ARTICLE VI: SITE PLAN REVIEW

Similar documents
ARTICLE 17 SITE PLAN REVIEW

ARTICLE IX SPECIAL PERMIT USES

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY

Non-Metallic Mining Reclamation Checklist

CITY OF ZEELAND PLANNING COMMISSION

ARTICLE V PLANNED UNIT DEVELOPMENT DISTRICT

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

Highway Oriented Commercial Development Criteria

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW

Erosion & Sediment Control Plan Application Form & Checklist

PRELIMINARY CONDITIONAL USE SUBMITTAL CHECKLIST REQUIREMENTS

APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN. Name of Applicant. Address, and Phone # of Applicant

Major Subdivision Sketch Plan Checklist

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

F. The following uses in the HR District: attached single-family dwellings, condominiums, and institutional uses; and

MEDWAY PLANNING BOARD MINOR SITE PLAN PROJECTS Application Guidelines

Asbury Chapel Subdivision Sketch Plan

Project phasing plan (if applicable) 12 copies of site plan

Zoning Ordinance Article 3

CHESAPEAKE LANDSCAPE ORDINANCE

CHAPTER NATURAL RESOURCE EXCAVATION

Application for Site Plan Review

64 Mineral Extraction Area Rules

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County

PART 1: PROJECT SUMMARY. The application is Attachment A. The site plan is Attachment B.

Article 7.05 Manufactured Home Park Districts

To encourage commercial development which is consistent with the long range, comprehensive, general plan for Knoxville and Knox County.

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001

DRIVEWAY REGULATIONS

ORDINANCE NO WHEREAS, the City of Kalama has many areas of timberland and open areas inside its City limits adjacent to residential areas;

2.4 COMMERCIAL POLICIES

Procedures IV. V. Rural Road Design Option

SITE PLAN REVIEW PROCESS

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

Planned Development Review Revisions (Project No. PLNPCM )

Exhibit A. 8:9 Scuffletown Rural Conservation District

Part 5. Environmental Protection Overlay District Regulations

CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET

The purpose of the requirements in this Article is to provide for landscaping and screening of parking and other outdoor areas that will:

SITE PLAN REVIEW APPLICATION AND CHECKLIST

River Corridor Overlay Zone (RCOZ) Article 5

Staff Report CONDITIONAL USE

Staff Report. Conditional Use PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT. Salt Lake City Planning Commission

Ephrata Municipal Code, Chapter 19.07, Landscaping Regulations DRAFT January 28, 2013 Page 1

Appendix I. Checklists

The Town Board of the Town of Vienna, County of Dane, State of Wisconsin, does ordain and adopt as follows.

Mill Conversion Overlay District Zoning Bylaw Amendment

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1150 OF PUTNAM COUNTY, WEST VIRGINIA Page 95 ARTICLE 1150 SITE PLAN REVIEW

PARK CITY MUNICIPAL CODE TABLE OF CONTENTS TITLE 15 LAND MANAGEMENT CODE - CHAPTER 2.21

CHAPTER 3 REGULATED LAND-DISTURBING ACTIVITIES AND APPLICABLE REQUIREMENTS

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING

PART 1: PROJECT SUMMARY. Proposed Land Use: 120 single-family lots. The application is Attachment A. The site plan is Attachment B.

ARTICLE 13 STREETS General

2.4 FUTURE LAND USE ELEMENT Goals, Objectives and Policies

Chapter Master Planned Communities (MPC) District

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

A BILL FOR AN ORDINANCE TO AMEND CHAPTER 9, KAUAI COUNTY CODE 1987, RELATING TO STREET REQUIRE:MENTS FOR SUBDIVISIONS

CHEBOYGAN COUNTY PLANNING COMMISSION

CHAPTER SPECIAL PURPOSE AND OVERLAY ZONING DISTRICTS

Town of Excelsior, Sauk County, Wisconsin DRIVEWAY ORDINANCE

ARTICLE 9: LANDSCAPING AND FENCING REQUIREMENTS

MEMORANDUM. Planning and Zoning Division Department of Community Development TO: FROM: DATE: July 23, SUBJECT: PLNSUB : Salt City Plaza

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

3.4 REL: Religious Use District

Chair Leskinen and Planning Commission Members Jessica Loftus, City Administrator

