Installation and Operation Manual IDRA N DS. Solar solar storage cylinder. Installation and Operation Manual

Similar documents
Installation and Operation Manual IDRA N DS. Solar solar storage cylinder. Installation and Operation Manual

Installation and Operation Manual IDRA PLUS DS. Solar Solar storage cylinder. Installation and Operation Manual

Installation Manual STOR C. Solar combination storage cylinder. Installation Manual

solar storage cylinder

Installation and Operation Manual IDRA MS 150. Solar solar storage cylinder. Installation and Operation Manual

cod. Doc rev. 2 12/ ACI PLUS EN INSTALLATION, OPERATION AND MAINTENANCE MANUAL

Installation and Operation Manual IDRA DS LE. Solar Solar storage cylinder. Installation and Operation Manual

Installation and Operation Manual IDRA MS 150 LE. Solar Solar storage cylinder. Installation and Operation Manual

cod rev. 4 08/ Kombisolar 2S EN INSTALLATION, OPERATION AND MAINTENANCE MANUAL

HYBRID STOR

cod rev. 0 03/ Kombisolar 3S EN INSTALLATION, OPERATION AND MAINTENANCE MANUAL

Installation and Operation Manual IDRA DS. Solar solar storage cylinder. Installation and Operation Manual IDRA DS IDRA DS

INSTALLATION, OPERATION AND MAINTENANCE MANUAL TBPS TBPS TBPS

INSTALLATION AND MAINTENANCE MANUAL TBPS KOMPACT

CONNECT SOLAR MR - 7,5m

NATURAL CIRCULATION SYSTEMS NS-SOL SOLAR INSTALLER, TECHNICAL ASSISTANCE CENTRE AND USER MANUAL

Installation and Operation Manual NB-SOL TI. Solar Natural Circulation Systems. Installation and Operation Manual

INSTRUCTION FOR THE USER THC V E OIL BLU

USER MANUAL ACQUAHOME 32 B BLU

CONTROL PANEL. RIELLOtech PRIME ACS INSTALLATION, OPERATION AND MAINTENANCE MANUAL

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

N-SOL SYSTEM SOLAR INSTALLATION INSTRUCTIONS

INSTALLATION, OPERATION, MAINTENANCE AND SYSTEM MANAGEMENT MANUAL THE/TG

WARNINGS FOR THE USER: Connect BASE conforms to: Low Voltage Directive 73/23/EEC. Electromagnetic Compatibility Directive 89/336/EEC

AUTOMATIC GRANULAR ICE FLAKER

MODULAR AUTOMATIC GRANULAR ICE FLAKER

STORAGE WATER HEATERS

Power X High Power Condensing Wall-Hung Boilers

Power X High Power Condensing Wall-Hung Boilers

INSTALLATION AND OPERATING INSTRUCTIONS GN2. HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS

CONDENSING BOILERS 45 B - 55 B INSTALLATION AND MAINTENANCE MANUAL GENERAL 1

AUTOMATIC ICE-CUBE MAKER - INSTRUCTIONS AND WARNINGS

INDIRECT WATER HEATERS

NOVELLA RAI RAI PV BOILERS CAST IRON BASE INSTALLATION MANUAL

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A

NOVELLA RAI BOILERS CAST IRON BASE INSTALLATION MANUAL

INSTALLATION AND MAINTENANCE MANUAL

2.1 BOILER ROOM BOILER ROOM DIMENSIONS 2.3 CONNECTING UP SYSTEM 2.4 CONNECTING UP FLUE 2.5 ELECTRICAL CONNECTION

AUTOMATIC MODULAR ICE FLAKER

International Markets. Product Catalogue. complementary items

INSTALLATION, TECHNICAL ASSISTANCE CENTRE AND SYSTEM MANAGEMENT MANUAL THC V E OIL BLU

User and maintenance manual

CONDENSING BOILERS TAU UNIT OIL 35 G OIL 55 G INSTALLATION, MAINTENANCE AND SYSTEM MANAGEMENT MANUAL

AUTOMATIC MODULAR ICE-CUBE MAKER WITH VERTICAL EVAPORATOR SYSTEM

HG 675 CX 60 HG 675 CN 60 HG 675 CW 60

Installation, Operating and Servicing Instructions

Contents. 1. Instructions for safety and use 20

ECOplus Solar Cylinder

HOT TAP WATER EXCHANGER with solar pump-group ENSOL IT INSTALLATION AND OPERATION MANUAL WARRANTY CARD

Installation, Operating and Servicing Instructions

IST 03 C CYLINDER WHPF BM USE AND MAINTENANCE HANDBOOK

GB User and maintenance manual

ACCUMULATION OF EUROPEAN CLASS

TERMO Combi Cylinder TECHNICAL INFORMATION

AUTOMATIC MODULAR ICE-CUBE MAKER

Operating instructions

Technical information Installation instructions. Modul-plus (F21-52) High performance calorifiers

Operating instructions

Operating instructions

CRISTAL Built-in Dish Sterilizer Instruction Manual

Operating instructions

The guarantee on this appliance is valid for 12 months from the first day of installation.

