COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

Similar documents
COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT

SECTION 2.0 INTRODUCTION

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE LAND PARK COMMERCIAL CENTER PROJECT

NOTICE OF PREPARATION

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT February 21, 2012 BRIGHTON LANDING SPECIFIC PLAN & DEVELOPMENT PROJECT

NOTICE OF PREPARATION

Notice of Preparation and Notice of Public Scoping Meeting. At Dublin Project

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE WEST BROADWAY SPECIFIC PLAN COMMENT PERIOD

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT

CITY OF VACAVILLE PLANNING COMMISSION Item No. 8.A STAFF REPORT July 18, 2016 STAFF CONTACT: Amy Feagans, Contract Planner (707)

CHAPTER 2 SUMMARY 1. PROJECT SUMMARY DATA

City of Del Mar. Del Mar Resort Specific Plan Environmental Impact Report Notice of Preparation

NOTICE OF PREPARATION

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER

Appendix A: Notice of Preparation and Responses

CITY OF ALHAMBRA DEVELOPMENT SERVICES DEPARTMENT 111 S. First Street. Alhambra, CA (626) FAX (626)

Prepared by: Casey Kempenaar, Senior Planner

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project

City of American Canyon Notice of Preparation and Notice of Public Scoping Meeting Napa Airport Corporate Center Project

City of Livermore Notice of Preparation and Notice of Public Scoping Meeting Sunset Crossing Project / Catalina Crossing Project

City of Fontana Notice of Preparation and Notice of Public Scoping Meeting Fontana North Walmart Project

City of Larkspur. Notice of Mitigated Negative Declaration for the 285

MEMORANDUM HONORABLE MAYOR AND CITY COUNCIL MEMBERS. SHERI REPP LOADSMAN, DEPUTY CITY MANAGER/ PLANNING & BUILDING DIRECTOR /s/

Oak View Estates Specific Plan

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT

PLANNING COMMISSION. Submitted

ENVIRONMENTAL INITIAL STUDY BERKELEY CITYWIDE POOLS MASTER PLAN

III. PROJECT DESCRIPTION

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC SCOPING MEETING: VERMONT CORRIDOR PROJECT

Drexel, Barrell & Co.

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

PROJECT SUMMARY. University of California, Irvine Humanities Building. Project No FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION

Drexel, Barrell & Co.

Notice of Preparation and Notice of Public Scoping Meeting IKEA Retail Center Project

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project

September 20, 2017 ENV EIR

2 Project Description

City of Orange Trails at Santiago Creek Specific Plan Recirculated Draft EIR Appendix C: Notice of Preparation (NOP) and Comment Letters

City of American Canyon Notice of Preparation and Notice of Public Scoping Meeting Napa Logistics Park Phase II Project

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

PUBLIC EIR SCOPING MEETING

Public Hearing April 12, Information as of April 12, 2018

NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC HEARING 2190 Shattuck Avenue Mixed-Use Project

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

3.0 Cumulative Scenario and Methodology. 3.0 Cumulative Scenario and Methodology

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

Central Reservoir Replacement Project. Community Meeting #2 February 13, 2018

December 18, January 14, 2019, 5:00 P.M. 7:00 P.M. See below for additional information.

NOTICE OF PREPARATION and ANNOUNCEMENT OF SCOPING MEETINGS

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

NOTICE OF PREPARATION

California Environmental Quality Act (CEQA) Environmental Review Process

Report to City Council

OCEANSIDE DEVELOPER S CONFERENCE. 1. 9:30-10:30 a.m. Proposed hotel on a 12,000 sq. ft. site at the northeast corner of Topeka St. and Tremont St.

2019 Hillcrest Campus LRDP EIR Scoping Meeting

Gadsden County Planning Commission Agenda Request

Notice of Preparation of Draft Environmental Impact Report

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

NOTICE OF PREPARATION

Planning Commission Staff Report June 5, 2008

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

Inglewood Transit Connector Environmental Impact Report Scoping Meeting July 26, 2018

EIR Scoping Meeting MULTI-BENEFIT/MULTI USE PROJECT

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018

NOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING

OP Council Resolution June 16, Planning and Development Services

REPORT TO PLANNING COMMISSION

SPECIFIC PLAN Requirements

SOUTHEAST AREA SPECIFIC PLAN. Planning Commission Study Session August 18, 2016

4.8 LAND USE AND PLANNING

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010

City of Reedley Community Development Department 1733 Ninth Street Reedley, CA (559) FAX

