Stakeholder Advisory Group Level 2 Recommendations Snapshot

Similar documents
Early in the scoping process, several groups submitted a letter that reflected our collective values for Sound Transit 3. These values include:

West Seattle and Ballard Link Extensions. Elected Leadership Group

West Seattle and Ballard Link Extensions. Early Scoping Information Report

BALLARD TO DOWNTOWN SEATTLE

Lynnwood Link Extension

Alaskan Way, Promenade, and Overlook Walk Final EIS Appendix D - Supplemental Draft EIS Comments and Responses October 2016.

South King County High Capacity Transit Corridor Report. Figure Other Infrastructure

METRO Gold Line BRT CBAC Meeting. August 23, 2018

SYSTEM EXPANSION. Sound Transit system expansion will:

DOWNTOWN REDMOND LINK EXTENSION SEPA Addendum to the East Link Project Final Environmental Impact Statement

CENTRAL AND EAST CORRIDORS

Port of Seattle Street Vacations Summary April, 2016

400 Seventh Street SW 1904 Third Ave, Suite 105 Washington, D.C Seattle, WA Phone: (202) Phone: (206)

South King County High Capacity Transit Corridor Report. Figure 1-1. Study Area

Lake Oswego to Portland Transit Project. Lessons Learned. John Cullerton Senior Project Manager, URS 2012 APTA/TRB Light Rail Conference

Eastside Transit Corridor Phase 2 Technical Study Update Community Outreach Meeting February 2017

Knoxville Area Transit (KAT) Transit Development Plan Corridor Analysis

Date From The priority greenways we propose meet five criteria:

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

Date From The priority greenways we propose meet five criteria:

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

4.8 VISUAL QUALITY AND AESTHETIC RESOURCES

What s Up Next In The Seattle Squeeze. PSRC Transportation Policy Board April 11

Seattle City Council Central Staff - Memorandum

Seattle Transit Master Plan

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

5.4.6 Cumulative Operational Impacts

Eglinton West LRT Update

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

Dallas CBD Second Light Rail Alignment (D2)

Dallas CBD Second Light Rail Alignment (D2)

Community Sensitive Design: (Context Sensitive Design)

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

Figure East End of 2 nd Street Tunnel

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

BACKGROUND, GOALS, STUDY AREA, EVALUATION CRITERIA, ORGANIZATION

The University District envisions, in its neighborhood

The Urban Transit Challenge

CITY OF WAUKEGAN MASTER PLAN AND DESIGN GUIDELINES

RE: Comments on the Environmental Notification Form (ENF) for the I 90 Allston Interchange Project MEPA #15278

D2 Subway Project Development. Stakeholder Committee October 24, 2018

Shift Rapid Transit Public Participation Meeting May 3, 2017

Transportation. Strategies for Action

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

1 INTRODUCTION Purpose Project Background PROJECT CONTEXT Background The Capital City Downtown Plan...

Evaluation Criteria. Detailed Evaluation Criteria

Green Line North Centre City Alignment

POCKET COMMUNITY PLAN

South 200 th Link Extension Open House April 3, 2013

TOD 203 CORRIDOR PLANNING and TOD

Right-of-Way Acquisitions and Relocations Technical Memorandum

Earth Technical Report Addendum Yesler Terrace Redevelopment Project Seattle, Washington

Attachment D Eastside Transit Corridor Phase 2 Technical Study Route Options Screening Analysis and Community Outreach Executive Summary April 2017

Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit

D2 Subway Project Development. Public Meeting September 12, 2018

Relief Line Project Assessment

I-84 Hartford Project Open Planning Studio #12. April 25, 2017

22a. Existing Condition. 22b. Simulation of NE 20th Street Alternative (D3)

Appendix H Historic Resources Discipline Report. Draft Environmental Impact Statement Alaskan Way, Promenade, and Overlook Walk

Equity and Environmental Justice B. MINORITY, ELDERLY, AND LOW INCOME POPULATIONS IN THE STUDY AREA

East Corridor Final Environmental Impact Statement

Silver Line Gateway. Extension of Silver Line Bus Rapid Transit (BRT) to Chelsea and East Boston. Public Informational Meeting Chelsea, MA

Route 7/15 Norwalk. Route 7/15 Norwalk Project Project Advisory Committee Meeting #5. Wednesday, November 14 th, Norwalk City Hall

Concept Evaluations 2 May 2009

Northwest commuter rail station US 36 BRT. Westminster Station

Creative Village Design Review Committee

Rapid Transit Implementation Working Group

Transportation Committee

SUNSET CORRIDOR LAND. The property is now available and ready for corporate utilization, development or investment.

Regional Transportation District

1.1 WATERFRONT SEATTLE

Rapid Transit Implementation Working Group September 14, 2017

117 E. Louisa St. #1 Seattle, WA January 29, 2016

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

3.5. Visual and Aesthetic Qualities

Erik Rundell, Project Manager

Tim Heron, Design and Historic Resource Reviews ,

Corridor Management Committee. September 29, 2017

City of Winnipeg. Southwest Rapid Transit Corridor Stage 2 Alignment Study. Final Report

Guiding Principles for the SR 520 Replacement Project

Designing Walkable Urban Thoroughfares: A Context Sensitive Approach

Locally Preferred Alternative (LPA) Report (Volume I) Appendix A

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

Gratigny Parkway East Extension Project Development & Environment (PD&E) Study

Stormwater and GSI - Setting the Stage and Rain garden and cistern sizing

4.2 Land Use Introduction to Resources and Regulatory Requirements

Abstract. See the Fact Sheet for persons who may be contacted for additional information concerning this document