AUTOMATIC ICE-CUBE MAKER

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS, for the User and the Installer. SMART Line. Smart ME A Y2000 B

WHE 2.24 / WHE 2.24 FF

CombiGrinder. Instruction manual. Grinder for cattle, horse and pet clipper blades. swiss made. Version/Index: CombiGrinder/A 09-16

RC411 Operator Manual

Installation manual Operating instructions

RENEWABLE ENERGY THERMAL SOLAR ENERGY. RENEWABLE ENERGY...pag. 05

Installation, operating and servicing instructions

Avensys Avensys FIN EST SLO RUS UAE

Industrial and collective. With coil exchanger. Technical data. Initial heat-up. surface area. Exchanger. Exchanger capacity.

Exclusive Green E Condensing Wall-Hung Boilers

IMPORTANT SAFETY INSTRUCTIONS DANGER: WARNING:

Niles Steel Tank Hot Water Generator Installation and Operation Manual

SUN EQUINOX HEATING SYSTEMS

Instructions for use

Proline GAS HOB Model TCG40IX Instruction Book

Installation, Operating and Servicing Instructions

HOW TO OPERATE THE FREEZER COMPARTMENT PAGE 15 HOW TO DEFROST THE FREEZER COMPARTMENT PAGE 17

BF2 GLASSLINED CYLINDERS WITH TWO REMOVABLE STAINLESS STEEL HEAT EXCHANGERS ( LITRES)

T UNI 7000 F. Operating instructions For the user (2006/05) AU/GB

Powerstock Storage Tank

Manual. Above-counter dispenser for hot drinks OTHG /12

REFRIGERAT A OR USE DF1-15 F ridge

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

User Manual for ICB Meat Grinders Models HM-12, HM-22B

POWERFLOW Series. Unvented Electric Storage Water Heaters. Installation & Operating Instructions Manual

CROWN WATER HEATERS CPU10 - CPU15 CPOS10 - CPOS15

CONTENTS QUICK REFERENCE GUIDE INSTRUCTIONS FOR USE BOOKLET PROGRAMME CHART

ELECTRIC BOILERS FOR CENTRAL HEATING

SAFETY AND OPERATING MANUAL

Bar Fridge USER MANUAL MB46W

Installation and Operating Instructions

INSTRUCTIONS AND ADVICE FOR THE USE, INSTALLATION AND MAINTENANCE OF BUILT-IN ELECTRIC HOBS

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A...

Installation, Operation & Maintenance Guide

TAHITI CONDENSING KR 55 - KR 85

HOW TO USE THE FREEZER COMPARTMENT PAGE 16

Transcription:

Installation and Operation Manual IDRA N DS Solar solar storage cylinder EN Installation and Operation Manual

