M4 Corridor around Newport Environmental Statement Volume 3: Appendices

Similar documents
BREEDON NORTHERN LIMITED

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

University Park, Worcester Non Technical Summary December 2011

Adran yr Economi a r Seilwaith Department for Economy and Infrastructure

Environmental Impact Assessment

The Place Solar Farm

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

NON TECHNICAL SUMMARY

Barvills Solar Farm Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Re-location of Rugby Farmers Mart

Strategic Employment Site, on land to the East of the M5, south of Junction 6, west of Pershore Lane. Environmental Statement. Non Technical Summary

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Preliminary Ecological Appraisal

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

LearnEcology Training

Elvetham Chase, Fleet. Environmental Statement: Non-Technical Summary. November New Fetter Lane London EC4A 1AZ United Kingdom

London Road, Derker. Non Technical Summary. Introduction

Burgess Hill, Land South of Freeks Farm Phase 1 of Burgess Hill Northern Arc East Environmental Statement Non-Technical Summary September 2016

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

North Leigh Park Group Limited North Leigh Environmental Statement Volume 3 Non-Technical Summary

The London to Fishguard Trunk Road (East of Magor to Castleton) Order 201-

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary

Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text. Chapter 1: Introduction

Non-Technical Summary

NON-TECHNICAL SUMMARY

Environmental Statement (Volume 1) Non Technical Summary

Kier Infrastructure and Overseas Limited Greenburn Surface Mine, Dalgig Farm Site

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary

Operation Stack: Initial Environmental / Policy Baseline Summary. Air Quality & Greenhouse Gas

Land at Porch Farm, Kingsclere Ecology Briefing Paper, April 2016 C_EDP3343_01a

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

Former RAF Sealand Site EIA

College Green Project Environmental Impact Assessment Report

7. The Landscape. 7.1 Introduction. Environmental Impact Statement (EIS) Scoping Report

7 Scoping and Introduction to the Assessments

Causeway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015

Report for Rother Valley Railway Limited Track Reinstatement between Northbridge Street and Junction Road Environmental Statement - Volume 1 Final

Grantham Southern Quadrant Link Road Environmental Statement

Environmental Assessment (Scotland) Act 2005: Clackmannanshire Council Sustainability Strategy Scoping Request

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Ʊ ± ªº Œª ºª ø ª ª ± ª

ENVIRONMENTAL STATEMENT SCOPING REPORT

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM

A1 in Northumberland Morpeth to Felton scheme. Preliminary environmental information report Non technical summary

PROPOSED RESIDENTIAL DEVELOPMENT ON LAND SOUTH OF SUTTON ROAD, LANGLEY, MAIDSTONE

Welcome to our exhibition

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

Chingford Pond Restoration Project Non-Technical Summary of Environmental Statement West Sussex County Council. February 2013

TOWN AND COUNTRY PLANNING ACT 1990 (AS AMENDED).

NON-TECHNICAL SUMMARY

Sandwich Town Tidal Defences Environmental Statement Non Technical Summary

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Rooley Moor Neighbourhood Development Plan

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

A737/A738 Trunk Road (Dalry Bypass)

TRANSPORT AND WORKS ACT 1992 TRANSPORT AND WORKS (APPLICATIONS AND OBJECTIONS PROCEDURE) (ENGLAND AND WALES) RULES 2006

Non-Technical Summary

Follingsby Park South Environmental Statement: Volume 1: Non Technical Summary (March 2018)

MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE

Thank you for sparing the time to visit our exhibition and to provide us with your feedback on our proposals displayed here today.

NRP North Environmental Statement Non Technical Summary. Norwich Research Park North Environmental Statement Non Technical Summary.

Natural Heritage Guidance and Information. 6 th of December 2007 Brendan Turvey

Blackley Mere Developments Limited Blackley Mere Redevelopment

WALES ONLY INTERIM ADVICE NOTE 135/10 (W) LANDSCAPE AND VISUAL EFFECTS ASSESSMENT

CORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009

LAND WEST OF ST ANDREWS ROAD

Tandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey

South Whitehaven, Cumbria EIA

Your ref: DS/PCL/1427 My ref: PA14/ Date: 3rd March 2014

Environmental Statement 2012 Non-Technical Summary

LAND NORTH OF NETHERHOUSE COPSE, FLEET

Wind Energy - Stepping Offshore to Building an Industry

Report reference: LT/WTE/LZH/1655/01/SCOPING June 2015

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd.

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

Broadmoor Farm, West Saltash

Wingerworth, Chesterfield. February Surveyor: James Porter

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire

Assessing the impact of smallscale wind energy proposals on the natural heritage

Non-technical summary

The Glasgow City Region City Deal CLYDE WATERFRONT & RENFREW RIVERSIDE AND GLASGOW AIRPORT INVESTMENT AREA ENVIRONMENTAL IMPACT ASSESSMENT

Environmental Impact Assessment Scoping Report

Environmental Statement Volume 3 Non-Technical Summary

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

PINEWOODS HOLIDAY PARK: HORSE PADDOCK. Non-Technical Summary

Policy DM19: Development and Nature Conservation

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Land at Copshurst Quarry, Stoke-on-Trent. Environmental Impact Assessment. Environmental Statement, Non-Technical Summary.

