CTH C RESURFACING Douglas County, Wisconsin

Similar documents
From local initiatives to some of the largest and most complex projects, KOA leads the field in:

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Fall 2017 Construction Update

Transportation Systems and Utility Infrastructure

Construction Engineering & Inspection

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

5-Year Street Reconstruction Plan ( )

DESIGN SCENE SUBJECT INDEX

RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals

Mendota Heights 2040 Comprehensive Plan Draft Vers

Clay Street Bridge Replacement Project

Olde Towne Vision Plan

2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

Planning Districts INTRODUCTION

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

ARTICLE 13 STREETS General

Victoria Bridge Municipal Class EA Civic Works Committee

Highway 15 Project - Hutchinson

2016 WORKSHOP LVR Field Trip

Access Management: An Overview

1 PURPOSE AND NEED 1.1 PURPOSE OF THE PROPOSED ACTION 1.2 NEEDS FOR THE PROPOSED ACTION

Spring 2018 Construction Update

ROAD PAVING VARIOUS LOCATIONS LANE KM

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

Public Information Centre. Welcome

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

1.0 Circulation Element

DEPARTMENT OF PUBLIC WORKS & UTILITIES

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

ARTICLE 13 STREETS General

Asbury Chapel Subdivision Sketch Plan

Great Lakes North Central South Central FAX: (718) CONTACT PERSON: ADDRESS: Daniel Hom, PE, Engineer-in-Charge

CAPA ASPHALT & AIRPORT PAVEMENT MARCH 27, 2019

DRAFT SECTION 4(F) EVALUATION LIFT BRIDGE

Engineering Department

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

4-Town Comprehensive Plan DRAFT 7/30/07

THE COMMUNITY-DRIVEN DESIGN PROCESS

St. Louis Engineering and Transportation Services

River Corridor Overlay Zone (RCOZ) Article 5

Mississippi Skyway Preliminary Engineering Report

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Cottage Grove Road Reconstruction. City of Madison Engineering

Stakeholders Advisory Working Groups (SAWGs) Smart Growth and TOD Land Use (#11) SAWG Meeting

Jenifer Street Reconstruction Neighborhood Engagement Meeting November 4, 2015

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Welcome to the Sellwood Bridge Project Pre-Construction Open House

Project Narrative For Fruita RV Resort Conditional Use Permit

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Chapter 5: Natural Resources and Environment

November 15, Dear Ms. Jacobs:

USA Addition of South & East Side Residential Parcels. USA Deletion of a Town of Christiana Parcel. Conversion from USA to Limited Service Area

STANDARD DETAILS QUICK REFERENCE

Roads Plan

Green Infrastructure The Indianapolis Greenways Connection

Local Municipal Forecast. OPAC Partners in Quality Road Tour Ottawa April 19, 2018

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

DESIGN CRITERIA PACKAGE

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

Project Descriptions for FY 15

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Focus Group First Meeting Belfountain Community Centre Tuesday June 29, :00 p.m. to 9:00 p.m.

ARTICLE VI: SITE PLAN REVIEW

Local Municipal Forecast. OPAC Partners in Quality Road Tour Sudbury April 17, 2018

HAZARD MITIGATION GOALS AND OBJECTIVES

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Berkshire Regional Planning Commission Clearinghouse Review Report

Title 11 Streets and Sidewalks

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

City of Richmond. Engineering Design Specifications

Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting

FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

2017 Canadian Consulting Engineering Awards

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL

REQUEST FOR COUNCIL ACTION

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Highway & Bridge Capabilities

DRAFT SECTION 4(F) EVALUATION KOLLINER PARK

Pennsy Greenway Trail

COMPLETE GREEN STREET CHECKLIST

Consultants. Contractors

Chapter 10 IMPLEMENTATION RECOMMENDATIONS

TRANSPORTATION: Roads and Highways Services

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

Public Meeting #3 May 9, 2009 MVVA Team

Transcription:

Krech Ojard s Civil Group provides full range design and construction management services for municipal transportation and utility projects, as well as a variety of private developments. With a staff possessing a breadth and depth of experience in the field of civil engineering, we are positioned to offer the range of services typical of larger firms, while retaining the individual, client-oriented focus of a much smaller one.. Our multi-disciplinary, team-based approach provides comprehensive services, addressing every aspect of a project. With an unparalleled ability to respond to the needs and concerns of our clients, our Civil Engineering Group brings cost-effective, real-world solutions to the most unique and challenging projects. From commercial and industrial to highway design projects, our clients have entrusted Krech Ojard & Associates to provide creative engineering solutions since 1984.