2

Dear Customer, Thank you for choosing a B solar storage cylinder. You have purchased a modern, quality product that is designed to give dependable and safe service and to provide comfort in the home for many years to come. Arrange for your B solar storage cylinder to be serviced regularly by an authorised B service centre. Their personnel are specially trained to keep your solar storage cylinder efficient and cheap to run. B service centres also stock any original spare parts that might be required. This manual contains important instructions and precautions that must be observed to ensure the trouble-free installation and efficient functioning of your B solar storage cylinder. Please accept our renewed thanks for your purchase, Beretta CONFORMITY B storage cylinders conform to DIN 753-3/UNI and UNI EN 10025 standards. b This product must only be used for the purpose for which it is designed and made, as specified by B. B declines all responsibility, contractual or other, for damage to property or injury to persons or animals caused by improper installation, adjustment, maintenance or use. RANGE MODEL CODE IDRA N DS 1500 20052790 IDRA N DS 2000 20052791 IDRA N DS 2600 20086803 ACCESSORIES For a complete list of accessories and details of their compatibility, refer to the Catalogue. 3 CONTENTS GENERAL.................................. 1 General Safety Information.................. 2 Precautions.............................. 3 Description of the appliance................. 5 Identification.............................. 5 5 System layout............................. 5 6 Technical specifications..................... 6 7 Water circuit.............................. 8 8 Location of sensors........................ 9 9 Overall dimensions and water fittings......... 10 INSTALLER................................ 11 10 Unpacking the product.................... 11 11 Handling................................ 12 12 Installing the magnesium anodes............ 13 13 Fitting the insulation....................... 1 1 Place of installation....................... 15 15 Installation in older systems and systems requiring modernisation........................... 15 The following symbols are used in this manual: b CAUTION! = Identifies actions that require caution and adequate preparation. a STOP! = Identifies actions that you MUST NOT do. TECHNICAL ASSISTANCE CENTRE........... 16 16 Putting into service........................ 16 17 Temporary shutdown...................... 16 18 Preparing for extended periods of disuse...... 16 19 Maintenance............................ 17 20 Cleaning and removing internal components... 17 21 Recycling and disposal.................... 18 22 Troubleshooting.......................... 18 END USER................................ 19 23 Start-up................................ 19 2 Temporary shutdown...................... 19 25 Preparing for extended periods of disuse...... 19 26 External maintenance..................... 19 This manual, Code - Rev. comprises pages. This manual, Code Doc-0071222 - Rev. 0 (05/16) comprises 20 pages.

GENERAL General 1 GENERAL SAFETY INFORMATION b Check that the product is complete, undamaged and as ordered as soon as you receive it. Report any discrepancies or damage to the B dealer who sold it. b This product must be installed by a legally qualified heating engineer. On completion of the installation, the installer must issue the owner with a declaration of conformity confirming that the installation has been completed to the highest standards in compliance with the instructions provided by B in this instruction manual, and that it conforms to all applicable laws and standards. b This product must only be used for the purpose for which it is designed and made, as specified by B. B declines all responsibility, contractual or other, for damage to property or injury to persons or animals caused by improper installation, adjustment, maintenance or use. b The product must be serviced at least once a year. Servicing must be arranged in advance with the B Technical Assistance Centre. b All servicing and repairs must be performed by a qualified heating engineer. b If water leaks from the storage cylinder, turn off the water supply and contact B s Technical Assistance Centre or a qualified heating engineer immediately. b If the solar storage cylinder is not going to be used for an extended period of time, contact the manufacturer s Technical Assistance Centre to have at least the following operations performed: - Close the shut-off cocks for the domestic hot water circuit - Shut down the boiler connected to the storage cylinder as instructed in its own manual - Switch the storage cylinder OFF at the control panel (if fitted) and at the mains power switch - Drain the central heating circuit and domestic hot water circuit if there is any risk of freezing. b This instruction manual is an integral part of the product. It must be kept safe and must ALWAYS accompany the product, even if it is sold to another owner or transferred to another user or to another installation. If you lose this manual, order a replacement immediately. 2 PRECAUTIONS The operation of any appliance that uses electrical power demands that a number of fundamental safety precautions be respected. In particular: a Never attempt to install the system without using suitable personal protection equipment and without following all applicable occupational safety standards. a Do not touch the storage cylinder when barefoot or wet if it has any electrical accessories connected to it. a Never clean or service the storage cylinder without first turning the mains power switch OFF to disconnect all electrical accessories (if fitted) from the mains electricity supply. a Never pull, disconnect, or twist any electrical cables coming from the appliance even if it is disconnected from the mains electricity supply. a Do not expose the storage cylinder to the elements. It is not designed for use outdoors. a If the pressure in the solar collector circuit drops, do not top up with water alone, since this increases the risk of damage from freezing. a Do not use connections or safety devices or fittings (expansion vessels, pipes, insulation) that are not specifically designed and tested for use in solar water heating systems. a Do not allow children or infirm persons to operate the system unsupervised. a Do not dispose of packaging material into the environment, or leave it within the reach of children, since it can become a potential hazard. Dispose of packaging material in compliance with applicable legislation.

