EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

Similar documents
INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL FIRE SAFETY ASSESSMENT

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE ASSESSMENT REPORT (FAR)

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE ASSESSMENT REPORT (FAR)

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION

INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

for Walmart suppliers. About Bureauu Veritas laboratories in building and Phase 1: Pre- Assessment until the factory Phase 2: Initial Assessment

Nirmal Chandra Sinha. Supposed to complete(dd/ MM/YYYY) Comments after Physical Inspection

Electrical Safety Requirements

9/7/2010. Chapter , The McGraw-Hill Companies, Inc. AND BONDING. 2010, The McGraw-Hill Companies, Inc.

ELECTRICAL SAFETY INSPECTION REPORT ANLIMA TEXTILE LTD, DHAKA, BANGLADESH

for Walmart suppliers. About Bureauu Veritas laboratories in building and Phase 1: Pre- Assessment until the factory Phase 2: Initial Assessment

TIME KNITWEAR (PVT) LTD.

ELECTRICAL SAFETY INSPECTION REPORT

Electrical Preventive Maintenance (EPM) Program

Systems of inspecting the existing building and the procedures of auditing engineering plans. M. Mostafa

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL

NEC Requirements for Standby Power Systems. New England Building Officials Education Association Annual Conference October 5, 2015

for Walmart suppliers. About Bureauu Veritas laboratories in building and Phase 1: Pre- Assessment until the factory Phase 2: Initial Assessment

Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

Reducing Arc Flash Risks with Electrical Maintenance Safety Devices - Part 2

TABLE OF CONTENTS CHAPTER 2 WIRING AND PROTECTION CHAPTER 1 GENERAL RULES... 19

Changes to NFPA 70E. - The Role of PdM &Safe PdM Work Practices. Tim Rohrer Exiscan LLC

Neil Hewitt Electrical & Air Conditioning P/L

Delta T Alert: Wireless Temperature Monitoring of Electrical Enclosures

Indian Standards On Fire and Electrical Safety. A K Purohit, Scientist E Bureau of Indian Standrds Bhubaneswar

FIRE SAFETY INSPECTION REPORT

Electrical Management

SECTION 2 NEC REFERENCES SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1. CHAPTER 1 GENERAL Introduction...35

P-16 ENGINEER NO. DATE DESCRIPTION 1 01/19/2016 FOR CONSTRUCTION 2 03/11/2016 REVISION # 2 DRAWN BY: CHECKED BY: DATE: SCALE: DRAWING NUMBER

SECTION ELECTRICAL IDENTIFICATION

Contents The IET Regulations, BS 7671, and this Guide 1.1 The need for this Electrician s Guide 1.2 The IET Regulations BS 7671

Chapter 1 General... 5

Requirements for Electrical Installations

IFGC-2012 AMENDED IFGC-2015 IFGC-2018 CHAPTER 1 SCOPE AND

Electrical Tech Note 107

SECTION (16075) - IDENTIFICATION FOR ELECTRICAL SYSTEMS

FIRE SAFETY INSPECTION REPORT

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

Property risk solutions

CONNECTICUT. Downloaded

Transcription:

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Factory Address: Assessor: 1Plot # 4 (half) 8, 12 (half)-16, DEPZ (Old), Dhaka EPZ, Ganakbari, Ashulia, Savar Ashulia, Savar Dhaka Bangladesh Uttaron 25 Feb 2014 The Alliance for Bangladesh Worker Safety Page 1/20

Factory 25 Feb 2014 Introduction to the Report The following report contains a site profile and summary of non-conformities identified during an onsite assessment commissioned by the Alliance for Bangladesh Worker Safety (Alliance) and conducted by a third-party Qualified Assessment Firm (QAF). The assessment was conducted against the Alliance for Bangladesh Worker Safety Assessment Protocols (APs) and Fire Safety and Structural Integrity Standard, which is harmonized with the factory assessment guidelines developed by Bangladesh University of Engineering and Technology (BUET) for the Bangladesh National Tripartite Plan of Action (NTPA). The goal of the Alliance process is to provide clear and practical technical requirements by which Bangladeshi Ready Made Garment (RMG) Factories producing for Alliance members may be consistently and fairly evaluated for fire, structural, and electrical safety in a non-duplicative manner. Each assessment will prompt action plans that will be used by RMG factories to systematically and sustainably improve safety conditions for garment workers. Beyond tracking and reporting on action steps taken in a transparent manner, the Alliance organization and its members will seek to further support factory improvements through technical assistance, training, implementation support for functional Worker Committees, and in some cases financial assistance and wage support for workers if factories are closed for remediation. The contents of the report do not constitute a guarantee of compliance with the applicable laws, the Alliance Standard or the absolute or continued safety against fire, electrical and/or structural integrity issues that may lead to injury or loss of life. The report is designed to provide a non-exhaustive summary of risk issues, based on a limited sampling and duration of time onsite by the named QAF. Neither the QAF nor the Alliance can certify or guarantee the quality, outcome, or effectiveness of actions taken in response to the report. For more information and report feedback please go to: www.bangladeshworkersafety.org. The Alliance for Bangladesh Worker Safety Page 2/20

