Safety rules & guidelines. for admission and work within cable tunnels in the city

Similar documents
English Translation. Fire Safety Regulations of the University of Lübeck of 22 May 2018

Contingency/Emergency Plan for all Hazards Page 1 of 9

Fire evacuation drill

Training Toolbox Series. ICA11v1.0 Information, Digital Media & Technology

Vacant Building Loss Prevention Best Practices

CORPORATE SERVICES HEALTH AND SAFETY

Emergency Action Plan

EMERGENCY EVACUATION PLAN for FIRE

DEF Fire Evacuation and Emergency Planning Criteria

Event Management CHECKLIST

Fire Safety Guide. Emergency Number:

[Name/title] is the Alternate Safety Officer/ Alternate Emergency Coordinator.

FIRE IMPAIRMENT NOTICE

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

TABLE OF CONTENTS: Building Executive Definition..3. Building Executives Areas of Responsibilities...4. Operational Issues..5

Department of Biological Sciences National University of Singapore. 4. Procedures: ACTIONS TO BE TAKEN IN THE EVENT OF FIRE DURING OFFICE HOURS

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

161 Rosebery Avenue, London, EC1 Fire Safety Management Plan & Evacuation Procedures

VISITOR SAFETY AND ORIENTATION BOOKLET

Emergency Evacuation or Lockdown

Evacuation Procedures For

EVACUATION PROCEDURES IN EDUCATION PREMISES

SCALES NW EMERGENCY ACTION PLAN

MANOR INFANT SCHOOL & NURSERY

Emergency Procedures Manual. (For market site only, to be read in conjunction with the UCOL emergency management policy version 16.

Workplace Safety North

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

OH&S WORKPLACE ASSESSMENT INSPECTION CHECKLIST

Emergency Procedures Manual (whole of site)

Mount Laurel Fire Department, Office of The Fire Marshal FIRE WATCH NOTIFICATION

OXNARD FIRE DEPARTMENT Fire Watch Guidelines

Enter Department Name Emergency Action Plan

Bishopstone Village Hall Health and Safety and Fire Evacuation Policy

FIRE SAFETY PLAN FIRST & JASPER JASPER AVENUE

EMERGENCY ACTION PLAN

EVACUATION PLAN FOR THE CLINTON COUNTY OFFICE BUILDING

Emergency Action Plan

FIRE SAFETY AND EVACUATION PLANNING FOR ASSISTED LIVING FACILITIES AND NURSING HOMES

EMERGENCY ACTION PLAN GOLDEN CITY CASINO HIGHWAY 162 OROVILLE, CALIFORNIA

Emergency procedures flip book

X0.01 Emergency Management. Approved: September 27, 2002 Revised: July 15, Next Scheduled Review: July 15, 2014 PROCEDURE STATEMENT

Standard Operating Procedure CCTV Guidelines

Patrick County Horizons Jeb Stuart Hwy. Stuart, Va

Health and Safety Services. Safety Guide 5. Fire drills

(Fire) Emergency Evacuation Plan

EMERGENCY EVACUATION PLAN

REED COLLEGE DEPARTMENT OF COMMUNITY SAFETY DEPARTMENTAL DIRECTIVE CSO FIRE & FIRE ALARM SYSTEM RESPONSE GUIDELINES

Public Notice of Amendment to New Shoreham General Ordinances Chapter 5 Fire Prevention and Protection New Article IV Fire Alarm Ordinance

Fire Safety Guide. Emergency Number:

C3 Fire Safety, including Emergency Preparedness and Response

FAIRFORD COMMUNITY CENTRE USER GUIDE. Contents

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

FIRE SAFETY AND PREVENTION POLICY

LESSEE EMERGENCY RESPONSE PLAN AFAS Live

Southern Baptist Theological Seminary. The Michael Minger Act Report for 2008 Activity Reported for Calendar Year 2007

Renovation Program. Renovation Program GENERAL

FIRE SAFETY POLICY LEEDS METHODIST MISSION. Oxford Place Centre

GUIDELINES FOR EMERGENCY PLANNING AND PREPAREDNESS. High-Hazard

Telephone: Mobile Number.