GENERAL 3 DESCRIPTION OF THE APPLIANCE B IDRA N DS solar storage cylinders are double coil units designed for installation in domestic hot water production systems heated by solar collectors. They come in capacities 1500, 2000 and 2600. The most important technical features of these solar storage cylinders are: - The cylinder and coils are specially designed and shaped for optimum performance in terms of stratification, heat exchange and replenishment times - vitrified cylinder lining, bacteriologically inert for maximum hygiene of the water, reduced lime scale deposits and easy cleaning - CFC-free polyurethane insulation and an elegant external casing reduce heat loss - Water fittings are available at different heights, permitting different hot water generators to be used without reducing the stratification effect - a flange for easy cleaning and maintenance of the anti-corrosion magnesium anode. B IDRA N DS storage cylinders can be connected to a special solar regulator and can be integrated in solar heating systems in which B boilers or water heaters provide supplementary heat. IDENTIFICATION 5 SYSTEM LAYOUT 1 UAC MC RC RL M 11 R EAF 2 3 5 6 7 8 9 10 12 13 B IDRA N DS storage cylinders are identified by: Data plate This lists the technical specifications and performance of the product. Il clima di casa Model: IDRA N DS 1500 Code: 20052790 Serial Number: KLH3800001 20052790KLH3800001 Capacità nom. sanitaria 19 L PS Materiale costruzione DD12/S235JR Trattamento SMALGLASS Capacità nom. riscaldamento L PS Scambiatore superiore 10. L 1.8 mq. PS Potenza serpentino sup. (DIN 708) 7 kw 1200 L/h Coefficiente di resa 5 NL Scambiatore inferiore 19. L 3. mq. PS Potenza serpentino inf. (DIN 708) 88 kw 2200 L/h Temperatura d esercizio max 99 C Peso a vuoto 330 kg Ingombro per raddrizzamento 2280 mm Anodo n Misure ØxLg. 32 mm 700/700 Beretta Caldaie Via Risorgimento, 13 23900 Lecco (LC) - Italy 8 bar bar 6 bar 6 bar b If these plates or any other means of clearly identifying the product are defaced, removed or lost, proper installation and servicing may be rendered difficult. SB 1 First magnesium anode 2 Boiler temperature sensor socket 3 Top coil Auxiliary temperature sensor socket (for models 1500-2000) 5 Auxiliary temperature sensor socket (for models 2600) 6 Cylinder body 7 Sleeve for electric heating element (not supplied) 8 Insulation 9 Bottom coil 10 Second magnesium anode 11 Solar controller temperature sensor socket 12 Flange cover 13 Cylinder inspection flange UAC MC RC M R RL EAF SB Domestic hot water outlet Outlet from boiler Return to boiler Solar circuit outlet Solar circuit return DHW circulation Domestic cold water inlet Storage cylinder drain 5

GENERAL 6 TECHNICAL SPECIFICATIONS 6 DESCRIPTION IDRA N DS 1500 2000 2600 Type of storage cylinder Vitrified Storage cylinder layout Vertical Heat exchanger layout Vertical Diameter of storage cylinder with insulation 1200 1300 150 mm Diameter of storage cylinder without insulation 1000 1100 1250 mm Height with insulation 2185 270 255 mm Insulation thickness 100 mm Diameter/length of first magnesium anode 32/700 mm Diameter/length of second magnesium anode 32/00 32/700 mm Flange diameter 290/220 mm Sensor socket diameter 8 mm Sleeve for electric heating element (not supplied) 1"1/2 Ø Bottom coil water capacity 19, 28,1 28, l Top coil water capacity 10, 16,9 20,3 l Bottom coil heat exchange surface area 3,,6,6 m 2 Top coil heat exchange surface area 1,8 2,8 3,3 m 2 Maximum operating pressure of storage cylinder 8 bar Maximum operating pressure of coils 6 bar Maximum operating temperature 99 C Net weight with insulation 330 5 600 kg Heat loss according to EN 12897:2006 at T=0 C 3,93,77 5,2 kwh/2h Power absorbed by bottom coil (*) 88 120 110 kw Power absorbed by top coil (*) 7 73 79 kw Domestic hot water production bottom coil (*) 2200 2900 700 l/h Domestic hot water production top coil (*) 1200 1800 300 l/h Flow required at bottom coil (*) 3,8 5,2 5,9 m 3 /h Flow required at top coil (*) 2,0 3,1,3 m 3 /h Useful volume 1390 1950 2572 l Dispersion 250 305 330 W 6 7,32 7,92 kwh/2h Insulation type Soft PU shells Useful non-solar volume (Vbu) 525 800 1000 l (*) In accordance with DIN 708, in order to produce hot water with a ΔT of 20 C (80 /60 C) at the coil, the absorbed power and flow rate values specified for the coil in the table must be respected.