25 Feb 2014 GENERAL INFORMATION General Information Factory Address: Country: Province: City: 1Plot # 4 (half) 8, 12 (half)-16, DEPZ (Old), Dhaka EPZ, Ganakbari, Ashulia, Savar Ashulia, Savar Dhaka Bangladesh Bangladesh Dhaka Ashulia, Savar Zip Code: 1349 Audit Duration: Re-Audit: Draft Report Date : Final Report Date : Are all action items from previous assessment complete? : Buildings in Complex : Is the building(s) owned or rented by the Factory?: Number of Building Levels (Stories) : Approximate Building Area (SF) : Date of Building Construction : Date of Last Building Renovation/Addition : Ancillary Structures in Complex : Approximate Ancillary Structures Area (SF) : 4 Days Re-Audit After 0 Months 25-Feb-2014 21-Jan-2015 N/A Two(1 Main building, 1 ancillary building). Owned Main factory Building: 1 storied R.C building. Total area of the main factory building is 20,700 SF.( GF: 5,100 SF, 1st: 5,200 SF, 2nd: 5,200 SF, 3rd: 5,200 SF.) Twenty years ago(1994). No 1 storied shed building with mezzanine floor. Total area of the ancillary building is 128,600 SF( GF: 107,000SF; Mezzanine: 21,600 SF) The Alliance for Bangladesh Worker Safety Page 3/20

25 Feb 2014 Number of Occupants : Total occupancy is 344. (main factory building: GF: 28;1ST: 25; 2ND: 32; 3RD: 21) ( Ancillary building: GF: 218; Mezzanine: 39) The Alliance for Bangladesh Worker Safety Page 4/20

25 Feb 2014 ASSESSMENT FINDINGS Electrical System Information Are as-built electrical drawings indicating information such as panel and circuit locations throughout the building(s) available for review? No Electrical approved as build drawings were available on site Document Review: No drawings found Obtain or create a full set of electrical system drawings, seek authority approval and store on site for further and future reference 15 Jan 2015 Alliance Standard Part 10 Section 10.3.7 Electrical System Maintenance Have workers that operate and maintain the electrical system received electrical safety training? Is training documentation on site? Workers that operate and maintain the electrical system received no electrical safety training and no related documents were found at the site. Training is required for workers who deal with electrical equipment. Uploaded Document: No record found., Visual Assessment, Uploaded Document: No record found., Visual Assessment Develop and implement an electrical safety program. Include key topics such as lock-out/ tag-out procedures, personal protective equipment requirements, etc. Reference NFPA 70E for example program requirements. Reference NFPA 70e for example Is a periodical Insulation Resistance Measurement Program established and recorded? The Alliance for Bangladesh Worker Safety Page 5/20

25 Feb 2014 Periodic electrical maintenance inspections were not observed. Document Review: No records found A planed program maintenance (PPM) system shall be developed and executed to rectify electrical system issues before they become safety hazards. 15 Jan 2015 Alliance Standard Part 10 Section 10.13.4 Insulation Tests and 10.13.8 Electrical Inspections Is the electrical switchgear and panel boards inspected on an annual basis to ensure that the equipment is installed in accordance with the listed ratings? Periodic electrical maintenance inspections not observed Document Review: No documents seen A planed program maintenance (PPM) system shall be developed and executed to rectify electrical system issues before they become safety hazards. 15 Jan 2015 Alliance Standards Part 10 Section 10.13.8 Electrical Inspections Are thermographic scans of electrical equipment completed at least every three years? Thermo graphic scans of electrical equipment are required at least every three years to ensure the proper maintenance of the electrical equipment. Such programs have not been witnessed in this factory. Visual Assessment: No previous thermo graphic scan report was found. Complete thermo graphic scans at least on a three year cycle. Thermo graphic scans shall be completed in accordance with the Standard for Infrared Inspection of Electrical Systems & Rotating Equipment and NFPA 70B. The Alliance for Bangladesh Worker Safety Page 6/20

