ENVIRONMENTAL IMPACT ASSESSMENT

Similar documents
ENVIRONMENTAL IMPACT ASSESSMENT

BASIC ASSESSMENT PROCESS

ENVIRONMENTAL IMPACT ASSESSMENT

RIVER MAINTENANCE MANAGEMENT PLAN APPLICATION

BACKGROUND INFORMATION DOCUMENT (BID) AND INVITATION TO PARTICIPATE

Cape Environmental Assessment Practitioners(Pty)

BASIC ASSESSMENT PROCESS THE PROPOSED CANELANDS EXTENSION, KWAZULU-NATAL KZN DAEA REF NO: DM/0031/2012 BACKGROUND INFORMATION DOCUMENT AUGUST 2012

Fabriek Street 45 Paarl. P.O. Box 2632 Paarl Tel: Cell:

Fabriek Street 45 Paarl. P.O. Box 2632 Paarl Tel: Cell:

PURPOSE OF MEETING MEETING GUIDELINES PROJECT BACKGROUND ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE

Attention: Interested and Affected Party (I&AP) Commenting Period: 22 November January 2018 GNEC Code: 20327

BACKGROUND INFORMATION DOCUMENT:

PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE

NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION

BASIC ASSESSMENT REPORT. Background Information Document

BACKGROUND INFORMATION DOCUMENT

PROPOSED GARDEN CITY NEW TOWN DEVELOPMENT, KRAAIFONTEIN DRAFT ENVIRONMENTAL IMPACT REPORT Summary Document

Reg. No. 2008/004627/07 VAT No Facsimile: (044) Progress Street, George Web:

SIBAYA WATERLINE BASIC ASSESSMENT PROCESS. PRE-APPLICATION MEETING WITH EDTEA March 2016

REDZ & POWER CORRIDOR GAZETTING. 25 July Environmental Advisory Services

APPENDIX D PUBLIC NOTIFICATIONS

MEETING HELD AT THE EDTEA OFFICES (ethekwini) ON 03 July 2018 AT 10h00. Ms. Naadira Nadasen (NN) Mrs Chen read (CR) and Mrs Tejal Singh (TS)

PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED SWARTLAND SHOPPING MALL

TSHWANE STRENGTHENING PROJECT PHASE 1, GAUTENG PROVINCE: Draft Scoping Report: Apollo - Verwoerdburg July 2009

N O T I F I C A T I O N O F I N T E N T T O D E V E L O P

Our Constitutional imperative

SINGITA SWENI LODGE EXPANSION: SUMMARY REPORT - BAR

PUBLIC CONSULTATION MACROBERT INCORPORATED GREENWAY FARMS (PTY) LTD BOKPOORT OPERATIONS INTEGRATED WATER USE LICENCE APPLICATION

Draft Western District Plan

14.5 HOPEFIELD: (REFER PLAN 39 AND PLAN 40)

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.

Public Hearing. Preliminary Draft Development Plans (zoning plans) Dutch Quarter and Middle Region. June 28, 2016

Communicate the results of the EIA for the proposed development;

1. Local Plan Context

HARTENBOS NORTH (population: Census 2011)

Draft Eastern District Plan

Services Department B September 10, 2007

CHAPTER 4: CONTEXTUALISING THE PROPOSED PROJECT ENVIRONMENT WITHIN THE NATIONAL AND LOCAL

MERIDAN PLAINS SAND RESOURCE AREA

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

TOWN OF BRUDERHEIM Report to the capital region board

Longbridge Town Centre Phase 2 Planning Application

Planning Justification Brief

INTRODUCTION. Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. THE CONSULTANT TEAM WHERE IS THE SITE?

CORNUBIA RETAIL PARK- PLANNING REPORT REVERT 3

PLNPCM Carl s Jr. Commercial Parking Lot at Redwood Road and 1700 South

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

GUILDFORD BOROUGH GREEN BELT AND COUNTRYSIDE STUDY

South of Eastern Strategic Direction Status Update

M07/11 CURRICULUM VITAE Kelly Tucker

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

Ebbsfleet Development Corporation

TOWN AND COUNTRY PLANNING ACT 1990 (AS AMENDED).