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001

DEPARTMENT OF COMMUNITY DEVELOPMENT Planning and Environmental Review Division DRAFT NOTICE OF PREPARATION

Clay Street Bridge Replacement Project

A 3: Scoping Meeting Materials

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

UNIVERSITY OF CALIFORNIA, SAN DIEGO

Glenborough at Easton Land Use Master Plan

ORDINANCE NO

Appendix A: Notice of Preparation and Responses

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Green Gables. April 24, 2013

01 PROJECT DESCRIPTION

CITY OF SEASIDE STAFF REPORT

CHAPTER 2 PROJECT DESCRIPTION

Osceola County Board of County Commissioners 1 Courthouse Square, Suite 1100 Kissimmee, FL

Planning Commission Staff Report March 15, 2007

TABLE OF CONTENTS. Tables Table UC Davis Park and Open Space Resources

PLANNING COMMISSION STAFF REPORT

CALIFORNIA ERIC GARCETTI MAYOR NOTICE OF PREPARATION. Responsible Agencies, Trustee Agencies, Stakeholders, and Interested Parties

County of Los Angeles

Venice Pumping Plant Dual Force Main Project Draft EIR

March 30, Keyes Van Nuys Honda Dealership Keyes Motor, Inc.

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

RECIRCULATED NOTICE OF PREPARATION/NOTICE OF PUBLIC SCOPING MEETING

Leonard s Beach Secondary Plan (Alcona North) Official Plan Amendment

City of Los Angeles Department of Public Works

4/8/2015 Item #10D Page 1

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting

Transcription:

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT http://www.edcgov.us/devservices/ PLACERVILLE OFFICE: LAKE TAHOE OFFICE: 2850 Fair Lane Court, Placerville, CA 95667 924 B Emerald Bay Rd. BUILDING South Lake Tahoe, CA 96150 (530) 621-5315 / (530) 622-1708 Fax (530) 573-3330 bldgdept@edcgov.us (530) 542-9082 Fax PLANNING (530) 621-5355 / (530) 642-0508 Fax planning@edcgov.us TO: FROM: Interested Parties Evan Mattes, Associate Planner, County of El Dorado DATE: SUBJECT: (NOP) of an Environmental Impact Report for the Tilden Park Commercial-Residential Development Project The County of El Dorado (County) will be the lead agency under the California Environmental Quality Act (CEQA) for the preparation of an Environmental Impact Report (EIR) for the Tilden Park Commercial-Residential Development Project (Tilden Park Project) in El Dorado County. The purpose of this (NOP) is to describe the Tilden Park Project and potential environmental effects in order to allow agencies and interested parties to provide input on the scope and content of the Draft EIR. The location, description, project entitlement requests, and probable environmental effects of the Tilden Park Project are summarized below. Comments and suggestions are requested during the 30-day public comment period for the Supplemental NOP regarding the environmental issues that may be affected by the Tilden Park Project. Agencies and interested parties may provide the County with written comments on topics to be addressed in the EIR for the project. Because of time limits mandated by State law, comments should be provided no later than 5:00 PM on December 15, 2018 (or next business day). Keep in mind that there will be another opportunity to submit detailed comments when the Draft EIR is released for public review. Please mail, email, or fax your comments to: Evan Mattes, Associate Planner El Dorado County Planning and Building Department 2850 Fair Lane Court, Building C Placerville, CA 95667 Email: tilden.park@edcgov.us Fax: (530) 642-5994 An open house will be held at 5:30 PM on Wednesday, November 28, 2018 at the El Dorado County Library located at 345 Fair Lane Court, Placerville, California 95667 to inform interested parties about the Tilden Park Project. El Dorado County 1 Tilden Park Commercial-Residential Project EIR