New Hardstone Quarry at Ta Klement, l/o Qala, Gozo. Environmental Planning Statement. August 1998

9 Archaeology & Cultural Heritage

Transcription:

Environmental Statement Volume 3: Appendices

Environmental Statement Volume 3: Appendices At Issue March 2016 CVJV/AAR 3 rd Floor Longross Court, 47 Newport Road, Cardiff CF24 0AD

Volume 3: Contents 1 Introduction 2 Scheme Description 2.1 Operational Traffic Data (Extract From Traffic Forecasting Report) 2.2 Drainage Strategy Report 2.3 Reen Mitigation Strategy 2.4 Carbon Report 3 Scheme Construction 3.1 Buildability Report 3.2 Pre-Construction Environmental Management Plan 3.3 Preliminary Construction Traffic Figures 4 Scheme Development and Alternatives Considered 5 Approach to Environmental Assessment 5.1 ES Scoping Report 5.2 Scoping Responses 5.3 Requirements of EIA Legislation 5.4 Health and Equalities Impact Assessment 6 Legislative and Policy Context 7 Air Quality 7.1 Operational Assessment Methodology 7.2 Baseline Air Quality Environment 7.3 Construction Traffic and Operational Assessment Results At Issue March 2016 Page 1

8 Cultural Heritage 8.1 Relevant National and Local Plan Policies 8.2 Desk-based Historic Environment Assessment 8.3 Assessment of the Significance of the Impact of Development on the Historic Landscape (ASIDOHL) 8.4 Detailed Gradiometer Survey Report 8.5 Newport Docks Historic Built Environment Assessment 2008 8.6 Results of the Electrical Resistivity Tomography and Electro-magnetic Surveys 8.7 Results of Aerial and Light Detection and Ranging (LiDAR) Survey and Satellite Image Analysis 8.8 Gwent Levels Archaeological Deposit Model 8.9 Non-designated Historic Landscape Characterisation 8.10 Cultural Heritage Mitigation Plan 9 Landscape and Visual Effects 9.1 Relevant Planning Policy for Neighbouring Local Authorities 9.2 Selected Viewpoints Within Initial 28km Study Area 9.3 Representative Viewpoints 9.4 LANDMAP Evaluation of Landscape Character Areas New Section of Motorway 9.5 LANDMAP Evaluation of Landscape Character Areas - Complementary Measures 9.6 Assessment Table Representative Viewpoints 9.7 Assessment Table - Residential Properties 9.8 Assessment Table - Non - Residential Properties 9.9 Assessment Table - PROW and Recreational Trails 9.10 Visual Assessment Table - Land with Public Access 9.11 Visual Assessment Table - Roads and Public Transport Routes 9.12 Photomontage Methodology 10 Ecology and Nature Conservation 10.1 Ecology and Nature Conservation: Legislation and Planning Policy 10.2 Extended Phase 1 Habitat Survey 2014 Report 10.3 Ecological Survey Site Selection Report 10.4 National Vegetation Classification Survey 2014 Report 10.5 Hedgerow Survey 2014 Report 10.6 Great Crested Newt Presence/Absence Survey 2014 Report 10.7 Bat Survey 2014 Report 10.8 Otter and Water Vole Survey 2014 Report At Issue March 2016 Page 2

10.9 Dormouse Survey 2014 Report 10.10 Hedgehog Survey 2014 Report 10.11 Reptile Survey 2014 Report 10.12 Wintering Bird Survey 2014 Report 10.13 Breeding Bird Survey 2014 Report 10.14 Aquatic Macrophyte Survey 2014 10.15 Terrestrial and Aquatic Invertebrate Survey 2014 10.16 Wintering Bird Survey Report 2015 10.17 Ecology Desk Study 10.18 Aquatic Environmental Baseline Study 2015 10.19 Phase 1 Habitat Survey 2015 10.20 NVC Survey 2015 Report 10.21 Hedgerow Survey Report 2015 10.22 Great Crested Newt edna Survey 2015 10.23 Bat Activity Surveys 2015 10.24 Bat Roost Survey 2015 Report 10.25 Otter and Water Vole Survey 2015 10.26 Hazel Dormouse Survey 2015 10.27 Reptile Survey 2015 10.28 Breeding Bird and Wader Survey 2015 10.29 Barn Owl Survey Report 2015 10.30 Aquatic Macrophyte Survey 2015 10.31 Terrestrial Invertebrate Survey 2015 10.32 River Corridor Survey 2015 10.33 Waxcap Survey 2015 10.34 Valued Ecological Receptors Designated Sites Summary Table 10.35 SSSI Mitigation Strategy 11 Geology and Soils 11.1 Land Contamination Assessment Report 11.2 Outline Remediation Strategy 11.3 Land Contamination Management Strategy 11.4 UXO Risk Mitigation Map 11.5 Environmental Permitting Strategy At Issue March 2016 Page 3

12 Materials 13 Noise and Vibration 13.1 Assessment Methodology 13.2 Baseline Sound Monitoring 13.3 Construction Noise and Vibration Assessment 13.4 Operational Noise and Vibration Assessment 14 All Travellers 14.1 Public Rights of Way User Survey Report 14.2 Non-Motorised User Context Report (Extract) 15 Community and Private Assets 15.1 Soil Auger Boring Descriptions 15.2 Farm Holding Proforma 16 Road Drainage and the Water Environment 16.1 Flood Consequence Assessment 16.2 Baseline Water Environment Report 16.3 Water Treatment Area DMRB Risk Assessments 16.4 Water Framework Directive Compliance Assessment 17 Assessment of Cumulative Effects and Inter-relationships 17.1 Developments Included in Traffic Model 17.2 Planning Applications 17.3 Allocated Sites 18 Environmental Management 18.1 Register of Environmental Commitments 19 Conclusions 20 References At Issue March 2016 Page 4