Installation guide. Evolve 950. Models: RHFE950ETRN/RHFE950ETRL

Similar documents
Installation guide. Evolve. Models: RHFE952ETRN / RHFE952ETRL RHFE1252ETRN / RHFE1252ETRL

Installation guide. Evolve RHFE951ETRN/RHFE951ETRL RHFE1250ETRN/RHFE1250ETRL

Evolve 951 & Product specification pages

Important: Appliance must be installed with a Rinnai approved flue system.

Installation guide Compact 2

Operation guide Evolve 950

INSTALLATION MANUAL Power Flued Flamefire Space Heater Co-axial Flue System

OPERATION & INSTALLATION MANUAL Power Flued Flamefire Gas Space Heaters RHFE-951ETR & RHFE-1250ETR

Energysavers. Appliance must be installed with a Rinnai supplied flue system. For flueing installation details refer to separate instructions.

Installation Manual EF5000 NZ

Installation Manual EF5000 AUS & NZ

Manual. Industrial Air Curtain Model IF. English. Version 1.1

Energysaver Space Heater Co-Axial Flue System Installation Manual

SLIMFIRE 25 FLAME FIRE. Customer Operation & Installation Manual

Operation & Installation Manual

Rinnai 650 / 750 GAS FIRE Operation / Installation Manual

ULTIMA II. Flued Space Heater Operation / Installation Manual. MODEL REH-311FT(B) - Inbuilt MODEL REH-311FT(C) - Console

Rinnai. Rinnai GAS SPACE HEATERS. Convector 417 Unflued Room Heater CUSTOMER S OPERATING INFORMATION AND INSTALLATION INSTRUCTIONS

IB850 and IB600 Installation Manual AUSTRALIAN EDITION

SAPPHIRE GAS LOG FLAME FIRE Operation / Installation Manual

Manual Cold room air curtain

INSTALLATION INSTRUCTIONS FOR MODELS 16NG50-6/16LP50-6, 16NG60-6/16LP60-6, 20NG50-6/20LP50-6, 20NG60-6/20LP60-6, 26NG50-6/26LP50-6, 26NG60-6/26LP60-6

Energysaver Space Heaters Models: RHFE-309FT & RHFE-559FT Operation and Installation Manual

Flue Installation Manual

Studio 2. Balanced Flue with Thermostatic Remote Control. Installation Instructions. For use in AU (Australia). IMPORTANT

Wall Mount Electric Fire Place with Remote Control

SAPPHIRE. Gas Log Flame Fire Operation / Installation Manual MODELS: RIB2310MN/A & RIB2310ML/A. This appliance shall be installed in accordance with:

MODELS: RDV3610ETR, RDV3611ETR

IB1100 and IB850 Installation Manual AUSTRALIAN EDITION

R32. Installation Manual Split Type Wall Mounted Air Conditioner. This appliance shall be installed in accordance with: REFRIGERANT

INSTALLATION & USER INSTRUCTIONS

SYMMETRY. Gas Log Flame Fire. Operation / Installation Manual MODEL: RDV This appliance shall be installed in accordance with:

(manual control) (ezi-slide control) INSET COAL EFFECT GAS CONVECTOR FIRE V1/100/B INSTALLATION & USER INSTRUCTIONS

Inset - IB850, IB1100 Fascia Installation Manual NEW ZEALAND EDITION

16 Ultiflame Inset Electric Fire

Direct Vent Service Manual

Riva2 530/670. Inset Convector Fire - Conventional Flue. with Thermostatic Remote Control. Instructions for Use, Installation & Servicing

F67 RIVA, F67 RIVA PEDESTAL, F67 RIVA BENCH Conventional & Balanced Flue Convector Fire

IMPORTANT INSTRUCTIONS & OPERATING MANUAL. Monaco Wall Mount Vertical Style LED Fireplace

Eastside Installation Guidelines and Operating Instructions January 2018

INSTALLATION AND OPERATION INSTRUCTIONS FOR

WHHR Midi & Midi Lite

PE MODEL WATER HEATERS SUPPLEMENT TO INSTRUCTION MANUAL P/N (Replaces pg. 2 in instruction manual.) CONGRATULATIONS!