SUPPLEMENTAL NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT (EIR) FOR THE TILDEN PARK COMMERCIAL-RESIDENTIAL DEVELOPMENT PROJECT LOCATION Project Information The Tilden Park Commercial-Residential Development Project encompasses approximately 12 acres, located within the Community of Shingle Springs in El Dorado County. The property is situated immediately north of Wild Chaparral Drive and U.S. Route 50, south and west of Crosswood Drive, and east of Many Oaks Lane. The property is surrounded on the west, north, and east by low-density residential and commercial development. A Regional Location Map and a Site and Vicinity Map are provided as Figures 1 and 2 respectively. Project Address: 4108 Wild Chaparral Drive, Shingle Springs, California 95682 County: El Dorado APNs: 070-280-59 & 070-280-60 USGS Quad: Shingle Springs USGS 7.5-minute topo quadrangle (1980). Longitude/Latitude: Centroid of the study area: 38.662392 North, 120.94467 West PROJECT DESCRIPTION The Proposed Project is for a commercial and residential development project. A site plan for the Proposed Project is provided as Figure 3. Requested discretionary actions include: (1) a General Plan Amendment for the southern portion of the site from Medium Density Residential (MDR), which allows for a maximum of 1 unit per acre to Commercial (C), which allows for commercial uses; (2) a Zone change for the southern portion of the site from One-Acre Residential (R1A) to Commercial Community (CC); and (3) a Tentative Map to create 3 residential lots and 3 commercial lots. Open space areas which includes existing wetlands and a 50-foot setbacks from a creek that flows through the commercial and largest residential lot on the approximately 12-acre site. The proposed land use and zoning is shown on Figure 4. Project Characteristics 1. Site Design The residential lots would range in size from 1.01 to 1.18 acres, totaling 3.20 acres, and would add housing adjacent to existing residential development within the Shingle Springs Community Region. The commercial lots, totaling 8.81 acres, would be located adjacent to existing and entitled commercial development and are proposed for the development of an 80-room hotel, a 3,800-square foot restaurant, a 20,000-square foot food mart, 6,500 square feet of shops, and 8,250 square feet of office space. The project site proposes commercial access from Wild Chaparral Drive and residential access from Crosswood Drive. The open space areas have been designed to preserve both sensitive plants (Ceanothus) and identified wetlands and other waters on the project site. El Dorado County 2 Tilden Park Commercial-Residential Project EIR

2. Access, Circulation, and Parking Wild Chaparral Drive, a two-lane roadway, is located along the southern project boundary. Two driveways along Wild Chaparral Drive would provide access to the commercial lots within the project site. Internal parking lots have been designed to provide adequate turning radius curves for emergency vehicle access to all proposed commercial buildings. The residential lots would be accessed by private driveways along Crosswood Drive. A pedestrian pathway and pedestrian bridge between the hotel and other commercial uses would be provided across the open space area in the south-central portion of the project site. The proposed circulation system, including access points, is shown on Figure 3. 3. Improvements and Infrastructure Water and Wastewater Water and wastewater services would be provided by the El Dorado Irrigation District (EID). The project site is within the EID service boundary. EID has facilities located near the northern and southern project boundaries. An 8-inch water line and 4-inch sewer force main are located south of the property in Wild Chaparral Drive, and an 8-inch water line is located in Crosswood Drive. The project would provide on-site water infrastructure improvements and would connect to a sewer pump station at the southeast corner of the project site. Stormwater Drainage Proposed site grading will maintain existing drainage patterns to the maximum extent practicable, with stormwater detention chambers located throughout the site, within or adjacent to planned parking areas. The proposed storm drainage system would be designed to ensure that post-construction runoff volumes do not exceed pre-development conditions and would be would be constructed in conformance with the standards contained in the County of El Dorado Drainage Manual. Other Utilities Electrical, gas, and phone services would be provided by Pacific Gas and Electric (PG&E) and AT&T. 4. Public Services Law enforcement services would be provided by the El Dorado County Sheriff s Department. Fire protection and emergency medical services would be provided by the El Dorado County Fire Protection District (EDCFPD). The project site is located within the Buckeye Union School District. PROJECT BACKGROUND In September 2011, an Initial Study/Mitigated Negative Declaration (ISMND) was circulated for public comments. The IS discussed in greater detail in the Probable Environmental Effects subsection below. On December 19, 2012, El Dorado County released a NOP for the Proposed Project. The purpose of the NOP was to provide notification that a Focused EIR for the Tilden Park Planned Development Project was being prepared and to solicit public input on the scope and content of El Dorado County 3 Tilden Park Commercial-Residential Project EIR