GENERAL Pressure drops TOP COIL PRESSURE DROP (mbar) 600 2000 500 00 1500 2600 300 200 100 0 0 1000 2000 3000 000 5000 6000 FLOW RATE (l/h) Pressure drops BOTTOM COIL 7 PRESSURE DROP (mbar) 1000 900 800 700 600 500 00 300 200 100 2000 1500 2600 0 0 1000 2000 3000 000 5000 6000 FLOW RATE (l/h)

GENERAL 7 WATER CIRCUIT TYPICAL WATER SYSTEM SCHEMATIC RC UAC 15 16 Outlet PRIMARY Inlet 11 5 12 10 2 MC 5 RL 19 12 M 3 1 1 R 13 1 C 6 5 7 12 9 M 8 10 11 SB 8 17 18 EAF Water control system 11 10 8 1 Solar collector 2 Storage cylinder 3 Collector probe Disconnect valves 5 Non-return valve 6 Temperature gauge 7 Vent valve 8 Safety valve 9 Pressure gauge 10 Drain 11 Expansion vessel 12 Pump 13 Flow regulator 1 Flow meter 15 Vent cock 16 Manual bleed valve (accessory) 17 Water softener filter 18 Pressure reducer 19 Mixer valve UAC Domestic hot water outlet EAF Domestic cold water inlet MC Outlet from boiler RC Return to boiler M Collector outlet R Collector return RL DHW circulation SB Storage cylinder drain Note! The above schematic is purely indicative. b B IDRA N DS storage cylinders are delivered without a boiler heating pump. A suitably rated pump must be provided and installed separately. Flow rate from the solar collector circuit depends on the type and number of collectors installed. For further information, consult the manual for the collectors. b The domestic hot water system MUST INCLUDE an expansion vessel, safety valve, automatic vent valve and storage cylinder drain cock. b Safety valves must be connected to a suitable collection and drain system. The manufacturer declines all responsibility for damage caused by water escaping from safety valves. b The choice of system components and the method of their installation are left up to the heating engineer installing the system. Installers must use their expertise to ensure proper installation and functioning in conformity to all applicable legislation. b Circuits filled with anti-freeze must be fitted with water disconnectors. b If the water supply is unsoftened, avoid setting the maximum temperature of the storage cylinder above 60 C, since higher temperatures can lead to the formation of more lime scale and consequently poorer thermal exchange efficiency. b Make sure that the storage cylinder is full of water before starting up the solar heating system.

GENERAL b If the storage cylinder is installed in systems that operate at pressures in excess of bar, fit a pressure reducer. b Take care when opening the solar heating circuit s vent valve. Risk of burns! b Make sure that the expansion vessel is able to withstand high temperatures and that its membrane is resistant to the water-glycol mix. b Use a thermostatic mixer valve to limit the domestic hot water outlet temperature. b If the pressure in the solar heating circuit drops, do NOT top up with water but use the proper water-glycol mix. Risk of freezing! b All piping, collectors, heat exchangers and other devices in the circuit must be subjected to proper hydraulic seal testing. 8 LOCATION OF SENSORS B IDRA N DS storage cylinders are equipped with dedicated sockets for the storage cylinder TEMPERATURE GAUGE or TEMPERATURE SENSOR. b The installer is responsible for making all necessary connections to the boiler and solar collectors. Installers must use their expertise to ensure proper installation and functioning in compliance with all applicable legislation. b Joins between temperature sensor cables and control panel extension cables must be soldered and protected by sheaths or other forms of electrical insulation. 9

GENERAL 9 OVERALL DIMENSIONS AND WATER FITTINGS B IDRA N DS storage cylinders can also be connected to previously installed hot water sources provided heat output is suitable and care is taken to ensure correct water flow directions. UAC MC Psc1 RC RL AD1 TR Psc2 E O N M L I H G M Psr R AD2 A B C F E D EAF SB P 10 DESCRIPTION IDRA N DS 1500 2000 2600 UAC Domestic hot water outlet 1 1/2 F Ø MC Outlet from boiler 1"1/ F Ø RC Return to boiler 1"1/ F Ø M Outlet from solar collector 1"1/ F Ø R Return to solar collector 1"1/ F Ø RL DHW recirculation 1" F Ø EAF (SB) drain) Domestic cold water inlet (storage cylinder 1 1/2 F 1"1/ F Ø Psc1 Diameter/length of boiler sensor socket 1/2" F - Ø/mm Psc2 Diameter/length of boiler sensor socket - - 1/2" F Ø/mm Psr Diameter/length of solar controller sensor socket 1/2" F Ø/mm RE Sleeve for electric heating element (not supplied) 1 1/2 F Ø AD1 Diameter/length of first magnesium anode 32/700 Ø/mm AD2 Diameter/length of second magnesium anode 32/00 32/700 Ø/mm TR Temperature gauge 1/2" F Ø A 1230 130 1310 mm B - - 155 mm C 1820 2000 1950 mm D 280 260 235 mm E 15 00 30 mm F 525 660 655 mm G 1125 1205 1085 mm H 1220 1315 1255 mm I 1315 125 125 mm L 110 185 - mm M 1720 1870 185 mm N 1870 1990 1950 mm O 2185 270 255 mm P 1200 1300 150 mm b We recommend that you install isolating valves in the outlet and return lines. b Check the efficiency of the seals when filling/refilling the storage cylinder.