Planning Proposal Concurrent DA/LEP Amendment for Belmont North Pharmacy Amendment No. 24 to Lake Macquarie Local Environmental Plan (LMLEP) 2014

DEVELOPMENT APPLICATION DECISION NOTICE Sustainable Planning Act 2009 (SPA)

Lake Macquarie City. A copy of the published amendment including the instrument and maps, is provided in Attachment 7 of this report.

SITE INVESTIGATION REPORT: CONSTRUCTION OF NTUMBA VEHICULAR/PEDESTRIAN BRIDGE ACROSS A STREAM IN ROOKDALE, OKHAHLAMBA LOCAL MUNICIPALITY

GREENBANK DEVELOPMENT MASTERPLAN

Progress on implementation of the REDZs and Power Corridors SAPVIA Protea Hotel Balalaika 25 November 2016

2A District-wide Policies

THE PROPOSED DEVELOPMENT OF A RETIREMENT VILLAGE AND RESIDENTIAL ESTATE, TOKAI

Presented by: Remy Norbert DUHUZE Director/ER&PC REMA

APPENDIX A LOCALITY MAP

N O T I F I C A T I O N O F I N T E N T T O D E V E L O P

SEQ Strategic Stabling Investigation Working paper: Northern corridor site selection - Town planning assessment

WHERE DO WE GROW FROM HERE?

Planning Proposal Charlestown Swim and Leisure Centre LEP Amendment

2. PROJECT SITE LOCATION & DESCRIPTION

I539. Smales 2 Precinct

STAFF REPORT. December 20, North York Community Council. Director, Community Planning, North York District

ONTARIO MUNICIPAL BOARD

CULTURAL HERITAGE IMPACT ASSESSMENT TERMS OF REFERENCE

A Growing Community Rural Settlement Areas

LAND USE ASSESSMENT REPORT (LUAR) PROPOSED AFFORDABLE HOUSING COMPLEX MAIN ROAD PDE FILE NUMBER: REZ

Mount Prospect Retirement Village (PTY) LTD

Standard Development Timeline

Request for Decision. Recommendation. Presented: Monday, Jul 07, Report Date Friday, Jun 20, Type: Public Hearings

Urban Growth Boundaries

Dispute over the requirement for fire door signage to hotel suites at 124 Devon Street West, New Plymouth

Environmental Impact Assessment Screening Report for proposed Environmental Improvement Works to the Front of Emily Square, Athy

Visual Specialist Opinion on Preferred Layout Alternative 4 September 2014 (Megan Anderson of MALA)

Town of Newmarket 395 Mulock Drive P.O. Box 328, Newmarket, Ontario, L3Y 4X7. Website: newmarket.ca Phone:

Natomas Vision Plan and PLNP

Local Growth Planning in North Central Green Line Communities

Visual Impact Assessment January 2013

City of Westbrook. 2 York Street Westbrook, Maine (207) Fax:

PHASE III: Reserved Matters Submission

PROPOSED CAPACITY IMPROVEMENTS TO NA- TIONAL ROUTE 2 (N2) AND NATIONAL ROUTE 3 (N3) WITHIN ETHEKWINI METROPOLITAN MUNICIPALITY

Land North of Hall Road, Rochford. Rochford District Council. Planning Application Index. Prepared on behalf of Bellway Homes Ltd

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

AMENDMENTS. Date Effective. Amendment No. Council. DCP 14 Davidson St, Greenacre Page 2

FURTHER TO EXECUTIVE COMMITTEE MEETING #11/12 To be held on Friday, January 11, 2013

E16: MAINTENANCE OF LANDSCAPED AREAS

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

2. PROJECT SITE LOCATION & DESCRIPTION

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

Next Steps / Development Process. Structure Plan. June submitted to City of Fremantle. Structure Plan. July supported for advertising