the document. A total of 15 comment letters were received in response to the 2012 NOP. At that time, the project included create14 residential lots, 2 commercial lots, and 2 open space lots. The project required a General Plan Amendment, Zone change, Planned Development and Tentative Map. Since the release of the NOP, the applicant has revised the project to be 3 residential lots 3 commercial lots, has eliminated the Planned Development request and prepared this Supplemental NOP. PROJECT ENTITLEMENT REQUESTS General Plan Amendment (A08-0015) for the southern portion of the site from MDR which allows for a maximum of 1 unit per acre to C which allows for commercial uses. Rezone (Z08-0039) of the southern portion of the project site from One-Acre Residential (R1A) to Commercial Community (CC). Tentative Map Subdivision (TM08-1485) of 12-acre property, creating a total of 3 residential lots and 3 commercial lots, with internal roadways and open space. Additional project information can be accessed via the following web link: https://edcgov.trakit.net/etrakit/search/project.aspx by typing the first word of the project name in the search box. Environmental Effects and Project Alternatives PROBABLE ENVIRONMENTAL EFFECTS A draft Initial Study (IS) and proposed Mitigated Negative Declaration was prepared for the Proposed Project and circulated for public review in September 2011 (A08-0015/Z08-0039/PD08-0025/TM08-1485/Tilden Park). The previous project description, location, and the potential environmental effects were described in the IS. The IS also included mitigation, as applicable, for environmental subject areas to reduce potential impacts to less-than-significant levels. With the implementation of the mitigation measures contained in the IS, potentially significant effects would not occur for the following resource areas: Aesthetics, Light and Glare Agricultural Resources Biological Resources Cultural Resources Geology and Soils Hazards and Hazardous Materials Hydrology and Water Quality Land Use and Planning Mineral Resources Noise Population and Housing Public Services Recreation Utilities and Service Systems Based on the analysis within the September 2011 IS, the reduction in intensity of the currently proposed project, and the comments received during the public review period, the County has determined that a Focused EIR [CEQA Guidelines Section 15063(c)(3)(A)] should be prepared to further evaluate impacts associated with Greenhouse Gas Emissions, and Traffic and Circulation. The Focused EIR will evaluate the Proposed Project s direct, cumulative, and indirect effects associate with these resource areas. The Focused EIR will also include a El Dorado County 4 Tilden Park Commercial-Residential Project EIR

discussion of potential indirect effects associated with growth inducement. Mitigation will be proposed for impacts that are determined to be significant, to reduce those impacts to less-than significant levels. Impacts that are determined to be significant after mitigation will be identified. A mitigation monitoring program will also be developed, as required by Section 15097 of the CEQA Guidelines. Comments and suggestions are requested during the 30-day public comment period for the NOP regarding the EIR. POTENTIAL ALTERNATIVES TO BE ADDRESSED IN THE EIR In accordance with CEQA Guidelines Section 15126.6, the County will evaluate alternatives that could feasibly attain most of the basic objectives of the Proposed Project and would substantially lessen one or more of the project s significant environmental effects. As required by CEQA, one of the alternatives will be a No Project Alternative, which will assume that the project site will not be subject to any development. According to CEQA Guidelines Section 15126.6(d), the significant effects of an alternative shall be discussed, but in less detail than the significant effects of the project as proposed. The assessment of project alternatives will be consistent with this requirement by presenting a sufficient amount of detail necessary to afford decision makers with a reasoned choice. A qualitative comparison of GHG emissions and traffic impacts associated with project alternatives will be conducted. Requests for Additional Information If you have any questions, please contact Evan Mattes at the County of El Dorado, Community Development Services, Planning and Building Department, 2850 Fair Lane Court, Building C, Placerville, CA 95667, by telephone at (530) 621-5994, or by email to tilden.park@edcgov.us. ATTACHMENTS: Figure 1 Regional Location Figure 2 Vicinity Map Figure 3 Site Plan Figure 4 Tilden Park Proposed Land Use and Zoning Designations El Dorado County 5 Tilden Park Commercial-Residential Project EIR

Project Site Project Site El Dorado County SCALE Miles 0 5 10 SOURCE: ESRI Data, 2012; AES, 2012 El Dorado County Tilden Park NOP / 212521 Figure 1 Regional Location

Project Boundary SCALE Feet 0 1,000 2,000 SOURCE: "Shingle Springs, CA USGS 7.5 Minute Topographic Quadrange, T9N, R9E, Section 1, Mt. Diablo Baseline & Meridian; AES, 2012 El Dorado County Tilden Park NOP / 212521 Figure 2 Site and Vicinity

LEGEND SOURCE: JK Architecture Engineering, 7/5/2018; AES, 7/10/2018 El Dorado County Tilden Park NOP / 215533 Figure 3 Site Plan

LEGEND NORTH NOT TO SCALE SOURCE: JK Architecture Engineering, 7/2018; AES, 7/10/2018 El Dorado County Tilden Park NOP / 215533 Figure 4 Tilden Park Proposed Land Use and Zoning Designations