25 Feb 2014 Alliance Standards Part 10 Section 10.13.8 Electrical Inspections Are periodic safety inspections of the electrical system components completed and documented? Periodic electrical maintenance inspections not were observed Document Review: No documents or practices were seen A planed program maintenance (PPM) system shall be developed and executed to rectify electrical system issues before they become safety hazards. 15 Jan 2015 Alliance Standard Part 10 Section 10.13 Inspection and Testing and Part 13 Section 13.6 Housekeeping A transformer oil analysis is routinely completed on main service transformers. Low Non-Compliance Level: 1 Oil test record was not found. Visual Assessment: Oil test record was not found. Complete an oil analysis on applicable transformers at appropriate intervals based on voltage and power. A transformer oil analysis shall be routinely completed to ensure uninterrupted service without major shutdowns. Alliance Standard Part 10 Section 10.13.8 Electrical Inspections Electrical System Conditions All equipment is efficiently earthed and properly connected to the required number of earth electrodes. All equipment is not efficiently earthed. Location: LT-01/Sub-Station/1st FL, LT-02/Sub-Station/1st FL, DB-P-06,SDB-04/Lab, SDB-05/Lab, SDB-06/Lab, SDB-07/Lab, SDB-08/Lab,SDB-09/Office, SDB-10/Office, SDB-11/Office, SDB-04/Knitting,SDB-03/Comp. Room, SDB-02/ Bianca, SDB-03/Mixer Room The Alliance for Bangladesh Worker Safety Page 7/20

25 Feb 2014 Visual Assessment: All equipment is not efficiently earthed. Provide earthling of equipment at required locations and connect to required number of electrodes. Refer to the BNBC for required number of electrodes. In general all parts of equipment and installation other than live parts shall be earth potential, thus Alliance Standard Part 10 Section 10.13.7.1 Inspection of Substation Installations. Is a readily accessible single point of disconnect provided for each main electrical service feed? A readily accessible single point of disconnect is not provided for each main electrical service feed. Location: SDB-04/Lab, SDB-06/Lab, SDB-09/Office, SDB-10/Office, SDB-11/Office Photograph: A readily accessible single point of disconnect is not provided for each main electrical service feed. Install a readily accessible single point of disconnect for each main electrical service feed. Main feeds for panels shall be equipped with disconnect and shall be installed at accessible height, maximum 6 feet. BNBC 2.7.5 Main Switch and Switchboards Are switchboards and/or distribution boards installed in compliant locations? The installed heights of some switchboards are over 2 meters from FFL. Visual Assessment: As seen on site Engage a licensed electrician or electrical contracting firm to rectify all non conforming and unsafe electrical works throughout the entire complex. 15 Nov 2014 Alliance Standard Part 10 Section 10.7 Main Switch, Switchboards and Metal Clad Switchgear Indications of overheating, overloading, or signs of burning were not observed. The Alliance for Bangladesh Worker Safety Page 8/20

25 Feb 2014 Details are in the thermo graphic report. Visual Assessment: Thermo graphic report Engage a licensed electrician or electrical contracting firm to rectify all non conforming and unsafe electrical works throughout the entire complex. 15 Nov 2014 Alliance Standard Part 10 Section 10.3.5 Is electrical wiring/cables sized according to capacity of circuit breakers (No higher rated circuit breakers with lower rated wiring)? Cables sized according to capacity of CBS are not provided on site. Location: LT-01/Sub-Station/1st FL, LT-02/Sub-Station/1st FL, DB-N-01,DB-N-03, DB-N- 04, DB-N-05, DB-N-06, DB-N-07, DB-N-09, DB-P-01,DB-P-02, DB-P-03, DB- P-04, DB-P-05, DB-P-06, SDB-02/Lab, SDB-03/Lab, SDB-05/Lab, SDB- 07/Lab,SDB-08/Lab, SDB-09/Office, SDB-11/Office, SDB-01/Knitting Sec.,SDB-02/Knitting Sec., SDB- 04/Knitting, SDB-02/New Rapid,SDB- 03/New Rapid, SDB-01/Jigger, SDB-01/GF, SDB-01/Jigger/Office,SDB- 01/Jigger/Office, SDB- 01/Comp.Room-01, SDB-03/Comp. Room, SDB- 01/Inspection, SDB-01/Inspection/GF,SDB-01/Workshop, SDB-02/Bianco, SDB-04/Boiler Room Visual Assessment: er rated circuit breakers with lower rated wiring was found. Consult with a qualified Electrical Engineer and ensure electrical cables are sized according to capacity of circuit breakers. Protective devices shall be provided to break any overload current flowing in the circuit conductors before such a current could 30 Sep 2014 Alliance Standard Part 10 Section 10.3.1 Electrical Connections. The Alliance for Bangladesh Worker Safety Page 9/20