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Barvills Solar Farm Environmental Statement Non-Technical Summary

Transcription:

ENVIRONMENTAL IMPACT ASSESSMENT NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE PROPOSED HAASENDAL DEVELOPMENT AND KUILS RIVER GOLF COURSE RE-DEVELOPMENT ON ERF 23580, ERF 23579, ERF 23582, ERF 23583, ERF 23584, FARM 1339, AND PORTIONS 60, 64, 67, 87 AND 106 OF FARM 222 IN KUILS RIVER, WESTERN CAPE. BACKGROUND INFORMATION DOCUMENT (BID) AND INVITATION TO PARTICIPATE July 2017 DEA&DP REFERENCE No: 16/3/3/6/7/1/A5/11/2082/17 1. PURPOSE OF THIS DOCUMENT The purpose of this document is to: Provide stakeholders with information about the proposed Haasendal Development and Kuils River Golf Course Re-Development on Erf 23580, Erf 23579, Erf 23582, Erf 23583, Erf 23584, Farm 1339, and Portions 60, 64, 67, 87 and 106 of Farm 222 in Kuils River, Western Cape. Introduce and explain the Basic Assessment and Public Participation process to be followed for the proposed development, in terms of applicable environmental legislation (National Environmental Management Act (NEMA), (Act No.107 of 1998), as amended; Invite all stakeholders to register and comment on any aspect related to the proposed development between the 28 th of July and the 29 th of August 2017. 2. PROJECT DESCRIPTION The proponent, Amphoria (Pty) Ltd, proposes to develop the Haasendal site which is set to include numerous residential precincts, a commercial node along Saxdowns Road as well as the re-development of the existing Kuils River Colf Course. Currently the farm portions where the development is proposed is lying vacant and is not in use although located within the City of Cape Town Urban Edge. The area was previously farmed, although the soil is not of high quality due to sandy substrate and farming potential was very limited. The existing Kuils River Golf Course is located on the property and a land swop has been entered into between the applicant and the

City of Cape Town in order to swop portions for the re-development of the Kuils River Golf Course and to avail other portions for development. The Haasendal Estate development is located toward the immediate south of the Bottelary Road and toward the immediate west of the Kuilsriver Golf Course in Brackenfell. The development leads all along Saxdowns Road toward the immediate east of Saxdowns Road. The site previously comprised of Portions 01, 11, 26, 30, 34, 58 and 87 of Farm Haasendal no. 222, Brackenfell, Western Cape. These portions have been since been consolidated and a range of new residential erven have been introduced since. This proposed development is now being applied for which includes Erf 23580, Erf 23579, Erf 23582, Erf 23583, Erf 23584, Farm 1339, and Portions 60, 64, 67, 87 and 106 of Farm 222 in Brackenfell, Western Cape. The site as it currently stands comprises of the existing Turnberry Single Residential Development which comprises 10ha in extent and 250 single residential units. The site is currently disturbed in its entirety and the road network has also been constructed on site. One existing dwelling (not older than 60 years) is present on the site which is being utilized as a site office for sales. The site furthermore contains Eskom powerlines and no biophysical constraints to development, apart from the Bottelary River which is to be protected by riverine buffers and is to be rehabilitated. The site is located within the City of Cape Town urban edge. It is further important to take cognisance of the fact that this entire site area has previously been approved as part of a full EIA process for the same development, although at that stage the proposal included only single residential units and the land swop was not confirmed at that stage. The City indicated that the previous approved proposal (DEA&DP Ref: E12/2/3/2-A4/62-0297/06) did not include enough density for development in this area. It should also be noted that the Haasendal Estate now includes a re-design of the Kuils River Golf Course to be included as part of the Haasendal Estate. The total site area included as part of this application (including the golf course) totals 151.53ha. The Haasendal development stretches toward the north and the south of the Bottelary River and will be an access controlled development with a number of individual residential precincts to form part of the greater Haasendal development. As a result of the scale of the proposed development, this EIA process will look to address all environmental impacts associated with the development of the greater Haasendal Estate and the incorporation of the Golf Course and all developable pockets will subsequently be designed inside these perimeters. Bulk services are currently under construction in this area by the applicant and connection points will be made available along the development. A package plant for the onsite (underground) treatment of sewerage will also be investigated. Please refer to the Preferred Site Development Plan provided below. Please also note that the grey nodes have already been approved in terms of the NEMA and does not form part of this application.

