INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

Similar documents
4.1 Build Alternative 1 Construction Phasing

DESIGN CRITERIA PACKAGE

4 CIRCULATION AND TRANSPORTATION

City of Richmond. Engineering Design Specifications

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

City of Grande Prairie Development Services Department

Rezoning Transportation Analysis Petition Number: General Location Identifier: , ,

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

Cottage Grove Road Reconstruction. City of Madison Engineering

JOB CREATION PROJECTS

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

5-Year Street Reconstruction Plan ( )

South Bismarck Watershed Model Update and Stormwater Improvement Project

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

PROJECT DESCRIPTION ENVIRONMENTAL SETTING. Project Site Location FIGURE 1 - REGIONAL LOCATION MAP

4.500 Preston Road Overlay District

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Leduc Industrial Outline Plan SE W4

2 ALTERNATIVES AND OPTIONS

ANTONIO R. VILLARAIGOSA MAYOR. Transmitted herewith, is the City Engineer's report dated September 28, 2006 for Council review and approval of:

Fall 2017 Construction Update

SITE PLAN REVIEW APPLICATION AND CHECKLIST

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN

City Development Department 9500 Civic Center Drive Thornton, Colorado FAX

Title 11 Streets and Sidewalks

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water

OP Council Resolution June 16, Planning and Development Services

Rezoning Transportation Analysis Petition Number: General Location Identifier:

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

A raised and landscaped median will be constructed in South College Avenue between Trilby Road and Skyway Drive.

9 th Street Sub Area Plan

Clay Street Bridge Replacement Project

Bylaw No. B-03/2011 Adopted by Airdrie City Council February 21, 2012

PDR /21/15 Noah Beals 1/7/15 xx

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

Section 1. Executive Summary

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details

Prince William Street Project (Grant Avenue to Wellington Road)

PROPOSED IMPROVEMENTS

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

Right-of-Way Acquisitions and Relocations Technical Memorandum

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

3.0 master plan concept

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

Public Works Project Delivery Report

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

WASHINGTON COUNTY OREGON

PLANNING COMMISSION. Submitted

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

Zoning Ordinance Section 1.100

2040 Long Range Transportation Plan

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES

STANDARD DETAILS QUICK REFERENCE

5.0 Community Design Plan

County of El Dorado Standard Plans

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

APPENDIX F: DETAIL DRAWINGS

INDEX EXECUTIVE SUMMARY...1 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS EXISTING UTILITIES

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

BROADWAY STATION Infrastructure Master Plan May 2016

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

CITY OF VALPARAISO STORMWATER MASTER PLAN

3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects. B. After construction and prior to recording Notice of Completion:

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

From local initiatives to some of the largest and most complex projects, KOA leads the field in:

2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects

Project Study Report Equivalent The Old Road Widening SIX FLAGS MAGIC MOUNTAIN. On Street The Old Road Between Magic Mountain Pkwy And Turnberry Lane

Planning Districts INTRODUCTION

COLLIER BOULEVARD (CR 951) CORRIDOR

CITY OF FORT LUPTON STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 10 STREETS

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

8 October 14, 2015 Public Hearing

168 & 170 BRADFORD STREET

Public Frontage Regulations Map

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

TABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08

GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

CRESCENT RESOURCES INC.

RESOLUTION NO R

Canal Road City Limits (East of Van Dyke Ave) to Saal Road

Bylaw C-1262 Adopted February 6, Planning and Development Department

Highway 15 Project - Hutchinson

Index to Projects by Project Name

Issues Requiring Future Study

Transcription:

7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure Needs B. Exhibit 50. INFRASTRUCTURE LOCATION MAP 7 INFRASTRUCTURE AMARGOSA CREEK SPECIFIC PLAN 149 OF 169

