Taku Lake Rain Garden

Similar documents
AWR Engineering, LLC

Stormwater Control Plan: Small (Tier 1) Land Development Project

Nonpoint Education for Municipal Officials. Linking Land Use to Water Quality. Partnership for Environmental Technology Education

Permeable Interlocking Concrete Pavement A Low Impact Development Tool Training for Developers

Kittson Parkway / Watershed Park Parking Lot

Preparing a Stormwater Control Plan for a Small Land Development Project

CAPE ELIZABETH, MAINE TOWN CENTER STORMWATER MANAGEMENT PLAN UPDATE

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

Controlling Urban Stormwater at the University of Wisconsin - Madison

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Reducing New York City s CSOs Using Green Infrastructure

Permeable Pavement Systems

Post Construction BMPs

Phase I Stormwater Best Management Practices Implementation Plan

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

Green Infrastructure Monitoring. Westmoreland Conservation District

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

APPENDIX G: TOWN ORDINANCE REVIEW

Green Infrastructure Implementation Planning for Multiple Objectives

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

NEW YORK STATE WATER RESOURCES INSTITUTE Department of Biological and Environmental Engineering

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

Green Bus Tour. International Water Association. Sponsored by the Metropolitan Sewer District of Greater Cincinnati and Greater Cincinnati Water Works

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Porous Pavements for Stormwater Restoration in Urban Environments

GSI Handbook Details Pervious Pavement

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

NPDES - PCSM. Permit Preparation

SMALL PROJECTS SIMPLIFIED APPROACH

Green Infrastructure & Low Impact Development

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

Appendix G. Detailed Design

Appendix E: Illustrative Green Infrastructure Examples

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Low Impact Development. Charlene LeBleu Auburn University Landscape Architecture (334)

Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St.

Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State. City of Sacramento Sacramento State Facilities Management

Rainwater Harvesting: Where does the Rainfall Go?

Green Infrastructure on Brownfields

J. Paul Guyer, P.E., R.A.

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

APPENDIX APPENDIX 6 STORMWATER MANAGEMENT REPORT

Chesterfield County Rain Barrel Workshops

Green Infrastructure and Low-Impact Development Technologies

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

Bioretention cell schematic key

Subsurface Infiltration Bed

GOING GREEN! NEWBURYPORT S PLAN FOR THE FUTURE

Importance of Master Planning Marcy Colclough

City of Richmond. Engineering Design Specifications

6.2 Flow-Through Planter

Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

BY GEOFF DEIGAN 2 0 I l l i n o i s P a r k s a n d R e c r e a t i o n w w w. I L i p r a. o r g

NAPA COUNTY PUBLIC WORKS Standards & Specifications

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

City of Vallejo. Stormwater Control C.3 Compliance Information. Addendum to C.3 Guidebook by Contra Costa Clean Water Program

Toronto Complete Streets Guidelines

Sustainable Stormwater Management with Low Impact Development (LID)

ATTACHMENT A STORMWATER MANAGEMENT TECHNIQUES Cahill Associates Environmental Consultants

ACTION PLAN FOR RETROFITTING THE EXISTING MS4 WITH STRUCTURAL BMPS

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax

Fall 2017 Construction Update

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

LID Retrofit of a Sloped, Impervious Parking Lot:

ABBREVIATIONS. Dwg LID of 1. Abbreviations

Appendix I. Checklists

Olympic Park, London. SuDS used. 1. Location. 2. Description. Case study

Green Infrastructure Recommendations For Parks and Public Spaces

Appendix B DETAILED DESIGN

Ames City Hall Campus: Stormwater Improvements

Successful Green Infrastructure Planning: A Micro-Scale Modeling and Field Investigation Approach

FACT SHEET: Pervious Pavement with Infiltration

Neighborhood Drainage Infrastructure Improvements Using Green Initiatives. Village of Hinsdale, IL

BARD COLLEGE REGIONAL GREEN INFRASTRUCTURE DEMONSTRATION PROJECT A Case Study Addressing Stormwater Management for a Small Watershed