INSTALLATION AND OPERATION INSTRUCTIONS FOR ZERO CLEARANCE AND INSERT UNITS

Specification and Installation Instructions

SUPER HIGH EFFICIENCY WATER HEATERS SUPPLEMENT TO INSTRUCTION MANUAL P/N (Replaces pg. 2 in instruction manual.) CONGRATULATIONS!

SHAMIC SHEETMETAL (AUST.) PTY. LTD.

GB IE INSTALLATION & USER INSTRUCTIONS. Model Number: V1/300/B (ez-slide control) HIGH EFFICIENCY INSET COAL EFFECT GAS CONVECTOR FIRE

INSTALLATION AND OPERATION INSTRUCTIONS FOR BI-DEEP UNITS

SERVICE MANUAL Sapphire - RIB2312 GAS LOG FLAME FIRE

Specification and Installation Instructions

PVK-80 Power Vent - Installation Instructions -

Riva2 670 Electric. Instructions for Use, Installation & Servicing. For use in AU & NZ (Australia & New Zealand). IMPORTANT

Installation Manual. For Australian refrigerator models: N304M.3 (93 liter 3-way operation with LP gas, 240 volts AC, or 12 volts DC )

Fyn Installation guide

ELECTRIC FIREPLACE HEATER OPERATION MANUAL

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A

Installation & Operation Manual Fascia / Firebox / Build-In Cabinet

Installation & Service Instructions

INSTALLATION GUIDE NZ AU E

Fundamentals of a gas fire New Zealand. August 2017

Product Catalogue 10YEAR. Fitzroy Profile and Canterbury Classic Series 2015 WAR RAN T Y YEAR

MILLA ELECTRIC FIREPLACE

INSTALLATION GUIDE NZ AU D

THE INSTRUCTIONS IN THIS MANUAL APPLY TO KENT GAS FIRES. CONTENTS:-

XANDER INSERT WOOD BURNER

INTERNATIONAL GAS CONVECTOR BOX

Clear Installation guide

INSTALLATION AND OPERATION INSTRUCTIONS FOR WALL-MOUNT AND BUILT-IN UNITS

Installation Instructions Horizon Natural Draft Electronic Ignition Gas Fireplaces

Corn Flame Energy Corn Stove Model 3000

INSTALLATION INSTRUCTIONS

Electric Fireplace. Electric Fireplace

SPECIFICATION & INSTALLATION GUIDE FOR MASPORT LE4000 PROVINCIAL INSERT FIRE, NEW ZEALAND MODEL

City Series CV40E Gas Fireplace

IMPORTANT INSTRUCTIONS & OPERATING MANUAL. Amazon Decorative Electric Fireplace with On Screen Display

Insert Electric Fireplace IF-40FSB IF-50FSB IF-60FSB. Please read all instructions carefully and Retain for future reference

NO VENTING REQUIRED 120V AC;

(SP4) SP420 (SP5) SP520 (SP9) SP920 AUS/NZ. 08/50019/5 Issue 5

Operation & Installation Manual

Greenfire GFi350L Gas Inbuilt

Alpha CD13R,18R and 24R

ELECTRIC FLAT PANEL FIREPLACE HEATER

INSTALLATION & USER INSTRUCTIONS

ELECTRIC FIREPLACE with Remote Control

Decorative Fuel Effect Appliances

INSTALLATION INSTRUCTIONS

16 XD Mk2 Inset Electric Fire

Manual. G51 Surefire. Owners & Installation PLEASE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE. Models: G51-NG G51-LPG

RWC Issue: F. Description: ARISTON WALL CANOPY Model Numbers: ARCH90BIX. Model may vary slightly from images pictured. All measurements are in mm.

VENTING CLEARANCES. BBT NORTH AMERICA Bosch Group. Bosch Water Heating 340 Mad River Park, Waitsfield, VT TWH-V-26 page 1 of 6 rev 01/06

INSTALLATION, USERS AND SERVICING INSTRUCTIONS

COMMERCIAL GAS AND ELECTRIC STACKED WASHER/ DRYER INSTALLATION INSTRUCTIONS

Installation Manual. ST900 Direct Vent Gas Fireplace. Important: NZ / AUS EDITION

Wok Cookers Instruction Manual

Duet XL /0929. Installation guide

IB1100, IB850, IB600 (Log Fire / Coal Fire) Installation Manual NEW ZEALAND EDITION

THE INSTRUCTIONS IN THIS MANUAL APPLY TO MASPORT BOSTON (Flued) AND CALGARY (Flueless) GAS FIRES.