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

ARTICLE 3. LARGE-SCALE SOLAR PHOTOVOLTAIC INSTALLATIONS SECTION XXI

DCA , Stormwater Quality and Facilities Ordinance June 23, 2009

CHAPTER 4 - LAND USE CLASSIFICATIONS

4. To assure that adequate screening and buffering will be provided between the planned project and contiguous properties;

5.1.1 The streetscape along US Highway 64 (Brevard Road); and, The built environment within new residential developments; and,

OFFICE CONSOLIDATION By-law Number 30-92

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1300 OF PUTNAM COUNTY, WEST VIRGINIA Page 119 ARTICLE 1300 LANDSCAPING AND SCREENING

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Narcoossee Roadway Corridor

C-I-10. The effect of establishing a comprehensive site review as follows will: B. Reduce the cluttered aspects of current development by:

SOIL EROSION AND SEDIMENT CONTROL

Urban Planning and Land Use

Gadsden County Planning Commission Agenda Request

ARTICLE VI AGRICULTURAL PROTECTION DISTRICT

Sec Intent and purpose.

Design Review Application *Please call prior to submittal meeting to determine applicable fees*

ARTICLE VI. LANDSCAPING, BUFFERING, AND OPEN SPACE REQUIREMENTS.

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

City of Fort Lupton Administrative Site Plan Process

APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject:

Example Codes. City of Brentwood, Tennessee Brentwood Hillside Protection Overlay District Summary

ARTICLE 9: Landscaping

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

CITY PLANNING COMMISSION AGENDA ITEM: C STAFF: ROBERT TEGLER FILE NO: CPC PUD QUASI-JUDICIAL

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

Glenborough at Easton Land Use Master Plan

1.1 Planned Unit Development (PUD)

Transcription:

Section 6.01 - Site Plan Review (All Districts) ARTICLE VI: SITE PLAN REVIEW Site plans give the Planning commission an opportunity to review development proposals in a concise and consistent manner. The use of the site plan ensures that the physical changes in the property meet with local approval and that development actually occurs as it was promised by the developer. 1. Circumstances Requiring a Site Plan: Site plans are required for the following uses: A. All new uses except one-family residential units. B. Expansion or renovation of an existing use, other than one-family or two- family residential use, which increases the existing floor space more than twenty five (25) percent. C. Changes of use for an existing structure or lot. D. Other uses as required by this Ordinance. E. Establishment via the Land Division Act, Subdivision Control Act, Condominium Act or any combination of the above, from any parent parcel of land resulting in the creation over time, of 4 or more development sites and/or parcel identification numbers. 2. Site Plan Data Required: Each site plan submitted shall contain the following information unless specifically waived, in whole or in part by the Township Planning Commission. The Planning Commission can waive any or all of the listed site plan requirements, when it finds those requirements are not applicable to the proposed development. A. The name and address of the property owner. B. The date, north arrow, scale and name of the individual or firm responsible for preparing said plan. The scale must be at least one (1) inch = fifty (50) feet for parcels under three (3) acres and not less than one (1) inch = one hundred (100) feet for parcels three (3) acres or more. C. A scaled drawing of the property, showing at a minimum the boundary lines of the property including all dimensions. The drawing should show existing and proposed grades and drainage systems and structures. A certified survey of the property, prepared and sealed by a professional licensed surveyor, showing at a minimum the boundary lines of the property, to include all dimensions and legal description may be required for final approval D. The location of all existing and proposed structures on the site, including the shape, size, location, height and floor area of all structures; the floor area and ground coverage ratios, and the finish ground and basement floor grades, as applicable. In addition, include proposed streets, roads, driveways, parking spaces, loading spaces, sidewalks, walkways, signs, exterior lighting, parking for the proposed uses (show the dimensions of a typical parking stall and parking lot), loading and unloading areas, common use areas and recreational areas and facilities, as applicable to the proposed development. E. The location and width of all abutting rights-of-way. Norwood Township Zoning Ordinance 2002 Update VI-1 ADOPTED: August 19, 2002