INSTALLER Installer 10 UNPACKING THE PRODUCT MODELS IDRA N DS 1500 B IDRA N DS storage cylinders are delivered in a single package, protected by a plastic bag inside a protective foam rubber wrapping and supported by a wooden pallet. - The following items are delivered in a plastic bag inside the packaging: - Instruction manual - Bar code label - Hydraulic test certificate The two magnesium anodes are supplied in a cardboard box on the pallet. MODELS IDRA N DS 2000 B IDRA N DS storage cylinders come in two separate packages: - The first contains the painted cylinder, protected by a plastic bag and supported on a wooden pallet. - The second package, also protected by a plastic bag, contains the polyurethane insulation with its elegant outer covering, fitting insulation sleeves, top cover, flange cover, identification plates and documentation. The following items are delivered in a plastic bag inside the packaging: - Instruction manual - Bar code labels - Hydraulic test certificate The two magnesium anodes are supplied in a cardboard box on the pallet. H H A IDRA N DS A (mm) B (mm) H (mm) Weight (kg) 1500 1000 1000 2325 30 B A IDRA N DS A (mm) B (mm) H (mm) Weight (kg) 2000 1700 1900 2000 565 B 11 b The instruction manual is an integral part of the solar storage cylinder. Once located, read it thoroughly and keep it safe. b The instruction manual is an integral part of the solar storage cylinder. Once located, read it thoroughly and keep it safe.

INSTALLER MODELS IDRA N DS 2600 B IDRA N DS storage cylinders come in two separate packages: - The first contains the painted cylinder, protected by a plastic bag and arranged vertically on a wooden pallet. - The second package, supplied separately and also protected by a plastic bag, contains the polyurethane insulation with its elegant outer covering, fitting insulation sleeves, top cover, flange cover, identification plates and documentation. The following items are delivered in a plastic bag inside the packaging: - Instruction manual - Bar code labels - Hydraulic test certificate The two magnesium anodes are supplied in a cardboard box on the pallet. 11 HANDLING b Wear suitable personal protective equipment and use suitable safety devices. b Make sure that any lifting equipment is of adequate capacity to lift and move the storage cylinder. a Do not dispose of packaging material into the environment, or leave it within the reach of children, since it can become a potential hazard. Dispose of packaging material in compliance with applicable legislation. MODELS IDRA N DS 1500 Cut the strap (1) located under the insulation at the zips to remove the cylinder from the pallet. Vertical H 1 12 A IDRA N DS A (mm) B (mm) H (mm) Weight (kg) 2600 1300 1300 2525 620 b The instruction manual is an integral part of the solar storage cylinder. Once located, read it thoroughly and keep it safe. B If suitable equipment is not on hand to lift the storage cylinder off the pallet using the eyebolt, proceed as follows. - Place a platform of about half the height of the pallet near the storage cylinder. Make sure the platform is able to support the weight of the storage cylinder - Remove the strap (1) then carefully rotate and slide the storage cylinder off the pallet on to the platform - Make sure that the storage cylinder is perfectly stable, and then remove the pallet - Carefully rotate and slide the storage cylinder off the platform on to the floor - Remove the platform. Position the storage cylinder as required. 1

INSTALLER MODELS IDRA N DS 2000 To remove the storage cylinder from the pallet, first remove the insulation then secure lifting cables to the lifting points on the top of the cylinder, and lift with care. 12 INSTALLING THE MAGNESIUM ANODES Proceed as follows to install the magnesium anodes: - Remove the protective plugs - Fit the two magnesium anodes in the fittings (1) and (2) - Screw in the magnesium anodes using a suitable spanner. 1 2 MODELS IDRA N DS 2600 - Proceed as follows to remove the storage cylinder from the pallet: - cut the straps - secure the lifting cables to the lifting points on the top of the storage cylinder - carefully lift the storage cylinder and position it as required NOTE: Tighten to a torque of 25 Nm. 2 13