Gallery Electric Fireplaces

INSTALLATION & USER INSTRUCTIONS

Transcription:

Installation guide Evolve 950 Models: RHFE950ETRN/RHFE950ETRL

Important: Appliance must be installed ith a Rinnai approved flue system. This appliance shall be installed in accordance ith: -- Manufacturer s installation instructions -- AS/NZS 560 Gas Installations -- Local regulations and municipal building codes Installation, servicing and repair shall be carried out only by authorised personnel. Warning Improper installation, adjustment, alteration, service or maintenance can cause property damage, personal injury or loss of life. For more information about buying, using, and servicing of Rinnai appliances call: 0800 RINNAI (0800 746 624). Rinnai Ne Zealand Limited 05 Pavilion Drive, Mangere, Auckland PO Box 5377, Auckland Airport, Auckland 250 Phone: (09) 257 3800 Email: info@rinnai.co.nz Web:.rinnai.co.nz.youtube.com/rinnainz.facebook.com/rinnainz

contents: Before you start... 4 Specification... 5 Gas supply... 6 Electrical supply... 6 Wall penetration... 7 Framing dimensions... 8 Clearances... 9 TV installation... 0 Flueing options... Evolve 950 installation overvie... 2 Connect flue system... 3 Install heater into enclosure... 4 Removing and replacing the glass panel... 5 Install burn media - log set... 6 Install burn media - stones... 8 Commissioning... 20 Install inner and outer frame... 2 Test operation and lighting sequence... 22 Wiring diagram... 23

Before you start Unpack the appliance and components and check for damage. DO NOT install any damaged items. Check all components have been supplied and that you have the correct gas type. Read these instructions to get an overvie of the steps required before starting the installation. Failure to follo these instructions could cause a malfunction of the appliance. This could result in serious injury and/or property damage. Flue installation guide These instructions are to be used in conjunction ith the Rinnai Arriva and Evolve flue installation guide supplied ith the flue kits. Carton contents The components for the Evolve 950 are supplied in three separate cartons (four if a mesh guard is purchased). Ensure all the components are supplied before starting the installation. 8 6 0 7 9 2 3 4 5. Evolve 950 engine 2. Remote control and batteries 3. Remote control mounting bracket 4. Scre pack 5. Flue clamp bracket 6. Cable tie 7. Fascia mounting scres 8. Operation and installation guides 9. Granule pack (x2) 0. Gas connections Inner frame Outer frame Mesh guard (optional accessory), packaged in a separate carton Log set OR river stone set 4 Evolve 950 Installation Guide: 247-A 0-4

Specification Evolve 950 Specification summary Input = 0-34 MJ/h Output = 2.4-8.3* kw Efficiency = 86% (on high) Heating area = 82-25 m 2 ** Gas type = NG or ULPG Inbuilt exhaust balance flued convection flame fire ith electronic temperature control, timer and remote. Suitability Ideal for living rooms and open plan areas. Versatile poer flue system makes for easy installation in almost any living space, including bedrooms. The Evolve is ideal for a ne build installation into a false (mock) chimney. Data plate Located inside the appliance, upper right hand side. Convection fan 2-speed centrifugal, double diameter 60 x 80 mm. Gas connection ½ BSP, the gas supply terminates inside the heater loer left hand side of the appliance. Ignition Continuous spark electronic ignition. Installation considerations Room size smaller rooms ill heat up quickly, and due to the efficiency of the appliance, the heater (if auto off is selected) ill turn to a lo flame setting once the set temperature has been reached. Noise level - 37-45 db(a) Poer flue Inner 50 mm, outer 70~80 mm. Appliance must be installed ith a Rinnai flue system. Poer consumption and electrical supply High = 60 W Standby = <8 W This heater has a.5 m poer cord ith a three pin plug supplied. The poer cord passes through a slot in the back right hand corner of the appliance. Safety devices Flame failure sensing system, pressure relief, overheat safety sitch, air temperature sensor, thermal fuse, overcurrent fuse, and spark detector. Temperature control Thermostatic, temperature control range 6-26 C. Weight - 75 kg * Will vary according to gas type and flue configuration ** Will vary depending on geographical location in NZ Dimensions are in mm. 070 430 420 660 500 ±25 65 560 960 25 25 568 Evolve 950 Installation Guide: 247-A 0-4 5