F. The location of existing environmental features, such as streams, wetlands, shorelands, mature specimen trees, wooded areas, archaeological features as defined under this Ordinance, and identification of existing manmade features such as roads or structures which are either to be retained, removed or altered, or any other unusual environmental features, as applicable. G. If evidence of archaeological features exist at a proposed mine site, the Township may request a State Archaeologist or accredited representative to evaluate the site. If significant archaeological or historic features are located within the area to be disturbed by the proposed excavation, a suitable mitigation plan must be negotiated with the Township. H. The location and identification of all existing structures within a two hundred (200) foot radius of the site. I. The existing zoning district in which the site is located and the zoning of adjacent parcels. In the case of a request for a zoning change, the classification of the proposed new district must be shown. J. The location of all existing and proposed landscaping as well as all existing and proposed fences or walls. K. A location sketch of the proposed use or structure. L. The type, location and size of all existing and proposed utilities. M. The location, size and slope of all surface and subsurface drainage facilities. N. Summary tables, cross-sections and/or floor plans should be included with site plans for proposed structures, giving the following information: 1) The number of units proposed, by type, including a typical floor plan for each unit. 2) The area of the proposed units in square feet, as well as area dimensions of driveways and staging areas. 3) Typical elevation drawings of the front and rear of each building. O. The topography of the existing and finished site shall be shown by contours or spot elevations. W here the existing slope on any part of the site is ten percent (10%) or greater, contours shall be shown at height intervals of two (2) feet or less. P. Anticipated hours of operation for proposed use. The Planning Commission may impose reasonable limits to hours of operation as a condition of site plan approval when warranted to assure compatibility with surrounding land uses. 3. Submittal and Approval Procedures: Eight (8) copies of the proposed site plan, including all required additional or related information, shall be presented to the Zoning Administrator's office by the petitioner or property owner or his designated agent at least thirty (30) days prior to the Planning Commission meeting where the site plan will be considered. The Zoning Administrator shall cause the submittal to be placed on the agenda of the next regular Planning Commission meeting. The Planning Commission shall have the responsibility and authorization to approve, disapprove or approve with modifications, the Site Plan in accordance with requirements of the zoning district in which the proposed use is located and shall further consider the following criteria: A. The proposed use will be properly served by essential public facilities and services, including but not limited to highways, streets, emergency services, drainage systems, water and sewage disposal facilities, and schools. Norwood Township Zoning Ordinance 2002 Update VI-2 ADOPTED: August 19, 2002

B. The location and nature of the use will not be in conflict with any principal permitted use and the proposed use will be designed, constructed, operated, and maintained to be compatible with the use(s) of surrounding properties. The planning commission shall at a minimum consider: 1) The location and screening of vehicular circulation and parking areas in relation to the use of surrounding property. 2) The location and screening of outdoor storage, outdoor activity or work areas, and mechanical equipment in relation to the use of surrounding property. 3) The hours of operation of the proposed use. 4) Proposed landscaping or other site amenities. C. The use will not create a traffic problem or hazard. The planning commission shall at a minimum consider: 1) The proximity of the use to major thoroughfares and intersections. 2) Traffic that could be generated by the proposed use. 3) Adequacy of driver sight distances. 4) Required vehicular turning movements. 5) Provisions for pedestrian traffic, including sidewalks. D. The use will not be any more objectionable to adjacent and nearby properties than would be any permitted principal use of the district by reason of traffic, noise, vibration, dust, fumes, smoke, odor, fire hazard, glare, flashing lights, or disposal of waste and sewage. E. The proposed use will not discourage or hinder the appropriate development and use of the adjacent premises and the neighborhood and will not be detrimental to the economic well-being of the adjacent premises and the neighborhood. F. The site plan is consistent with and meets the requirements of the Norwood Township Land Use Plan. G. The proposed use is compatible with the natural environment and conserves natural resources and energy. H. The arrangement of uses on the property, including the orientation of buildings, driveways, parking areas, open spaces, the visual exposure of waste storage facilities, loading docks, or service door, in order that the arrangement of uses promotes public safety, protects land values, and carries out the spirit and intent of the Zoning Ordinance. Any conditions or modifications required by the Planning Commission shall be recorded in the minutes of the appropriate Planning Commission meeting. 4. Expiration/Extension of Site Plan A. The site plan shall expire unless substantial construction of an approved site plan improvement has begun within 365 days of approval. Thirty days prior to expiration of an approved final site plan, an applicant may make application to the Planning Commission for a one year extension of the site plan. The Planning Commission shall grant the requested extension for an additional one year, if it finds good cause for the extension and that the zoning regulations governing the site plan approval have not changed since the approval. B. If the site plan approval expires pursuant to subsection A. above, no work pursuant to the site plan shall be undertaken until a new site plan approval is obtained from the Planning Commission following the procedures for site plan approval. Norwood Township Zoning Ordinance 2002 Update VI-3 ADOPTED: August 19, 2002

