Report to/rapport au : Transportation Committee Comité des transports. November 26, novembre 2012

Similar documents
PLANNING COMMITTEE REPORT JULY COMITÉ DE L URBANISME RAPPORT 34 LE 11 JUILLET ZONING 968 ST.

Report to Rapport au: Planning Committee / Comité de l'urbanisme November 10, 2015 / 10 novembre 2015

PLANNING COMMITTEE REPORT 33A 11 JULY COMITÉ DE L URBANISME RAPPORT 33A LE 11 JUILLET ZONING , 4479 AND 4487 INNES ROAD

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

2. RIDEAU RIVER MULTI-USE PATHWAY CROSSING ENVIRONMENTAL ASSESSMENT STUDY RECOMMENDATIONS

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

Report to Rapport au: Planning Committee / Comité de l'urbanisme February 23, 2016 / 23 février 2016

Report to/rapport au : Ottawa Built Heritage Advisory Committee Comité consultatif sur le patrimoine bâti d Ottawa. and / et

Report to/rapport au : Ottawa Built Heritage Advisory Committee Comité consultatif sur le patrimoine bâti d Ottawa

1. APPLICATION FOR NEW CONSTRUCTION AT 506 KENT STREET, A PROPERTY LOCATED IN THE CENTRETOWN HERITAGE CONSERVATION DISTRICT

9. LANSDOWNE Ŕ HERITAGE AND ALGONQUIN INTERPRETATION AND PUBLIC ART IMPLEMENTATION PLAN

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1

Services Department F May 28, 2007

Report to Rapport au: Built Heritage Sub-Committee / Sous-comité du patrimoine bâti December 10, 2015 / 10 décembre and / et

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

MEMORANDUM. Future Urban Area Conceptual Master Plan Cultural Heritage Resources

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

2. Approve the application for a one storey flat roofed addition at the east side of the building included in Document 4;

Humber Bay Shores Precinct Plan Final Report

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Report to: Development Services Committee Report Date: September 11, 2017

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

Commissioners Road West Realignment Environmental Assessment

Services Department B September 10, 2007

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

quarters Building Our Cultural Quarters Together

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Report to/rapport au : Built Heritage Sub-Committee Sous-comité du patrimoine bâti. and/et. Planning Committee Comité de l'urbanisme

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Elfrida Growth Area Study

2450 Victoria Park Avenue Official Plan Amendment Application Preliminary Report

Report to Rapport au: Built Heritage Sub-Committee / Sous-comité du patrimoine bâti April 9, 2015 / 9 avril and / et

Local Growth Planning in North Central Green Line Communities

Kanata Light Rail Transit Planning and Environmental Assessment Study

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

2. APPLICATION TO ALTER 192 STANLEY AVENUE, A PROPERTY LOCATED IN THE NEW EDINBURGH HERITAGE CONSERVATION DISTRICT

1.0 INTRODUCTION AND BACKGROUND

Report to/rapport au : Planning Committee Comité de l'urbanisme. and Council / et au Conseil. January 8, janvier 2014

Mavis Road Class Environmental Assessment

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS

Master Environmental Servicing Plan & Secondary Plan

Rapid Transit Implementation Working Group September 14, 2017

Portage Parkway Environmental Assessment Public Information Centre No. 1

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE

Agenda Standing Policy Committee on Infrastructure Renewal and Public Works January 31, 2013 REPORTS

Director, Community Planning, Toronto and East York District

Mill Woods Town Centre Proposed Rezoning LDA

Request for Qualifications. Knowledge Park Pedestrian/Cyclist Connectivity Planning and Design

SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies

Report to/rapport au : Transportation Committee Comité des transports. and Council / et au Conseil. October 24, octobre 2012

Shift Rapid Transit Public Participation Meeting May 3, 2017

Planning for the Future Urban Area. in north Markham. Update. Development Services Committee. December 9, De Development Services Committee

1 Introduction. Chapter. In this chapter:

240 and 242 Finch Avenue West Zoning By-law Amendment Application Preliminary Report

1. Planning and Development Approvals Commissioner s report dated 06 Oct 2000 is immediately attached.

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

Report 1.0 BACKGROUND 2.0 INPUT FROM OTHER SOURCES 3.0 ANALYSIS. To: Date of Report:

2. Section 239 Urban Exceptions (f) Maximum building height 11.0 metres.

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE

Red Hill Valley Project More Than A Road October 16, 2006

Infrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)

2 STATUTORY PUBLIC MEETING AND INFORMATION REPORT FOR PUBLIC MEETING ON AMENDMENT NO. 62 TO THE YORK REGION OFFICIAL PLAN

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

South of Eastern Strategic Direction Status Update

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

The MSII reports for the bridge indicate that the Annual Average Daily Traffic at the bridge is 100. The road can be considered a low volume road.