Gas supply Gas pipe sizing must consider the gas input to this appliance, as ell as other gas appliances in the premises. The gas supply termination is inside the heater, and enters from the loer left hand side of the appliance. To ensure correct positioning terminate the gas supply so it is 75 mm in from the front face of the enclosure opening. Purging the gas supply Foreign materials and debris such as sarf, filings etc. must be purged from the gas supply. Failure to do so may cause damage to the control valve causing it to malfunction. Flexible pipe (supplied) Front of enclosure Consumer pipe Adapter (supplied) 75 mm Gas supply pressure to be.3 to 3 kpa Rear of enclosure 75* 97** * Where copper pipe ends ** With RNZ supplied adaptor Electrical supply This heater has a.5 m poer cord ith a three pin plug supplied. The poer cord passes through a slot in the back right hand corner of the appliance. Rinnai recommend the heater be plugged into a 230 V, 0 A earthed poer point. The poer point must not be above the heater. Alternatively the appliance can be direct ired if the poer supply is to be concealed. Consult a qualified electrician if direct iring is required as it must comply ith AS/NZS 560 and AS/NZS 3000 and other relevant local regulations. 6 Evolve 950 Installation Guide: 247-A 0-4

Wall penetration Direct flue all penetration requirements Use the guide pictured to mark the penetration points for the gas supply and flue transition locations. Consideration must be given to the position of any studs, noggins or other components of the all structure on both sides of the all. Mark these measurements accurately as this is critical to a successful installation. The penetration for the flue transition only needs to be made for direct flue installations, here the terminal is directly to the rear of the appliance. If no flue pipe penetration is required the markings are still useful for indicating the correct position of the flue transition ithin the enclosure for other flue applications. For eatherboard alls, drill through the centre of the eatherboard from the outside, then drill from the inside through the plaster board. Dimensions are in mm. Flue pipe penetration Centreline of enclosure Gas supply penetration Ø 85~95 65 420 (left) 430 (right) 500 ± 25 Base of enclosure Evolve 950 Installation Guide: 247-A 0-4 7

Framing dimensions Enclosure dimensions W-idth 965-980 mm H-height 570-580 mm D-depth 570 mm min. H W D The main points governing location are flueing and arm air distribution. The Rinnai Evolve has an integrated zero clearance box that isolates the appliance from combustible materials. This means it can be installed directly into a decorative fireplace constructed from materials such as ood or plaster. The heater must be positioned ithin the enclosure on a flat level surface that allos free movement of the appliance. The joists used to support the appliance off the ground must be capable of supporting a minimum of.5 times the eight of the appliance. A pair of heels located at the rear of the heater allos the unit to slide in and out of the enclosure for installation and maintenance. 8 Evolve 950 Installation Guide: 247-A 0-4

Clearances (from the edge of the glass) The appliance must not be installed here curtains or other combustible materials could come into contact ith the heater. In some case curtains may need restraining. The clearances listed belo are minimum clearances unless otherise stated. Floor protection Heat radiating from this fire may over time affect the appearance of some materials used for flooring, such as, carpet, vinyl, cork or timber. This may be amplified if the air contains cooking vapours or cigarette smoke. To avoid this occurring, it is recommended that a mat be placed in front of this appliance. To ceiling 400 000 Mantels and surrounds A mantel and surround are alloed providing they are outside the minimum clearances shon. 400 000 400 Hearths A hearth is not necessary but can be used for decorative purposes or protection of sensitive flooring if required. A hearth must not obscure the front of the fire. Note: Measurements are taken from the edge of the glass. The 400 mm side clearance includes side alls. B - Mantel depth A - Mantel height from top of glass D - Surround projection C - Surround from side of glass A Mantel height from top of glass 400 mm min. B Mantel depth at A - 400 mm (vertical clearance) 250 mm max. For every 50 mm of added mantel depth, there must be an additional 00 mm of vertical clearance. For example; a mantel depth (B) of 350 mm ill require 600 mm (A) of vertical clearance. C Surround from side of glass 250 mm min. D Surround projection at C - 250 mm (side clearance) 250 mm max. Evolve 950 Installation Guide: 247-A 0-4 9