CTH C RESURFACING Douglas County, Wisconsin Krech Ojard was awarded the construction administration for the repaving of County Trunk Highway C in Douglas County, Wisconsin. Krech Ojard served as Project Engineer and site inspector during construction and represented WisDOT. One problem area included a Frost Heave section that had a history of freezing ground water causing bumps in roadway during winter months. During construction it was decided to excavate an additional four feet in areas to find ground water. From the additional excavation, the engineers discovered an underground natural spring running diagonally across road. The solution involved installing a six inch underdrain and sloped native clay below base materials two percent over 600 of roadway to allow proper drainage to prevent further issues with the road heaving. The project was funded by the American Recovery & Reinvestment Act Stimulus. (ARRA) STATE HIGHWAY 13 Red Cliff, Wisconsin Assisted the Red Cliff Band of Lake Superior Chippewa with the project planning, ARRA funding submittal, and project design for their TE portion of the project. Then after several meetings involving Tribal, WisDOT and BIA representatives, WisDOT requested to develop a design and prepare plans for its planned improvement to the roadway and combine the roadway improvement plans into one project that addressed all proposed improvements within the project limits. This marriage of two separate projects demanded a high degree of coordination and communication between all parties involved due to the condensed time frame to go from concept to Final PS&E in order to not jeopardize the source of project funding. STH 70 (ARRA) WisDOT NORTHWEST REGION Burnett County, Wisconsin Hired as construction project engineer for the resurfacing of 12.07 miles of STH 70. The project was funded by the American Recovery and Reinvestment Act (ARRA). The project consisted of resurfacing of the highway and improvements to a wayside rest area. Work included asphalt milling, HMA pavement, sign replacement and permanent pavement markings. The services provided included full-time site representation, material testing of base aggregate, full service construction management including quantity calculations, submission of payment estimates, and project finals. The project was the recipient of the Region s Excellence in Asphalt Paving Award for 2010. NORTH 28 th STREET RECONSTRUCTION WisDOT NORTHWEST REGION This project is currently in the design phase and consists of the construction of sidewalk, curb cuts and pedestrian ramps along the south side of North 28 th St from Weeks Ave to Catlin Ave. Modifications to the storm sewer system are also being made with this project. The Superior Senior High School and its athletic facilities are located in the immediate project area, as are several residential units. This project involved coordination with the City of Superior and residences along 28 th Street.

DULUTH INTERNATIONAL AIRPORT TERMINAL EXPANSION Duluth, Minnesota Krech Ojard & Associates was contacted by Reynolds, Smith & Hills (RS&H) to assist with the stormwater handling and stormwater management associated with the Phase I Landside Development of the Replacement Terminal project at the Duluth International Airport. The project consisted of the reconstruction/relocation of the access loop road and construction of vehicle parking lots. As portions of this project were funded by the American Recovery and Reinvestment Act (ARRA), design needed to be completed quickly to avoid jeopardizing the project s funding. Krech Ojard worked with RS&H to quickly develop a phasing plan for the installation of the new storm water system in order to minimize interruptions to the operation of existing terminal parking lot and traffic flow. Due to the proximity to Miller Creek and area wetlands and the lack of stormwater management from the existing parking lot and access roads, The Duluth International Airport Authority, RS&H and Krech Ojard decided to treat more than double the volume of stormwater runoff that was required by current environmental regulations. LAKESIDE ROCKRIDGE SIP Duluth, Minnesota Provided designs,plans, specifications, estimates, and also construction administration inspection for the reconstruction and rehabilitation of nine blocks of city streets in the Lakeside Rockridge neighborhood of Duluth. The project consisted of street reconstruction, storm sewer replacement, I & I pipe installation, spot sanitary sewer repairs, and replacement of the current watermain with HDPE watermain., as well as subgrade and subgrade drainage, aggregate base, bituminous pavement, construction phasing, and traffic control. HAMMOND AVENUE RECONSTRUCTION DISTRICT 8 Retained by the city of Superior to manage the reconstruction of Hammond Avenue in. Work was conducted in three phases. The project involved reconstruction of an urban collector street, including concrete pavement, curb and gutter, storm sewer construction, and other amenities. The area of reconstruction was approximately ¾- mile in length with a total construction cost of $2.7 million. The project was selected by WisDOT District 8 for the 2002 Excellence in Concrete Paving Construction Award, and earned an award from PCI for the concrete paving. NORTHSHORE MINING BIKE TRAIL Silver Bay, Minnesota Provided engineering services relative to the Gitchee Gammi Trail Tunnel under Northshore Mining s existing railroad tracks. The existing trail on required users to cross the tracks at grade and therefore exposing them to live trains and potential injury. To eliminate this point of conflict, prepared construction documents, provided survey services and inspected the installation of a precast box culvert under the tracks. The Gitchee Gammi Trail was also being redesigned and reconstructed under a separate project, therefore KOA had to coordinate with the Minnesota DNR and other consultants to ensure that the culvert crossing met State Standards and transition smoothly into the overall plan of reconstruction.