APPENDIX C Discipline Report Errata Sheets. Final Environmental Impact Statement Alaskan Way, Promenade, and Overlook Walk

178 Carruthers Properties Inc.

West Broadway Transit Study Initial Screening of Alternatives Memo

Expo Light Rail Line. Expo Line Community Meeting Phase 2 Design Update November 2011

Kanata Light Rail Transit Planning and Environmental Assessment Study

Appendix K Vegetation and Wildlife Discipline Report. Draft Environmental Impact Statement Alaskan Way, Promenade, and Overlook Walk

Pace University Land Use and Sustainable Development Conference Tensions and Opportunities in Urban Revitalization

Por favor, levanten la mano si necesita traduccion en espanol Please raise your hand if you need Spanish translation

Railyard Alternatives and I-280 Boulevard Feasibility Study. MTA Board Meeting May 6, 2014

Crenshaw Transit Corridor Alternatives Analysis/EIS/EIR

Transcription:

Stakeholder Advisory Group Level 2 Recommendations Snapshot The following recommendation tables were completed with the West Seattle and Ballard Link Extensions Stakeholder Advisory Group (SAG) during the meeting on September 26 th, 2018. The SAG made recommendations on which Level 2 alternatives should be carried forward into Level 3. 1

Interbay / Ballard SAG recommendations Central Interbay/ Some support for fixed bridge and Ballard station with Fixed Bridge/14 th fewer property effects Central Interbay/ Concern about movable bridges Movable Bridge/14 th 15 th /Fixed Bridge/15 th Concern about Fishermen s Terminal effects Carry Explore Ballard Station access at 15 th Ave NW, closer to center of urban village General support for more cost-effective tunnel crossing Armory Way/ Support for Ballard station with fewer property effects Tunnel/14 th Explore Ballard Station access at 15 th Ave NW, closer to center of urban village Central Interbay/ Concern about tunnel cost vs. Armory Way/Tunnel/14 th Tunnel/15 th Support for 15 th Ave NW station 20 th /Fixed Bridge/17 th Concern about overall cost Concern about Ballard Station property, construction and visual effects, though support for location 20 th /Tunnel/15 th Concern about tunnel cost vs. Armory Way/Tunnel/14 th Explore Ballard Station access at 15 th Ave NW, closer to center of urban village 2

Downtown SAG recommendations Carry 6th/Boren/Roy Limited support for Denny station at Boren (due to steep grade) and South Lake Union station at Roy, but interest in maintaining 6th Ave route through Downtown 5 th /Harrison Support for this alternative with Seattle Center station located at Republican With Seattle Center station located at Republican 5 th /Terry/Roy/ Mercer Some support for Denny station at Terry, with interest in 6th Ave route through Downtown With 6th Ave route through Downtown 3

Chinatown-ID SAG recommendations Surface E-3 (shorter 5 th Ave Cut-and- Cover Tunnel) Massachusetts Tunnel Portal (5 th Ave Bored Tunnel) Concern about cut-and-cover tunnel construction effects Support for reduced construction effects and shallower station Carry 5 th Ave Mined C-ID Support for reduced construction effects Concern about access due to deep station 4 th Ave Mined C-ID Support for closer proximity to King Street Station and reduced CID effects along 5 th Ave Concern about traffic detours and access due to deep station 4 th Ave Cut-and-Cover C-ID Support for closer proximity to King Street Station, reduced CID effects along 5 th Ave and shallower station Concern about traffic detours 4

General Discussion Chinatown-ID Keep exploring 4 th Avenue options. 5

SODO SAG recommendations Carry General support for surface alignment Surface E-3 Support for new roadway overpasses at Lander and Holgate Some support for second Stadium station Explore shifting existing and new SODO stations closer to Lander Massachusetts Tunnel Portal General support for surface alignment Support for new roadway overpasses at Lander and Holgate Explore shifting existing and new SODO stations closer to Lander Explore shifting existing and new SODO stations closer to Lander Occidental Ave. Some support for locating new SODO station further west Some concern about freight mobility and property effects 6

General Discussion SODO Mix of opinions on Occidental Avenue alternative, continued interest in a Western station location but concerns about freight effects and displacement of industrial businesses Mix of opinions on Surface E3. Interest in additional stadium station location. Interest in improved bus connections to SODO station and concerns about loss of E3 busway 7

West Seattle / Duwamish SAG recommendations Carry Oregon Street / Alaska Junction / Elevated Concern about elevated guideway across California Ave If elevated, explore locating terminus station east of Junction Oregon Street / Alaska Junction / Tunnel General support for north crossing of Duwamish due to less environmental effects; but interest in minimizing freight effects Concern about Junction station location at 44 th Concern with higher guideway along Genesee Explore Junction station location at 41 st /42 nd Golf Course / Alaska Junction / Tunnel General support for this alternative, with development opportunities at Delridge station location to serve neighborhood Support for lower guideway along Genesee Explore Junction station location at 41 st /42 nd Explore north crossing of Duwamish Explore Junction station location at 41 st /42 nd Explore north crossing of Duwamish Pigeon Ridge / West Seattle Tunnel Concern about overall cost and environmental effects Support for lower guideway along Genesee and support for fewer residential effects in Delridge Support for Junction station location at 42 nd 8

General Discussion West Seattle / Duwamish Explore refining by moving Delridge Station further south and Alaska Junction east and oriented north/south Mix of opinions on Pigeon Ridge - Strong concerns expressed about cost 9