TV installation The Evolve 950 has a fan that distributes arm air from the top of the appliance out into the room. As arm air is dispersed outards, as opposed to directly upards, installation of a TV may be an option. The diagram shos recommended clearances hen installing a TV directly above the Evolve 950, or into a recess. All dimensions are in millimetres. At least the depth of the TV 400 mm dimension The 400 mm dimension is the minimum clearance required to to a mantel. The image adjacent shos the dimension from the edge of the frame, in the case of the Evolve the 400 mm dimension can be taken from the edge of the glass. For a TV mounted directly above the unit, the mantel must be at least the depth of the TV to deflect heat aay. Alays check ith the TV manufacturer It is up to the oner to check the TV installation ith the TV manufacturer some have arranty conditions that state a TV is not to be installed above a fireplace. Rinnai does not accept any responsibility for damage to a TV resulting from the use of this information. TV Rinnai gas fireplace 400 mm 0 Evolve 950 Installation Guide: 247-A 0-4

Flueing options The belo options detail the most common flue installations. If you are doing something different, for example up and sideays, and are not sure hat components you need, please contact Rinnai. Rear external all* Vertical in-all Through-all vertical Through-all sideays* A B A False all False all B False all Flue components: - Direct A flue (R273), or - Direct B flue (R2732), or - Direct flue (ASPDFK) This flue configuration could be up to 8.5 m long (no bends). Don and out* Flue components: - Adaption flue (EVOKIT03) - Coaxial pipe (ESPIPE900) - Bend 2 x 45 (ESBEND x ) - Wall terminal (ESWTERM) A flue components: - Adaption flue (EVOKIT03) - Coaxial pipe (ESPIPE900) - Roof col (ESROOFCOWL) A flue configuration could have a flue length of 7 m and contain one 90 bend the 90 bend ould be the flue transition (EVOKIT03). B flue components: - Adaption flue kit (EVOKIT03) - Coaxial pipe (ESPIPE900) - Bend 2 x 45 (ESBEND x ) - Roof col (ESROOFCOWL) B flue configuration could have a flue length of 6.5 m and contain to bends the first 90 bend ould be the flue transition (EVOKIT03), and the second 90 bend ould be the to 45 bends (ESBEND). A flue components: - Direct flue (ASPDFK) - Coaxial pipe (ESPIPE900) - Bend x 90 (ESBEND x ) - Condensate trap (ESCONDK) - Roof col (ESROOFCOWL) A flue configuration could have a flue length of 7.5 m and contain one 90 bend the 90 bend ould be the 90 bend (ESBEND). B flue components: - Direct flue (ASPDFK) - Coaxial pipe (ESPIPE900) - Bends 2 x 90 (ESBEND x 2) - Condensate trap (ESCONDK) B flue configuration could have a flue length of 6.5 m and contain to 90 bends the bends ould be the to 90 bends (ESBEND). ASPDFK, remove terminal and use on outside all. Flue components: - Adaption flue (EVOKIT03) - Coaxial pipe (ESPIPE900) - Wall terminal (ESWTERM) * Allo for a 2 fall from the heater connection to the all terminal. Flueing notes For all installations a Rinnai flue system MUST BE used. Detailed flue instructions are provided ith the flue kits. Termination point Flue is not to terminate under floors or in a roof space. Exterior all Heater Under floor Flue terminal Exterior all Flue terminal Heater Condensate A condensate trap is required for vertical in-all and through-all vertical flue installations to ensure condensate generated during combustion is trapped and prevented from entering the chamber of the heater. For horizontal, and don and out installations, there must be a continuous fall of at least 2 to the all terminal. This equates to approximately 20 mm per metre to the termination point to drain the condensate. For direct flueing, direct flue kits A and B have an inbuilt 2 fall. Don rating the appliance For all flueing EXCEPT direct flueing, the appliance must be don rated (ensures optimum performance of the fan) as per the instructions on the commissioning sheet. Maximum flue length and number of bends Max. flue length - 8.5 m Max. number of bends - three One 90 bend equals m. For every 90 bend the overall length must be reduced by m. For example if an installation has three 90 bends, the maximum flue length can be 5.5 m. The flue transition for all flueing installations, excluding direct horizontal flueing, is counted as a 90 bend. Evolve 950 Installation Guide: 247-A 0-4