PARKLAND INDUSTRIAL PARK Krech Ojard provided full plans, surveying, specifications and estimates for the development of the Parkland Industrial Park, a new improvement in. The project consists of master planning, redevelopment of a brownfield site, unique roadway design, alternative stormwater, water and sanitary sewer extensions, platting, site design and parcel development. CURTIS OIL MASTER PLAN Duluth, Minnesota Provided full plans, surveying, specifications and estimates for the development. The project consisted of master planning, unique roadway design, alternative stormwater, water and sanitary sewer extensions, platting and site design. VINJE INDUSTRIAL PARK Provided full plans, surveying, specifications and estimates for the development. The project consisted of master planning, redevelopment of a brownfield site, unique roadway design, alternative stormwater, water and sanitary sewer extensions, platting and site design and parcel development. TOPOLOBAMPO PORT DEVELOPMENT Sinaloa, Mexico Provided engineering services for a proposed copper concentrate storage, handling, and exporting facility at the Port of Topolobampo in Mexico. The port will be used to export copper concentrate mined from a new mine under development near Tucson Arizona. The first phase included a review of the existing facilities. Meetings were held in Duluth with Augusta Resource principals to determine their requirements, producing a general schematic design that Augusta Resource was able to present to the officials of the Port of Topolobampo. The project encompasses all of the core abilities of Krech Ojard with involvement of the mechanical, civil, structural, railroad, electrical and architectural departments.

NORTH SHORE SCENIC RAILROAD KNIFE RIVER BRIDGE REPLACEMENT Knife River, Minnesota Scenic Highway 61 located between Duluth and Two Harbors, Minnesota runs parallel to the railroad and crosses under the rail line just south of Knife River. The reversing horizontal curves of the under passing highway required advisory speed limits, and during inclement weather, the bridge s concrete abutments were struck by vehicles and snowplows alike. Vertical clearance at the bridge was also limited to 13-8. The solution was to replace the bridge and realign the highway. Softening the reverse curves required increasing the skew of the bridge from 42 degrees to 64 degrees. Increasing the vertical clearance under the bridge required lowering the roadway profile. Sight distance through the bridge was also improved by lengthening the bridge to three spans and lengthening the center span to 67 feet. Since this stretch of roadway was on the south end of the town of Knife River, it was requested that the project construct curb and gutter for the length of the project to create a feeling of an urban setting, therefore suggesting slower speeds to the traveling vehicles. With the conversion of a rural roadway to an urban roadway cross section with curb and gutter, required the construction of storm sewer. Wide paved shoulders will provide refuge to bicyclists, pedestrians, and rollerbladers that frequent this stretch of highway known for its views of Lake Superior. DEDHAM ROAD BRIDGE OVER NEMADJI RIVER South Superior, Wisconsin Served as construction project engineers for the construction of a concrete slab span bridge to replace a failing metal girder suspension bridge over the Nemadji River. Bridge approaches and river bank stabilization services were also performed during the update. What was once a closed or limited, one-lane, questionable access across the Nemadji River, is now a safer and more visually pleasing connection. The new bridge helps to salvage a road in South Superior that local residents have been without for years. EASTVIEW ROAD BRIDGE MUSKEG CREEK Oulu, Wisconsin Hired by the town of Oulu to design a replacement structure for the town bridge on Eastview Road over Muskeg Creek. The existing structure was a cast-in-place slab span bridge built in 1928 and was deteriorating. Due to its short span, it frequently caused roadway flooding. The design of a long-span low-rise corrugated metal arch structure on pile- supported cast-in-place concrete footings was selected for its economy and ease of construction. The long span and low rise were required to match the stream width and place the bottom of the metal structure above the normal water elevation, without raising the roadway elevation over the structure. The unique and cost-effective design of this bridge replacement also poses minimal impedance on the visual environment. BRIDGES AND APPROACHES WisDOT, DOUGLAS COUNTY & MnDOT Various Locations in Wisconsin & Minnesota Krech Ojard has worked in conjunction with numerous entities of state and local government on projects related to bridges and approaches. Our efforts have included design and construction management of several local road, county trunk, and state road bridges in the northern counties of Wisconsin and Minnesota.

krechojard.com