HEALTH AND SAFETY INDUCTION CHECKLIST

THE DIGITAL HUB COMPANIES, HEALTH & SAFETY HANDBOOK

Fire Safety Guide. Emergency Numbers:

Emergency Procedures Policy

CLYST ST. MARY VILLAGE HALL

(h) Pesticide Application.

H&S Forum. Fire Safety Policy Glascote Academy

John Jay College of Criminal Justice HOT WORK PERMIT STANDARD OPERATING PROCEDURES

Emergency Action Fire Prevention Plan

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

This contractor induction represents UNSW Policy, and all contractors are required to follow the procedures described.

Health and Safety Policy. Version Author Revisions Made Date 1 Colin Campbell First Draft March 2014

EXHIBITION SITE. fieramilanocity. Exhibition Site Safety Document (An. IV and V Min. Decree 22/7/2014)

Fire and Bomb. Evacuation Policy

ERDMP & RISK ASSESSMENT REPORT

KING S HOUSE SCHOOL FIRE RISK MANAGEMENT POLICY & PROCEDURES

Harvard University - OEB Glasshouse Emergency Evacuation Plan

How to Become an Authorized Physiotherapy Provider

7.0 SAMPLE PERMITS, FORMS AND CHECKLISTS SELF INSPECTION CHECKLIST

RAMBLER PARK FIRE SAFETY INFORMATION

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION:

Emergency Evacuation Plan. Kettering Labs. School of Engineering

Business Emergency Plan

Charlotte Building, 17 Gresse Street, London W1T 1QL

For additional information please contact the Chesapeake Fire Prevention Office at or at

The Dell Out of School Club

TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2

PASCOE S PTY LTD EMERGENCY RESPONSE MANUAL. (Public Version) SOP 531. July 2015

Report For NHS Shetland

Safety Manual: Emergency Response

TRAINING OCCUPATIONAL SAFETY, HEALTH PROTECTION AT WORK AND FIRE SECURITY

Emergency Evacuation Plan South Patterson Building (SPB)

GUIDELINE for CONTRACTOR SAFETY INDUCTION and PROTOCOLS for working in ACSV Residence

Campus Emergency Response Plan Standard Operating Procedure

Hospital Codes, Safety, Exposure Control, Emergency Plans Handout

Southern Baptist Theological Seminary. The Michael Minger Act Report for Activity Reported for Calendar Year 2004

Hythe Marina Association (HMA) Ltd

Emergency Action Plan. Revised: 1/22/2018

HEALTH & SAFETY MANAGEMENT ARRANGEMENTS FOR FIRE SAFETY

Code of Practice on Closed Circuit Television (CCTV)

Transcription:

Safety rules & guidelines for admission and work within cable tunnels in the city 1

In case of emergency: Call 112 2

Contents 1 Permission Page 4 2 Request to work Page 6 2.1 Before starting work 2.2 On completion of work 3 Safety and security Page 8 3.1 Security and privacy 3.2 Personal safety 3.3 Entering and exiting 4 Loss of access card Page 12 5 Confirmation of receipt Page 12 6 Facility hazard reporting Page 12 7 Contacts Page 14 7.1 Access cards, permit to work and special permits 7.2 Facility hazard reporting 7.3 In case of emergency or danger 3

1 Permission 4

Access to the tunnel system may be granted following completion of screening by the respective tunnel security officer as follows: Jointly Fortum Värme and Stockholms stad Trafikkontoret Telia Sonera Stockholm Vatten Access requests should be sent to trafikkontoret who issue personalized access passes. Passes are collected from trafikkontoret. Before access is granted, authorized personal must firstly be informed of these Safety Rules & Guidelines. Access may be granted for: operation and maintenance work in tunnels, monitoring and control of works and personnel, guided views or site visits. Such visits should always be in the company of a person with good knowledge of these Safety rules & guidelines, assistance requested in the event of accident, illness, fire, theft, breakage, etc. 5