Evolve 950 installation overvie. Construct frame as per enclosure dimensions on p. 8. 2. Line all could also plaster at this stage. 3. Complete the gas connection refer p. 6. Electrical supply can also be completed at this point. 4. Connect flue system. 5. Install heater into enclosure, scre to frame, and complete gas, air hose, and flue connection p. 4. 6. Install burn media, refer p 6-9. 7. Commission unit, refer p. 20. 8. Install outer frame, mesh guard (if purchased), and inner frame refer p. 2. 9. Test operation and lighting sequence, refer p. 22.. Complete installation checklist in operation guide and complete customer handover add a touch of magic! 2 Evolve 950 Installation Guide: 247-A 0-4

Connect flue system Consult the Rinnai Arriva and Evolve flue installation guide supplied ith the Arriva/ Evolve flue kits for detailed flue installation instructions. For connection of the flue to the heater refer information belo. Removing the pipe clamp, extension tube and exhaust pipe Before installing the heater into the enclosure the pipe clamp, telescopic extension tube, and exhaust pipe need to be removed so there is room to connect the flue system.. Undo the pipe clamp and remove the telescopic extension tube from the exhaust pipe. 2. Secure the telescopic extension tube to the flue system ith the exhaust pipe lock or the flue clamp bracket. 3. Attach the air hose to the flue transition and secure ith the cable tie provided. Please note that in the adjacent image in step 4 the air hose is already connected to the flue. It is much easier to connect the air hose to the unit than to connect the air hose to the flue once the heater is in place. Ensure the air intake hose of the heater is properly secured to the air connection on the flue system using the cable tie provided, and that the rubber seal is placed on the unused air intake connection. Exhaust pipe lock For Direct A and B flues (R273/R2732), the flue clamp bracket (pictured belo) is provided ith the engine. For ASPDFK and EVOKIT03 flue kits, the exhaust pipe lock is provided ith the flue kit. Flue transition (ASPDFK, EVOKIT03) The flue transition provides a connection beteen the flue system and the heater s flue spigot and air intake. For all flueing installations, except horizontal direct flueing, the flue transition is counted as a 90 bend. The flue transition requires a 5 mm clearance from combustibles. This clearance is provided automatically hen the supplied standoff brackets are used. All other flue components, except the elbo section of the EVOKIT03, are designed for zero clearance and can be placed hard against timber or plasterboard. Unused air intake Flue transition outlet ASPDFK Wall terminal Air intake Evolve 950 Installation Guide: 247-A 0-4 3

Install heater into enclosure. Carefully move the heater into the enclosure, guiding the piping, flexible gas connection, and telescopic extension tube into the access openings and through the appliance. Ensure that the air hose is not in a position here it could get caught or crushed by the unit. 2. Once the engine is in place reconnect the flue exhaust to the telescopic extension tube and secure together ith the pipe clamp. 3. Secure the heater flange in place using the seismic constraint scres provided. 4. Complete gas, air hose, and flue connection. If vertically flueing ensure condensate tube, provided ith the EVOKIT03 flue kit, is attached to the condensate pipe on the heater refer images belo. Please note: The unit is supplied ith the heater condensate already connected. Telescopic extension tube Pipe clamp Flue exhaust Flange scre position in total Flue condensate pipe connection The engine comes ith the heater condensate already connected. 4 Evolve 950 Installation Guide: 247-A 0-4

Removing and replacing the glass panel Before the burn media can be installed into the combustion chamber, the glass panel needs to be removed. Remove the four retaining scres to at the top and to at the bottom. When replacing tighten all four scres and then back off by quarter of a turn. If the glass panel is screed too tight, the panel ill bo and the spring release mechanism on t ork properly. The glass panel needs to be replaced after installing the burn media and before commissioning. Front panel of the Evolve shoing the four scre positions for removing and replacing the glass panel Evolve 950 Installation Guide: 247-A 0-4 5