7.01 EXISTING INFRASTRUCTURE A circulation Public streets surrounding the project site may be summarized as follows: Avenue K-8 currently exists as an isolated frontage road east of the Amargosa Creek. It was constructed when the existing multi-family housing was built to the north and consists of full improvements on the north side of the ultimate street s centerline and to approximately 20 feet on the south side of the centerline. Avenue K-8 at this location begins approximately 900 feet east of 10th Street West and extends approximately 1,050 linear feet easterly toward 5th Street West, and does not provide an outlet at either street. A secondary arterial is to be constructed along the eastern boundary of the project site, identified as 5th Street West. It currently exists as an unimproved road along its southern most stretch bordering the site, providing access from Avenue L to a public (L.A. County) well and related improvements. Avenue L full width improvements have been constructed north of the centerline except for a segment roughly between what would be future 7th Street West and future 8th Street West. Presently, a bridge structure provides passage over the Amargosa Creek. Avenue K-15 exists as a partially completed street to provide access from the north to the multi-family housing facility that is situated on the northeast corner of the intersection of Avenue L and 10th Street West. 10th Street West has been constructed to full major arterial width along the westerly boundary of the project site. B Signals Two traffic signals currently exist along the project s boundary. At the northwest corner of the project area, a 3-way signal provides traffic control at the intersection of 10th Street West and Avenue K-8. At the intersection of 10th Street West and Avenue K-15, a protected all-way traffic signal controls traffic entering the Costco site and the multifamily housing area from 10th Street West. C drainage Amargosa Creek is the primary north-south corridor for storm water conveyance through this area, and is included as a part of the Lancaster Master Plan of Drainage. Nonetheless, the California Department of Fish and Game (CDF&G) maintains oversight authority for this streambed. Roughly along the north-south alignment of the future 7th Street West from Avenue L to the Amargosa Creek, a graded ditch carries local storm water into the Amargosa Creek. 150 OF 169 CITY OF LANCASTER

7.01 D utilities Existing public utilities in the perimeter street rights-of-way should be adequate albeit that the extension of servicing mains in some rightsof-way will be necessary to provide service to the facilities identified in the Specific Plan. The right-of-way for future Avenue K-8 presently contains a 12-inch water main. Terminating from the north roughly at the centerline of Gadsden Avenue is a 10-inch sanitary sewer collector and a natural gas line. Within the right-of-way for the future 5th Street West is a 12-inch water main. Avenue L between 5th Street West and 10th Street West contains all utilities along at least a portion of the street. Within the 10th Street West right-of-way all utilities services are installed along the full frontage of the project site. AMARGOSA CREEK SPECIFIC PLAN 151 OF 169

7.02 PROPOSED INFRASTRUCTURE A OVERALL CONCEPT A.1. Summary. Public infrastructure improvements will be limited primarily to perimeter arterial street alignments. The development of this property under the Specific Plan will also require the installation of a new traffic signals at key locations as a condition of development. Except for the construction of underground drainage to convey storm flows through the Amargosa Creek corridor, all other improvements interior to the perimeter of the overall project are expected to be privately held and maintained. A.2. Timing & Changes. Development of the site is expected to proceed in phases, and will be coordinated with the provision of adequate infrastructure. The Reviewing Agency shall be responsible for determining the extent and timing of the infrastructure required for each phase as development moves forward, including the determination of any necessary changes to the infrastructure plan. B CIRCULATION Anticipated public street improvements are as follows: Along the frontage of this project on 10th Street West, the project will require landscaped medians in 10th Street West and 150-foot long deceleration lanes with 90-foot long tapers at three entrances to the commercial area as well as at the intersection with future Avenue K-8. Also required will be some pavement improvements, curbs, gutters, sidewalks, curb ramps, landscaping, and relocated street lighting. Avenue K-8 improvements required of the project include pavement improvements, four deceleration lanes, curbs, gutters, sidewalks, landscaping, curb ramps, landscaped raised-medians, and street lighting. Avenue K-8 construction will also require the extension of 10-inch and 8-inch sewer mains, fire hydrants, water service laterals, and dry utility extensions. A separate project planned for the northeast corner of 10th Street West and Avenue K-8 may construct first and will build a portion of Avenue K-8. The construction of 5th Street West between Avenue K-8 and Avenue K-12 (half the total length) will include full improvements for the westerly half of the ultimate 84-foot right of way plus 20 feet east of the centerline with painted medians. Street improvements will include pavements, curbs, gutters, curb ramps, sidewalks, four deceleration lanes, and street lighting. Utilities to be constructed in this right-of-way include a 12-inch sewer main extension, water service laterals, 6- inch gas line extension, fire hydrants, and dry utilities. The construction of 5th Street West between Avenue K-12 and Avenue L (half the total length) will include full improvements for the westerly half of the ultimate 84-foot right of way plus 20 feet east of the centerline with painted medians. Street improvements will include pavements, curbs, gutters, curb ramps, sidewalks, four deceleration lanes, and street lighting. Utilities to be constructed in this right-of-way include a 12-inch sewer main extension, water service laterals, 6- inch gas line extension, fire hydrants, and dry utilities. Avenue K-15 will require widening improvements along its northerly frontage. To be constructed are pavement improvements, curb, gutter, curb ramps, sidewalks, landscaping, street lighting, fire hydrants and dry utilities extension. The Avenue L right-of-way will require widening along the northerly frontage to include pavement improvements, three deceleration lanes, landscaped medians, curbs, gutters, sidewalks, landscaping, and street lighting. Avenue L construction will also include the extensions and laterals for water, sewer, and storm drain services, as well as dry utilities installation. 152 OF 169 CITY OF LANCASTER