Commissioners Road West Realignment Environmental Assessment

Central Lake Ontario Conservation Conservation Lands Master Plan

Declarations of Pecuniary Interest under the Municipal Conflict Of Interest Act

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

114 Richmond Road Les Soeurs De La Visitation D'Ottawa. Community Discussion

6 CATHEDRAL COMMUNITY SECONDARY PLAN OFFICIAL PLAN AMENDMENT 123 TOWN OF MARKHAM

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

Ashbridges Bay Erosion and Sediment Control Project

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

4/8/2015 Item #10D Page 1

Figure 1- Site Plan Concept

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 24, 2014

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

112 College Street Zoning Amendment Application Preliminary Report

THE CORPORATION OF THE TOWN OF OAKVILLE BY-LAW NUMBER

Presentation Overview

Committee of the Whole Report

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Public Information Centre #1

The protection of the agricultural resources of the Province;

Lone Oak Road/ 70 th Street West. Efficient, Effective, Responsive. Preliminary Design Services (CP 26-54)

IFLA Regional Office for Latin America and the Caribbean: Call for Applications to host the Regional Office

1.1.1 Growth Plan for the Greater Golden Horseshoe 2006 Office Consolidation January 2012

Toronto Complete Streets Guidelines

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 24, 2017

Director, Community Planning, Etobicoke York District

Transcription:

1 Report to/rapport au : Transportation Committee Comité des transports November 26, 2012 26 novembre 2012 Submitted by/soumis par : Nancy Schepers, Deputy City Manager/Directrice municipale adjointe, Planning and Infrastructure/Urbanisme et Infrastructure Contact Person / Personne ressource: Bob Streicher, Acting Manager/Gestionnaire par intérim, Transportation Planning/Planification des transports, Planning and Growth Management/Urbanisme et Gestion de la croissance (613) 580-2424 x 22723, Bob.Streicher@ottawa.ca College (8), Rideau-Goulbourn (21), Kanata South (23) Ref N : ACS2012-PAI-PGM-0255 SUBJECT: OBJET : KANATA SOUTH (TERRY FOX TO WEST HUNT CLUB ROAD) ENVIRONMENTAL ASSESSMENT AMENDMENT TO STUDY SCOPE ÉTUDE D ÉVALUATION ENVIRONNEMENTALE DE KANATA-SUD (DE LA PROMENADE TERRY-FOX AU CHEMIN HUNT CLUB OUEST) MODIFICATION À LA PORTÉE DE L ÉTUDE REPORT RECOMMENDATION That the Transportation Committee approve the amended Study Scope of Work for the former Hope Side Road Extension (Richmond Road to West Hunt Club Road) Environmental Assessment Study now named the Kanata South Environmental Assessment Study. RECOMMANDATION DU RAPPORT Que le Comité des transports approuve la modification de la portée de l étude d évaluation environnementale du prolongement de l ancien chemin Hope Side (du chemin Richmond au chemin Hunt Club Ouest) qui s appelle désormais l Étude d évaluation environnementale de Kanata-Sud. BACKGROUND On 21 November 2007, Transportation Committee approved the Hope Side Road Extension (Richmond Road to West Hunt Club Road) Environmental Assessment Statement of Work (ACS2007-PTE-POL-0066). The City s Transportation Master Plan

2 (TMP) envisioned the extension of Hope Side Road east as a new two lane road connecting to Moodie Drive, then extending east and north towards West Hunt Club Road. This new extension crosses the National Capital Commission (NCC) Greenbelt, and provides the most direct route to Highway 416. Figure 1 illustrates the original study area and concept plan from the City s Official Plan (OP) Schedule B Urban Policy Plan. Note that the concept plan is identified as the Primary Study Area, while a Secondary Study Area is identified to allow for the examination of other alternative solutions in accordance with the Environmental Assessment (EA) Study process. Figure 1: 2007 EA Study Area This EA Study was awarded in September 2008, and the Study commenced thereafter. Since a large part of the study area lies within the NCC s Stony Swamp Conservation Area, a core natural area within the Greenbelt, the NCC s participation was required.