5. Additional Site Plan Requirements for Quarrying Operations, Mining Operations, Excavation Operations and Mineral Extraction Operations: In addition to the site plan data required under this Section 6.01, the following additional site plan data for quarrying operations, mining operations, excavation operations or mineral extraction operations is required: A. A vicinity sketch showing the location of the site in relation to the surrounding street and road system. B. The proposed location, with a plan view of the estimated depth and time table of extraction. C. The proposed location of spoils piles, tailing ponds, sediment basins, material stockpiles, onsite processing areas, including but not limited to crushing and sorting equipment and other permanent or temporary facilities and structures utilized in the project. D. An assessment of the proposed operation's impact on the natural, historic, economic and community features by an expert in these fields. E A hydrogeological study providing sufficient description of the general surface and groundwater conditions, including wetlands on and adjacent to the project site. Such study shall describe the surface-ground water connections and the chemical characteristics of water on the site. In addition, such study shall specify anticipated hydrological impacts of the operation, if any. As applicable, the Owner/Operator shall identify plans to alleviate possible problems in the water table supply to adjacent landowners in order to eliminate any adverse impacts. F. Operation Plan: 1. A description outlining the estimated life span which the operation will cover; the type of material to be extracted; the type of mining operation and processing equipment to be used; measures to control noise, vibration, dust and pollution from the operation; plans for blasting, if any; effect on groundwater flow; proposed frequency of and travel route to be used to transport the mined material to processing plants and markets, and the proposed steps to be taken to relieve adverse effects in accordance with Parts 31: W ater Pollution Control Act; 201: Environmental Response Act; and 55: Air Pollution Control Act of Michigan's Natural Resources and Environmental Protection Act, PA 451 of 1994, as amended. 2. A description of the social and economic impact on Norwood Township and Charlevoix County, including an estimate of the number of potential employees, proposed transportation routes for employees and product, and impacts or changes in the present road system that might be necessary by the proposed operation. The Planning Commission reserves the right to establish truck routes, number of vehicles per day and truck weight requirements for all vehicles entering, exiting and operating on Township public roads with respect to any quarrying operation, mining operation, excavation operation and/or mineral extraction operation. Norwood Township Zoning Ordinance 2002 Update VI-4 ADOPTED: August 19, 2002

2. Roads: Equipment used on roads must meet all federal, state and local guidelines, including any guidelines of the Charlevoix County Road Commission with respect to loads. Additionally, any private lanes, roads or driveways leading out of the site shall meet the requirements of the Charlevoix County Road Commission with respect to where they may require that the Owner/Operator use certain roads, routes, load limits and reasonable limitations on the daily amount of truck and heavy equipment traffic entering andleaving the site. Additionally for the type of vehicles used, an opinion from the State Highway Commission (MDOT) or the County Road Commission, as applicable, that the existing roads, from point of egress from the site will utilize a road in each direction to connect to a Class A road and that such roads are suitable for the traffic. If the operation will use Class A roads only no such traffic study or opinion is required. The site plan application will include a study of the ability of all connecting roads to handle the projected traffic, including a study of the road bed, shoulders, road width, expected road bed deterioration, site distance analysis, expected daily traffic at peak times, in compliance with the applicable MDOT and county road standards. 3. Proof of required county, state and federal permits or affidavit of application for county, state and federal permits. 4. A description of the measures to be taken to ensure that any excavations, pits, pond areas, banks, or slopes are adequately guarded by rail and/or fences and posted with signs to prevent injury to individuals, inclusive of barrier. 5. A reclamation plan showing the following: a. Final grading, anticipated final slope angles, wall reduction, benching and terracing of slopes, slope stabilization and revegetation, erosion control, and alternative future land uses. b. Description of topsoil stripping, if any, storage/staging location, and conservation measures during storage and replacement. c. Plan description of anticipated final topography, water impoundments and artificial lakes on the property. d. Plans for disposition of surface structures, roads and related facilities after the cessation of mining. e. A plan for disposal or treatment of any harmful or toxic materials found in any formation penetrated by the mining operations or produced during processing or minerals, and of chemical or materials used during the mining or processing operations. Any conditions or modifications required by the Planning Commission shall be recorded in the minutes of the appropriate Planning Commission meeting. Norwood Township Zoning Ordinance 2002 Update VI-5 ADOPTED: August 19, 2002