INSTALLER 13 FITTING THE INSULATION MODELS IDRA N DS 2000 to 2600 Once the storage cylinder is correctly positioned inside the room where it is to be installed, proceed to fit the insulation and the accessories to complete the cylinder. Proceed as follows: - Unpack all the material from the second package - Wrap the insulation (3) around the storage cylinder, carefully lining up the fittings with the holes on the inside of the insulation. Secure the insulation in place with the zips () at the edges of the two sections 8 7 1 5 1 3 2 - Perforate the insulation at the fittings and fit the insulation sleeves (5) - Fit the flange cover (6) - Finally, fit the insulation top panel (7) and cover it with the thermoformed cover (8). 3 6

INSTALLER 1 PLACE OF INSTALLATION B IDRA N DS storage cylinders can be installed in any room where there is no specific requirement for an electrical protection rating higher than IP X0D. 15 INSTALLATION IN OLDER SYSTEMS AND SYSTEMS REQUIRING MODERNISATION When installing B IDRA N DS storage cylinders in old systems or systems requiring modernisation, always perform the following checks. - Make sure that the system is fitted with safety and control devices in accordance with applicable legislation and standards - Make sure that the central heating circuit has been flushed out to remove all sludge and lime scale, and has been vented and seal tested - Make sure that a suitable water treatment system is installed if the quality of the supply/recirculation water so demands (refer to the reference values listed in the table alongside). 0,3 m 0, m 0,6 m 0, m REFERENCE VALUES ph 6-8 Electrical conductivity less than 200 μs/cm (25 C) Chlorine ions less than 50 ppm Sulphuric acid ions less than 50 ppm Total iron less than 0.3 ppm Alkalinity M less than 50 ppm Total hardness less than 35 F Sulphur ions none Ammonia ions none Silicon ions less than 30 ppm b Specified minimum distances must be respected, and the space in which the storage cylinder is to be installed must be easily accessible in order to permit easy installation and assembly and subsequent inspection, maintenance and repair. In particular, access must permit the storage cylinder to be removed without disassembly at the end of its useful life, and another unit to be installed in its place. Users are therefore responsible for any costs incurred to demolish masonry or other structures preventing or impeding free access to the space where the storage cylinder is to be installed. 15

TECHNICAL ASSISTANCE CENTRE Technical Assistance Centre 16 PUTTING INTO SERVICE It is essential to perform the following checks before starting up or testing the functioning of the storage cylinder. In particular, check that: - The supply cocks in the domestic water circuit are all open 17 TEMPORARY SHUTDOWN If you are going away for a short period of time like a weekend or a short holiday, etc., and outdoor temperatures are going to remain above ZERO, proceed as follows. - Adjust the storage cylinder thermostat to its minimum setting. b If outdoor temperature may drop below ZERO (risk of freezing) perform the operations described in the Preparing for extended periods of disuse section. - The water connections to the boiler and solar collectors have been made correctly - All the pipes in the water circuit have been insulated in conformity to relevant standards - The electrical connections of all accessories have been made correctly - The solar collector circuit has been correctly flushed out and filled with water-glycol mix, and all air has been bled out of the circuit (see the manual for the solar collectors) - Start up the boiler (if installed) as instructed in its own manual. - Put the solar collectors into service. See the manuals for the solar collectors and associated accessories. 18 PREPARING FOR EXTENDED PERIODS OF DISUSE If the storage cylinder is not going to be used for an extended period of time, perform the following operations: - Switch the electricity supply to the storage cylinder s valve group and to any associated boiler OFF at the main switch and at the control panel 16 Once the system has been started up, perform the following checks. - Make sure that all pumps are free and rotate in the right direction - Make sure that all circuits have been bled. - Close the shut-off cocks for the domestic hot water circuit. b Drain the central heating circuit and domestic hot water circuit if there is any risk of freezing. - Make sure that the boiler and solar collectors connected to the system shut down correctly when their mains power switches are turned OFF. Provided the above checks have been completed satisfactorily, restart the system and verify its performance.