Install burn media - log set The log set, consisting of eight log pieces, and to granule packs come packaged in a separate box. The glass retainer ill need to be removed before installing the log set and granules. Use extreme care hen handling the log pieces, they are made from a fragile material and ill damage easily. 8 2 6 7 3 5 4 Locating pin Burner slot Locating bracket It is important to place the pieces in the correct position. Incorrect placement can create carbon buildup and affect performance. Malfunctioning due to improper log/granule placement is not covered by arranty. The unit must never be used ith broken logs or other burn media (except those specifically designed for the Evolve).. Back left log Align bottom locating holes ith the locating pins at the back of the burner the log ill sit up against the back of the combustion chamber. 2. Back right log Align bottom locating holes ith the locating pins at the back of the burner the log ill sit up against the back of the combustion chamber, and there ill be a gap beteen the back to logs. 2 6 Evolve 950 Installation Guide: 247-A 0-4

3. Front left small log Refer fully assembled image for reference. Place onto the middle left locating pin and left front locator bracket. 4. Front right small log Refer fully assembled image for reference. Place onto the middle right locating pin and right front locator bracket. 3 4 5. Front middle small log Refer fully assembled image for reference. Place onto the middle locating pin and central front locator bracket. 6. Front large left log Place onto the locating pin of the first log and slot onto the left front locating bracket. 5 6 7. Front large middle log Place onto the locating pin of log four and slot onto the right front locating bracket. 8. Top upper right large log Place onto the locating pin of log seven and sivel OVER log 4 so the end rests into the burner slot. 7 8 Adding the granules The granules as ell as being added to create a more realistic log flame affect (by diffusing the gas flames through the burner ports) also assist in soot prevention and are CRITICAL to the performance of the heater. Never pour the granules directly from the pack as dust particles from the plastic bag may block the ports. DO NOT place the granules in the left hand operational area (highlighted) and DO NOT have them touching the flame rod as this ill cause a blockage and the unit ill not start. Place the granules evenly (do not stack) around the logs in the front part of the burner and on the middle section of the burner (in the gaps beteen the logs) refer fully assembled image. Evolve 950 Installation Guide: 247-A 0-4 7

Install burn media - stones The stone set, consisting of 30 stones (0 hite and 20 grey), and to granule packs come packaged in a separate box. The glass retainer ill need to be removed before installing the stones and granules. Use extreme care hen handling the stones, they are made from a fragile material and ill damage easily. L L2 L3 L5 L4 L6 G 2G 3W 4G 5W G, 2G, 4G = front grey cut out stones 3W, 5W = front hite cut out stones L-L6 = large grey stones = small to medium hite stones It is important to place the pieces in the correct position. Incorrect placement can create carbon buildup and affect performance. Malfunctioning due to improper stone/granule placement is not covered by arranty. The unit must never be used ith broken stones or other burn media (except those specifically designed for the Evolve).. Place first grey cut out stone (G) The five stones ith the bottom cut outs need to be placed first on the front burner brackets. Place the first grey cut out stone on the far left burner bracket. 2. Place the second grey cut out stone (2G) Place the second grey cut out stone on the left burner bracket. 3. Place first hite cut out stone (3W) Place the first hite cut out stone on the middle burner bracket. The hite stones are designed to be interspersed to add contrast and provide a good visual picture make sure they are not all placed together. 4. Place the fourth grey cut out stone (4G) Place the fourth grey cut out stone on the next burner bracket. 8 Evolve 950 Installation Guide: 247-A 0-4

5. Place the fifth hite cut out stone (5W) Place the fifth hite cut out stone on the far right burner bracket. 6. Place back three large grey stones Place the three large grey stones (L, L2, L5) at the back of the burner as shon they can be positioned over the locating pins. 7. Place middle three large grey stones Place the remaining three large grey stones (L3, L4, L6) in the middle of the burner as shon. 8. Place smaller grey and hite stones front and back Place the smaller grey (g) and hite () stones at the back and front of the burner. g g g g g g 9. Place smaller grey and hite stones in the middle Place remaining smaller grey (g) and hite () stones in the middle section of the burner g g g g g Adding the granules Refer p. 7 for important information about placement of the granules. The only difference in installation are the granules ill be placed evenly around the stones ith particular attention to the front section refer fully assembled image on previous page. Evolve 950 Installation Guide: 247-A 0-4 9

