DIVISION LOW VOLTAGE DE-ICING / SNOW MELTING SYSTEM IN EXISTING ASPHALT/CONCRETE

Similar documents
SECTION RADIANT-HEATING ELECTRIC CABLES / MATS

CSI Master Format 2004 Guide Specification for: Snow Melting (Mineral Insulated)

CSI Master Format 2004 Guide Specification for: Freezer Frost Heave Prevention (Mineral Insulated)

Heatizon Systems Owners Manual Heatizon Systems Low Voltage Products CBX6 Series CBX23 Series SLC500 Series

SECTION ELECTRIC FLOOR HEATING AND SNOW MELTING EQUIPMENT

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Linear Heat Detection Engineering Specifications

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION FAN COIL UNITS

SECTION GENERATOR PARALLELING CONTROLS

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION RADIANT-HEATING ELECTRIC CABLES PART 1 - GENERAL 1.1 SECTIONS INCLUDES

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ).

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

UFGS (February 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS

CSI Master Format 2004 Guide Specification for: Flow Maintenance of Above Ground Greasy Waste Disposal Lines

SECTION ROTARY-SCREW WATER CHILLERS

SECTION AIR DOORS

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

SECTION AIR DUCT ACCESSORIES

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION ENCLOSED CONTROLLERS

CSI Master Format 2004 Guide Specification for: Flow Maintenance of Aboveground Fuel Oil Lines

100A / 200A. Maximum Heating Load: Enclosure Type: NEMA 4

SECTION (16460) - LOW-VOLTAGE TRANSFORMERS

SECTION ELECTRICAL GENERAL PROVISIONS

PRO-WATCH NOTIFIER SECONDARY FIRE INTERFACE ARCHITECT AND ENGINEERING SPECIFICATION

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Wilo Top S Wet Rotor Circulation Pumps. Engineering Specification

CONTENTS AUTOMATIC TRANSFER SWITCHES

SECTION ISOLATED POWER SYSTEMS

SECTION ELEVATOR FIRE RATED SMOKE CONTAINMENT SYSTEM

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials.

15900 HVAC INSTRUMENTATION AND CONTROLS

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

FIRE SUPPRESSION SPRINKLER SYSTEM

A. ASHRAE Handbook HVAC Applications, Snow Melting and Freeze Protection

SECTION ELECTRIC WATER HEATERS

DETEX ARCHITECTURAL SPECIFICATIONS, June 2012 AO19 SERIES HEAVY DUTY LOW-ENERGY ELECTRIC SWING DOOR OPERATOR

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Video Surveillance Remote Devices and Sensors

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW)

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

A. Product Data: Include rated capacities, furnished specialties and accessories.

NFPA 2001: Standard for Clean Agent Fire Extinguishing Systems NFPA 70: National Electrical Code (NEC) NFPA 72: National Fire Alarm Code

SPECIFICATION: AlarmLine TM INTELLIGENT LINEAR HEAT DETECTION

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION LOW VOLTAGE POWER PANELBOARDS - SPECTRA

PANELBOARDS & BUILDING DISTRIBUTION

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

SECTION PLUMBING EQUIPMENT

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Fire Protective

GUIDE SPECIFICATION ADVANCED RADIANT SYSTEMS DU/DUH DUAL OUTPUT RANGE INFRARED TUBE HEATERS

SECTION ULTRASONIC TRANSIT TIME CLAMP-ON FLOW MEASURING SYSTEM

A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings.

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015.

1.3 REFERENCE STANDARDS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION PUBLIC ADDRESS SYSTEMS

CHAPTER 20 SERVICE EQUIPMENT

Design & Construction Standards, Revised January

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Temperature Rise Door Framing

SECTION DOMESTIC WATER PUMPS

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

SECTION SOLAR PHOTOVOLTAIC (PV) POWER GENERATION SYSTEM

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

Architectural Specification Sheet

SECTION AIR COILS

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Fire Protective

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.

ELECTRIC COOKTOP INSTALLATION INSTRUCTIONS

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING SuperLite TM I-XL minute SuperLite TM I-XL IGU minute PART 1 GENERAL

A. This Section includes the following lighting control devices:

Design & Construction Standards, Revised January

SECTION LIGHTING CONTROL DEVICES EATON S LIGHTING SYSTEMS (FORMERLY COOPER CONTROLS) VACANCY/OCCUPANCY SENSORS

WALLCOVERINGS WALLCOVERINGS

IN2 Lighting Control Devices

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

PART 1 GENERAL 1.01 SUMMARY

GUIDE SPECIFICATION ADVANCED RADIANT SYSTEMS KMI GoGas RANGE HIGH EFFICIENCY, HIGH INTENSITY INFRARED HEATERS

MODEL EUR -5A AUTOMATIC SNOW/ICE MELTING SYSTEM CONTROL PANEL

UFGS (August 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS

Freezer Frost Heave Prevention

SECTION INTRUSION DETECTION SYSTEM

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri

SECTION ELECTRIC WATER HEATERS

SPECIFICATIONS: FIREGUARD CROSS CORRIDOR CC

SECTION SECURITY TESTING AND COMMISSIONING

Transcription:

DIVISION 23 8313 LOW VOLTAGE DE-ICING / SNOW MELTING SYSTEM IN EXISTING ASPHALT/CONCRETE PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install low voltage de-icing / snow melting cable system in existing asphalt/concrete as described in Contract Documents B. Related Sections: 1. Section 32 0630 Sidewalks: Installation coordination with concrete pavements. 2. Section 32 1400 Unit Paving: Installation coordination with unit pavers. 3. Section 03 3000 Cast-In-Place Concrete. 4. Section 26 0600 Electrical: Materials and installation of wiring and electrical power source. 1.2 SYSTEM DESCRIPTION A. The system shall consist of all equipment and materials for a complete snow melting system to be installed in existing concrete or asphalt. B. The area covered and heat density (measured by Watts or BTU equivalent) per linear foot of heating element or square foot of area for each Heatizon System product are determined by the spacing between adjacent runs of heating element, the total length of heating element, and the size of the transformer. See manufacturer s installation instructions for more detailed information. 1.3 SUBMITTALS A. Product Data: Submit manufacturer s technical product data and written installation instructions for snow melting cable system. B. Shop Drawings: At Architect s request, submit drawings showing layout of system control box, activation device, grounding connections, and heating cables required to provide complete operating system. Include the following: 1. Locations for activation devices. 2. Location of low-voltage heating cable step-down transformer and control box. 3. Cold-lead cable runs from transformer to heating element connection points. 4. Heating element layout and spacing. 5. Cold-lead jumpers between non-adjacent areas. 6. Connections between cold-lead and heating element. 7. Low-voltage wiring between control box and activation device. 8. Location of aerial or slab-mounted temperature/moisture sensor(s). 9. Low-voltage wiring between sensor(s) and activation device(s). 10. Differentiate between: Heatizon Systems 1 Division 23 8313

a. Control wiring. b. Heating element. c. Cold-lead. d. Branch-circuit wiring. 11. Differentiate between zones of heating element. C. Operation and Maintenance Data: Submit manufacturer s written maintenance and operation instructions for system. D. Warranty: Submit copy of system manufacturer s standard warranty for system. 1.4 QUALITY ASSURANCE A. Manufacturer s Qualifications: 1. Firm regularly engaged in manufacturing of electric cable heating elements, of type, sizes and ratings required, whose products have been in satisfactory use in similar service for not less than five years. B. Installer Qualifications: 1. Licensed Contractor with a minimum of two years successful certified experience installing projects utilizing electric heating cable systems equal to systems specified in this section. C. Regulatory Requirements: 1. Comply with applicable local electrical code requirements of local authorities having jurisdiction. 2. Provide products that are listed, recognized, and labeled by Nationally Recognized Testing Laboratory (NRTL) that include but are not limited to: a. ETL subsidiary of Intertek Testing Laboratories, b. Canadian Standards Association (CSA), and c. Underwriters Laboratories (UL). 1. Conform with requirements of Safety for Electric Radiant Heating Panels and Heating Panel Sets (UL - 1693, 1st Edition, dated December 11, 1996). 2. Conform with requirements of Outline of investigation for Roof and Gutter De-icing Cable Units, (UL 1588 Issue 4, dated May 24, 2002), and IEEE Recommended Practice for Electrical Impedance, Inductive and Skin Effect Heating of Pipelines and Vessels (IEEE 844-2000). 3. Conform with requirements of Dry-Type General Purpose and Power Transformers (UL 1561). 4. Conform to Requirements for Electrical Resistance Heating Cables and Heating Device Sets (CSA 22.2, No 130-03, dated January, 2008) 1.5 DELIVERY STORAGE AND HANDLING A. Deliver, store, and handle in accordance with manufacturer s written instructions. Store the materials in dry indoor location off the ground. B. Remove damaged materials from job site and replace with new at no additional cost to Owner. 1.6 WARRANTY Heatizon Systems 2 Division 238313