North Street Reconstruction & Integrated Stormwater Management System

Chapter 6. Green Streets

DIVISION E ENGINEERING STANDARDS

Case Studies of Rain Harvesting Use & Dry Weather Runoff Reuse in Santa Monica, CA

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

TURN TO THE RIVER CITY PLAZA LANDSCAPE DESIGN CONCEPT May 25, 2016

Municipal Guide to. Storm Water Management Techniques

Separate Storm Sewer System Study Questions/Answers

The Engineer/Developer s Perspective on Storm Water Management

2016 WORKSHOP LVR Field Trip

water that enters our streams during storms. Any water the rain garden can t accept will continue into the storm sewer system.

Low Impact Development a great program that helps make the best use of something we re all familiar with - rainwater. practices.

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967

Patrick E. Lindemann INGHAM COUNTY DRAIN COMMISSIONER. Towar Rain Garden Drains A Low-Impact Urban Retrofit

ARIZONA WATER COMPANY

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Utilizing Green Infrastructure to Protect Public Health at Beaches: A Case Study in Suttons Bay, MI

Transcription:

Taku Lake Rain Garden Location: Taku Lake Park, E 76th Ave (Go west on 76th from Seward Hwy to the end) Completed: June 2007 Size: 1,000sqft Landscaper: Seacoast Construction

Taku Lake Rain Garden Construction: June 2007

Taku Lake Rain Garden Planting: June 2007

2007 2008 2009 Taku Lake Rain Garden Maintenance: June 2009

Russian Jack Springs Park Low Impact Development Pilot Project Project Description. The Russian Jack Spring Park (RJSP) project is located on the northeast side of Anchorage, near the intersection of Pine Street and Debar Road. This project was a joint effort between the Municipality of Anchorage (MOA) Parks and Recreation Department (Parks) and the MOA Project Management and Engineering, Watershed Management Services group. The purpose of the project was to reconstruct the existing RJSP parking lot in order to provide improved parking and pedestrian facilities for park users. The RJSP parking lot is used in the summer months for the softball fields located north and south of the parking lot. It is also used year round for access to the park's popular trail system. The improvements included demolition of the park's existing tennis courts, replacing existing gravel parking with asphalt parking, providing pedestrian trails around the parking area, and visually enhancing the park with new landscaping features. LID Features. The LID features of the project included construction of porous asphalt pavement and installation of a sub surface infiltration gallery. Stormwater runoff from the parking lot was completely contained on site with no discharge to surface waters. The porous asphalt and associated sub grade was designed to store and infiltrate events up to the 10 year, 24 hour rainfall event. Most sections of porous asphalt were installed with a perforated conveyance pipe at the upper portion of the subgrade. During larger events, if the asphalt subgrade fills, these perforated pipes will direct water to the nearby subsurface infiltration gallery. Stormwater runoff from portions of non porous asphalt is also directed to the subsurface infiltration gallery. Together, these facilities are designed to accommodate events up to the 100 year, 24 hour event. This parking lot provided an unique opportunity to try porous asphalt as a pilot project because only a portion of the parking lot is used during winter months. Through coordination with Parks maintenance, the porous asphalt was strategically placed in locations that are not anticipated to require snow removal or sanding. The asphalt will be monitored over time to determine how it performs in Anchorage s cold climate. Monitoring Plan. Construction of this project was completed at the end of the 2012 construction season. The performance of both the porous asphalt and the subsurface infiltration gallery will be monitored starting in the summer of 2013. The monitoring will include installation of a rain gauge at the site and installation of a pressure transducer in a manhole located immediate upstream of the subsurface infiltration facility. Monitoring wells were installed in the porous asphalt subgrade during project construction. By tracking the amount of rainfall that occurs at the site and checking water levels is the porous asphalt during significant rainfall events, the performance of the porous asphalt can be evaluated. By converting pressure readings from the pressure transducer to flow rates at the manhole upstream of the infiltration gallery, we can compare measured runoff hydrographs to synthetic runoff hydrographs. The subsurface infiltration gallery was installed with inspection ports that will be used to monitor water levels and performance of that facility during and following significant rainfall events.