3 At that time, and as a key landowner, the NCC was unable to participate in the EA Study until the update to their Greenbelt Master Plan (GMP) was complete. The GMP update was underway in 2008 with completion expected in early 2013. Given that the GMP sets out the vision, principles, and land use policies pertaining to Federal lands, the NCC s position was that any involvement in this EA Study would be premature. Without the ability to access the Greenbelt lands to conduct an inventory of existing conditions upon which the impacts (particularly on the Stony Swamp area) of various alternative road corridor options would be determined, the EA Study could not advance and was put on hold. DISCUSSION Urgency to Resume Study With the passage of time, growth and development continues in Kanata s Monahan Landing Community and the Fernbank and Kanata West developments. There is an urgency to resume the EA Study and amend the original EA Study area to incorporate the widening of the existing Hope Side Road between Eagleson Road and Richmond Road for the following reasons. Enbridge Gas Distribution Inc. (Enbridge) has completed an EA Study for a 24 inch diameter pipeline to be located entirely within the relevant road allowances of the existing Hope Side Road, Richmond Road, and West Hunt Club Road. Construction is scheduled to begin in early 2013 with completion within a one year time period. Development applications are currently being finalized along the north side of Hope Side Road between Eagleson Road and Richmond Road. The Tomlinson quarry on Moodie Drive has applied for access to Hope Side Road at the intersection of Richmond Road. In the absence of a completed EA, proceeding with the projects noted above directly limits the City s ability to study alternative roadway corridor options, some of which may have little impact on Stony Swamp. Figure 2 illustrates the amended study area to include the proposed widening of the existing Hope Side Road from Eagleson Road to Richmond Road. The Enbridge pipeline project is worthy of further discussion and is noted below.

4 Figure 2: Amended Kanata South EA Primary Study Area On 19 October 2012, the Ontario Energy Board (OEB) gave Enbridge conditional approval to proceed with the pipeline project. Figure 3 illustrates the approved pipeline routing within the City s road allowance.

5 Figure 3: Routing of Enbridge Pipeline Project Of immediate concern to the City are the pipeline routes to be constructed within the road allowances of Hope Side Road, Richmond Road and the segment of West Hunt Club Road to Hwy 416. Existing Hope Side Road is scheduled to be widened in 2017/2018 as per the City s long range capital plan and the TMP. Even earlier is a connection to the east to Highway 416, which is scheduled to be implemented in 2015/2016. Over the last year, the City and Enbridge have been engaged in numerous discussions and meetings to, among other things, identify a suitable placement of the pipeline within the City s road allowance. However, without the benefit of an EA Study, the City risks incurring relocation costs in the future should the recommended solution to this EA be a widening of Richmond Road and Hunt Club. Under the 2006 Model Franchise Agreement between the City and Enbridge, costs of relocation are to be shared 35 per cent by the City and 65 per cent by Enbridge. During discussions with Enbridge, the City suggested delaying construction of the section of pipeline from Hope Side Road at Eagleson Road through to Hunt Club Road at Hwy 416. Enbridge expressed an interest in this strategy on the condition that the City commence immediately with the EA Study and a commitment to have the functional design portion be completed by the end of 2013. It is staff s opinion that this is achievable provided that the Study gets underway now. The functional design will identify the right-of-way requirements and road profile needed to respond to Enbridge on the ideal/permanent placement of the pipeline. Very recently, the delay to construct a section of the pipeline was endorsed by the OEB in accordance with its staff submission document dated 19 October 2012. It states the following: Board staff submits that Enbridge...continue construction when the EA is completed which would provide certainty and clarity on the location of the Proposed Pipeline in those areas where the City may undertake road reconstruction.