25 Feb 2014 No multi looping of wiring/cables observed at circuit breakers within switchboards and/or distribution boards. Multiple cables are installed at single points. Multiple and looping are found at circuit breakers in the distribution boxes at every floor. Photograph: Multiple and looping cables were found at MCCB & bus bar terminals.. Separate the multiple cables so that only one circuit lands on each circuit breaker. Alliance Standard Part 10 Section 10.3 Electrical Wiring and Cabling All metal in the building is connected to the building earthing/grounding system such as metal rebar in concrete, metal frame of building, or metal water pipe. All metal in the building is not connected to the building earthing/grounding system. Visual Assessment: All metal in the building is not connected to the building earthling/grounding system. Provide earthing/grounding system for All metal in the building. In general all parts of equipment and installation other than live parts shall be earth potential, thus ensuring that persons coming in contact with these parts shall also be at earth potent Alliance Standard Part 10 Section 10.10 Earthing Light fixtures without protective covers are not installed in storage areas or in any area where the Inspector of the Factories Rules (1.5.3.5) Part 53 disallows these fixtures. Naked light fixtures are installed in storage areas. Visual Assessment: Naked light fixtures installed in storage areas. The Alliance for Bangladesh Worker Safety Page 10/20

25 Feb 2014 Remove light fixtures without protective covers from storage areas or in any area where the Inspector of the Factories Rules (1.5.3.5) Part 53 disallows these fixtures. Light fixtures without protective covers (otherwise known as naked lights) shall not b 31 Jul 2014 Alliance Standards Part 10 Section 10.15 Naked Lights No circuits are drawn for loads without the incorporation of a overcurrent protection device (circuit breaker). Non-Compliance Level: 1 Circuit breakers were not identified with ratings. Location: DB-P-02, DB-P-04 Visual Assessment: Found protective device without identification of their ratings. Provide protective devices (circuit breakers) for all circuits drawn for loads. Install appropriate protection at switchboards and distribution boards for all circuits and sub circuits against short circuit and over current. The protective device shall be Alliance Standards Part 10 Section 10.9 Protection of Circuits Shielding or additional insulation is provided for wiring exposed to external heat sources. Non-Compliance Level: 1 Insulation is not provided for the cables and wiring as required. Visual Assessment: Insulation is not provided for the cables and wiring where needed. Provide insulation for the cables and wiring as required. One of the following methods shall be used to protect wiring systems from heat: (1) shielding; (2) placing 900 mm (36 in.) from the source of heat; (3) selecting a system with due regard for the ad 31 Aug 2014 Alliance Standards Part 10 Section 10.3.4.2 External heat sources. Are all switchboards and/or distribution boards properly grounded (earthed)? The Alliance for Bangladesh Worker Safety Page 11/20

