exterior Breezeway on north side of building Downspout Above No Metal 500 BY Exterior Northwest building entrance Handrails No Metal 10 BZ Exterior Northwest gym entrance Handrails Below No Metal 60 CA Exterior Southwest gym entrance Handrails Below No Metal 70 CB Exterior West building entrance by cafeteria Door frames No Metal 30 CC Exterior East side of building Handrails Below No Metal 600 CD Exterior Main office Side of roof overhang Above No Metal 40 CE Exterior Stairs to 32 Handrails No Metal 30 CF Exterior Outside 125 Wall Above No Plaster 10