3. NATIONAL ENVIRONMENTAL MANAGEMENT ACT (ACT NO. 107 OF 1998), AS AMENDED Environmental Assessment The National Environmental Management Act (NEMA) (Act No. 107 of 1998) identifies the proposed application for the Haasendal Estate Development and Kuils River Golf Course Re-Development as an activity that may have detrimental effects on the environment with the following listed activities: Government Notice No. R. 327 of 7 April 2017: Activity No: 9; 10; 12; 19; 27; 28, and Government Notice No. R. 324 of 7 April 2017: Activities 4 and 12. Definition of an Environmental Impact Assessment (EIA) An environmental impact assessment is a good planning tool to assist in the identification, evaluation and assessment of potential positive and negative impacts of a proposed development on the environment. It also recommends ways to avoid or reduce negative impacts, and ensure that developments are sustainable without affecting people s lives and the environment adversely. As mentioned, an EIA is undertaken in terms of the NEMA (Act No 107 of 1998) as amended, and the EIA Regulations.

4. POTENTIAL ENVIRONMENTAL ISSUES Potential environmental issues that will be addressed in the assessment include inter alia: Noise There will be a temporary noise impact due to construction vehicles operating on and around the site. During the operational phase of the activity, additional noise associated with the additional traffic in the area. This impact is deemed negligible and is consistent with urban areas. Traffic There will be construction vehicles moving to and from the site during the construction phase of the development. Furhtermore during the operational phase there will be significantly more traffic on the Saxdowns Road and the surrounding roads infrastructure. A Traffic Impact Assessment has been conducted in order to mitigate this impact and propose phased upgrades to roads infrastructure. Freshwater The proposed activity will impact on Freshwater sources as confirmed by the freshwater assessment. The impacts on the Bottelary River will be mitigated by means of riverine buffer areas which are to be rehabilitated. No construction other than that required as part of earthworks for the golf course will be allowed within these buffer areas. Furthermore seasonal streams from the north of the Bottelary River has been protected by means of 15meter ecological buffers toward the Bottelary River. Botanical According to The Vegetation of South Africa, Lesotho and Swaziland (Mucina, Rutherford & Powrie, 2005) the study site would have historically contained two vegetation types, Cape Flats Sand Fynbos and Swartland Granite Renosterveld (Figure 8). Cape Flats Sand Fynbos covered the major part of the site, with a small fraction of Swartland Granite Renosterveld on the eastern and northeastern boundary. The site supports minimal natural vegetation, and most areas have a Low botanical conservation value, presenting no significant constraints to development. Economic The proposed development will have a positive economic impact on the greater Brackenfell and Kuils River area as it will create a number of single residential and higher density residential units for residents in the greater area. Furthermore the development will include a number of commercial activities creating jobs, as well as a private school. This will see great economic investment into the greater area. Social The social impacts associated with the development is deemed to be a positive one. The nature of the development will see a landmark development being constructed and will include a school, shopping facilities etc. The development will enable economic injection into the area and provide services such as the previously approved shopping centre, filling station as well as the private school included as part of this application. As mentioned, the Basic Assessment Report will identify measures to reduce identified negative impacts, and optimise positive impacts.