Commissioning The gas pressures of the appliance are factory preset for direct flue installations (most common type of installation) and ill normally not require adjustment. The combustion chamber glass must be on hen checking the operating pressures. The commissioning sheet is located in a plastic pouch inside the unit on the right hand side. For all Evolve flueing EXCEPT direct flueing, the appliance must be don rated as per the instructions on the commissioning sheet. Follo the commissioning instructions to complete the gas pressure adjustments. When commissioning is complete check for full and correct operation of the appliance, and return the commissioning sheet to its plastic pouch. Commissioning sheet located inside a plastic pouch inside the unit (right hand side) 20 Evolve 950 Installation Guide: 247-A 0-4

Install inner and outer frames Installing the outer frame. Hook the inside fold of the outer frame to the top lip of the engine body. 2. Rotate the bottom of the outer frame in toards the engine body, connect the control panel cat 5 cable, and secure ith the to retaining scres. Lip of engine body Mounting brackets To retaining scres Installing the optional mesh guard The optional mesh guard, if purchased, needs to be installed before the inner frame as the inner frame holds it in place. Hook the mesh guard over the to top mounting tabs on the engine front and rotate toards the engine body. Mounting tab Installing the inner frame. Hook the tabs of the inner frame to the top lip of the combustion chamber glass. 2. Rotate the bottom of the inner frame in toards the engine body alloing the magnets to secure the inner frame to the engine. Tabs on inner frame Lip of combsution chamber glass Magnets Evolve 950 Installation Guide: 247-A 0-4 2

Test operation and lighting sequence It may take approximately to hours of operation for the burn media to achieve their full flame pattern and glo. During the initial burning in period, some smoke and smell may be experienced. The appliance should run on the high setting in a ell ventilated room until these dissipate. It is important to check the flame pattern during this time. Abnormal flame pattern Abnormal flame performance and/or pattern can indicate a problem ith your fire, such as blocked gas injectors, or that the burn media has shifted. There are some arning signs that could indicate a problem. -- Unusual smell from the appliance -- Continued difficulty or delay in establishing a flame Normal flame pattern -- Flame appears either very short or very long -- Flame only burns part ay across the burner -- Severe soot building up on the inside of the glass door Important It is the responsibility of the installer to check that under normal conditions of the appliance, all flue gases are exhausted to the outside atmosphere, and that there is no spillage of combustion gases into the room. Abnormal flame pattern If the appliance cannot be made to perform correctly please contact Rinnai. Installation checklist and customer handover Complete the installation checklist in the customer operation guide, and make sure you leave the guide ith the customer. Explain to the customer about the use and care of the unit, and ensure they understand the instructions and operation of the appliance. 22 Evolve 950 Installation Guide: 247-A 0-4

Wiring diagram (part of commissioning) ON/OFF DISPLAY UNIT ON OFF Wiring Diagram RHFE950ETR Issue A CONTROL DISPLAY UNIT RCR OH.TH 2 2 2 blk blk 3 3 bk r bl bl r 2 0 9 8 7 6 5 4 3 2 2 2 3 4 3 4 2 COM bk HI r MED bl LOW y MED r LO COM bl HI bk r 4 4 bl BL r bk 3 2 FM gy or 2 3 2 OH.TH R.TH TF bk bk bl bl r 3 4 3 2 9 8 7 6 5 4 3 2 gy gy 5 4 6 5 3 2 pl gy or y or 4 3 2 bl y bk r bl 6 5 4 3 2 bk bk bk y 2 4 3 2 bk br bl bl br F (3A) AC 230-240V gr/y gr/y + - POV bl 8 6 3 4 SP ER TR F R 4 Rear Burner F R F R 3 Rear Burner F R 2 Pilot Front Burner br p SV4 REARB SV3 FRB SV SV2 PB Evolve 950 Installation Guide: 247-A 0-4 23

Experience our innovation Rinnai.co.nz 0800 746 624 http://.youtube.com/rinnainz http://.facebook.com/rinnainz Evolve 950 Installation Guide: 247-A 0-4