25 Feb 2014 All switchboards and/or distribution boards are not properly grounded (earthed). Location: LT-01/Sub-Station/1st FL, DB-N-02,DB-N-04, DB-N-05, DB-N-07, DB-N-09, DB-P-01, DB-P-03, DB-P-04,SDB-01/Lab, SDB-02/Lab, SDB-03/Lab, SDB-04/Lab, SDB-05/Lab,SDB-06/Lab, SDB-08/Lab, SDB- 09/Office, SDB-10/Office, SDB-11/Office, SDB-02/New Rapid,SDB-03/New Rapid, SDB-01/Jigger, SDB-01/Jigger/Office, SDB-03/Comp. Room, SDB- 01/Inspection/GF, SDB-01/Workshop, SDB-02/Standard-04, SDB-04/Boiler Room Photograph: All switchboards and/or distribution boards are not properly grounded (earthed) Provide grounding (earthling) for distribution boards as per BNBC section 2.8.1. Panel board cabinets and panel board frames, if of metal, shall be in physical contact with each other and shall be grounded. Where the panel board is used with nonmetallic r Alliance Standard Part 10 Section 10.10.2 Circuit and System Earthing Do switchboards and/or distribution boards have capacity information labels? Switchboards and/or distribution boards have no capacity information labels. Location: All DBs. Visual Assessment: Switchboards and/or distribution boards have no capacity information labels. Provide capacity information labels (Maximum current rating, no of circuit breakers etc.) for Switchboards and distribution boards. Capacity labels shall describe the maximum number of protective devices that can be accommodated and the capacity of the bo 31 Aug 2014 Alliance Standard Part 10 Section 10.7 Main Switch, Switchboards And Metal Clad Switchgear and 10.13.7 Inspection of the Installation Are switchboards and/or distribution boards free of dust and debris? Switchboards were found with dust and foreign materials The Alliance for Bangladesh Worker Safety Page 12/20

25 Feb 2014 Visual Assessment: As seen on site A planed program maintenance (PPM) system shall be developed and executed to rectify electrical system issues before they become safety hazards. 15 Jan 2015 Alliance Standard Part 10 Section 10.3.9.1 Enclosures Are switchboards and/or distribution boards provided with physical means to prevent the installation of more over current devices than that number for which the panel board was designed, rated, and listed. No physical means were found to limit the installation of additional over current protective device. Location: All DBs. Visual Assessment: No physical means were found. Switchboards and/or distribution boards shall be provided with physical means to prevent the installation of more over current devices than that number for which the panel board was designed, rated, and listed following NFPA 70 section 408.54. Alliance Standards Part 10 Section 10.7 Main Switch, Switchboards and Metal Clad Switchgear Each circuit is provided with a dedicated neutral. Circuits are not provided with a dedicated neutral for each load. The use of common neutral for more than one circuit is not permitted in the standard. Location: LT-01/Sub-Station/1st FL, LT- 02/Sub-Station/1st FL, DB-N-02,DB- N-05, DB-N-06, DB-N-07, DB-N-08, DB-N-09, DB-P-01, DB-P-03,DB-P-04, SDB-01/Lab, SDB-02/Lab, SDB-03/Lab, SDB-04/Lab, SDB-05/Lab, SDB- 06/Lab, SDB-07/Lab, SDB-08/Lab, SDB-09/Office, SDB-10/Office, SDB- 11/Office, SDB- 01/Knitting Sec., SDB-02/Knitting Sec., SDB-01/Jigger, SDB- 01/GF,SDB-01/Jigger/Office, SDB-01/Inspection, SDB- 01/Inspection/GF, SDB-02/Standard-04, SDB-02/Standard- 04, SDB-03/Mixer Room Visual Assessment: Circuit is not provided with a dedicated neutral for each load. Provide dedicated neutral for each circuit. The Alliance for Bangladesh Worker Safety Page 13/20

25 Feb 2014 Alliance Standards Part 10 Section 10.3 Electrical Wiring and Cabling Are electrical wiring/cables properly identified? Electrical wiring/cables are not properly identified. Location: DB-N-02, DB-N- 03, DB-N-04, DB-N-05, DB-N-06, DB-N-07, DB-N-08, DB-N-09, DB-P-02, DB- P-03, DB-P-04, DB-P-05, DB-P-06, SDB-01/Lab, SDB-02/Lab, SDB-04/Lab, SDB-05/Lab, SDB-06/Lab, SDB-07/Lab, SDB-08/Lab, SDB-09/Office, SDB- 10/Office, SDB-11/Office, SDB- 01/Knitting Sec., SDB-02/Knitting Sec., SDB- 04/Knitting, SDB- 02/New Rapid, SDB-03/New Rapid,SDB-01/Jigger, SDB- 01/GF, SDB- 01/GF, SDB-01/Jigger/Office, SDB-03/Comp. Room, SDB- 01/Inspection, SDB-01/Inspection/GF, SDB-01/Workshop, SDB- 02/Bianca,SDB-02/Standard-04, SDB-03/Mixer Room, SDB-04/Boiler Room Photograph: Electrical wiring/cables are not properly identified. Maintain color code for all cables. For phase conductors use Red, Yellow, Blue, For Neutral conductors use black and For Grounding cable use green dotted yellow. Bangladesh Electricity Rules 1937 Rule 51 and 56 Cable joints are through porcelain/pvc connectors with PIB tape wound around joint. Improper cable joints were found. Location: DB-N-05/Knitting/GF, SDB- 03/New Rapid/GF Photograph: Improper cable joints were found. Re-install cable joints through porcelain/pvc connectors with PIB tape wound around joint. Cable joints shall be installed in accordance with the direction described in the standards to avoid loose connections. Alliance Standards Part 10 Section 10.3.8.4 Cable Joints The Alliance for Bangladesh Worker Safety Page 14/20