A. Provide Manufacturers Standard with following requirements: 1. Control Box Components - One year 2. Power Transformer - Five years 3. Heating Element - 25 years PART 2 PRODUCTS 2.1 MANUFACTURER A. Heatizon Systems, 4137 South 500 West, Murray, Utah 84123, (888) 239-1232 www.heatizon.com. 2.2 DISTRIBUTOR A. COMFORT RADIANT HEATING, LLC, 9 Morris Lane, Clifton Park, New York, 12065 (888)448-0555 www.comfortradiant.com 2.3 COMPONENTS A. Heating Element: 1. Copper stranded cable insulated with chemical- and gasoline-resistant thermoplastic vinyl and sheathed with nylon jacket for corrosion and mechanical protection. 2. Rated for operating at variable output of 0 to12 watts per linear foot. 3. Maximum Operating Voltage: 0.118 volts per linear foot of heating element. 4. Maximum Secondary Voltage: Not to exceed 65.5 volts. 5. Heating Element Operating Temperature: Not to exceed 80 degrees C. 6. Heatizon Systems Tuff Cable number E101 (UL E174340) C. Heating Cable Power Transformer: 1. Properly sized so cable heating element operation is less than 96 amps. 2. Multi tapped on primary side to allow for operation of supply of 120, 208, 240, and/or 277 volts. 3. Multi tapped on secondary side to allow proper operation when operating range of heating elements lengths. 4. Heatizon Systems Options: a. S050 (0.5kVA) b. S101 (1kVA) c. S102 (2kVA) d S103 (3kVA) e. S104 (4kVA) f. S105 (5kVA) g. S106 (6kVA) h. S202 (2x 2kVA) (single primary with dual secondaries) i. S203 (2x3kVA) (single primary with dual secondaries) D. Control Box: 1. Provide unit that: a. Soft starts transformer. b. Monitors overall system for proper and safe operation. c. Interfaces with activation device. d. Shuts system off in event of fault. e. Provides protection for over-current, undercurrent and high temperature transformer (CBX6T and CBX23T models have a 24VAC power supply for Activation Device). 2. Provide means of faults and fault status. 3. Fitted with power service disconnect rated for system operating range. Heatizon Systems 3 Division 23 8313

4. Heatizon Systems Control Box: SLC500, CBX6, CBX6T, CBX23, and CBX23T (CBX6T and CBX23T models have a 24VAC power supply for Activation Device). E. Activation Device: 1. Provide unit with a dry contact rated for 1 amp and 250 volts AC. 2. Provide one of the following: a. Controller, Slab Temperature: Model M333 which requires Selector Box Model M329 or CBX6T / CBX23T. b. Remote Bulb Temperature Sensor: Model M320 c. Pavement Mounted Temperature Moisture Sensor: Model 331 which requires Selector Box Model M329 or CBX6T / CBX23T. d. Aerial Mounted Temperature - Moisture Sensor: Model M326 which requires Selector Box Model M329 or CBX6T / CBX23T. e. 12 hour Mechanical Timer: Model M325D. f. 24 hour Programmable Timer: Model M323. PART 3 EXECUTION 3.1 EXAMINATION A. Examine existing concrete or asphalt paving for proper installation, cleanliness, or condition that may hinder successful installation of snow melt system. 1. Notify Contractor in writing of items needing correction. 2. Do not install snow melt system until faulty conditions are corrected. 3.2 PREPARATION A. Mark concrete or asphalt for saw cutting using chalk line. B. Mark layout in accordance with approved Shop Drawings, including cutouts for joins between cold leads and heating elements. Pattern must allow for continuous run of heating element without crossing itself and ending at junction points. C. Clear coat the chalk lines with acrylic lacquer after chalking is complete. D. Saw cut concrete or asphalt for cable heating element and cold leads. 1. Cuts for cable heating element are to be ¼" wide by 1" deep. Wherever saw cuts join to make a turn, the saw cuts must overlap by 2r-1 where "r" is the radius of the saw blade. 2. Cuts for cold lead are to be ½" wide x 1½" deep. 3.3 INSTALLATION A. Interface with Other Work: Coordinate installation of low voltage cable heat melt system with appropriate sections of Division 23 Electrical. B. Install snow melting system, including Heating Element, Transformer, Control Box, and Activation Device, in accordance with Manufacturer s written instructions and approved Shop Drawings. C. Caulk or seal coat saw cuts after installation is complete. D. Attach manufacturer s supplied red octagonal warning sign (STOP! DANGER!) spaced equally on De-Icing / Snow Melt System on surface in which system is installed. 3.4 FIELD QUALITY CONTROL A. Testing as directed by System Manufacturer: Heatizon Systems 4 Division 238313

1. Prior to covering, visually inspect the heating element and cold leads for cuts, shorts, and other damage; repair as necessary. 2. Check for continuity to any conductive material, including but not limited to metal; eliminate as necessary. 3. Conduct After-Installation Element Tests per manufacturers installation instructions. Test system in presence of Architect, Contractor, and Owner s Representative, to be certain system functions in accordance with design intent. B. Verify that all heating element is completely embedded. 3.5 DEMONSTRATION A. Provide adequate demonstration and training to Owner in operation and maintenance of system. END OF SECTION Heatizon Systems 5 Division 23 8313