5. PUBLIC PARTICIPATION In terms of the NEMA, public participation forms an integral part of the environmental assessment process. The public participation process provides people who may be affected by the proposed development with an opportunity to provide comment and to raise issues of concern about the project or to make suggestions that may result in enhanced benefits for the project. Comments and issues raised during the public participation process will be captured, evaluated and included in a Comment and Response Report. These issues will be addressed and included in the final, Basic Assessment Report which will be submitted to the Department of Environmental Affairs and Development Planning (DEA&DP). 6. DELIVERABLES The environmental assessment will culminate in the compilation of a Basic Assessment Report and Environmental Management Plan. The Basic Assessment Report will be submitted to the Department of Environmental Affairs and Development Planning (DEA&DP), the regulatory authority responsible for the review of the report. The DEA&DP has to reach a decision as to whether, and under what conditions, the project may proceed, based on environmental considerations. An environmental authorization will be issued based on the information provided in the Basic Assessment Report. Interested and Affected Parties who have registered will be notified of the environmental authorisation.

7. TIMEFRAMES The table below provides an indication of the proposed timeframes for the project. Activity Estimated Timeframe Compilation of Notice of Intent to Submit an Application(NISA) (DEA&DP) May 2017 Compilation of Notice of Intent to Develop (NID) (HWC) May 2017 Submit NISA & NID May 2017 Compilation of Specialist Studies May 2017 Compilation of Basic Assessment Report July 2017 Project announcement to key stakeholders and registered I&Aps July 2017 Amend BAR and EMP Compile EIA Application & submit to the DEA&DP August 2017 2 nd PPP Draft Final Bar & EMP September 2017 Amend Final Bar & EMP and submit final Basic Assessment Report to decisionmaking Authority for a decision November 2017 DEA&DP Review November 2017 February 2018 Authorisation February 2018 Commencement of activity June 2018 8. INVITATION TO PARTICIPATE GNEC was appointed as an independent environmental consultancy by Amphoria (Pty) Ltd to facilitate the environmental impact assessment and public participation process for the proposed project. A copy of the Pre-App Draft BAR is made available at the Brackenfell Public Library in Paradys Street from the 28 th of July 2017 until the 29 th of August 2017. Alternatively a copy of the report is also available on the GNEC website at www.gnec.co.za. To register as an Interested and Affected Party, please complete and return the enclosed registration sheet and submit any written comments to: GNEC Att: Mr Renier Kapp P.O. Box 2632,, 7620 Tel: 021 870 1874 Fax: 021 870 1873 Cell: 082 675 5233 E-mail: renier@gnec.co.za GNEC Ref No: 20401 DEA&DP Ref No: 16/3/3/6/7/1/A5/11/2082/17 Please submit the registration sheet to GNEC by no later than Tuesday 29 August 2017.

PROPOSED HAASENDAL DEVELOPMENT AND KUILS RIVER GOLF COURSE RE-DEVELOPMENT ON ERF 23580, ERF 23579, ERF 23582, ERF 23583, ERF 23584, FARM 1339, AND PORTIONS 60, 64, 67, 87 AND 106 OF FARM 222 IN KUILS RIVER, WESTERN CAPE. Title Company Name/Interest Postal-or-Residential Address Area Tel: Fax: E-Mail Address REGISTRATION AND COMMENT SHEET July 2017 DEA&DP REFERENCE No: 16/3/3/6/7/1/A5/11/2082/17 GNEC REF: 20401 Name and Surname Postal Code Cell Phone Please indicate you preferred method of communication (Please indicate with an X) Fax E-Mail Post Comments (You are welcome to attach more sheets if necessary (Your comments will be considered in the EIA (BA) process) Please provide details of any other person/company whom you would like us to add to our mailing list Title Company Name Tel: E-Mail Name and Surname Fax No: Please complete and return to GNEC by no later than Tuesday 29 August 2017 Attention: Mr Renier Kapp P.O. Box 2632,, 7620 Tel: 021 870 1874, Fax: 021 870 1873, Cell: 082 675 5233, E-mail: renier@gnec.co.za Thank You for your participation