25 Feb 2014 Electrical connections at equipment, fixtures, etc are properly secured. All connections are not secured. Location: LT-01/Sub-Station/1st FL, LT- 02/Sub-Station/1st FL, DB-N-01, DB-N-02, DB-N-03, DB-N-04, DB-N-06, DB- N-08, DB-N-09, DB-P-01, DB-P-02, DB-P-03, DB-P-05, DB-P-06, SDB- 01/Lab, SDB-02/Lab, SDB-03/Lab, SDB-07/Lab, SDB-02/New Rapid, SDB- 03/New Rapid, SDB-01/Jigger, SDB-01/GF, SDB-01/Jigger/Office, SDB- 01/Comp.Room-01, SDB-01/Inspection, SDB-01/Inspection/GF, SDB- 01/Workshop, SDB-03/Mixer Room, SDB-04/Boiler Room Photograph: All connection are not secured If flexible metallic hose is used for wiring to motors and other equipment, the wiring shall be enclosed to the full length, and the hoses secured properly by approved means. Connections between conductors and between conductors and other equipment shall 31 Aug 2014 Alliance Standards Part 10 Section 10.3.1 Electrical Connections Is all electrical wiring/cable properly terminated at its point of termination (No un-terminated wires, lugs are provided at terminals, etc)? Cables are connected without lugs. Location: DB-N-03/GF/Jigger Sec., DB-N- 01/Boiler-01/GF Photograph: Cables are connected without lugs Ensure all electrical wiring/cable properly terminated at its point of termination. Unterminated cables may lead to electrical short circuits. Cables shall be connected to terminals only by soldered or welded lugs, unless the terminals are designed to sec Alliance Standards Part 10 Section 10.3.9.2 Wiring of Sub-distribution Boards The Alliance for Bangladesh Worker Safety Page 15/20

25 Feb 2014 Are junction boxes and other electrical devices provided with covers? Junction boxes were installed without covers. Photograph: Junction boxes have no cover. Provide adequate covers for junction boxes and other electrical devices. Proper junction boxes shall be used wherever conductors are joined or crossover of conductors takes place. Junction boxes shall have covers to prevent lint buildup and reduce the po 15 Aug 2014 Alliance Standard Part 10 Section 10.3.5 and 13.6.2 Mechanical guards are provided for electrical equipment and wiring where necessary. Mechanical guards are not provided for cables. Location: Substation Photograph: Mechanical guard is not provided for cables. Mechanical guards shall be provided for electrical equipment and wiring where necessary. Rotating parts of electrical equipment and wiring shall have mechanical guards. 15 Aug 2014 Alliance Standard Part 10 Section 10.3 Electrical Wiring and Cabling, 10.6.5 Cables, and 10.7 Main Switch, Switchboards And Metal Clad Switchgear Phase separators are provided between terminals on circuit breakers. Low Phase Separator is not installed on circuit breakers. Location: Every floor. Photograph: Phase Separator is not fixed on circuit breakers. Install phase separators between terminal connections at the noted locations. Phase separators are required for the terminals of circuit breakers to prevent arcing and short circuit between phases. The Alliance for Bangladesh Worker Safety Page 16/20