2 Request to work 6

2.1 Before starting work Request to work: Timing and scope of works in the tunnel shall be notified well in advance and be approved by trafikkontoret s co-ordinator and by the applicable system owner(s). Health & Safety Plan must be submitted to the coordination officer. Work application: Before work commences, a Notification Of Works shall be completed on the appropriate form and given to trafikkontoret (see section 7.1). The notification must state: foreman in charge and/or contact person, phone number of the applicant, date of start of works together with planned completion, names of those accessing the workplace, risk assessment, if the works involve a fire risk or other risk (such as noise and vibration). Trafikkontoret reserves the right to inspect the site before works, during works and on completion of final cleaning. If works are not being carried out as per agreement, trafikkontoret has the right to abort work in progress. 2.2 On completion of work Works or visits are reported as finished by returning access cards to trafikkontoret s Coordination Officer (see section 7.1). Workplaces will be inspected when completion is reported. If final cleaning is not satisfactory, trafikkontoret will charge the cardholder the relevant costs. 7

3 Safety & security 8

3.1 Security and privacy The following apply in order to protect the tunnels against sabotage and unauthorized access: Information about tunnels may only be communicated to those who need it in their work or to security approved. Photography, filming and sketching are forbidden in tunnels. Anyone who carries out work in tunnels or otherwise clutter up are required to clean up after themselves. No waste may be left or stored in tunnels. Operation of tunnel equipment such as fans, pumps, etc. shall only be performed by trafikkontoret s authorized maintenance personnel. Walkways, doors, safety materials etc. must not be blocked. 3.2 Personal safety Working alone is not permitted. Location of emergency exits should be ascertained when entering areas of work. Protective equipment shall be worn as per site instructions. Trafikkontoret s Operations Office (Driftcenter) shall be contacted immediately in case of accident, fire or other disaster risk (see section 7.1). 9

First Aid equipment is available at each exit. Incidents or occupational injury must be notified to trafikkontoret s Coordination Officer (see section 7.1). N.B. Mobile phones lack normal coverage in the tunnel system. 3.3 Entering and exiting Entry and exit is only permitted via main entrances and using personal access cards. Exit via other doors and hatches is only permissible in case of emergency. Trafikkontoret must be notified if material transport is required through doors and hatches (see section 7.1). This notification shall be made at least one working day before the delivery to allow for disconnection of alarms. Failure to abide by these requirements will lead to the card holder being debited for any damages or call-outs. 3.4 Fire safety Trafikkontoret issue permits to work for each individual case (see section 7.1). 10

From a fire safety point of view, the following applies: Smoking is prohibited in the entire tunnel system. Regulations apply for all Hot Work. Fire extinguishing equipment is required for all works involving fire hazards. Applications for disconnecting and reconnecting fire alarms shall be made to the Coordination Officer at least three working days in advance (see section 7.1). Storage of LPG is forbidden in the tunnel system. Flammable liquids and gas cylinders must not be introduced in larger quantities than the daily requirement. Gas cylinders and flammable liquids must not be stored in the tunnel system at the end of the working day. If a gas leak is suspected, electric lighting must not be switched until the error is corrected, and thorough ventilation performed. trafikkontoret shall be notified (see section 7.1). 3.5 Fire fighting measures Rescue people in danger. Alert SOS alarm 112. Be careful with address details, use section signage marked on the door, and describe the extent of the fire. If possible, try to contain the fire. Never take any risks. Meet the fire brigade at the agreed address and guide them to the location of the fire. Inform trafikkontoret s on-call Electrical Officer, telephone 070-779 44 98. 11

4 Loss of access card 5 Confirmation of receipt 6 Facility hazard reporting 12

4 Loss of access card Loss of cards and/or keys must be reported immediately to the Coordination Officer and the police. Police report shall be submitted to the Coordination Officer. 5 Confirmation of receipt Confirmation of Receipt occurs at the receipt of access cards and attest that the cardholder has studied and received a personal copy of Safety rules & guidelines for admission and work within cable tunnels in the city. 6 Facility hazard reporting Damage or defects detected in the tunnel system must be reported immediately to trafikkontoret. 13

7 Contacts 14

7.1 Access cards, permit to work and special permits Contact the Coordination Officer during normal working hours. Trafikkontoret Driftteknik Box 8311 104 20 Stockholm Address: Mästerfaret, Mellangatan 6, Stockholm Telephone: 08-508 278 49 E-mail: tilltrade.tk@stockholm.se 7.2 Facility hazard reporting Contact the Coordination Officer during normal working hours. As above. Other times - after normal working hours: Trafikkontoret Driftcentralen Telephone: 08-651 00 00 7.3 In case of emergency or danger Always call: 112 15

In case of emergency or urgent need of assistance: Call 112 16