7.02 C SIGNALS Anticipated signal improvements are as follows: The existing traffic signal located at the intersection of 10th Street West and Avenue K-8 will be modified to accommodate four-way traffic with protected left turns. Included will be all conduit, poles, signs, lights, and controllers with video detection. New traffic signals will be constructed at the intersection of Avenue K-8 and Drivers Way, the new primary entrance to the project site on 10th Street West that aligns with the entrance to Lancaster City Park, and the new intersection on 10th Street West that provides a more southerly entrance to the project near what would normally be Avenue K-12. The new signals will provide for protected left turns and will include all conduit, poles, signs, lights, and controllers with video detection. D DRAINAGE With the approval of the California Department of Fish and Game and the receipt of a streambed alteration agreement, the Amargosa Creek will be totally reconstructed as an underground conveyance. This construction will allow for the continued recharge of the underlying aquifer by storm water or other water that may be introduced for the purpose of aquifer recharge. Between Avenue K-8 and Avenue L, and based upon the preferred site layout of the Specific Plan, it is estimated that approximately 3,500 linear feet of under-grounded storm channel will be constructed; that portion passing through the commercial development site is estimated to be approximately 2,200 feet in length. Two new traffic signals will be constructed at the intersections of Avenue L and the future 5th Street West and 7th Street West. The new signals will provide for protected left turns and will include all conduit, poles, signs, lights, and controllers with video detection. AMARGOSA CREEK SPECIFIC PLAN 153 OF 169

7.03 INFRASTRUCTURE MAP A KEY INFRASTRUCTURE NEEDS A. The construction of the south half of Avenue K-8 (which includes pavement improvements, four deceleration lanes, curb and gutter, sidewalk, curb ramps, 10 and 8 sewer mainline extension, fire hydrants, water service extensions, dry utility extensions, and street lighting). B. The construction of the west half of 5th Street West (which includes pavement improvements, four deceleration lanes, curb and gutter, sidewalk, curb ramps, fire hydrants, 12 sewer mainline extension, water service extensions, 6 gas extension dry utility extensions, and street lighting). C. The construction of the Avenue L widening to the north (which includes pavement improvements, three deceleration lanes, landscaped medians, curb and gutter, sidewalk, curb ramps, fire hydrants, water service extension, sewer service extensions, storm drain extension, dry utility extensions, and street lighting). D. The construction of the Avenue K-15 widening to the north (which includes pavement improvements, curb and gutter, sidewalk, curb ramps, fire hydrants, dry utility extensions, and street lighting). H. The modification of an existing traffic signal at 10th Street West and Avenue K-8 (which includes all conduit, poles, signs, and lights). I. The construction of a new traffic signal at 10th Street West and Avenue K-10 (which includes all conduit, poles, signs, and lights) J. The construction of a new traffic signal at 10th Street West and Avenue K-12 (which includes all conduit, poles, signs, and lights). K. The construction of a new traffic signal at 7th Street West and Avenue L (which includes all conduit, poles, signs, and lights). L. The construction of a new traffic signal at 5th Street West and Avenue L (which includes all conduit, poles, signs, and lights). B Exhibit 50. INFRASTRUCTURE Location MAP E. The construction of the 10th Street West improvements (which includes four deceleration lanes, pavement improvements, landscape medians, curb and gutter, sidewalk, curb ramps). F. The construction of the Amargosa Creek concrete arch culvert with Armorflex bottom (which includes excavation/backfill, concrete arch, and an armorflex lining). G. The construction of a new traffic signal at Drivers Way and Avenue K-8 (which includes all conduit, poles, signs, and lights). 154 OF 169 CITY OF LANCASTER

7.03 Exhibit 50 G H I E J D A F B G. INFRASTRUCTURE LOCATION MAP K C L 0 150 300 600 AMARGOSA CREEK SPECIFIC PLAN 155 OF 169

156 OF 169 CITY OF LANCASTER