25 Feb 2014 Alliance Standard Part 10 Section 10.3.1 Electrical Connections Are electrical insulation mats provided in front of substation, switchboards and/or distribution boards? Low Non-Compliance Level: 1 Electrical insulation mats are not provided in front of substation, switchboards and/or distribution boards Location: DB-P-06, SDB-05/Lab, SDB-07/Lab, SDB- 08/Lab, SDB-09/Office, SDB-10/Office, SDB-11/Office, SDB-01/Comp.Room- 01, SDB-02/Bianca Visual Assessment: Electrical insulation mats are not provided in front of substation, switchboards and/or distribution boards Provide electrical insulation mats in front of distribution boards. Graded insulation/rubber mat shall be provided in front of all switchboards and distribution boxes to prevent electrocution. 15 Aug 2014 Alliance Standard Part 10 Section 10.13.7 Inspection of the Installation. Are meters and other electrical devices (Ammeter, Voltmeter, PFI Auto Controller, etc) installed on the main electrical equipment operational? Low Non-Compliance Level: 1 Ammeter, Voltmeter are not working in this factory. These meters are the primary source to see the current status of the system. Location: SDB-03/New Rapid, SDB-01/Comp.Room-01 Photograph: Some of the meters and other electrical devices (Ammeter, Voltmeter, PFI Auto Controller, etc.) installed on the main electrical equipment are not operational Ensure meters and other electrical devices installed on the main electrical equipment are operational. Repair or replace as required. 31 Aug 2014 Alliance Standard 10.13.7 Inspection of the Installation Signage indicating the prohibition of light fixtures without protective covers is installed at required locations. Low The Alliance for Bangladesh Worker Safety Page 17/20

25 Feb 2014 Non-Compliance Level: 1 No signs are posted prohibiting light fixtures without protective covers. Visual Assessment: No indication of prohibition of light fixtures with protective covers. Light fixtures without protective covers (otherwise known as naked lights) shall not be allowed in storage areas or in any area where the Inspector of the Factories Rules (1.6.3.7) Part 53 disallows these fixtures. Install signs posted in Bengali and Engl 15 Aug 2014 Alliance Standards Part 10 Section 10.15 Naked Lights Emergency Power System Are cable trenches properly covered? Cable trenches are not properly covered. Photograph: Cable trenches are not properly covered Provide adequate non combustible cover on cable trench. All cable trenches shall have covers of noncombustible material. Underground cables for electrical distribution in the remiss/garden/compound of the building shall be encased in GI or PVC pipes and l 15 Aug 2014 Alliance Standard Part 10 Section 10.13.7 Inspection of the Installation Are emergency power switchboards, distribution boards, and circuits properly identified? No identification was evident in any area. Visual Assessment: No identification evident here in all areas. All boxes and enclosures (including transfer switches, generators, and power panels) for emergency circuits shall be permanently marked so they will be readily identified as a component of an emergency circuit or system. All emergency power switchboards, 15 Aug 2014 The Alliance for Bangladesh Worker Safety Page 18/20

25 Feb 2014 NFPA 70 Chapter 7 Article 700.10 Wiring, Emergency System Are life safety loads (fire alarm, fire pump, elevators, emergency lighting, exit signage, etc) connecting to the emergency power system? Life safety loads (fire alarm, fire pump, elevators, emergency lighting, exit signage, etc.) are not connected to the emergency power system. Visual Assessment: Life safety loads are not connected to the emergency power system. Provide emergency power for life safety loads. Life safety loads (fire alarm, fire pump, elevators, emergency lighting, exit signage, etc.) shall be connected to the emergency power system to ensure an uninterrupted power supply to this equipment. Alliance Standard Part 10 Section 10.8 Standby Power Are inspection, maintenance, and testing procedures of the emergency generator being completed and documented? Low Non-Compliance Level: 1 No IMT documents were available. Visual Assessment: Document was not found. Establish a routine maintenance and testing program for the emergency generator. Document inspection, maintenance, and testing procedures of the generator. The program shall be based on all of the following: (1) Manufacturer's recommendations (2) NFPA 110 Chapter 8 Are inspection, maintenance, and testing procedures of the UPS being completed and documented? Low Non-Compliance Level: 1 No ITM records for the UPS were available. The Alliance for Bangladesh Worker Safety Page 19/20

25 Feb 2014 Visual Assessment: No record found on inspection, maintenance, and testing procedures of the UPS Inspection, maintenance, and testing procedures of the UPS shall be performed and documented. The routine maintenance and operational testing program shall be based on all of the following: (1) Manufacturer's recommendations (2) Instruction manuals (3) Mi Alliance Standard Part 13 Section 13.11 NFPA 111 Chapter 8 NFPA 70B Chapter 28 Lightning Protection System Is a lightning protection system installed on the building? Non-Compliance Level: Alliance Standards Part 10 Section 10.11 Lightning Protection. Calculate Risk Index to determine if required. The Alliance for Bangladesh Worker Safety Page 20/20