TECHNICAL ASSISTANCE CENTRE 19 MAINTENANCE Scheduled maintenance is essential for the safety, efficiency and long working life of your storage cylinder. Proper maintenance also reduces energy consumption and ensures reliability over time. Have your storage cylinder serviced either by the manufacturer s Technical Assistance Centre or by a qualified heating engineer at least once a year. Perform the following operations before beginning any maintenance: - Switch the electricity supply to the storage cylinder s valve group and to any associated boiler OFF at the main switch and at the control panel - Close the shut-off cocks for the domestic hot water circuit - Use a 5 mm wrench to unscrew the anode plug (3). 3 - Check the magnesium anode for wear and replace it if necessary. - Repeat this operation on the second magnesium anode, using a suitable box spanner to remove it. - On completion of cleaning, follow the above steps in the reverse order to refit all removed parts. NOTE: Tighten the anode plug to a torque of 25-30 Nm. Cleaning inside the storage cylinder - Remove the flange cover () - Unscrew the bolts (6) securing the flange (5) and remove the flange - Remove the seal - Clean inside the storage cylinder and remove any residues through the access hole. 5 - Drain the storage cylinder s DHW (secondary) water circuit. 17 20 CLEANING AND REMOVING INTERNAL COMPONENTS EXTERNAL CLEANING Clean the outside of the storage cylinder with a soft cloth damped in soapy water. To remove stubborn marks, use a cloth damped in a 50% mix of water and denatured alcohol or a suitable cleaning product. Dry the storage cylinder after cleaning it. a Do not use abrasive products, petrol or triethylene. INTERNAL CLEANING Removing and checking the magnesium anode - Remove the cap (1), cover (2) and the anode insulator disc. 2 1 6 b Check the seal for wear and replace it if necessary. On completion of cleaning, follow the above steps in the reverse order to refit all removed parts. b Tighten the bolts (6), proceeding diagonally around the flange to apply pressure uniformly around the seal. - Fill the storage cylinder s DHW (secondary circuit) and check that there are no leaks from any of the seals - Check the performance of the storage cylinder.

TECHNICAL ASSISTANCE CENTRE 21 RECYCLING AND DISPOSAL At the end of its useful working life, do not abandon the storage cylinder in the environment, but dispose of it through the proper channels in accordance with applicable legislation. 22 TROUBLESHOOTING SUPPLEMENTARY HEATING CIRCUIT FAULT CAUSE SOLUTION The storage cylinder functions incorrectly or irregularly Flow rate too high There are blockages or deposits in the domestic hot water circuit The pump is malfunctioning The water temperature from the boiler is too low There is air in the primary circuit - Fit a pressure limiter - Fit a flow reducer - Check and clean as necessary - Check the pump - Check the temperature setting - Bleed the circuit SOLAR COLLECTOR CIRCUIT FAULT CAUSE SOLUTION 18 The storage cylinder functions incorrectly or irregularly There is air in the circuit The flow rate is too low or too high Pressure is too low - Bleed the circuit - Check the flow rate of the collector circuit - Check that circuit pressure is approximately 3 bar when cold There is lime scale or sludge in the cylinder - Check and clean as necessary The storage cylinder loses a lot of heat overnight There is natural circulation to the collectors - Make sure that the non-return valve is efficient and closes properly. Replace if necessary

END USER End user END USER INSTRUCTIONS Refer to the GENERAL SAFETY INFORMATION and PRECAUTIONS section for safety-related information. 23 START-UP The storage cylinder must be put into service for the first time by personnel from the manufacturer s Technical Assistance Centre. Under certain circumstances, such as after long periods of disuse, the user may need to re-start it without involving the Technical Assistance Centre. Before doing so, perform the following checks and operations. - Check that the supply cocks in the domestic water circuit are all open - Switch the electricity supply ON at the mains power switch and at control panel switch (if fitted). 2 TEMPORARY SHUTDOWN To reduce impact on the environment and save energy, before leaving for the weekend or a short break, etc., provided outdoor temperatures will remain above ZERO, simply adjust the storage cylinder s thermostat to its minimum temperature. b If outdoor temperature may drop below ZERO (risk of freezing) perform the operations described in the Preparing for extended periods of disuse section. 25 PREPARING FOR EXTENDED PERIODS OF DISUSE If the storage cylinder is not going to be used for an extended period of time, ask the manufacturer s Technical Assistance Centre to make the system safe. 26 EXTERNAL MAINTENANCE Clean the cover, painted and plastic parts with a cloth damped in soap and water. To remove stubborn marks, use a cloth damped in a 50% mix of water and denatured alcohol or a suitable cleaning product. b Do not use fuels, sponges impregnated with abrasive solutions or powder detergents. 19

Doc-0071222 - Rev. 0 (05/16) Commercial Offices: Via Risorgimento, 23 A 23900 - Lecco www.berettaboilers.com Beretta reserves the right to modify the characteristics and specifications given in this publication at any time and without prior notice as part of its policy of continuous product improvement. This publication cannot therefore be understood as a contract with third parties.