6 Cumulative Effects Study A joint NCC and City study, to support the review of the NCC s Greenbelt Master Plan and streamline future Federal EA approvals, was undertaken to study the effects of transportation infrastructure within the Greenbelt lands. This recently completed study is entitled Joint Study to Assess Cumulative Effects of Transportation Infrastructures on the National Capital Greenbelt, and will form the basis for joint decisions between the City and NCC on future proposed transportation infrastructure projects. The Cumulative Effects Study concluded that the Stony Swamp Area is regarded as one of 10 Core Natural Areas (CNA) within the Greenbelt lands. The CNA s are considered to be irreplaceable reservoirs of native biodiversity, providing a variety of groundwater and surface water enhancement benefits and forming critical stepping stones across the Greenbelt and the urbanized portion of the National Capital Region. Accordingly, a proposed extension of Hope Side Road, as envisioned in the City s TMP, was identified as potentially contributing to the cumulative effects on the CNA. Furthermore, the study concluded that a proposed Hope Side Road extension through the Stony Swamp Area would not be acceptable and recommended the City examine least damaging alternatives such as Richmond Road and West Hunt Club Road. As a result of the Cumulative Effects study findings and the documented evidence of the significant impact a proposed extension of Hope Side Road will have on the Stony Swamp Area, the option to extend Hope Side Road easterly connecting to West Hunt Club Road will not be carried forward into the EA study and the Scope of Work will be amended accordingly. Instead, it has been agreed to by the City and NCC that an acceptable option is widening Richmond Road/West Hunt Club Road between Hope Side Road and Highway 416, and that this project will be included in the NCC s Greenbelt Master Plan. This is being done in order meet the guiding principles of the Cumulative Effects Study including preventing Greenbelt fragmentation, improving Greenbelt landscape connectivity, and fully considering Greenbelt connectivity during transportation infrastructure planning exercises. Amendment to the EA Study Scope In order to respond appropriately to Enbridge on the location of the pipeline, an amendment is required to the existing EA Study to include the existing Hope Side Road from Eagleson Road to Richmond Road. Furthermore, the rapid development of Monahan Landing to the north of Hope Side Road and west of Richmond Road limits the City s ability to assess alternative road corridor options and designs. Whereas the 2007 Primary Study Area (Figure 1) identifies a proposed extension of Hope Side Road easterly, through the Stony Swamp Area, the amended study area, as illustrated in Figure 2, will allow for an examination of a reasonable range of alternative solutions connecting to West Hunt Club Road and Hwy 416, including the widening of the existing Richmond Road and West Hunt Club Road.

7 The City recognizes that the NCC will play a major role in this study as a key landowner and Federal authority for the Greenbelt. Given that the Stony Swamp Area is identified as one of 10 Core Natural Areas within the Greenbelt lands, any proposed solutions impacting this area will be a significant consideration in the preliminary screening of alternative solutions. Additional funding required for the amended Study Scope of Work will be financed from capital account # 906420 2012 EA Studies Arterial Roads. RURAL IMPLICATIONS As the southern limits of the study area is adjacent to the rural area, any potential impacts will be fully considered in the development and evaluation of alternative solutions and mitigation measures identified. CONSULTATION The Study s consultation process will include meetings with key stakeholders through the Agency Consultation Group, Public Consultation Group, and Business Consultation Group. Consultation with the general public will occur principally through open houses and also through the project web page, e-mail, and additional meetings as required. This process has not changed from the original approved Statement of Work for the Study. COMMENTS BY THE WARD COUNCILLORS Councillor Moffatt s comments: "I concur with the report as amended." Councillor Hubley concurs with this report. Councillor Chiarelli is aware of this report. LEGAL IMPLICATIONS There are no legal impediments to implementing the recommendation in this report. RISK MANAGEMENT IMPLICATIONS There are risk implications and these risks have been identified and explained in the report and are being managed by the appropriate staff. As noted earlier, an amended EA Study to address the future widening of the existing Hope Side Road between Eagleson Road and Richmond Road is required to avoid incurring pipeline relocation costs in the future. Additionally, the amended EA Study needs to proceed immediately in order to provide clear direction to Enbridge on the location of the pipeline by the end of 2013 in accordance with the OEB Conditions of Approval.

8 Additionally, there is a risk that the NCC s updated GMP may not be completed in early 2013 as expected and this could affect the Commission s participation in the EA Study. However, there are other study activities that can be carried out independently (such as the assessment of the section west of Richmond Road) should the NCC s study schedule be delayed slightly. FINANCIAL IMPLICATIONS The additional funding required for the amended scope of work on the Hope Side EA Study is available within 906420 2012 EA Studies Arterial Roads. ACCESSIBILITY IMPACTS There are no accessibility impacts. ENVIRONMENTAL IMPLICATIONS The Study will examine and evaluate the project s effects on social, cultural, physical, and natural environments within the study area. Appropriate mitigation measures will be developed and post mitigation environmental impacts will also be determined. Furthermore, as the study area lies within the Stony Swamp Conservation Area of the NCC s Greenbelt, alternative road corridor solutions impacting this area will be a significant consideration. TECHNOLOGY IMPLICATIONS There are no technology implications associated with this report. TERM OF COUNCIL PRIORITIES The recommendation contained herein aims to support the following Term of Council Priorities approved by Council in July 2011. TM3 Provide infrastructure to support mobility choices. DISPOSITION Following Committee approval of the amendment to the Hope Side Road EA Study, City staff will re-initiate the EA Study with the new expanded Scope of Work.